Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
PFI2020-00341
1111 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT s COMMUNITY DEVELOPMENT Permit#: PF12020-00341 T I A D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 09/22/2020 G R. Parcel: SEG695 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Job#M2867212 Project Description: SEG 695/775. OH to UD conversion for new 81 unit apartment building. Class of Work: FEES Description Date Amount Type 1 -Utilities(gas, electric, data) Total Owner: REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at www.tivard-or.nov to schedule inspections online. Contractor: PHONE: Applicant: WAYNE BRABHAM 2213 SW 153RD DR BEAVERTON, OR 97003 PHONE: 5036725440 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant X��," Signature: J . PCAc ' Issued By: 7k7V Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12020-00341 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work,effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc.shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept.of Transportation, FHWA,current edition,American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OUCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.Traffic control devices,flag persons,etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic,at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service.Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080.Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules,contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16 -TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads,ditches,etc.)as may be necessary,as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector,<Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection,and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance,and all attachments,and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms,conditions and provisions and to the City approved permit plans,and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may,at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector,in writing,of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements,shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI_Utilities 31 -OTHER Applied Notice Other RECEIVED City of Tigard S E P 2 1 2020 PFI#: 20LD 00 �z} ENGINEERING DEPARTMENT CI'I l OF TIGARD Public Facilities `imlpro' nt (PFI) Permit PROJECT INFORMATION TYPE OF WORK Project name: PGE Job # M2867212 R TYPE 1—Franchise Utility Work Brief description of project: OH to UD conversion for performed by NWN,PGE, or utility agency new 81 unit apartment building ❑ TYPE 2—ROW Sidewalk/Driveway/Sewer Work performed for the purpose of: • Sidewalk installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitary sewer lateral installation and Location (address if available): SW 72ND & SW BAYLOR mainline tap �� f ,,5/ 0 TYPE 3—Full Scale Development Work c J (09 performed with land use approval which includes any of the following: • Subdivisions or Partitions APPLICANT INFORMATION • Street widening Name: PGE DENISE CHON FOR Linda Ott • Mainline