Loading...
Report . . RECEIVE[ NORTHWEST ,4UG 7 2ozu CITY OF TIGARD ENGINEERING GROUP BUILDING DIVISION Ms. Carley Davis August 13, 2020 Ram Jack West 862 Bethel Drive OFFICE COPY CITY OF TIGARD Eugene, OR 97402 REVIEWED FOR ODE COMPLIANCE Approved: ' [ Re: Ms. Patrice Richmann OTC: [ Site Inspection 7117 SW Mapleleaf Ct Permit#: WV-2,13W —(56 C� Tigard, OR Address: rl c,J 1p Approved plans Suite #: 1 / /Dear Ms. Davis, 1 '•^ Date: 2Z1ZO hall henn _ E'_ _,. B, Per your request, a site inspection was performed at the above residence on July 28, 2020. The purpose of the site inspection was to provide a general assessment of the structural condition of the foundation at the residence. The inspection was strictly visual and limited to the exposed areas of the structure. Documents detailing the construction of the residence were not available for review. The residence is estimated to be approximately twenty-seven (27) years old and for orientation purposes is assumed to face south. LNkbii_i I Y SPECIAL INSPECTION ECIL .� �-, .¢ City of Tigard and its State of Oregon Structu : .;$ cia,y Cowie: .pr'e - -mployees shall not be r •onsible for discrepancies Concrete and Reinforcing ,. -:'.1 . .<Az hi •h may appear herein. 0 Boils Installed in Concrete ;. ' �' , 0 Special foment-Resisting «. t1• a Rxain rcir'q Steel &Prestre. �1. 1 r. __ , fi LIDITY OF PERMIT E ISSUANCE OF A PERMIT r<r'urai Welding ASED ON CONSTRUCTION t DOCUMENTS AND OTHER `_" ��gtli Bolting iATA SHALL NOT PREVENT rAA14)i y t•,, , HE CODE OFFICIAL FROM ,»� H: e OUIRING THE CORRECTION O Reinforced y prsum Caner ��, � s. 3. 1 ,, w' . '- OF ERRORS. ORSC 105.4 CI insulating Concrete Fill . 0 Spray Applied Fire-Resistive r ateria`ix . Image 1: Front Elevation Pilings, Drill Ir story wood framed structure. The residence has fiber cement and wood siding covering the exterior walls. The foundation of the residence is a wood floor system ® Shotcrete supported by piers and concrete beams.The roof consists of composite asphalt shingles and has 0 Special Gr.iem gutitirsvom Fristevilttle residence. The interior walls of the residence are constructed of sheetrock. The interior floor covering consists of wood. Per customer's request, the scope of the ;-:i Smoke-Conhrvestigation was limited to the proposed remedial repair at the addition foundation located at the north end of the structure. The assessment of the foundation system in all other areas except for •th sr tnspa f itiowic out ofthe seope.of•thie report. P.O.Box 10393/Eugene,OR,97440/541.393.7363/WWW.NWENGGROUP.COM Ms. Patrice Richmann August 13, 2020 Foundation Inspection Page 12 7117 SW Mapleleaf Ct Tigard, OR OBSERVATIONS Vegetation around the residence consists primarily of grassy areas with some small to medium shrubs. The residence does not appear to have a sprinkler system. The surface grades on the al sides of the addition on the north side of the residence appear to be relatively flat. No areas of ponding water were observed. Some evidence of foundation movement was observed during the inspection which is noted on the attached Foundation and Elevation Assessment Plan (SK-1). The evidence consisted primarily of sheetrock cracks, floor board separation, doors out of plumb, and