installation for sanitary sewer, storm sewer, Tigard water, and Tigard Mailing address: 2213 SW 153rd Dr water service area city/state: Beaverton, OR Zip: 97003 0 TYPE a—Small Cell technology ❑ TYPE 5—Tigard Triangle Phone: CREWCOODINATION-WESTERN@pgn.com Email: Phone: NOTE: Type 1 and 2 applications may be Contact name: Wayne Brabham emailed to rowpermits(a)ti}ard-or.gov. Phone: +1 (503) 672-5440 Email: CONTRACTOR INFORMATION El Same as applicant Name: CCB Number: Mailing address: City/State: Zip: Phone: Email: ENGINEER INFORMATION Name: Mailing address: City/State: Zip: Phone: Email: ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ (within the public right-of-way) Is work related to a LAND USE DECISION? IDYes 0 No Case number: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as"Applicant" shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the ownex's signature on the application. I, the applicant, certify that: • To the best of my knowledge,all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted, I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. Liisd2 Ott- Linda Ott for Wayne Bradham 9.17.20 Applicant's or authorized agent's signature Print name Date Property owner's signature (if requited) Print name Date STAFF USE ONLY Case No: P-F[VD2-0<034I Permit fee: Received by: Kt,' Date:q I2d ,LO Approved by: d Date: 7/2.2/a' Notified by: ??I Date: In 20 City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 10%of the Net PFI Permit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR STAFF USE ONLY FOR STAFF USE ONLY TYPE 4: SMALL WIRELESS FACILITY TYPE 1-3:DETAILED SUBMITTAL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? ❑Yes ❑ No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): ❑Small Cell 0 Macro ❑ Street Name How many install sites are proposed as part of this permit 0 Site Address application? TYPE 3-Must provide 4 sets of plans (sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: ❑Public Right-of-Way 0 Private Property 0 Cover—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the 0 General Notes(City,Water,Sewer,etc.) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities O Grading O Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) O Details ❑ Traffic Sight Distance O Signing and Striping O Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineer's Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design O Water Provider Approval City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 3 of 4 4 sw .. y_ .. sI Edge ofPavemertt "II'— Ditch _; Streetlight Ir{- xu.Dram -.:vi$ 7 P'roposrcrSewe riine-- Ir.. I• 1 a l I Existing House r �I,• 1 Existing �� � Driveway 1 ~I uI 1 on 1 a `m F 1 �1 a, 'F II t 1 1 1 I o'm• 1 Existing Shop i L •. -',\ Powerpole I I o I o I •-----,..." lc- 95' - - I I o �ropedy Line— I I Q 1 Fire Hydrant(FH) I I I I Scale: '1-=30' I I I I I I I TYPE 1 AND TYPE 2: MINIUM SKETCH REQUIREMENTS (Put N/A if not applicable) North arrow Property lines&dimensions Existing utilities locations (sewer, storm,water) Street& street names All existing structures Proposed work Existing curb or edge of pavement Utility& street light poles Existing S/W or D/W apron Slope of property Trees City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 4 of 4 www.invarion.com av3HY a oM T IIOtl I} N DEVICE SPACING: A TAPER: 20' 031,01d3Hd TANGENT:20' as e C COOT PERMITO . it ~WA' rwcrneseorree G NN PGE llkoeVO N1.0C1 MOM' N 40 10“ SW T21d Ave&SW Saylor St eai 4]X1/.[01. M27718 0 TIpNG n O G PGE CID + � aaaARneeerauABu: oew it..t1I Wayne er.*h rS3472-54.10 wasT.b5L*n pp..tan rereaxo P: narre mnaovmmanv C Borden Poteko We. 1 K=11110 POTELCc INC I I Pole#144 / 1 / SW 74th Ave , oVJLJ/ \ , he-10Cr+/--o-H-100'+/- e-100'+/- p VT-146 p T I O A IF T Wrco �Q 1 v�ilT° ® meo 134 1 a� / / • C SW Baylor St -.I— ---."...\\ ( I 0 0 II I c BE PRE PARED TO STOP I II o O_ All signs and devices SHALL conform to the MUTCD/OTTCH. I Will adjust to fit field conditions as needed for safety. ROAD Plan NOT to scale. WORK I I AHEAD Www.invarion.com VSHV N os av IT N DEVICE SPACING: ATAPER: 20' TANGENT:20' dOSS 01 03/Vd3Bd as ODOT PERMIT C 0 W runla: r.o.cl/oe.uw.. POE(Wllsonallle LOCI M2771156 ® N 3 walt<TINMPpiA.l10M: OTY/SG1(: 6 < 11117bd lure i SW eel'b Si Tiprd,W PINK mMTeanan Per COMMO NNE/MIMu: BIY: Wayne arabham/501-671.14110 way=lyeMa^rpPOasIM • IEeano n: TeM QyM.mmMmOSIOR C Borden PoLeko Inc 3111, POT E LC O I tfr C SW 74th Ave H-100'+/- 0-100'+/• ►+� 100'+/---►I` D o ifn Dpy Mym1101° r O 0 Pole#6882 1 VT-147 PD-148 ® m a o o W 6o a3� 6 1 1 / SW Baylor St w / / l T o' elQ Hit H11 BE PREPARED TO STOP I ' All signs and devices SHALL conform to the MUTCD/OTTCH. Will adjust to fit field conditions as needed for safety. Plan NOT to scale. ROAD WORK ARE www.invarion.com •V1H MNOM avoa N DEVICE SPACING: dOISD TAPER: 20' Oaa3Haad ,.°/ A TANGENT:20' e 0 =SW741h Ave + f N n C 1 al m + oio 0 0 + A '+T . 00 i a T4 m1N D; h_100'+l- ►1.... 100 +/- ..I.., 100.+!-,1 SW Baylor St a S w ---''\\ I \ I \ Pole#6867 Pole#5041 Pole#136 1.....„--VT-98 I IT NPole#6690 4e$ 0 I i &1 I t I + OOOT PERMIT II . 0 oaaP: noenAn Meape I I POE(Wilsonville LEL) M2771656 rP FI OBaMMI/IOEAIILW: art/srert: I 4101° SW 1LM Ave&SW Baylor St RRPM,OR POW rOPITIU OR I I i. PEE e e PORK,BABRAWeRo: MAW I I ‘i Wayne BraMam/S03472.SIAO aatne.trabham•PP.rvm BE MIMEO eV: 1Wnctvna WRTRen41 I I PREPARED TO STOP C Borden Poteko Inc POTELCO INC 0 Ito ROAD All signs and devices SHALL conform to the MUTCD/OTTCH. I I f WORK Will adjust to fit field conditions as needed for safety. HEA. Plan NOT to scale. www.invarion.com •tl3H DEVICE SPACING: NNOM T A N avos }I TAPER: 20' g TANGENT:20' AO 01 O3UVd3Hd 3e —/ O O =SW 74th Ave it f N CS 6 Hi: ifz <11101 I. ySD e O T.O O O_ 1t`1 1 J N D • a 4 D.y3Q® wa 00wa i • 1[ Pole#30-....„...............„iA \ 100'+1- 100'+1- -I- 100'+1.� Pole#30 A SW Baylor St f �..,.... .....4 ` Flaggers are to hold traffic for \1 crew to safely install/remove span. Pole#6867 I • 1 TT A + 0 0 f4 1300T PERMIT* oanu, MAMMAWEArn: I i : PGE(Wilsonville LCC) M27711156 cO OCAI PROMPT MOMEWA ON: mynn:a SW 72d Ave a LW Baylor St TDOMO,Olt BE D Ot PREPARED PGE TO STOP comma MM1MN U. emu+ Wayne B•wn,m/503.Ln.saw .arna.Bnbnamipp&a,uam lo !PREPARED AY: "UAW°SWAM m OWEIDE 0 C Borden Potelco Inc ROAD P OT E L.CO 1 N C WORK ..o.._....._. —. 