sloping floors. Relative floor elevations were provided by Ram Jack West. The floor elevations were reportedly taken on March 24, 2020 with a Ziplevel. The Ziplevel is a pressurized hydrostatic altimeter and works by measuring the difference in elevations between the base unit and the handheld unit. The basepoint was reportedly set to 0.0 inch and located near the southwest corner of the addition. Negative elevations referenced are below the basepoint, and positive elevations are higher than the basepoint. The lowest point was recorded near the northwest corner of the addition. The high point was recorded at the basepoint. The elevation differential between the low and high points of the addition was found to be about 2 1/2 inches. These elevations are shown on the attached Foundation and Elevation Assessment Plan (SK-1). RECOMMENDATIONS I recommend a total of six (6) helical steel piles be installed at the residence. Pile locations are shown on the Foundation and Elevation Assessment Plan (SK-1). The steel piling system used should have an evaluation service report(ESR) recognized by ICC-ES showing compliance with the currently adopted International Building Code (IBC). The helical steel piling system should have a minimum allowable working load of 10.0 kips and be capable of uniformly raising the foundation as applicable. The minimum installation torque for the helical piles is 2,300 ft-lbs. The purpose of underpinning the foundation is to support portions of the structure that has experienced some differential settlement. The underpinning piles are designed to support the structural loads in the immediate areas where they are placed and not to prevent uplift from soil heave. Maintaining uniform moisture around the foundation is very important. The landscape grades around the residence should be maintained to slope away from the residence where required. The landscape grades should slope away from the foundation at a minimum of 1/2" per foot for six (6'-0)feet.The top soil should extend a minimum of one(1'-0)foot above the bottom of the grade beam and should not extend above four(4") inches below the bottom of the siding. All new fill soil should be clayey sand with a minimum Plasticity Index (PI) of twenty-five (25). Watering the soil around the foundation is also important during dry periods to help maintain uniform moisture in the soil. P.O.BOX 10393/ Eugene,OR,97440/541.393.7363/WWW.NWENGGROUP.COM Ms. Patrice Richmann August 13, 2020 Foundation Inspection Page 1 3 7117 SW Mapleleaf Ct Tigard, OR This concludes this report. Observations made in this report pertain to the condition of the residence on the date of the inspection which is subject to change. No foundation warranty is expressed or implied by this report. If I can be of further assistance or should you have any questions about this report, please do not hesitate to contact me. Sincerely, 8 eke2 4,R5.D PRopFS `' 03INt4. szoy APi � o•.. ¢ lF vi*K 24" e�4'`� 4O. STS0t. EXPIRES: ‘0/ lZz James Hogan, E.I.T. Charles Steffensmeier, P.E. Engineering Technician Civil Engineer Attachment: Site Plan (SK-0) Foundation and Elevation Assessment Plan (SK-1) Ram Jack Helical Pile Detail with 4038 Bracket(SK-2) Footing & Pile Calculations Ram