1 AREAS All signs and devices SHALL conform to the MUTCD/OTTCH. Will adjust to fit field conditions as needed for safety. Plan NOT to scale. COMMERCIAL LEGEND NEW PGE FACILITIES TO BE INSTALLED ill ;r6; (UNLESS OTHERR'ISE SPECIFIES r:S/JVE FACILITIE INSTALL FACILITIES �ABANDON FACIL1l1E9 O612-PGE VAULT,WITH 01YT3]3TN5-PGE TOP PROVIDED d INSTALLER BY CUSTOMER mw PGE TO INSTALL et2-PGE SWITCH VAULT,1566 B.O TOP dt2 YAM!verses tO.Tor PROVIDED&INSTALLED BY CUSTOMER FOR TO ANT swaolts PD-145 Arno.V_ FROVIDED&NsraccEC BY CUSTOM R1332P-PGE TOP, POE TO INSTALL 3-5 WAY LATERAL TAPS 3 FAULT INDICATOR 24 TO`� y �D u FL • INSTALL(SWAMP OH CABLE DISCONNECT PL 1M r Lau ` p./� Sm<Nn ADI r+>: PL-144 Si, E • INSTALL SOOAAP PAD MOUNTED VISTA SWITCH Nonslip Vistatpadmount lwikN lM Cl 1J60 r_ • V++ al-I, O NSTALLIkl50 AL-TX EPR JUT PRIMARY IN EACH OF 2.6•PVC \ + w 13 LINE m CONDUITS,ALL0-PROVIDEDdINSTALLEp BY CUSTOMER x`_� A ® PRI 15,987lI NMelEt IN AL-EPR JKT,....g TIN d-PVC CONDUIT 47 ,�� PROVIDED d INBTALLfO BV CUSTOMER 1�M_ro TO OIT Ivr NE �pIj/�411 ED NEUT 12,825p C11-36D .a orsreo �•TO'VT1d `�7=AJ" POLES 612-PGE SWITCH VAULT 12' 2-H POLE CLASS (1,2.3,4.H1,H2,S) ADM!OLB TOP SW •I• CONDUIT LANDSCAPE: _. HT-CL -OLE HEIGHT (FEEL) owe Merawam CLEAR 75'NORTH OF POLE 6880 rVNOMA3 GI STEEL 1 OODM INSTALL 2-6+POLE CONDUIT UNIT FRAMING WIiJiaFw'S-FF RM1rrN INTALLST ND-OFF. RACKET AFTER TRANSMISSION DISTRIBUTION(sEE CODES BELOW) VT-146 INSTALL STAND-OFF BRACKETS AFTER - tmaA PD 145 �� XOTEc POLE IN INSTALLED melee FRAME DIS}RmrION Lmmn MUNa1 PD 1d5 RIM -6BBD ,MRItOFi ON OE PIBE0.C1084.POLYI �� lint1ioutu u STACK\ I 50.2 i Y MNowe rvNOE. SPAN �I SL 12 LINE �" iIaii sGl�oineEnlcus4"vaO1vF D TOP OE ID TO 2-0 TO °°B0 SLACK SPAN Pp lab /, FESETM FINAL a aM .0E, OM CIF p 1125' ow AO'roE /eIBI p- 3.DO NOT CROSS 90M I 7488. ,IPYM.500.11 8702 A___V saw w Ma♦ RN Me Pic. Ir PD 145 26-TG 1 1 1b-.. ' LSMI Pw YI'MMN q , 98^ L-TO i 1 A"IXFI PaMK +''X'.•! VT98 11D 9058 I1i1 319E 5106-PGE VAULT VT 146 I, 5M6-T_3-332AKaE °ioi IONS. y,1 VT-147 In- - T ro 1 I PL-6802 / A AT meanernp°Ife. 'r;240'�srr TOP OF Nm 10 Gil-36D "' REMOVE. NMI le 2538105 � .?' •PA IV III AGE OWNED POLE _ III PEE TO PULL • a• D813. eEIwFFn U I TEMP TWINSPER COMM 101 .T I OMEN. N I ❑PGE PULLED. ;R \ / =I 111 ❑TOPPED IOcoma(5) II e d'TO 1TIBKa W ENN I2 FR H6 / ALL \.. ii REMOVE STREET DGM-. I Ill 45-3 _ :• 'N ,I''TO PD1lR 5 III -. \ .• , CI fJN • •P a g2111 • • el 11' • d•TovrM PP %R��i wows d-TO vr&T T ABANDON o:i e VEST Vawi •:;�. �TT (ABC 5W 802 661YPOE 3YAT FAST c it! TZNA 105ERINSTALLED oprn.w 11.VL•sat I1 ++1E 11a PO 143 +¢ A + ABANDON DB PRIMARY 166 11111 T2 r,¢SIMMONS, Aa MN raw CUSTOMER TO CALL PGE SERVICE DESK 30� 3..1N/1� 1moA 25 9 N.NAw 1A 503-323-6700,TO SCHEDULE CREW STAND BY sroF ;II CR eNa '1. WHILE PLUMBING INTO VAULT 33 O i O F B 119867 184 �� I 46,4867 M 50d °Dd] . 11/ 1051 )5 .os 58.12 AW 1 •901 RI II 11 p� I • 11326' r -SDILt 1•O FDL�O �1 C 30'L eT O PGE OWNED POLE I' N6i°t� as$ POE TO PULL ii LINE ® PRITT8,289L TEMP TRANSFER COMMIS II ❑POE PULLED. H • 11+ ❑TOPPED TO COMM(31 9€y p LL{ NEUT 8,570q t REMOVE PRI d NEUT SPAN GUY SZ 1, P--138 • �4Y lug S ' /O REMOVE 12" TRANSFER i/ 50-2 12DOA Cr;OM 2-6' OH SECONDARY PLB887 -- co II CONDUIT POE OWNED POLE OPOE OWNED POLE smon reIII at POE TO PULL INSTALL 2fi"POLE CONDUIT UNIT PGE TO PULL ' Nlm,a TOPPOLLED.ERCOMM(N, INWITALL STAND-OFF.120OA CO MU0503 ow. ace pUELEI)FER COMM Isl i eee6 PGE PULLED' INSTALL BRACKETS AFTER - �� Xu ❑iDPP6D TO coMM lr. POLE IN INSTALLED aIB 0 TOPPED TO COMM t 5)• '. CO OWNED POLE REMOVE OH SECONDARY 4 STREET LIGHT e'ww1 �b,S90 PGEE TO TO PULL -98 POLE TO BECOME LIGHT POLE TEMP TRANSFER COMM IS' , C11-36D VSPLICE 750 " ' ❑PGE PULLED. Y ❑TOPPED TO COMM(S) . CI 1-360 I REMOVE OH SECONDARY TO STREET LIGHT 8 e PULLING TENSION I NO LUREI "tim�u 5706-PGE VAULT 1T 9870 VT 107 5106-T-3-332P-PGE 1u we I tt,,-,. d,-r I' 98 PULLING TENSION I NO LUNT CUSTOMER TO CALL PGE SERVICE DESK �BSTOvr foe 503-323-6700.TO SCHEDULE CREW STAND BY i VT 1 V 1.VA RT TO N ?d WHILE PLUMBING INTO VAULT 98 F- ^` % APPROVES,tEn°.O1°cE vuLLINGTENsroN rvo LURE; V xA-TO ~'L'GG ` $ PL 50d1 TO d6 0 • Der FOR 4 d0o • N0TC0055 EV TOi PL�90 � RCutT1 N PL 136 N.A.s�u / ••• 4AWG HGr NE. • ••/ VICINITY MAP le atISWO.OEA � - o P0mun0 Hr41rowl.,.. EFFp p.a., ANCHORS i t 5 ANC 0-saner s, - 9 _ npIMa1FMIRCPTIRC 0 A ((LEaD> a g a in yF."`I" INpHme.eS aHm i +xm L (L68) . NEE ,24' S GSxWEYNemxV ANCHOR CODE m©©= 1Ii 1 ORMma CImF.. y Aallwll o GUYING Lo' s o ; u n u ( NaY a IPOS:LBS.: O m . k PN11 N.1W T, -��'AP8 E-R8-FF�R1 1 GUY ®®13:13E�YE riiBl:!Li�',Li I - 2GUYS ®®mrF3YFIIJFY Frei rii�L1 +h'ORS y 3GUYS m m•©IIIY'iJGL(Si{BI y DIRmn E� 00O Oo-'NII,v.,, 0.. CONSTRUCTION NOTES: CMDEV AV N. 1.RROOAAD GS IO OSSIN5PoN51NE FOR ALL TRENCH.COMIRT.VNATS,PADS AND A,POE STANDBY GREWIS SECURES FOR OPENNG ALL ENERGIZED POE VMIL TS, Bryan MCMcelo w o CONNRi9PNC PUSS STiMG9 CALLISERVIZIE COUDIDBNGBOOTI�ISOSJPRd7O0�ATON ErMVWNne N'HEnULE A POE STANDBY CREW. 0, RF CONDUI TORE INSTALLED WITH 30 INCHES(MIN. COVER AT TOP OF CONDUIT 4 dW CLINTON IT S00.061 CONDUCTORS TO BE INSTALLED IN GRAY.SCHEDULE 80.ELECTRICAL GRADE. TXE S12E WIC 8=BERL8P Cd0IRS R 01➢RED.MMMNM N IAVVER11CAL IMIHFM MIINVE _ N HOR.ONTAL INCHES CLEARANCE BETWEEN GAS AND OTHER UTILITIES.All ELBOWS INCH^SMALLER TO BE M IHCH RADIUS.ALL BENDS MUST BE 8ACTCAY MADE $NaITSIC0IIam+.• BP ALL ELBOWS LARGER T1ANa INCH TO BE W INCH RNMIS RIGID STEEL OR POE SR A,y„+A '.5 II Wp]n APPROVED FIBERGLASS RENEE ME SECURED FAIR RUNS 0E151 FEET OR LONGER, 9 CM APPROVED FORANY LENGTH RUN WITH CORETHAN 1000EGREE$EI BENDS PVC SCHEDULE 3 BENDS N ANY OONEUR MINISRR TOEGREE FEET OR LE99. EMAtlMUN TOTAL 874 5.OIRECTIUNALBIKING RECVREMENLG RACK MOPE XIGX DENSITY POLYETNYLENp DUCT O E CLOT S(y�•B p 9 - - NM OR SCHEDULE 4OPVC WTSI AMECXANICAL CONNECT/N CERT0.LOV OR LIKE YEOMANIfY. PRATES PAl S CmnURINCemmarn I coMlE071MI PRnnuep AS Ax ALTERv^TSE rOHOPELfl+opcL xn 51 INEET THE REourmyENTSOSPOE SE SOSiOU DUCT 1AL ME SLAQ WP[OTMRETFROId1FPLY PROTECT MVNGROO FOR 05030 RE43CN4PHETDEGCII0XLL OUI EEO 9W j HOPE