Jack 4038 Bracket Shop Drawing Ram Jack 2 7/8" Helical Pile Specification P.O.BOX 10393/Eugene,OR,97440/541.393.7363/WWW.NWENGGROUP.COM 71' +/- PROPERTY 7 I LINE--\\I I 7117 SW SPECIAL INSPECTIONS: MAPLELEAF CT —\\ SPECIAL INSPECTIONS OF PILE INSTALLATIONS SHALL BE I PERFORMED ACCORDING TO ESR 1854, SECTION 4.3, PARAGRAPH 2. INSPECTION SCHEDULE SHALL BE �, CONSISTENT OF VERIFYING AND DOCUMENTING PILE AND BRACKET I I + NUMBERS ON SITE, FOLLOWED BY `2 OBSERVATION OF THE FIRST INSTALLATION'S LOCATION, EMBEDMENT DEPTH,AND FINAL INSTALLATION TORQUE VALUE, I CORRELATED TO THE REQUIRED ' DESIGN LOAD.ONSITE LOG BOOK 1 11' +/- FOR REMAINING INSTALLATIONS x WILL BE VERIFIED.A FINAL INSPECTION OF THE INSTALLED REMAINING PILES AND LOG BOOK ENTRY DATA WILL BE DOCUMENTED IN A 1 BRIEF LETTER SUBMITTED TO THE \ + BUILDING AUTHORITY. r3."\ I SPECIAL INSPECTION OF ALL PILES � \ — — — I SHALL BE PERFORMED BY NORTHWEST ENGINEERING GROUP. 59' +/- B/d o SITE PLAN ` p PR op �� /It, TREE PRESERVATION NOTES: 88 vr- Alik 1.ALL HOLES ARE EXCAVATED NEXT TO THE A . ON „ STRUCTURE FOUNDATION 7I!, 90 2pea �4 S NORTH 2.THE TOTAL AREA OF EXCAVATED HOLES 25 SOFT �Oe BTEffEt9 EXPIRES: 4. /22 NORTHWEST P;� ICE S MAPLELEAF CT SHEET: ENGINEERING GROUP TIGARD,OR SK-6 P.O.BOX 10393 SCALE: DATE: EUGENE,OR 97440 (541)393-7363 1/20"=V-0 08/13/2020 WOODEN DECK-tea 2-0" x 4,8 0" 2-0 ®03 04® � ` 0 -2X" -2X" '4? �'- ®02 ®'�05 c ADDITION o `� 01 `D ® 0" y, ® }06 \ / d LL 7117 SW AC MAPLELEAF CT -1 I 4 ENTRY GAS 2-CAR METER GARAGE COCNRETE PORCH I 1 a) Oh° FOUNDATION & ELEVATION ASSESSMENT PLAN NORTH SsoD PR op 24i, , NGI. FF ssoy LEGEND 8/3" T I � ' �� -y4" ----FLOOR ELEVATIONS TAKEN BY RAM JACK WEST ON 3/24/2020 r ON it el ---HELICAL STEEL PILE(10.0 KIP CAPACITY) ✓OF STEC.- NORTHWEST PATRICE RICHMANN SHEET: EXPIRES: /tea 7117 MAPLELEAF CT S K-1 ENGINEERING GROUP TIGARD,OR P.O.BOX 10393 SCALE: DATE: EUGENE,OR 97440 (541)393-7363 3/32"=1'-0 0 8/1 312 0 2 0 EXISTING EXTERIOR EXISTING FLOOR JOISTS WOOD FRAMED WALL BEAR ON FOUNDATION WALL R APPROXIMATE EXTERIOR GRADE ELEVATION, SOIL OR CONCRETE Jr` PAVING. (VERIFY EXACT CONDITIONS IN FIELD) EXISTINGCONCRETE \ / / //i r STEM WALL / \"/\%\%/ / \\-:\ \';:% /:A ?.-i\ i„/' E EXTENT OF EXISTING o j FOOTING BEYOND M o -J W a CHIP-OUT POCKET IN EXISTING FOUSH ATI WALLOTING AS NE EL WITH TO INSTALL FOUND ON i- / /Y/. \i / :, ' /,\ X//\\'\j\ V r i i BRACKET. /;//,% /1 I %jam BRACKET MUST SUPPORT THE TABLE 1 BOTTOM OF THE FOOTING AND SHALL NOT RELY ON POST-INSTALLED PILE HELIX PILE MIN. ANCHORS FOR GRAVITY SUPPORT. BRACKET DIA. CONFIG. SERVICE INSTALL. LOAD TORQUE 4038 2%8" 10" 10.0 KIP 2,300 FT-LBS HELICAL PILE(REF.TABLE 1) MINIMUM EMBEDMENT DEPTH=7 FT tsoD PR0A- I 0i.. _p s r I /� yr'/"�� �` �i N TYPICAL HELICAL PILE DETAIL ape 6,20ktit' ..1,�' dal EXTERIOR ADDITION FOUNDATION °E STEFF��9 EXPIRES: Aft 022 NORTHWEST PATRICE RICHMANN SHEET: 7117 SW MAPLELEAF CT 5 K-2 ENGINEERING GROUP TIGARD,OR P.O. BOX 10393 SCALE; DATE: EUGENE,OR 97440 (541)393-7363 3/4"=1'-0 08/13/2020 NORTHWEST PILE CALCULATION Date: 8/13/2020 ENGINEERING GROUP Designer: Charles Steffensmeier, P.E. P.O. Box 10393 Project: Patrice Richmann tEp,EO PRop,, 5. Eugene,OR 97440 7117 SW Mapleleaf Ct z‘c' GINS Sip Tigard,OR R T Design Loads: i %,,erffi irf �—Dead: 1 fr' 4 �.T,�" Roof= 15 psf 0as � STEfF�oE Third Floor= 0 psf / Second Floor= 0 psf EXP,RES: ////,3tVZL First Floor= 15 psf Walls= 12 psf ` rtr Live: *Roof snow= 25 psf *Roof live= 20 psf ‘ Third Floor= 0 psf t Second Floor= 0 psf ... bW / First Floor= 40 psf ii *(the greater of the two) - i ', Foundation dimensions: 111 h= 36 in b bw= 8 in / I /' b= 16 in hf= 6 in - Vertical Design Loads: Tributary Widths: Roof= 6 ft » u plf Third Floor= 0 ft » 0 plf Second Floor= 0 ft N 0 plf First Floor= 3 ft H 45 plf Walls= 9 ft » 108 plf Foundation self-weight= » 3 plf 2 DL 593 plf Live: Roof= ft » 150 plf Third Floor= ft » 0 plf Second Floor= ft » 0 plf First Floor= ft » 120 plf 1 LL 270 plf (without roof LL) 1 LL 120 plf Page 1 NORTHWEST PILE CALCULATION Date: 8/13/2020 ENGINEERING GROUP Designer:Charles Steffensmeier, P.E. ASD Loads: Load,w2=EDL+FLL plf (comb.412 -without roof LL)OR Load,w4=1DL+ELL(0.75) plf (comb.#4-with roof LL) Max. load w ASD= plf Concrete Analysis:ACI 318-14 LFRD Loads: Load,wlz 830 plf (comb 1) Load,w2_ 979 plf (Comb 2) Load,w3= 1012 plf (Comb 3) Load,w4_ 847 plf (Comb 4) Max. load w LFRD= 1012 plf Max. beam span(e)= 8 ft= in M,,,ax=w,,.l2/8= 97 in-kips= k-ft Shear,,,ax_(5/8)*w..E= kips Foundation Width,bw= in Code Reference Foundation Depth,d= 34 in (h-2") ACI 14.5.1.7 Cross Sectional Area,A= 27. in2 Section Modulus,Sxb= S41333 in3 Gross Moment of Inertia, Is= 6202.67 in° Assumed Conc,Pc= 2500 psi Yi= 17 in Foundation Moment&Shear Capacity Per ACI 318-14 Code Reference Conc Modulus of Rupture,f,= psi ACI 19.2.3.1 Cracking Moment, M,= k-ft ACI 24.2.3.5 Flexure Reduction Factor,4)= 0.6 ACI 21.2.1 Design Moment,4)Mn= k-ft OK ACI 14.5.2.1a&14.5.2.1b Shear Strength,Vn= kips ACI Table 14.5.5.1 Shear Reduction Factor,4)= 0.6 ACI 21.2.1 Design Shear,On= kips OK Notes: 1)Foundation analysis is based on having an unreinforced section 2)When calculating member in strength in flexure,combined flexure and axial load,or shear,the entire cross section shall be considered in design,except for concrete cast against soil where the overall thickness shall be taken as 2 in.less than the specified thickness. (ACI 14.5.1.7) Page 2 NORTHWEST PILE CALCULATION Date: 8/13/2020 ENGINEERING GROUP Designer:Charles Steffensmeier, P.E. Pile spacing(4)= 8 ft= in Pile Working Loads: Pile Service Load, Pn= 6364 lbs (wall load x pile spacing) Pile Ultimate Load, PuLT= 12728 lbs *Safety Factor of 2 Applied Deflection check Beam El= 2.22E+10 lb-in2 Live Load Deflection= 1.12E-03 in < 0.27 in OK in 0K Total Beam deflection= 0.004 in < 0.40 Minimum pile installation torque Quit Tmer. — —Kt Required ultimate soil capacity(Quit)= 12728 lbs Pile 0= 2 7/8" Torque factor(Kt)= 9 Minimum pile installation torque,(Turin)= 1500 ft-lbs Bracket= 4038 Bracket Allowable Capacity= 19,700 lbs Page 3 7 Rev Revision note Date Signat Check NOTES: UNLESS OTHERWISE SPECIFIED No ure ed ;1 nuuu 1.-3 ,/2• / B EI 3 1/2" 0.D_ SLEEVE (FY�MIN. 65 KSI) f 1 f�i _ _ ��I --- -----Himil I a=km ��a se en e-i--7't1rr-- TrrfTrAm I mid I �1___ ILL 3 ��r�r N I[ \ ' M FASTENING STRAP WITH i •7 \\\\` 1' DIA ALL THREADS 1s i� AND NUTS i i II 1 I II u i 1 I 1 2 7/8" DIA. HELICAL PILE - \ I 41177.78 3" 3 lZ T FRONT VIEW WI InI l 10• / 3 1/2' DIA. BRACKET SLEEVE IBII N. TOP VIEW 3/8' BRACKET SEAT 1 NOTES 1. POLYETHYLENE COPOLYMER THERMOPLASTIC COATING PER ICC-ES AC - `1 -- 228 •' I HE;•1. 3. MANUFACTURER TO HAVE IN EFFECT INDUSTRY RECOGNIZED WRITTEN an ii O. QUALITY CONTROL FOR ALL MATERIALS AND MANUFACTURING PROCESSES. 1 TYP. INSTALLATION -11j_ 4. ALL WELDING IS TO BE DONE BY WELDERS CERTIFIED UNDER SECTION 5 I SCALE: 1"=1' OF THE AWS CODE D1.1. 5. THE CAPACITY OF THE UNDERPINNING SYSTEM IS A FUNCTION OF MANY INDIVIDUAL ELEMENTS, INCLUDING THE CAPACITY OF THE FOUNDATION, BRACKET, PIER SHAFT, HELICAL PLATE, AND BEARING STRATA, AS WELL ‘0 I AS THE STRENGTH OF THE FOUNDATION BRACKET CONNECTION AND I THIS DRAWING AND ITS CONTENTS ME THE QUALITY OF THE INSTALLATION OF THE PILE. YOUR ACHIEVABLE coNncDRAWINGNTIAL AND THE EXCLUSIVE PROPERTY CAPACITY COULD BE HIGHER OR LOWER THAN THOSE USTED DEPENDING INI , 1 OF RAM JACK SYSTEMS DISTRIBUTION, LLC. ON THE ABOVE FACTORS. NO PUBUCARON. DISRNIBUTION OR COPIES MAY BE MADE WITHOUT THE EXPRESSED 6. RAM JACK ENGINEERING HANDBOOK FOR ALLOWABLE VALUES AND/OR WRIREN CONSENT OF RAM JACK STSI EMS CONDITIONS OF USE CONCERNING MATERIAL PRESENTED IN THIS DOCUMENT. SIDE VIEW DISTRIBUTION, LLC. ALL RIGHTS RESERVED UNDER COPYRIGHT LAWS. UNLESS OTHERWISE SPEC/FED • DIMENSIONS ME IN INCHES • TOLERANCES: ANGLE it. 4038 PILE HT. rsalo OF 7 �2•_T 3 PLACE DECIMALS s .02 s� A-SIZE TITLE BLOCK 44-. ) P.AI'JI11JAC2 PLA INFO t .02 • REMOVE ALL BURRS AND SHIP EDGES p,Am t0_2_08 CHARLES T.MARVIN • PARENTHETICAL INFO FOR REF ONLY HOLE TOLERANCES aim DARIN WILLIS 013 126 251 AM DARIN WILLIS THRU'm, THRU'4,, RIRU'.�, ,ten 4038 HELICAL PILE BRACKET .125 .250 .500 Afv DWG MO L i'so.501 m ,oo!Am Z000D1o' Lw • 4038-02-07 A 2 . 875"0 HELICAL PILES AND ANCHORS — UPSET CONNECTION "C" „D„ 6„ „B„ \A -I/ t(TYP.) IM P _�00 oo d MEM 00 oo • oo] Iti 11 r ` - .,A" -- "A" - "A" ( LEAD SECTION HELIX EXTENSION EXTENSION MECHANICAL TORQUE RATING - 6,000 FT-LB LEAD SECTION TABLE HELIX EXTENSIONS ULTIMATE CAPACITY(TENS/COMP) - 54.0 KIP* ALLOWABLE CAPACITY(TENS/COMP)-27.0 KIP" CAT.# "A' "B" "C" 'D" CAT# "A° "B *BASED ON A TORQUE FACTOR(Kt) = 9 —6125 5'-0 8" 8605-8 5'-0 8" 6140 5'-0 8" 10" 8605-10 5'-0 10" 6142 5'-0 10" 12" 8605-12 5'-0 12" 3Yz' 6143 7'-0 10" 12" ii 8607-10j TA 10" t 6147 7-0 8" 10" 12" 6148 7'-0 10" 12" 14" EXTENSIONS 6188 10'-0 10" 12" 14" 7. N le CAT# "A" %a'0 HOLES TO "MULTI-HELIX ARE SPACED 3 DIAMETERS 8605 5'-0 ACCEPT i"0 OF THE LOWEST HELIX. B607 7'-0 THRU BOLTS 8610 10'-0 NOTES: 27/8"O.DPILING 1. POLYETHYLENE POLYMER THERMOPLASTIC COATING PER ICC-ES AC 228.(GALVANIZED AND UNCOATED PILES AVAILABLE UPON REQUEST) CONNECTION 2. LEAD AND EXTENSION SECTION LENGTHS ARE NOMINAL. DETAIL 3. SHAFT MATERIAL IS 2%"O.D.,0.217"WALL, MINIMUM Fy=65 KSI AND Fu=80 KSI,ASTM-A500. 4. HELIX BLADE MATERIAL IS HOT ROLLED, MINIMUM Fy=50 KSI AND Fu=80 KSI CARBON STEEL. PLATE THICKNESS IS AVAILABLE IN%"AND Y2"THICKNESSES. 5. NOMINAL SPACING BETWEEN HELICAL PLATES IS THREE TIMES THE DIAMETER OF THE LOWEST HELIX. 6. MANUFACTURER TO HAVE IN EFFECT INDUSTRY RECOGNIZED WRITTEN QUALITY CONTROL AND RAMJACK ASSURANCE FOR ALL MATERIALS AND MANUFACTURING PROCESSES. 9 7. MANUFACTURER SHALL BE ISO CERTIFIED. 8. ALL WELDING IS TO BE DONE BY WELDERS CERTIFIED UNDER SECTION 5 OF THE AWS CODE Di.1. DWG NO.:2876.03 CATALOG NO.:SEE TABLES REV.1 9. ALL COUPLING BOLTS TO BE%"R,SAE J429 GRADE 8 BOLTS,(SAE J429 GRADE 5 IF GALVANIZED). BCALB-0 oRAwuSABv DATE on1v,1 SKEET,oF, w+1' NORTHWEST RECEIVED AUG 172020 ENGINEERING GROUP CITY OFTIGARD Ms. Carley Davis August 13, 2020 Ram Jack West 862 Bethel Drive Eugene, OR 97402 Re: Ms. Patrice Richmann Site Inspection 7117 SW Mapleleaf Ct Tigard, OR Dear Ms. Davis, Per your request, a site inspection and soil borings were performed at the above referenced site on July 28, 2020. The purpose of the site inspection was to provide consultation regarding the soil parameters for the proposed deep foundation system. The soil investigation is relatively conservative and is based on limited surface and subsurface soil observations at the site. Documents detailing the construction of the residence were not available for review. The residence is estimated to be approximately twenty-seven (27) years old and for orientation purposes is assumed to face south. GEOLOGICAL SETTING AND SOILS According to DOGAMI, the site exists in an area that is considered to have a low susceptibility to landslides and is relatively flat. The geologic setting in this area is comprised of deposits of poorly indurated gray and brown silt and clay, with some silty fine sand and occasional pebble conglomerate beds (Lower Pliocene) (USGS National Geologic Map Database). Preliminary soil data was obtained from the Web Soil Survey from Natural Resources Conservation Service produced by the United States Department of Agriculture. This soils survey indicates that the primary soil at the residence is classified as Helvetia silt loam. This soil has a slow infiltration rate and a slow rate of water transmission. Helvetia silt loam has a moderate shrink-swell potential with Plasticity Index ranging from 8-20. SOIL OBSERVATIONS Surface observations are as follows: • Vegetation around the residence consists primarily of grassy areas with some small to medium sized shrubs. • Grade has downward slope from the northeast side to the to the southwest side of the site. The grades around the residence appear to be relatively flat. • The soil near the surface was very stiff and dry. • Pebbles and small gravel were observed on the surface. • No areas of ponding water were observed. P.O. Box 10393/Eugene,OR 97440/541,393.7363/WwW.NWENGGROUP.COM Ms. Patrice Richmann August 13, 2020 Foundation Inspection Page 12 7117 SW Mapleleaf Ct Tigard, OR Multiple Dynamic Cone Penetrometer (DCP) tests were performed on July 28, 2020. DCP tests are used to measure the strength of the in-situ soil and the thickness of the soil layers. DCP is a hand-held device which consists of two 5/8" dia. shafts coupled near midpoint. The lead shaft contains an anvil and a pointed tip which is driven into the soil by dropping a sliding 35-lb hammer contained on the upper shaft onto the anvil. The underlying soil strength is determined by measuring the penetration of the lower shaft into the soil after each hammer drop, The number of drops required for a penetration of 4" is then recorded and converted to an equivalent SPT N- values which is reported on the attached boring log (DC-1). The first DCP boring extended to a depth of(0'-4") below grade before hitting refusal. The entire soil profile consists of very stiff material between the surface four inches below grade(0'-4")where the boring was terminated. The DCP boring log (DC-1) is attached to this report. The second DCP boring extended to a depth of four feet (4'-0") below grade. There was a small layer of soft material which exists about one and one-half foot below grade(1'-6"). Other than that small portion, the entire soil profile consists of very stiff material between the surface and four feet (4'-0"). Refusal occurred at four feet (4'-0") and the boring was terminated. The DCP boring log (DC-2) is attached to this report. RECOMMENDATIONS It is our opinion that the settlement is the result of improper foundation drainage and/or undersized foundations.We understand that helical piles are proposed to underpin portions of the north side of the residence. A hydraulic torque driver head is used to install the helical pile. Advancement of the pile will continue until the minimum installation torque is achieved as specified by the torque correlation method to support the allowable design loads of the structure using a torque factor. We recommend that the proposed piles achieve a minimum embedment depth of seven (7) feet. However, it is anticipated the actual pile embedment depth may be greater. The repair work will not interfere with the existing lateral support conditions. Therefore, there are no lateral design concerns. Maintaining uniform moisture around the foundation is very important. The landscape grades around the residence should be maintained to slope away from the residence where required. The landscape grades should slope away from the foundation at a minimum of/" per foot for six (6'-0)feet. The top soil should extend a minimum of one(1'-0)foot above the bottom of the footing and should not extend above four(4")inches below the bottom of the siding. All new fill soil should be clayey sand with a minimum Plasticity Index(PI) of twenty-five (25). Watering the soil around the foundation is also important during dry periods to help maintain uniform moisture in the soil. This report is for the sole use of Ram Jack West and their design consultants for the foundation repair at the referenced site. Northwest Engineering Group assumes no responsibility or liability for any engineering judgement, inspection or testing performed by others outside the scope of this report. Our services do not include any survey or assessment of contamination or potential P.O. Box 10393/ Eugene,OR 97440/541.393.7363/WWW.NWENGGR0UP.COM Ms. Patrice Richmann August 13, 2020 Foundation Inspection Page 13 7117 SW Mapleleaf Ct Tigard, OR • • This concludes this report. If I can be of further assistance or sho : .; • PR• * •uestions about this report, please do not hesitate to contact me. ,tkG!NFFR 'oy 4 88 • Sincerely, �. / • . I G 44 30 ON 4444' '1E• BTEFF° EXPiRes: ,/ ZZ James Hogan, E.I.T. Charles Steffensmeier P.E. Engineering Technician Civil Engineer Attachment: Site Plan (SK-0) Dynamic Cone Penetrometer Test(DC-1) Dynamic Cone Penetrometer Test(DC-2) P.O. Box 10393/Eugene,OR 97440/541.393.7363/WWW.NWENGGROUP.COM ____. _____I _ _ 71, +/- _ _ PROPERTY LINEN DC-2 I 7117 SW SPECIAL INSPECTIONS: MAPLELEAF CT SPECIAL INSPECTIONS OF PILE INSTALLATIONS SHALL BE C-1 I PERFORMED ACCORDING TO ESR 1854, SECTION 4.3,PARAGRAPH 2. INSPECTION SCHEDULE SHALL BE CONSISTENT OF VERIFYING AND 0' DOCUMENTING PILE AND BRACKET / I + NUMBERS ON SITE, FOLLOWED BY / // '/' o OBSERVATION OF THE FIRST ' �7/// /;/ /;/f/' INSTALLATION'S LOCATION, /7 // / /-/ I EMBEDMENT DEPTH,AND FINAL 7/; / ' ,/'/, " , INSTALLATION TORQUE VALUE, / / CORRELATED TO THE REQUIRED Q DESIGN LOAD.ONSITE LOG BOOK Ill„ 11' +/- I FOR REMAINING INSTALLATIONS }( 1L WILL BE VERIFIED.A FINAL I INSPECTION OF THE INSTALLED REMAINING PILES AND LOG BOOK ENTRY DATA WILL BE DOCUMENTED IN A I BRIEF LETTER SUBMITTED TO THE \ BUILDING AUTHORITY. I SPECIAL INSPECTION OF ALL PILES r-\ - - - I SHALL BE PERFORMED BY NORTHWEST ENGINEERING GROUP. 59' +/- i/43/20 ,/sp,EDPRope SITE PLAN ,c, NGINFF As'46 TREE PRESERVATION NOTES: Et '' -- et. 4k 1.ALL HOLES ARE EXCAVATED NEXT TO THE ► •P -i� Zp\A 4, VP STRUCTURE FOUNDATION SROE STEF00 NORTH 2.THE TOTAL AREA OF EXCAVATED HOLES<25 SOFT EXPIRES: to ZZ NORTHWEST PATRICE RICHMANN SHEET: 7117 SW MAPLELEAF CT S K-0 ENGINEERING GROUP TIGARD,OR P.O. BOX 10393 SCALE: DATE: EUGENE, OR 97440 (541)393-7363 1/20"=1'-0 08/13/2020 r r WILDCAT DYNAMIC CONE LOG Page 1 of 1 North W est Engineering Group P.O.Box 10393 PROJECT NUMBER: 04117 Eugene,OR 97440 DATE STARTED: 07-28-2020 DATE COMPLETED: 07-28-2020 HOLE#: DC-1 CREW: James Hogan SURFACE ELEVATION: PROJECT: Patrice Richmann WATER ON COMPLETION: ADDRESS: 7117 SW Mapleleaf Ct HAMMER WEIGHT: 35 lbs. LOCATION: Tigard,OR CONE AREA: 10 sq.cm BLOWS RESISTANCE GRAPH OF CONE RESISTANCE TESTED CONSISTENCY DEPTH PER 10 cm Kg cm' 0 50 100 150 N NON-COHESIVE COHESIVE 25 111.0 25+ DENSE HARD 28 124.3 25+ DENSE HARD 1 ft 30 133.2 25+ DENSE HARD 2ft 3ft - im 4ft 5ft 6ft - 2m 7ft 8ft �/ - 9 ft (9/4vYZ49 pED PROF FS - 3 m 10 ft �`g aGINee %y - lift = G / et p`F4#1 ar •�4i 410 E STEot,-- 12 ft EXPIRES: 1, - 4m 13ft C:WIy DocumenlsimacuMVc_XL97.xt s WILDCAT DYNAMIC CONE LOG Page 1 of 1 North West Engineering Group P.O.Box 10393 PROJECT NUMBER: 04117 Eugene,OR 97440 DATE STARTED: 07-28-2020 DATE COMPLETED: 07-28-2020 HOLE if: DC-2 CREW: James Hogan SURFACE ELEVATION: PROJECT: Patrice Richmann WATER ON COMPLETION: ADDRESS: 7117 SW Mapleleaf CI HAMMER WEIGHT: 35 lbs. LOCATION: Tigard,OR CONE AREA: 10 sq.cm BLOWS RESISTANCE GRAPH OF CONE RESISTANCE TESTED CONSISTENCY DEPTH PER 10 cm Kg cm' 0 50 100 150 N' NON-COHESIVE COHESIVE - 20 88.8 25 MEDIUM DENSE VERY STIFF - 20 88.8 25 MEDIUM DENSE VERY STIFF - 1 ft 25 111.0 25+ DENSE HARD - 2 8.9 •• 2 VERY LOOSE SOFT - 10 44.4 •••••....... 12 MEDIUM DENSE STIFF - 2 ft 17 75.5 21 MEDIUM DENSE VERY STIFF - 18 79.9 22 MEDIUM DENSE VERY STIFF - 14 62.2 17 MEDIUM DENSE VERY STIFF - 3 ft 17 75.5 21 MEDIUM DENSE VERY STIFF - 1 m 17 75.5 ..........••••••••••• 21 MEDIUM DENSE VERY STIFF - 30 115.8 25+ DENSE HARD - 4 ft 30 115.8 25+ DENSE HARD - 30 115.8 25+ DENSE HARD - 5ft - 6ft - 2 m - 7ft - 811 Ip - 9 ft �ll3fA?� 0. PROFSP • 5 GIN i - 3 m 10 ft ��0 -NEF� 0 7 - r 88 PE - ,t// - 11 ft 7 vo :� •e zoo .0 �s�0E ono- - 1 - 12 ft EXPIRES: b /22 - 4m 13ft C:VAy Dc mentslWAaca9WC_XL97.XLS