PALE I6 REOVIREO AFTER PSSTALLAl10N WITH POEEINSPECTOP ARESFMµEL fE510F Fixed Lepme2 JOB SITE .9 U.B�UIISIXIE3 W�NABLBFORMOVERHANG TRANSFORMERS TO EuHIRTNP e(FEET 1KRDM FROM Fl�m'CRurtDBiN1E VItl ' ALWAYS WALL ORO WITNN fL-ETEO ADRIYFAN FlRE11 SW TM A+e + ALWAYSRIIMAINIE AEV081 WIRIN FRONT TOP 55100155 AER3. R SW Baald C' 04 ante sn umsv ).NOD TOORME0.P4DS 4RS TO RE 9ET90TYTTHETCP I9PINCIIFSABGVE °VN Q �I AND TO EXTEND IN NCH ABOVE TIEp DlEONPADA5IN0IUTED IN DEAIL A.STEEL CARRIER P0015ARE REOEIIRED AIRLINE TWdYpSMERS TIMT ARE EXPOSED ABC IN]59a0 �AICILL a P FOVEHICLES. (y A I 1� S.CALSNTCM VµKT3 iO BE SET Ai FPYL GRADE NTN$NCXGRMVEL BASE MNDG CgDURS WUiIEDTO FMFRTHE VAULT'TOW LOSSES KXCCB0005(TERMAOUCTB) lose LETML6IAI SKETCH II. PGE TO°E NOTIPIEDINDIN$PELT NLCgCUrt NS VSR FIPOCEUI ILL m- BEFCREBALKCOSTUMWVAIfIT^PADLOun8x5T15°E ¢-cauelED wrH FCC AxD cusTOMR RErRESExrAnxF. It.REPORTS PGE ELECTRICAL BERJICE REQUREPRENTS BCV'K FORFVURw E�FH THIS d dPECFIL REQUIREMENTS.LIMO LO mom w U' � '� BPvk K1`^I 2. HENSIEONSMpWYVBNRONDA IPQp NANS0.ADND j CONTACT SERVICE COORDINATOR LEGEND FOR-MEN,MO COM1W+NS.ECTKN PRVP 13.TXE POIMT OG DEVVERY/VAgVIS DUNE ET EEH TIECVSTOMFR MID TI PA WIUBELTTHELNESDE FTHERE .us E Din48'8VSAR in j m '�seewesery c eN TO NI, COORDINATOR1 PGE CONSTRUCTION DRAWING Min c^.:. I+HM NI,., THINK ws3z2s7DD OR e6Ds4za01B CUTE 6CALE GGlwlvr: "0 oB NO j T "m'""" SAFETY 9nsrmzD NTs I^ ID7Doo1 1 -1(J00004597 P Mza67z1z Trtl[ 15I ®I°`0° FIRST( ANY DEVIATION FROM THIS DESIGN MUST N. Scan EdwaTI Arohitactur° s<NH New BE APPROVED BY PGE PROJECT MANAGER W TL EST PORAND-72ND $M22K34 Ix• IEEE S __ ATTENTION: INM CALL 511 BEFORE YOU DIG PG? LOC TON OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED SW T2 end SW Baxter St,TIGARD Lola uee Teen eso om RIGHT-OF-WAY PERMIT NOTICE: BY THE OREGON UTILITY NOTIFICATION CENTER. DESCRIPTION A PERMIT FROM THE LOCAL JURISDICTION IS REQUIRED BEFORE ANY THOSE RULES ARE SET FORTH IN OAR 552001-0010 OH to UD convenslon lel new 81 unit apartment OUMdl15 WORK IN THE RIGHTOP-WAY MAY BE PERFORMED. ONLY PGE APPROVED THROUGH 952-001-0090.YOU MAY OBTAIN COPIES OF ' IKINw SECTION(A WORKWiTX VPEET PRE-CONSTRUCTION MEETING)TRENCH MID CONDUIT INSPECTION CONTRACTORS AND CONTRACTORS WHO HAVE MADE OTHER SPECIAL THE RULES BY CALLING THE OREGON UTILITY WASHNGTON C11-36D M2771056 I DFI BEAVERTON YOUR PROJECT REQUIRES A PRECONSTRUCTION MEETING CONTACT YOUR SERVICE d DESIGN AGREEMENTS WITH POE WILL BE ALLOWED TO WOOL UNDER POE's PERMIT. NOTIFICATION CENTER ADMINISTRATION 00 I SDO.232ISCO) 0. GESIGH BY RIONE 1170 OPAVM BC PROJECT MANA000TTO tO WORKING DAYS PRIOR TO EXCAVATION TO COORDINATE THE THE CONTRACTOR MUST NOTIFY THE LOCAL JURISDICTION 40 HOURS To REQUEST UTILITY LEGATES CALL THE OREGON a1pF MN�•I LIBION WryOR BreNlam 872-5440 LANE WHINEY PRE-CON.POE'S FIELD CONSTRUCTION COORDINATOR(FC WILL PROVIDE YOUR TRENCH BEFORE WORK IS TO BEG/N.A COPY OF THE PERMIT MUST BE ON SITE UTILITY NOTIFICATION CENTER.811AT LEAST Call Wen BEAVERON.on wow AND 2 BUSINESS DAYS PRIOR TO EXCAVATION. work 0 PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED