Loading...
Plans (16) PLM 2018-00427 _ __ _____. \, A.-).---2, c, \.9._coy- e\-\i -, . 7‘..- PLUMBING LEGEND AND ABBREVIATIONS :lv IED ABBREVIATIONS ABBREVIATIONS LEGEND LEGEND (CONTINUED) PIPING LEGEND (CONTINUED) MISCELLANEOUS SEP 13 201$ CORGAN CITY OF TIGARD AD AREA DRAIN JS JANITOR SINK • BUILDING DVSION Alla RISER AFF ABOVE FINISHED FLOOR kPa KILOPASCALS ' Y STRAINER WITH BLOW OFF VALVE Cu P-TRAP WASTE I VENT I STORM • AP ACCESS PANEL L LAVATORY E'.1 FLEXIBLE CONNECTION c FLOOR CLEANOUT/GRADE CLEANOUT SAN SANITARY ABV Q RISER DESIGNATION RISER NO. BLDG BUILDING LDR LEADER (XJ ( 0 F FLOOR) 0 ISSUES BOB BOTTOM OF THE BEAM LPS LITERS PER SECOND (H) (L) EXPANSION LOOP SIZE CLEANOUT/PLUG --- —SAN— — SANITARY(BELOW FLOOR) X 1 08/17/2018 ISSUE FOR PERMIT& BIDDING \ EQUIPMENT BOP BOTTOM OF PIPE MZ SQUARE METERS SEISMIC JOINT --- EQUIPMENT DESIGNATION X-X\ EQUIPMENT NO. 0 PIPE DOWN --V VENT PIPING FLOOR NO. BT BATHTUB M3 CUBIC METERSIPV POST INDICATOR VALVE C PIPE UP ST STORM DRAIN PIPING / BV BALANCING VALVE M METERS DETAIL DESIGNATION ( DETAIL NUMBER CA COMPRESSED AIR MA MEDICAL COMPRESSED AIR 4 SHOCK ABSORBER C CAP OST OVERFLOW STORM PIPING ? 10- }— DWG. SHEET NO. CD CONDENSATE DRAIN mm MILLIMETER 4 VACUUM BREAKER CHANGE IN PIPE ELEVATION IW INDIRECT WASTE PIPING CFH CUBIC FEET PER HOUR MAX MAXIMUM © NUMBERED NOTE NUMBER 4M MANUAL AIR VENT J ARROW INDICATES DIRECTION OF FLOW CD CONDENSATE DRAIN PIPING CFM CUBIC FEET PER MINUTE MG MEDIUM PRESSURE GAS CFS CUBIC FEET PER SECOND MGA MEDICAL GAS ALARM QA AUTOMATIC AIR VENT — PITCH PIPE DOWN IN DIRECTION OF ARROW SPD SUMP PUMP DISCHARGE PIPING CI CAST IRON MH MANHOLE A\ REVISION NUMBER CLG CEILING MIN MINIMUM A REVISIONS PRESSURE GAUGE AND COCK BEL00300000 INSULATED AND HEAT TRACED PIPING SED SEWAGE EJECTOR DISCHARGE PIPING CO CLEANOUT MS MOP SINK Q THERMOMETER ( FRESH AIR INLET GW GREASE WASTE PIPING COTG CLEANOUT TO GRADE MVP MEDICAL VACUUM PUMP - PLUMBING SHEET LIST CONN CONNECTION (N) NEW m WATER FLOW SWITCH WALL HYDRANT ---SPV SUMP PUMP VENT PIPING SHEET NUMBER SHEET NAME CONT CONTINUATION NC NORMALLY CLOSED RUNNING TRAP —SEVSEWAGE EJECTOR VENT PIPING P00-01 PLUMBING LEGENDS AND ABBREVIATIONS CP CIRCULATING PUMP NIC NOT IN THIS CONTRACT PIPING LEGEND — P00-02 PLUMBING SCHEDULES CV CHECK VALVE NO NORMALLY OPEN �, BASKET STRAINER — — SV— — SOVENT PIPING (BELOW FLOOR) P01-00 PLUMBING UNDERGROUND DEMOLITION PLAN-LEVEL 1 P01-01 PLUMBING DEMOLITION PLAN- LEVEL 1 CW COLD WATER NPW NON-POTABLE WATER VALVE (SPECIFICATION FOR TYPE) FUEL OIL PDR PLANTER DRAIN PIPING(ABOVE FLOOR) P01-02 PLUMBING DEMOLITION PLAN- LEVEL 2 DF DRINKING FOUNTAIN OD OUTSIDE DIAMETER P01-03 PLUMBING DEMOLITION PLAN- ROOF DFU DRAINAGE FIXTURE UNIT OFD OVERFLOW DRAIN ti: CHECK VALVE FOS FUEL OIL SUPPLY PIPING — —PDR— — PLANTER DRAIN PIPING (BELOW FLOOR) P02-00 PLUMBING UNDERGOUND PLAN LEVEL 1 DI DEIONIZED WATER OST OVERFLOW STORM PIPING 7`. CHECK VALVE WITH ABD FOR FUEL OIL RETURN PIPING PD PUMP DISCHARGE P02-00A PLUMBING UNDERGROUND PLAN- LEVEL 1 SEGMENT A DIA DIAMETER OS&Y OUTSIDE SCREW&YOKE GATE VALVE P02-00B PLUMBING UNDERGROUND PLAN- LEVEL 1 SEGMENT B >4 SOLENOID VALVE —FOV--- FUEL OIL VENT PIPING SSD SUB-SOIL DRAIN (ABOVE FLOOR) P02-01 PLUMBING PLAN- LEVEL 1 DER DEIONIZED WATER RETURN PDR PLANTER DRAIN — P02-01A PLUMBING PLAN- LEVEL 1 SEGMENT A DN DOWN PD PUMP DISCHARGE ye; PRESSURE REDUCING VALVE FOF FUEL OIL FILL PIPING — —SSD— — SUB-SOIL DRAIN (BELOW FLOOR) P02-01B PLUMBING PLAN- LEVEL 1 SEGMENT B DR DRAIN P/FT PITCH PER FOOT P02-01 C PLUMBING PLAN- LEVEL 1 SEGMENT C DROP DROP(WITHIN FLOOR) PIV POST INDICATING VALVE n 1 OS&Y (OUTSIDE SCREW&YOKE)VALVE LABORATORY!MEDICAL-WASTEIGAS GWS GRAY WATER SUPPLY PIPING P02-02 PLUMBING PLAN- LEVEL 2 DWBP DOMESTIC WATER BOOSTER PUMP POC POINT OF CONNECTION P02-02A PLUMBING PLAN- LEVEL 2 SEGMENT A �E) PROF- w AUTOMATIC FLOW CONTROL VALVE G NATURAL GAS PIPING(LOW PRESSURE) GWW GRAY WATER WASTE PIPING P02-02B PLUMBING PLAN- LEVEL 2 SEGMENT B ��'� GIN Ss/ DWG DRAWING PRV PRESSURE REDUCING VALVE . FF o �c: BUTTERFLY VALVE (MANUAL) -----GV----- NATURAL GAS VENT PIPING (LOW PRESSURE) OW GREASE WASTE(ABOVE FLOOR) P02-03 PLUMBING PLAN- ROOF E �' 90-�44P 'p DWHE DOMESTIC WATER HEAT EXCHANGER PSI POUNDS PER SQUARE INCH PO2 03A PLUMBING PLAN ROOF SEGMENT A DWP DOMESTIC WATER PUMP PSIG POUNDS PER SQUARE INCH (GAUGE) w GLOBE VALVE — P02-038 PLUMBING PLAN- ROOF SEGMENT B R MG NATURAL GAS PIPING (MEDIUM PRESSURE} —GW-- — GREASE WASTE (BELOW FLOOR) �,// - ON DWST DOMESTIC WATER STORAGE TANK ROOF RECEPTOR P03-01 PLUMBING ENLARGED VAULT PLAN • `' R BALANCING VALVE ---MGV--- NATURAL GAS VENT PIPING(MEDIUM PRESSURE GD GARAGE DRAIN PIPING (ABOVE FLOOR) PO4-01 PLUMBING SANNENT RISER DIAGRAM- SEGMENT A s RS�\ti DWTP DOMESTIC WATER TRANSFER PUMP ROOF DRAIN ) DWTT DOMESTIC WATER TRANSFER TANK RR ROOF RECEPTOR �.f VALVE WITH TAMPER SWITCH — PO4-02 PLUMBING SAN/VENT RISER DIAGRAM- SEGMENT B J _ HG NATURAL GAS PIPING(HIGH PRESSURE) —GD— — GARAGE DRAIN PIPING (BELOW FLOOR) PO4-03 PLUMBING WATER RISER DIAGRAM SEGMENTA (E) EXISTING I RISE RISE(WITH IN FLOOR) PO4-04 PLUMBING WATER RISER DIAGRAM SEGMENT B GAS COCK VALVE ---HGV--- NATURAL GAS VENT PIPING (MEDIUM PRESSURE) — — —C_— — — CENTER LINE FEW EMERGENCY EYE WASH 1 RW RECLAIMED WATER P05-01 PLUMBING DETAILS �$'� 712Q 8 EL ELEVATIONSA SHOCK ABSORBER ',-L.: SEISMIC VALVE STM STEAMER PIPING EXISTING PIPING P05-02 PLUMBING DETAILS ET EXPANSION TANK SAN SANITARY TI PACKAGE EWC ELECTRIC WATER COOLER SCW SOFT COLD WATER RELIEF VALVE DI DISTILLIED WATER PIPING /,//j///7 EXISTING PIPING TO BE REMOVED EWH ELECTRIC WATER HEATER SD SMOKE DETECTOR ANGLE RELIEF VALVE AW ACID WASTE BELOW FLOOR POTABLE WATER FCO 1 FLOOR CLEANOUT SE SEWAGE EJECTOR OFFICE COPY FD FLOOR DRAIN SED SEWAGE EJECTOR DISCHARGE TEMPERATURE MIXING VALVE — —AW— — ACID WASTE BELOW FLOOR ----- DOMESTIC COLD WATER PIPING FL FLOOR SF SQUARE FEET UNION ------AV--- ACID VENT PIPING -- DOMESTIC HOT WATER PIPING FLH FLOOR HYDRANT 1 SH SHOWER FOA FUEL OIL ALARM PANEL I SHW SOFT HOT WATER REDUCER LW LABORATORY WASTE ABOVE FLOOR --- DOMESTIC HOT WATER RETURN PIPING CITY OF TIGARD 111 FOF FUEL OIL FILL PIPING I SHWR SOFT HOT WATER RETURN r_; ECCENTRIC REDUCER(E.R.) — —LW— — LABORATORY WASTE BELOW PIPING NON-POTABLE I INDUSTRIAL WATER Approved Conditionally Approved [ 10 CK FOP FUEL OIL PUMP I SK SINK See Letter to:Follow [ I FOR FUEL OIL RETURN PIPING SU SAND/OIL INTERCEPTOR SLEEVE ----- LV --- LABORATORY WASTE VENT PIPING SCW DOMESTIC SOFT COLD WATER PIPING Attached. ] ILI FOS FUEL OIL SUPPLY PIPING SPD SUMP PUMP DISCHARGE -� Permit Number: PLM �t��4 'I FOST FUEL OIL STORAGE TANK SP SUMP PUMP PUMP AR ARGON GAS PIPING SHW DOMESTIC SOFT HOT WATER PIPING Address IAS Sew• G4 /�wi. (f) M; METER — 3HWR DOMESTIC SOFT HOT Q By: .Date:. `]-�.4-ISH r — FOV FUEL OIL VENT PIPING SPKR SPRINKLER —CO— — CARBON MONOXIDE PIPING WATER RETURN PIPING Z-k. irior p( (Q• H Z `J c,.w. 0 FS FLOW SWITCH SPV SUMP PUMP VENT I HOSE BIBS CO2 CARBON DIOXIDE PIPING RW RECLAIMED WATER PIPING O J FSK FLOOR SINK SSD SUB SOIL DRAIN m co T s WATER HAMMER ARRESTER CDA CLEAN DRY AIR PIPING 1CW INDUSTRIAL COLD WATER PIPINGCI.J.] 0 FT FEET ST STORM PIPING FLOOR DRAIN,AREA DRAIN, PLANT DRAIN, GARAGE Limi ¢ 0) U FU FIXTURE UNIT TD TRENCH DRAIN DRAIN CA COMPRESSED AIR PIPING IHW INDUSTRIAL HOT WATER PIPING 0 < G (LOW PRESSURE) NATURAL GAS TDH TOTAL DISCHARGE HEAD Z INDUSTRIAL HOT WATER cr) w O FLOOR SINK HE HELIUM GAS PIPING IHWR GAL GALLONS TMV TEMPERATURE MIXING VALVE RETURN PIPING GD GARAGE DRAIN TOP TOP OF PIPE 0 Li ROOF RECEPTOR HV HOUSE VACUUM PIPING TP TRAP PRIMER CtI— C rCh � GPM GALLONS PER MINUTE TOS TOP OF SLAB 2 CC GV GATE VALVE TP TRAP PRIMER O ROOF DRAIN H2 HYDROGEN GAS PIPING IRR IRRIGATION PIPING121 LLI I— < =O 0 Q fl GW GREASE WASTE TPV TRAP PRIMER VALVE • OVERFLOW ROOF DRAIN LA LABORATORY COMPRESSED AIR PIPING NPW NON-POTABLE WATER to i= GWH GAS WATER HEATER TS TAMPER SWITCHCK 0- `� N GWS GRAY WATER SYSTEM TYP TYPICAL POINT OF CONNECTION (NEW TO EXISTING) LN2 LIQUID NITROGEN PIPING DE DEIONIZED WATER SUPPLY c\ 0 GWW GRAY WASTE WATER UON _ UNLESS OTHERWISE NOTED DLV DELUGE VALVE W/ALL RELATED APPURTENANCES MA MEDICAL COMPRESSED AIR PIPING DER DEIONIZED WATER RETURN Z 0 HB HOSE BIBB UP UP (PENETRATES FLOOR SLAB) HD HUB DRAIN UR URINAL DCVA DOUBLE CHECK VALVE ASSEMBLY N2 NITROGEN PIPING ROS REVERSE OSMOSIS SUPPLY (9 < HT HEAT TRACING I V VENT DDCA DOUBLE DETECTOR CHECK ASSEMBLY 02 OXYGEN PIPING ROR REVERSE OSMOSIS RETURN imi 0 HW HOT WATER VB VACUUM BREAKER HWCP HOT WATER CIRCULATING PUMP VR VENT RISE , RPBP REDUCED PRESSURE BACKFLOW PREVENTER ASSEMBLY LPG LABORATORY PROPANE GAS PIPING 3W SOFT WATERIl HWR HOT WATER RETURN VTR VENT THROUGH ROOF BA SELF CONTAINED BREAHTING APPARATUS SG SPECIALTY GAS PIPING TW TEMPERED WATER HX HEAT EXCHANGER WC WATER CLOSET ID INSIDE DIAMETER WH WALL HYDRANT C BOTTOM PIPE CONNECTION VAC VACUUM PIPING 'NS WATER SOFTENER IE INVERT ELEVATION WHA WATER HAMMER ARRESTER C TOP PIPE CONNECTION WAGD WASTE ANESTHETIC GAS DISPOSAL PIPING GWS GRAY WATER SUPPLY IN INCH WFU WATER FIXTURE UNIT IW INDIRECT WASTE 7 ZONE Ct VALVE IN VERTICAL NO NITROUS OXIDE PIPING z 0 P Q 5 w 1 m m Q 0z 0 z LU (D Lu CD Z PLUMBING 2 LEGENDS AND ABBREVIATIONS C O 0 0.- WSP USA Buildings Inc, " SI )S I ) 999 3rd Avenue,Suite 3200 Seattle,WA 98104 JOB Project Number (206)342-9900 L1) wDATE 08/17/2018 co 0 N SH =ice= "::--,;_-_-:."- -..-_-- - ---;:ti =- - ..._ ::-2-- --.:_„---11_____-:1_,- ----.--_ PLUMBING PUMP SCHEDULE PLUMBING GAS WATER HEATER SCHEDULE " -� MOTOR NATURAL GAS CHARACTERISTICS ELECTRICAL CHARACTERISTICS WATER CHARACTERISTICS -------t-_r_- - w -------_-_,1571----_ ==£ _ : - r - ----- =` = - - .� = ---„--. ....--,---.:_f— _ --= .._- 7 co 1 RRAN 0 ISSUES 1 08/17/2018 I ISSUE FOR PERMIT&BIDDING I I I I I I I I I I I I I I I I I I 1 I I I I I I I I 1 I 1 A REVISIONS 1 I 1 1 I 1 I I 1 I E 1 1 I I I I I 1 I I E C 1 1 1 1 1 1 1 1 1 I 1 I 1 I I I I 1 I I �O PROp �`5 �G 1 N FF io I I i I I I I �`�� ass I I I I I I I I I I ,7Jf"'4 0-•'rON <v • SJ . NWS I I I I 1 I I I I I 08/17/2018 1 I I 1 I 1 I 1 1 1 TI PACKAGE , 1 I 1 1 I I I I I I Th.,,,,,z (E)4" STS TO REMAIN I (E)4" STS TO REMAIN �- I I I (E)4" STS TO REMAIN / � r � / I I DEMOLISH 4" STS I 1111 CK_ I 1 . — — L 1 CIA - I MINIM LLI ,, 1 I I I I 1H Z < I I (/) FE- ›. a O I I I I I I I I UmCY)NW (Ni LU JO I I I I I I I [mliii 0 Qa) Z z0) 0 Vz (0WoY ct 1— ce CD _ � (/) I I I I i I I I a0 W 0 - u � a. co0 N I I I I I I I/ (imi.) (7.::i 0 < Z 0 i i I I I I I EIE-3--) 0 < imi (.10) _ I I I I I I I I -I Film T Ij I I I I I I I I w J z EXISTING 4" &SMALLER SANITARY -`''`�-- � 1 EXISTING 4" &SMALLER SANITARY ILINES TO BE DEMOLISHED OR EXISTING 4" SANITARY LINE TO BE LINES TO BE DEMOLISHED OR KEYPLAN a. 1 ABANDONED IN PLACE. I DEMOLISHED OUT TO CONNECTION I ABANDONED IN PLACE. z WITH 6" BUILDING SEWER. O C J 0 I I I I I I I I w a a z a I I I _ _ I I I I Q w cc w a n I I I I I I 1 (Z _ ,. i I _ 1 ` II — PLUMBING D I I _ (E)4" STS TO REMAIN I (E)4" STS TO REMAIN �l. I I (E)4" STS TO REMAIN I I (E)4" STS TO REMAIN I I UNDERGROUND ,, DEMOLITION PLAN a I 1 I ► I I I I I ► — LEVEL 1 2 a. WSP USA Buildings Inc. �— NN 146 p 999 3rd Avenue,Suite 3200 M (----� Seattle,WA 98104 JOB Project Number CI CM CI 40 6fill 8 9 (10/ (206)342-9900 CN \ / wsp.com Lri \ ,._- DATE 08/17/2018 co -- Tc- SHEET cc., ® PLUMBING UNDERFLOOR DEMOLITION PLAN - LEVEL 11.°- ))' 1/8 = l'-0" PLAN p 0 1 ,.. 0 0 NORTH -...I 0 NUMBERED NOTES ___=,„_____,, _i_-_____„•_-_ ---„,„---_,..-__„-_,-„__7„-„ - - -- - -v -_ -.-,• ------ . - - - --- ' 1 -R - G -1- ' ---- 1 --7_-• 0 ISSUES 1 08/17/2018 ISSUE FOR PERMIT&BIDDING A REVISIONS .s..,00 PROpk.s GiNk- tiliS 44 (.9 ct 90•d 4' t-- ,- . / \, —11 t9 ikS J. Mtk 08/17/2018 Ti PACKAGE 1 1 1II I W Ct 0 . UJ I --1 (E)CTG (E) CTG (I) H >" 1 (E) CTG (E) CTG 1.,r-4 _ ____ I _ i - 1 - 7 ...7--f—r1-1 1,--- - t-.—. --- '..-1.--- ---7:= ---i - ''' ' - 1 f------r A a 0 . . Ii \ ,N - H Z g 0 ! \ (E)3" STS UP TO SECOND (E)3" STS UP TO SECOND 11 / \, / '‘., (E)3" STS UP TO SECOND (E)3" STS UP TO SECOND , ,..._ I 1 , FLOOR AND DOWN TO FLOOR AND DOWN TO I I 3, \ 1 . FLOOR AND DOWN TO FLOOR AND DOWN TO 03 (.0 —1 (E) HOSE BIBB TO REMAIN. BELOW SLAB.. BELOW SLAB. I CI) W w RI 0 i 1 BELOW SLAB. BELOW SLAB. - PROVIDE 6" CAPPED STUB- LL < °) 0 OUT&SHUT-OFF VALVE IN = z z , - 1 r- _i CEILING SPACE FOR I 1 FUTURE RECONNECTION. ---r , i I Et liLeL61 CI) - --I I 1 . _, = c9 u) - 0 W 's 6 7 - kir 0 u) 1=-- D. . II (E)SANITARY LINE SERVING (E) MOP SINK 1fit 0 Fl 2 II ABOVE. DEMOLISH BACK TO POINT 1 7- DEMOLISH (E) MOP SINK& (NI 0 I INDICATED & PROVIDE TEMPORARY CAP ASSOCIATED PIPING. — 3/4" CW-1 1 < Z 0 -" LI 1 Li li — — — = FOR FUTURE RECONNECTION. r---- -1 _, _ = ,.... -Ir -= 1 1 : - - = ____ ----- _ _ . ill -1 /ii\ r II 0 )1<C 3/4"cw---i v [ II 1 II I New/ . II , „,-.1" cw UP rr , ___ ___ __ ,, 11 '"4'' h-) in-, i , 1 21/2 IF 2 1/2"CW1 i 1" OW-- ....1.1 \ —3/4"CW I— 'c. -NN"•- CONNECT 1/2" CW I CONNECT 1/2" CW 1 /\ N -L, -t, -t, ,16 1 „ L _ _ _ _1 — i"cw TO 2 1/2" CW 2 1/2"CW TO 2 1/2" CW I 1 I f _ ---1-__ _ . 1_1_ _Eiffk ltr--- - =II- - -1 --1 --T-- i-- , °ILI — —11 , i 11--- --1 R FED.‘ii.=-F 1 7- () 1 I I C III II L 1 n 1 flv LI II 3H V , i V I Il 1 II --------------1 (E) HOSE BIBB TO REMAIN. PROVIDE L I 1 U U 11 u —3/4"CW I U I Il 6" CAPPED STUB-OUT& SHUT-OFF I I _ 1---- — ----- 11 ( - KEYPLAN VALVE IN CEILING SPACE FO R FUTURE I I I I I I 1 I I I 11 (E)HOSE BIBB TO REMAIN. PROVIDE RECONNECTION. /\ I ' _1 6" CAPPED STUB-OUT&SHUT-OFF 1 / LV 1= _ _ _ __ _ IL __ /71: I 1 1 , 11 ___ ___ __ VALVE IN CEILING SPACE FOR FUTURE Lu RECONNECTION. C > e W —.I L \_ DEMOLISH (E) PLUMBING -_-,-1 71 FIXTURES &ASSOCIATED PIPING. z [ 1 1 B A a. I II z 0 T CW II P 1-- PRESSURE REDUCING I 7' 0 4 [XI STATION (EXISTING) 1 11 . I W .— . 3" STS UP TO SECOND z i 3" STS UP TO SECOND FLOOR AND DOWN TO / 3" STS UP TO SECOND / 3" STS UP TO SECOND — 65 / FLOOR AND DOWN TO BELOW SLAB. TRANSITION / FLOOR AND DOWN TO / FLOOR AND DOWN TO PLUMBING [ / TBOEL40.WSISSLAPRB.IOTRRATNOSITIONTO 4" STS PRIOR TO ELBOW. BELOW SLAB. TRANSITION / BELOW SLAB. TRANSITION .....iI IINA,' ' TO 4" STS PRIOR TO ELBOW. TO 4" STS PRIOR TO ELBOW. ELBOW. DEMOLITION PLAN (7) I--i 1 1_,_.,,,...„1 6-7.„ .1 ,,„„,,,...,„,,,...,_4 I .1---1. _ _ i i .....„: ; .„,...,,J r;: A Ii _______ i , " I, A „,,, i .. ,___,___,_,____,1 ---- 0 1,—_______: iltr=7.,trw,/, r--- L,„,„i _____] I _ 4 (-73-------mi L. , ....._.! i--- i ( ) - LEVEL 1 a; CTG CTG _ --.. ,,, (E) HOSE BIBB TO REMAIN. PROVIDE CTG CTG a. I I I I I 6" CAPPED STUB-OUT & SHUT-OFF I I 2 VALVE IN CEILING SPACE FOR FUTURE a. RECONNECTION. x N 446 p WSP USA Buildings Inc. CD 999 3rd Avenue,Suite 3200 11111 CI CO Se ,WA 98JOB ( CO CO C (206)342-990 wsg.com N 4 6 9 j-0) attle0104 Project Number DATE 08/17/2018 in , co is N , PLUMBING DEMOLITION PLAN - LEVEL 1 SHEET i---- 1/8" = V-0" 8 1)))'' PLAN p 0 1 -0 1 NORTH - 0 NUMBERED NOTES j _==teer- .,_-,.____-_-,___ . - = - __..,--,===-1 =_ _ = __ CORGI -- 0 ISSUES 1 08/17/2018 ISSUE FOR PERMIT&BIDDING A REVISIONS Y ��E� PROF�ss et 4i 90.44- 'A rad, /0!!'/ON 44 Iret T1s ✓ . wit\.9 � 08/17/2018 TI PACKAGE I W CatI 0IIIIIIIIIIIIIIIIIIIIII W 1 I 1 I 1 I I 1 I U") I— ›.- imi- Z o O 3" STS UP TO RD-1 3" STS UP TO RD-1 3" STS UP TO RD-1 J I I AND DOWN TO FIRST I AND DOWN TO FIRST t--. ,i— , i � r-_ _ -.-- i-- AND DOWN TO FIRST I I I Cl) m N FLOOR. FLOOR. - I FLOOR. W N 1 / d0' U - ;-+---1 1,- I -i -r--- I 1---1 I' I 1 1.I - - - z -_ i - - - �„-,. I 3 I• —I" - j -1— A 11-1 (1) = 6 I I I I I I I F-„ W Ili ci (,) 3 STS UP TO RD-1. DEMOLISH FROM i - ce I L H Q CO POINT HIGH IN LEVEL 2 CEILING SPACE I I I I I I AS NECESSARY TO ALLOW FUTURE = = - - NUJ Q i co d- REROUTE. PROVIDE TEMPORARY CAP BELOW RD-1 OUTLET. CAP REMAINING : 2 2 VERTICAL PIPE &ABANDON IN PLACE. 1 0 I I I I I I I I z 11 1 . (I) 11514i 1 1 I I DEMOLISH (E)3/4" G, 1-1/4" HW, 1 I I II - II 1-1/4" CW DN TO (E) GWH-1 HW, CW, &V SERVING (E)MOP SINK. II =- 1..... ' - = AC-A-3I f DEMOLISH BACK TO INDICATED POINT, = _ _ - - L _ _ _ - - - , LL _ , PROVIDE TEMPORARY CAP FOR FUTURE �� I 400MBH 1 1 II I RECONNECTION.' I I j DEMOLISH DEMOLISH1 1/2" V 11L -DEMOLISH (E) ft I II „ 1" 1 G UP TO I (E)1" G UP I • (E)TO AC-A P CW 3/4 G & CAP AT I I I I i 1 (E) I 5 O MBH TO 2 II (E)1 1/2"GAS DNI.----f---- l_500MBH MAIN. III 3"VTR TO BE DEMOLISHED. �T, - - - - _ -is - - _ - \ 11 I I \ I j - II _PATCH ROOF OPENING TO - - II - DEMOLISH (E)1" III - /_ I - - - - -+ [� (� I '` I � � r) _ = f) MATCH EXISTING. -.� I CWr\11 ,- --�! - -;f B rE) 1 1/2"GAS (E)1^G I III I �' /N.,,, __Jr.,_ — — i" `� II , ' ( I KEYPLAN I —i� _ _ _ 1 III _ _ _ —3" V N I 3"-- EV I �1nG 1 I - � ��_� �.� �L o � � _ � ��1 �� ,J ( � II H I -7T 3"VTR TO BE DEMOLISHED 1 C w - II III U I I I I I I II III & REPLACED WITH 4" VTR w 3"VTR(E) II II II IJ II 1 U U III AT SAME LOCATION z I I I II � I II III I III I III I B } A 7 [V L _ _ _ _ =II IL __JI— JI —. Ll. L J _Q 1 T\-- J �- I I I I I I DEMOLISH (E) PLUMBING FIXTURES &ASSOCIATED PIPING. p - -- 0 I I I I I I I z I PLUMBING a. I ► I I I I I DEMOLITION PLAN a CNI I - LEVEL 2 a. I I I I I0 I I a WSP USA Bunue,Sta In . v; II— .. I -- ---I I. - 1 I� L ---A 1 1 �—t+ ' I 11 - 1 1 1 ll 1 ll 4 _ EON kt I 9993rd Avenue e3200JOB Pro'ect Number — �` ! 3� I G i t `f �' �� r n� ! -� 1d 1- ' 1– I ! r- -- Y' J �` H1 C L I f n� � i n n n ,� Seattle,WA 98104(206)342-9900 "! 1 f 3" STS UP TO RD-1 I 3" STS UP TO RD-1 I I 3" STS UP TO RD-1 I 3" STS UP TO RD-1 I wsp.com DATE 08/17/2018 co AND DOWN TO FIRST AND DOWN TO FIRST AND DOWN TO FIRST AND DOWN TO FIRST o FLOOR. FLOOR. FLOOR. FLOOR. I SHEET N «, ill 0 0 0 4 6 8 g �1 PLAN NORTH p01 - 02 0 NUMBERED NOTES = _= ==- I 7IIIIIIII.IIIIIIIIIIIIIIIIIII / . — 1 / 1 � _� �_ i 1 It� ��ryry V 1 I1 / I �R� ,,,,, - ._____ s.7.,:, A I r I 1 1 I I c I ( OJ r I 1 108i17i2018 SSCIES II ; I I ( I ISSUE FOR PERMIT&BIDDING I 1 1 :---1 I / I ! I I Ir Ii I i 1 I I I I _ i 111: CI I I t :. I ,I il / / 4.. i 1 1 ° z Y ,4 4. aIPU 1'::a-'' :'':1 1 h"---- .-- l 1 - 0. i il I Ilff ft.- II 1 111 -----/- •i I / I l) 61 / 1111 •/ d e-.,‘I - „ - Q'• a .°I:. 4111: 4:4. d a` ,.. •4'I ~ ` 1 . d . •ER SEPARATE •-•;:- ll/ „,,,,,,,,,„, s ..' „ . . . . • co etss II / . .., i III I —�� °_._ .. . . a.• ; 1 ,a e4 . "o `d/I !1 t li d : , :- diVo >0 "--- [ / , ,, _ . s, ..,. _ yi fp-- 1 , -...' , 4• Aa- - -,a,d ,a. a ♦l 71 i L 1 /1 y : ; 0811I eI 1 , ___ ___ i . ?/2` 4° t• / t- . • °`' 4• 1 V) 4:I / L ...............,,,P77-- , .-------a")-1 ,i i LLI: ........, ..... . / il \.„.....„1,1 / .... .,„,, ,i __ _ ir a Liu ,." , i I/ Ci) 1...... i __ 1:: 1 ._ / I "M Zi I0° 89 I I l I CO __________ \1\1 , . ...,... ,„ . —� _ 7 l \: .. ,, c, a �li l u......„. - I I — -�— _ ,i ., - -14-- _ ( (...) w-----14- — L I .-•�, I l' / i I _ —-- — _ I w izz 1:::) Ill . 0 ---, X (a) : I-- co 1,1 '1 -r.--------H F. <CI Z aiimiese f / .I I (.9 , i,‹I1i I 1i 1 I1 II 1 i I ::7"-' II , - 2 - ------ 1 \'. .o I II�` I I KEYPL AN l ------ - ------------ , F On 0 1 1 _ 11 I II 0I f �`_1 ___________ I I... / . -7-- / ._.. • f UNpE I • --_ 1 --N - LEVELI II 1 1 ) I I I �-"`,,, ,� A 4 — - _ —__ ___ _ I _ . 6 I -- ._'0 i _ I 0 , 0 I PLUMBING ._ $ I UNp • ERGOU ``' - g pLSVD AN LEvEL 1Q",-- L;S::::: guildi9rRgs lnc,_ enue,Surfe 3200 A 98104 ws 900 /O • p corn �/ B DATE Prof(71- % Nu 48/1 mber PLAN SHEET X2018 NORTH r ,P02*-/ 00 1 -- I -----7_-_,,,,E--'-_� s em _ _-- ,?-7.----,--=___-- ---- _ice- =- C Al - -wN -m I I I I I 0 ISSUES 1 08/1712018 ISSUE FOR PERMIT&BIDDING I I -4'_ 4 d • �•• - " " -,I� �i Ej- °• a 4" .d->!> 'Ia, ,• a - d - f'• I • a • .b •4a`. .•a a a, d as , o C7 (E)4" STS TO REMAIN a d; _ °'. ' a 6 a d °• I I I d• p'• ,I) ' - Q_ ' °�d _ , - „ _ d, ,mob da . - •d• I • - - - - Q - - - - -- - A ) I I I A REVISIONS I 4" SAN UP 4" SAN UP 2" VUP ---\ \,4 I ///"--- UP TO WALL CLEAN OUT 2"VUP I I I 2" SAN UP ---- �"`` � 1-1/2" VUP 3" SAN UP I I 4" 2" SAN UP I 7 � 4" 2" SAN UP / / I - // / C / I I I II 1 1 UP TO CLEAN OUT I _ 4" I I I I I .0/-4" RED PROFF - I I 2" SAN UP -�::,......\ I �..0 �G 1 N F�si0 II 2" 4"- 90•, 4-. 2" SAN UP UP TO WALL CLEAN OUT I I P /'� rt. O" ON I I \\\:._./, N. tfois j . toks<c> 4"---/ : _-\_ I I _ 2" SAN UP 08/17/2018 1 0 1-1/2" VUP z-- 4" SAN UP I I 4" SAN UP Ti PAC KAG E 2" SAN UP / I I I / UralI I I rot 1 ! I-I-I —+-I I I — U UP TO WALL CLEAN OUT ._.. 11..1 I I I I (f) Film >"Z 1-1/2" V UP r 3" SAN UP Q 2" SAN UP " H d a 0 7-4 I UP TO FS-1 I I I Cm cn J 4" SAN UP 2" SAN UP — 4" jj '."...1, 0 4"— ( _ \ 1-1/2" VUP Ui0 = Z U ` 4„ I ) - --_ 2" V UP 7 " I7UP TO WALL CLEAN OUT 0 Z co I 1 I 1 I 1 ISI I I (f)Et ..../7 { I 1 � Q r,,-4" a. OW O CC Q 2" SAN UPV 2" SAN UPI IM G N .,-- 4" SAN UP 4" SAN UPI _ I r 0 � - t I I -/ I 0 I - 2" VUP _, _ � 4" SAN UP " 2" SAN UP j \1 I 2 VUP I ; 0 < �/ Imo,,. 0 4" SAN UPH I -� I I - 4 SAN UP I A/ 4" < /--- 2" SAN UP z N - 2 SAN UP 2 I w \\- UP TO WALL CLEAN OUT KEYPLAN , I I I -J W " • I " C J I rte—s1 Z I I I g - _ I B A a a z n I I I cc C90 oc z UP TO WALL _ I CLEAN OUT 2" SAN UP 4„ ;\ -2" UP TO WALL CLEAN OUT 1 Z t 1 1 1 1 1 1 1 , 1 • - Eti PLUMBING I I UNDERGROUND 4 — 9" SAN UP 2" SAN UP I �- 7" SANUP 2" SAN UP o� , u ; I _ ---r, PLAN - LEVEL 1 o a. SEGMENT A ��-- (E)4" STS TO REMAIN ---- -- (E)4" STS TO REMAIN a. " WSP USA Buildings Inc. N999 3rd Avenue, )LO CONNECT TO EXIST. 6" SIDE SEWER / 8 79 10 �zos�e, A 98 Suite 3200 Cl Seattle,WA JOB Project Number .�\ ,,.� co DATE 08/17/2018 co tiN 1 PLUMBING UNDERFLOOR PLAN - LEVEL 1 SEGMENT A ..1))) �'J w S �� 1/4" - 1' 0" 00 PLAN P02 -OOA NORTH CORGAN I i I I 0 ISSUES ' 1 08/17/2018 ISSUE FOR PERMIT& BIDDING 1 r- I —I (E)4" STS TO REMAIN o 0 (E)4" STS TO REMAIN CA)I I I I d \ s I I A REVISIONS UP TO WALL CLEAN OUT UP TO FS-1 4"--,,,..,,>,/ I 1 1-112" VUP - 2" SAN UP UP TO WALL CLEAN OUT 2" SAN UP 4" SAN UP --\ 4" SAN UP Ai 4" SAN UP 2" SAN UP -�-a r.=i) II UP TO WALL CLEAN OUT /--. I _� ! 2" I (00 PROFFS 2" SAN UP I _ I s „� 4„ _ GINEi 2" VUP to <(/ Fop �� 4 c . 90'44' r- 4" — — )r/i_i/ 1.4\ ' I I I I N _1/ I I ���, o �oN UP TO WALL CLEAN OUT 1\ 2 V UP 4" - s t,�p,Rs :ci\.\:41 - r � � � � 1 I I �� / 0 08/17/2018 7- 2" SAN UP T I PACKAGE /\\ 4SANUP I I 2" SAN UP i \ 2" SAN UP la 2" SAN UP I \-2" I I I W -- - 3----_ _ - - - - - - -_---I -F - - - ❑ - - 1-1 - - - - —I--H - - - - - I I - - - - - B 0 rt UP TO WALL CLEAN OUT 1..0 I I I l I (1)k V 1 4" Z o 0 I I � � I I m J " " (I) Umil wN O � 4 0 Q N. U _ r LLI zz I ' , I I m0 z 2" SAN UP r-� se fc r RCK w 0 (n UP TO WALL CLEAN OUT 2" SAN UP - z < < cc (n 4" SAN UP I ` -4 I I _ 0 LL-1 D0 " g w-' a. / Et 0 (1-- I� I I o "- < Z 4" SAN UP - U 2" VUP / 0 < " I I 4 SAN UP 2" VUP (ID H I • / I i 2" SAN UP m z 2" SAN UP I i w M w Co KEYPLAN J I I I I w wC g z-4 4 SAN UP B A z D 0cc 0 /-I I I I cc UP TO WALL CLEAN OUT - UP TO WALL CLEAN OUT w D _\ r 2" r"z \ >1 1 1 e \-., i N0 z .7PLUMBING d �� 2" SAN UP -r I �� 2" SANUP --� I I UNDERGROUND On „ -- -- ._...--- - ------ -- -- -- - 9 PLAN - LEVEL 1 i I. ___I__ 0 N a - SEGMENT B 1 I I I (E)4" STS TO REMAIN (E)4" STS TO REMAIN �� a ' 1k ) 999 USA Buildings Inc. 999 3rd Avenue,Suite 3200 lf3 Seattle,WA 98104 JOB Project Number N 04 0 0 0 `� (wOp�m2-9900 DATE 0811712018 00 o SHEET PLUMBING UNDERFLOOR PLAN - LEVEL 1 SEGMENT B '11 ))11 ti 114" = 1'-0" PLAN p02 . 00B NORTH CORGAN 0 ISSUES 1 08/17/2018 ISSUE FOR PERMIT& BIDDING • I I I I I I I I I I I I I I I I I 0 REVISIONS I I I I I I I I I I I I I I I I I I I I I I I I E I I I I I I I I I I I I I I I I I I I P ICD IIU 90.,,4. 1 y LH] I I /. I I I I i I I i _ •— I ,— _ VAULT ADDITION — — ,. �i —I - UNDER SEPARATE+ — I- 'S MkO\ PERMIT_ I I I I 1 k I < 41 11 — _ ii - ,I. 11 > 11 _ li _ I�- - � 08/17/2018 J I I I I I I I Iik, �� ��I I /1 I ,_ 1 Ti PACKAGE CP VAULT 1400 I I I I I I 1 1 I I I n q n Q110 LI I I I I I I I I I I ,------ --------- ------------1 OW CK liri,-le—r" • -,--.-.-1 t t ._ _. 11 r i r ,, •. - I IIIIIIMI Ill ST,- VESTIBULE (/) H >- f I I . .. ..•.•.._ 1-1 �aoa- r a �— f 4 A r / / / / / / / / / / / / / % n , , k J UBLI 2ET I - rrJ V / / / / / / / I I r - - r pI (�� u C� ii= �L - ] /STAIR I r _ LJ n j ,I % I TLET ITLINAC CONTROL Z d ❑ 0 LI 1p02 /`_ ,u� C ] C J 3- MIMI ,-„ LI 1003 I .1011,__I _ STCi?/'.CE 1104 - m (h 1 �' '1 --- -� LOBBY 2-STORY zf--f I� f _� 1102 111 I ? J. CE,L 1._I__I w cel O ti 1111 I MP Q • 0 1 �_ _ OPEN ATRIUM . _ I 1VP�CH 11 s r LAB I ' a.._.-a 1001 '"_ _ ;i �- !� TORAGE (1 110. II �� ' Li 0 V STAFF �- I , _ I i ) :;' . Z STAFF LOUNGE 1 ONFERENCE -__ . 1 J. _.ter.; :.1 110- I I ��%//%/�%%%////////%�%�////%///////%%moi. - I- 0 Z I 1304 1025 1 r �� i� PHLEBO gra_ R� - 1 I --- , ,,F o) W y q 1024 I _ I0 CK [ .J ' - I - =Y Jr_i 1302 F _ - WAITING ROOM I 1 CORR IDO ' f�-E . J+r,�- -�=__ . �+ , y-+ ��] Vii- u ii .� 1004 I --- --- .-=_-_-_-_-_=_-_-_----043-:_-_0-73=---- -� -- --- 1107 O r^ T y — i_�►1 s Wh'` ; - - Ir S�4Fr..I IT�- - - - I 1 w V J - -_ ,- _ !I = 1 LAB STOR. �y.TAF I I„1 E ,,I' OIL' WI ".I= _ _, I II / III _ _ r i I 2 g '" _ «I - / I H I__ . I I STD 1 _ I t I Q T 1 r 1305 10- 1 -1 DESSI - 1 0 II , I __ :I°,. ii 111 I-C� - 1108 I 1- {..L LI — LirL.1 ' 1 !fi! 1 i I c� r — — — RRIDOR T 1� N T e _ — li 1203 I CORRIDORII DRES G LSC 13RSH _ --- -1112 I� 11 11110 u -,PI�YSlCS STORA�;� CK (1111) N 1 [17 __ .._.jr'-r--___---/fi----__I I i _ --;!� ' J 1106 r - 0 `= r 1118 1115 _ ___ 1 1 • ' , I I I I MAIN RECEPTION i �""' j CK ROOM I U I I I •i■ I _ � I �� � 1007 ■■ ■■ rr ■■ ^ _� 1109 S_5 < Z I- _'- •�--�., I I ; *I' �1 I _- I I k PHLEBO _ I - i - • ice;;'-- •- Iii ;.i __,� ■, , ■ ADA L - .� . �u , SUB-WA T i , - r CLEAN LINEN DRESSING GOWN4D �I _� _ _I •• •- . 1,; . REAST EXAM BREAST 1300 1 , ■ Y l r. ' EAST EXAM REAST Ir M ' _ _1_ �_- - ■ d NAVIGATOR 3 ELEV. EMR ELETRICAL 1117 STAIR 1 i ROOM 01 S REAS TT , I I` 1116 SUB-WhIT (IR/SEF CD < - ROOM 03 ROOM d — o OFFICE , , , 110271 STAIR • 1 120• 12 I 1204 1200 p1023 1 i 1 r i 11005 1006 1008 ■ II 1111 1 1026 ,- • 1028 im 0 — rte. ' r- __ 1 j 1 ■ flHOLDlNG CTSTOR. � E _- (B) ; ••• 0 ' - LI'- --4- „ II ,L-__1-__t-2,-_-_=-1 si 111v I 1 I • CORRID -I(G9) 1 IT ROOM RECEIVING II 124 I VITALS 1022 1]21 MAILROOM --��n r 1 i_ " -- - -- -�_—. - - - -- ; I -1• '11 �� piP . _ _ _ I - IIk '1„ ,,:A �w� -_- 11 1 �_.- t _ --- y `_ _ sr•r' �..� ,.4_ - 12,33 , 1009 (1130•10 11 - - _ _- • IIo ,7 I — . L { H , J'W9I■ I1 T/ — r � — 11— 1 / II / /I / ' } ��— — — :: P I .�..1 • ' k , K 111' PATIE I—IJI I � IF! J L J- I 11 PH�ICIAN i �, µ .r 4_ LINEN LI i - W- iTi J LINEN /% / / /% — -- ; �. I PHY4C IST IL -- -- -- 1s ■ .4.t J I I �7iI 1 �� /� % - OF.III E 01 L'�'� BREAST CONSUI,Ll9n - �J - - I � u BREAST Mr1'_'-, �� SCHED SUB WAIT � r��� _/I CT CONTROL rw ';'�` � .� flsI 1208 I N 1227 11 31 01 I =' I : ; 1 { L _ r a e 112I A T 1232 STATION - •, 1020 II: I i n. 1 1�.`BRE S J a_ 1 r , i 1124 / / / 1 2� ,= i1 .Th 1 1127� a KEYPLAN 1 -t g YNOC I PROCEDURE 1 f� _ 1234 �: '- 7_ / /� I ARED EQUIP. I - 111 - . liz F�pCEDURE _ ROOM 01 ---=L I I 1< ':.•` N a / 1 1 14 MA STP TIO I a ( I i ROOM 01STOR. 1230 ee1� r __�:• .,_ _ e,i,: .e.. _-- _____======= - --_-- _ -- - _ _--_! ---_=____ ______ - _ __ •_ _-- i•. _- 1 -_--- _ ____ _ -'' �qY 4 . � I 1 I I _ I� L} I �+ } 1229 � w• C � 0 RIDOR (GO) 1225 " GYNOC _ 1220 ' ' / / / / /i/ / I I ' till e,- 1228 1 �1)NLE �t+�YNOC CONSUL STATIC: I :; P 1 1 l BIO I - ' _ - - �, �AF f ) 7 1 1 f1 1 �_ PH $ICIAN I. 01 12211 I I 7 �;. -_ 1 1226 il - - .- .- .- .- f ' - I I ,r I� I1 ' L� TfDt�ET� — — 1 I ft ' I1 0CE 02 RC1 1" 1223 - I =1; _ _ :' '',.'-''..6_,I..-.1:-'; i ` e \ - ' 1209 � k _ :t. .t a1 u, I 1_ - ' T �� I D I TR`' I I1 i `] os M B A �� w. / / ' ITA-LAS I ' �`- ;':..,,i:.=;::; RAD ONC i § " i_ -iii / /�� 1 1 I *�: '';' �.• FIN CNSL, SWI1 I �' - Lt J �� _ ,J I i I OFF/ E x 1 y �� -I/ K/ u--- / / / / / /� 1 0 1222 1 :1 1 Lam_:' 1 h _ 1 I I �• SUS-WAIT I 2113 W I 11�1 I I 1016 � CORRIDOR 1012 1139 I I I VITAS � - ' PH ICIAN C RRIDOR (GO) I 1011 I 11x3rit:1I ! i W i I _E SCHED --- ;14 --- --- - - --- --- , I! ':4- F-4 — - - - - 1219 - _- - ---- _ --_ k 1018 I �- - - - - - - -- - Z to Fs a , L'''''f�, „f ] , a I 1 :1111111` I�MN ...,._....._.. I a m„,„1 L F 9' / ../L- ? /,1 /L P / / , I J.' / / ,,L / / / / ji\A/# 1- D. v I I I I „ d C C d � d I _ Z / GYNOC EXAM a GYNOC E VI GYNOC EXAM GYNOC EXAM ! GYNOC / / r SUPERVIS •R PA OFFICE EAD & NECK EE --EXAM ROOM M ROOM —EEXAM ROOM ij RAD ONC RAD 1)NC SWING FICE 1 Fa PHYSICIAN TRIAGE APP OFFICE /� / / NEW SCHED. L _ _1 VESTIBULE CONSULT 0 - - - PLUMBING PLAN ROOM 01 u 0� ROOM 1 ROOM 03 l ROOM 04 �. SUB-WAIT QFIEICE 101 ROOM q , r 03 1 ;, it I 02 , r 01 q QF CE 01 OFF- 2 SM NF- OFF 12'12 1:13 / 1214 / / 10'(1—I 1317 c _ 1-(33 ,► 1 I -r- 1215 I 1 1216 1217 1218 �1 d15 I 1137 1136 - 1 1135 s 1134 1-133 111-2-11131 D 1 r 1 -- i-. 1 I tl T �T/�%/ / / �:� -__- -' : if - -- -- �:-� _,, - .; i / /c / / /c / / /rrAl R 1014 E -- — ' -- —_— —' ll -- -- -- -� ._L � I —1- LEVEL 1 / / /rte / / / / -� r / / / / / // / / 1 i® I D - I a I 1., 1 1 1 I '_\-H '�I' I 0- WSP USA Buildings inc. XXL ) � 41110 0 0 � �0 a C7) � 1 O Seattle,WA 981046C-9) 999 3 venue, uite 3200 NJOB Project Number (206)342-9900 0 wsP.�om DATE 08/17/2018 03 Z- SHEET N O PLUMBING PLAN - LEVEL 1 '14)1' I� 1/8" = 11-011 M� W PLAN p02 . 01 NORTH CORGAN 0 ISSUES I I I I 1 08/17/2018 ISSUE FOR PERMIT&BIDDING -11 11 ''Ye-:- : ''; -:- ---ill I-11 �� .i ' I a-.r _1 - • . • ._ " < a r d a 4 r d Y I 7 ,___ .• 11 L _T _ I L ___._ .-'d-° e _ " N 4; "i • •' . _ . •a a_ • •4 , -r- e a _ dr" - °" .�-e s��r I� " I VESTIBULE -_. M i i — 1 �laoa — J — — — — 1c ;� NI �; — 1c �i I�w ti I I! - - - [ s u A J �2" SANUP � � r - -2"� - � II I 2" SAN UP I __ �— 2" SANUP �_ I U i I - - - I 1� I _ _ _ _ _ 2 v UP - A REVISIONS " _t 1 4 1 II II 'll 1 L J PUBLIC IPET I 1� 'N �I TOILET7 OILS f ,� " 2" SAN UP LINAC CONTROL II I II 1003 _ " .WC-1 1101 II 1 CW TO RPBP-3 FOR 112 2 I • ,r______) WCO II WC-1 ,-'" 12" j L-11 CONNECTION TO LINACC 1104 L-1, 11I II 2" - �� 2 III I AUTOMATIC COOLANT STORAGE I I , li ---- b- -- — '- -- - SWITCHOVER PANEL. SEE 1102 I I � � lr ,- _ 1 I�( I 0C _ � 0C _ � _ t SHEET M5.02. �' MS-1 I ELECTRIC/NL LOBBY 2-STORY 112' 1-4-7--__ I "' _ _ - = I RECH _ 1105 ¢ e//. ISI- -4l )u- - OPEN ATRIUM • L--- `1'- _ = PAT. LI 2" SAN 1103• I ����I 1001 I . . L . • t • , "1112" STORAGE I ..1...._, IR I //_ jz,////////////////////////zzil/z////z/ ¢ _ 112 I l; 1100 } WCO ����� I 11 I 2" SAN DN ¢ I I. 1-1112" ( L_ - � I 1 w\_ �, I I 3/4" 1 • I 314" 314" 1 112"- 1 I ' 314" I [ WAITING ROOM 1004 - 1 - --- --- ---I --- --- --- --- --- --- --- -- __ ` DSI --- --- --- -- CORRIDOROIDOR [ r - -, rr Ti____________ - - - - - D4 D4 r - - I - UPTO 112" 1 I I � I *" I I i 1 I Iff3f4 1112" $$^1-\I 2" 2" SAN DN " 1 J -I t 111 I 1 I `QED PROFFS J L• ^1 I I DR STD SSI I Y 1 1I2"12 J' 11 I I DIRTY LINEN i --- �`�� �G 1 N`-„ `rip I ct 90 '4" , UPTO I UPTO � - 112" - - - 1108 1 _ 11 a : 1114 S=1 - S_1 - I Mr - - I - - C 70 I I C - 7O C _ 0 ` L-1 —alip.Ltar . r - - 0 1 i i _ %�1 O'/ON . I - - I I L =. -� - - - - I I I -- • 417/ - 1 .. I I l I a - - M•I r PATIENT I �-� �STA F_ SH-1 1 112" I I • 'ii: • \v UPTO I I 1 112" f WCO-1 �' I TOILET I I TOILETISHOVI` R I O I I- - L - - J kS' J . ,,RSA WC-1 I STD LOCKERS 1 112" / I I2 1112 I IL—� -2" 11�I • /•.' 3_ LcJ PHYSICS STORAGE CORRIDOR DRESSING 1113 h - - - V DN 1 �L`� IIr - _ , [ 1106 I 2.. V UPI 1 I 1115 I Ir - C-1 —_- ` —I�_ `_ �_ 1 1 • A1"+I I ; - - I S fi _ I r 08/17/2018 1 MAIN RECEPTION - 4" SAN DN 1 I , ,- -- 1— WC-1 I BLOCK ROOM L - - J 1007 - "11 II II II II II Il III 11 E I I I 1109 ,- -, limo ■■■ ■■ ■■■ ■■ ■■ ■■ ■■ Pm ■■ ■■ ■■ ■ ■■ ■■ an ■a ■■ ■■ ■■ 1■ ■■ /_ ,• 1/7 112" I i I I TI PACKAGE - (E) 2" SANITARY I _1! 2"-->\ ADA 2112"� - 1 1/2" CW DN :I Wri-- - —11■. SERVING (E) MOP • w - I =UPTO S-1 1 SINK ABOVE. • - CLEAN LINEN ARES 61NG = llw+ • •• ' 1" 1117 GOWNS 1 �� R� R# �� �� �� fit it !� ELEV. I EMR ELETRICAL I SUB-WAt STAIR - 1005 I - 1006 - - 1008 1- 1111 I I 1028 - ■ ■ 11 ■ m II _� _ - _ _ _ _ - - CONNECT TO 1 Lill 1 ■ I i (E) 3" V UP •• ' ' II I I I STRETCHER 11" — 1 CK - I �, 1 u 1 m CT STOR. 0• - - - ■ ■ - - - - - = I L .------ ----41-213-- HnIDING _ ---.j- - 1119 - - - i . � im . . i �� � - - - - - - - - - M . lin ■E■ ■■■ ■N■ •• i �I 1■f I ■1: _ �` I — — m li I t ■■ ■■ ■■ ■1 ■■ ■■ • W I- — � L J -�-� �: � r 17 � I I I II " • I 1 • / 2 SAN UP 1 �/ P05-01 1 r 1112" I (—t .H - - - -� 3 �_. 1 2112" I ':----) cf) HQ 'r- CP 1 1, 0 1 FS-1 I 1 I - - - - - �- - -- - (E} HOSE BIBBZ 0 05-0 1 2" VDN 1 112" HW I - (TOREMAIN J MAILROOM t It UP _-_ ,__ousELLEI__ __- __- ___ ___ ___ _ __ 1 t I m c� --�- _ „ 1121 - N T.. I " , ".. Lii W N O 1 1ao9 L_ r 112" it l 314" HWR I 1" I r I 1.. 1__> 2 SAN UP , ¢ 1---EN I I� i� L-1 1-112" SAN UP - - - , --.-- - -- - - -- = I Z U I I 1 T 2 1 A _ _ — UP Lil "' ---- -- - 1 _ _�T��-- -- ��- -_ i " " 1 vivo I �L L - r, - -L - �, - Ji Il ' I rrr- - �,J 1 I I- O Z �, �� Il 2" CW UP / " I I 2 SAN UP 2 SAN UP ,I �. _ u I I, 11 1 II11 I0OV/ O2 SANUP I �c1 1_ 2 c I 2 1 11 ' 1 ' . �, - -�' J .�� r ` I 111 1 314 P.O.C. w 0 �. .� �. .- ... ... - �, HO KEEPING I PAT1�4 T IL 11 7 -1- = I S_1 ' �. . . _ . . l `� - �' 1 (/) I „° °_ 1-112" VDN J 1 10MS-1 I �� I _ � 2" SANDN 1 ,r- - 1 i � \ \ 1 I , � � O _ 2 SAN DN� _ I 1 _114 1 1 1 r \ ,--,=__ - • I WCO , I2o (n[I - T I i 1 TTY 1 I I Fl L - - - - 1J rt I 1 / .�/ \ I1 / PHYSCIT = � 1 1 1 I 1 1 �► 1 1 1 1 ' I `� I I " 111 77-7 ,/� \ 1;'1 � I 1 1129D I- Q �- -1, i r I I Z I C �1I t 1112 / " „ I I j I o 2 I CT CONTROL Zjiz -A•eyff '''"G: r 1 '/- .� //� 1 112 `_ U'-� 314 314" - �Iit - - w O - 1 112 SAN DN " I I I � N: 2 SAN DN I 1 �I rip _ -1 1124 �) 1125 1 rl , �, I I 1127 I I I " I � " I _ ,' 1 1 F I I II M cc 1-112" SAN UP � 4" SAN DN 2"— I I - 1 1/7 - 112 I I ll U 2 V UP 1 I " / ; i , N 10 OO I I C " " 2" i " 4" SAN UP i i 4 SAN DN 1 � I l i i Ii 11 2" VDN I 4" SAN UP _. _ 11,,,t 0 4 SAN DNC 2 V UP �j - 1 MA STAT 7N / , I I 1 i' 1 r 1 ir'IT � 1 1 Il; r - �. . .s_i___.„—_,._—7_7—1-1 --1=-7— II L _ _i 1-21_ m < Z U I { , 1 I 11 ________________ _ • 1 _ _ _ _ _ _ _ _ _ . ._ I 1 I IT -i I o ,\ `\ — — — - I II II I 11 C — L J I I I I I L "� "� L " " o L1 >J I \ \ 1 11 I1 i 2112 1 1I2 [1" 1 1 I r _� _ 10 Q 1 1 1 il 2112" 1 112" 314" 112" ¢ I -� * - i � - - I0 < WC-1 I� ____ I 1 �; u ! �� I ' _ V - j , _ �i � ' JI I 1 4 SAN DNr _I_1 0 Hith--p (( }} , I STAFF 1 I I 314" d , L L L-1 I ; 1-112" SAN I I TOILET I m I 4I\.. I I ' - WC-1 I I I \- - - / --I �� _ 1 I [ 2 li LJ if 1 f I ICTTOILET J r - 7 = u i - - i -'- - -I I j T -4-9)- • I I 1-1/2" SAN UP r 1 1-112" SAN UP r1 OC _ 7 I �L126 I 2" SANDN 1 _ _ _ I I � � �I I L - J L I I J I . .. ..1 = - I I - }- t I DOSIMETRY - FIN CNSL SWING RAD ONC 314"' I - T I • I OFFICE I I 1130 1016 1012 SUB-WAIT I 1 I 112" I WCO 0T CORRIDOR 1139 i i 2" SAN UP VITAS 1" 112" 2" SAN UP 2" SAN UP 1/2"-----1i " �- KEYPLAN X112 1011 I 112 I L7 -- — —1 - - - - Ill- I D� - - - - - - - - - - - - _�_J [ C Z ! • o • f,, C:=1:: _ E - 0 F/Ar/ W cw —I [:._.= I I 1-•••-314" v L " �- - 314 • r-J 0 j 2"� I I / //i J E ISANDN �' I � , Z I PA OFFICE Lu _ r2" E I - n- JVESTIBULE ,e :VISOR 1013 m CONSULT ,� HEAD & NECK 0 EXAM ROOM � ,* EXAM ROOM �� EXAM ROOM El ONC RAD w•,• - SWING I�PICE 1 a. ' 1. E 0 C _ 1138ROOM 03 02 01 E 01 OFF 02 SM iI1F. _ �, i. 1. — 1, C _ _ � Z 1017 C 1015 I WCO-1 ��• I I1 1137 11361 112" 1 112„ I 1135 • -----, WCO 1134 1133 1131 1131 FO L --" - _ I _ �_ I PLUMBING PLAN — e D - RESPITE I _� i ------ _ li 1014 1 : - -- - -- - SL I _____ ___j_ = �� �� __ __-— � ] =- -- -- -- -- -- - - LEVEL 1 SEGMENT 51 I �� S-1 _ S-1 1/2" pm S=1 _FEE I , 1 I' - �' I R 111 1 1 I: -II I L_.-: 1l , j_1/2"-7-. - i �- c.l - — -- - — ¢i " " I 411 c) I 112 314 - a 2" SAN FROM SINK 2" SAN FROM SINK 2J \ " SAN FROM SINK ABOVE, OFFSET ABOVE, OFFSET 8 ABOVE, OFFSET I9� 10 a NN VVSP USA Buildings n3 l— N I ) 999 3rd Avenue, r � - Seattle,WA 98104uRe 3200 (206)342-9900 JOB Project Number Nwsp.com co DATE 08/17/2018 SHEET z N PLUMBING PLAN - LEVEL 1 SEGMENT A ' -1)))' 1~ 114" = 11-0" PLAN Po 2 _ 01A NORTH CORGAN 0 ISSUES I I I I 1 1 08/17/2018 ISSUE FOR PERMIT& BIDDING (E) HOSE BIBB ! I I I 3I f �� TO REMAIN , 1 I ! ilErip 1I 21r I I l u 1 VESTIBULE — �A Ni — Ir C >� If I[ lI [ ]; I rL r. 11 I �f ]f 1 i: if 1 1f 1: i ]� I — — — — — E �' — 1©00— 1 ir I H I I P.O.C. I 1 , fri,G/5 _ �` �H� I - H • I REVISIONS 1 1 i i I 0 O j • I L t o I • STAIR L J I 11 I \ 1 1 r - i r - i 2" SAN UP Cn • 314" - 1002 \ _ o % L _ J L - J - LJ 1 WCO 1 1 • 1 t- -1 314" RPBP-2. COORDINATE 13-) MOUNTING HEIGHT WITH PURE 0 FS-1 M _ 1 LOBBY 2 STORY 0 WATER SYSTEM EQUIPMENT. 5-02 ' REFER TO { - - OPEN ATRIUM I+ ROUTE DRAIN TO FLOOR SINK. - LAB I 1001 in 1112"- ' ' 314' CW DN 1304 4" SAN DN 2 SAN DN= STAFF LOUNGE n STAFF , I „ 1025 II CONFERENCE I I TERMINATE WITH - �1 � — - 1 I I 1024 L J BALL VALVE. 1 ' ' ' ` S-3 WCO 111 in p 1 PHLEBO - 1 302 se - - - o f - � I - , WB-2 1 o -WB-2 -\1 0 E 'WB-2 I _ _ - r 1 I 1 ej i • 7 - 1--17 - "-1 - -7 L _ J 77 - -T E, =r-T I i„_ir 4 _, I LJ LJ Lu _ • • S O R I ---�-- -- -- -- 1x r -- 71, l - -- • ' III I i „A r — — — — 1 S-2 p -------------- - AN UP � v , -- 1 L-1 I - 1301 - - - LII - - - C1 IIL=1 LOET � li L 101)j 11 2VDND mi --� -- 1X112" s LAB STGIt. STAT F TOIL W1L1-202f - 1 r2„ SANUP 1 1 i2"� J1 >< I_ �� <<, � 1 1 1 I I I - - . ft 90.44- HZ .� 112" 1/2"- %i I i \� i " ��"�, o-/ON ` . --�— — — — ____________D.4_ I 112 CW UP ` -- -- --- -- I - -- -- ---�1 - oRRIDOR 1 112" SAN UP ��, . s�\�REFER TO 112" --- ----- -__ ----- --_- --- ' - --- --- ___ - -_ � sjMAR(---i) 05-02 __ __ - 4" SAN UP II1 -- 314" 1 2„ 1203 112" HW UP + --- --- 1 1 1" CW UP �, / 2" VUP ! I 1" 1 114" 112 HWR UP • I WCO • , 1, 1 I 1112" I 314"I 1 08/17/2018 III41') 1 I 2, I 4„ SAN IMIMf� 171 • 1 • 1I I - • - - - - -1 - - - - -�r1- - -� I S-44 DN �� S_..._1 11 . —i - 2" VUP11 f 1 , _ _ T I PACKAGE I II I I I I ME I BE I LiL2„ i ; ®� I - 4" SANUP n AN P T t--`” t - I S U L 1 1 RR SUBWAIT _ - _ _ J 1 1 LJ_ J :IRR If = 1 � 1l• I<>�>t = 1 V=I= II• = 1 = 1 TI lip I Fl Io 1300 iPROVIDE / 2" SAN DN 3/4" HWR UP I "a �•�1 `' ,I ' I I x 1I BREAST EXAM BREAST v • I UNDERSINK 1" HW UP J BREAST EXAM BREAST E cAJjI I ROOM 01 ; SUB-WAIT NAVIGATOR • E. • ROOM 03 ROOM 02 I 1204 ] 1200 RISER CLEANOUT 1 1/2" SAN UP STAIR 1206 1205 I � OFFICE 1027 1023 1 1/2" CW UP 1026 I 1CE ' j I -� i . I t 1 It___TL IIII II II 11 II II II IB , ■a ■■ ■a ■■ II ■a ■■ m Iia ma mm • us m II II MI II II II NI �I ] 0 V • 1 I 314"1 I WCO -. 1 " 1 _ 1 Ill 1 1/2" SAN UP rr)1 114 - (E) HOSE BIBB CAn 1..1 ›- CORRIDO G0) 2" �� TO REMAIN 1 4" 1207 ] .O IT ROOM RECEIVING LJL - imil SAN Z o 0 Itrommornmiiirmir S=1 I 2° V UP 1 I VITALS I 1022 '1021 m E J - I C,) Ill lL! N (2 I Li 1 ...._, { . . ., . .�. „� . . .- , . 112 . . t I t1233o A(! L I I 1 WCO I- - " T - " T - �' -I T- - `° Tr- u I IJ. IH i f I I 1 J Lll \-16P.O.C. 1 . . . . , I C -'1 -1rt � � 4 wo __ = 1 r � I 112" 1 ° n n n � I I - � HU PMrr Y IAN - - - - - :I-- --- --- -- --- 121 --- --- " IENT 1- n o - VJ LINEN _ �- 4" �= E — - I I 2 �, VJ E 01BREAST CONSULT .- 1208 2" SAN UP T 1227 ro I S=1 SAN DN III 1231 1 I U SCHED SUB WAIT Pfi I I I I ! _ I 01 1 BREAST MA n 1020 1-1/2" SAN DN0W O - I WC-1I- \ 1 �4" �N III r J 1232 -� 1 I STATION 1 1 C (A 2" SAN UP U L - I-1-- ., .rt, 17 - - 7 oU 1-1/2" SAN UP - C " BREAST ' 1 Tii ~'� I I I ! 0 N 1 2 112 �-: PROCEDURE ,I t I - I ¢ I I a I __ __ __ ___ _-_ ___ ___ ___- GYNOC SHARED EQUIP. ROOM 01 , ,1_LI, � - --- --- --- --- --- --- --- --- --- • 1 PROCEDURE 1230 rE r i - - -- -- -- -- -- -- __-- -- -- -- -- -- v, - 1 ROOM 01 I - < Z 0 STOR• r I11'11. I� LJL JLJ I I -- — � �— — ----------- ' — — — — — — — -- 1225 1229 I + 1 1 113,64"4----- 22 " CORRIDOR (GO) 1 112 I 2" VUP illiI n 2112 0 ( I< -- 1228 SAN UP 11 1,LEENTT GYNOC MVI u _ _ -BIO 4" SAN UP o I I _ o STATION I o I 11224- - I GYNOC CONSULT _ 1221 I I I— ni I 1223 ; �I S-1 U - -J= 01 C .pICIAN „ If_ - -ICCE 02 314 - I n L ' r te- ° 1223 In� 11 I I 17 1209 -- -- �-ti3 T T- — I C0-1 LJ i -f T r L-1 - r 1 i I 0 \ - �\- - i JFK � - _ J I I 1 1 fri,'>' ' frr,4/>c �7 \\_ 2” SAN UP i , \ I- • � - � . . J I 1 11 — - LI - L _ SS=1 I I " 1_._1. I 1 1/2" I " I I I�1 114" I I — 2 1/2" KEYPLAN n C 112 CORRIDOR (GO) 1 1 2" 1 2112" I I" I /-3/4" m PI :ICIAN 2112" 1213 11 �_�- __- _ _ '[�_ _-- _-- —__� I 4" SAN UP SCHED O CE - - - - - - - - - - - - - — — — — - - - - - - - - - 1018 C Z 12101)\-S1— u LU -*ilk--Al-- - r- , J %i/////////////////%l///////////////////%//////////////////////////////////// �` �� l t I r '� X,f�/I�IMIYl�9�J7HGfK' i 2,X s;O•fffJJJJJJff f' it./r/// 1I 61,110// �fHAY i ,/i"��/. T r� C7 P.O.C. I I I �/ LU °� � � 1 1112" SAN UP 2" VUP c � � i'—' c1) �� - o - � o C _ Do 1114" I " - o _ - f_ - Do B A 314" _ \ 4 SAN DN \ /\ EXISTING 2 EXISTING I I I� 1 1/4 CW UP I _1 CW SERVICE KPRV STATION I ! C C IC 3/4" HW UP I I r - - - 7 ' -I I I El " z \ I " 2 SAN UP 1 -= 1 1C GYNOC EXAM 1114 1 L _ _ _ � TRIAGE APP OFFICE u ROOM 01 WCO-1�. GYNOC EXAM GYNOC EXAM GYNOC EXAM �[ •I WCO-1 GYNOC NEW SCHED. VESTIBULE a• PI4'-JCIAN 1212 I 1213 0 1214 ROOM 02 I I 1 1 114" ROOM 03 ROOM 04 SUB WAIT 1019 I 1017 O Orr�IaE 04 r � 1- 1215 I - 1216 I is 1217 r— ,f 1218 ZP El --19--)1I- g 1.-_ 10 I I 0 112"� -- I f,ro -- -- `S�1 I �. �o — -- S`1 I _ a ,� l, [ 2 INSTALL RPBP-1 ON EXISTING DOMESTIC - I ) � _ • R+ _ 1— =: ' _ _ - _ ` " P 0 C I ' PLUMBING PLAN S 1 - - I'� -'��p,r, - 2 SAN DN - - �Po�-01 WATER SERVICE TO BUILDING. 's o � � � CC = o � - � I} -1 „� 1 - " OE = D OE = OL = 1 1 LEVEL 1 SEGMENT a COORDINATE LOCATION WICIVILCCI .' �- - � �' I +� 112"� S=1 I `+� 112 I , 2 SAN UP N �� 1. �� �I _..... . .. IF li �F �I —_..1� I� �I i li I '---._.... ...:,,I1 Ii 3/4"—II ;I �� . ...- I - —;: — 1_;; 1! 1 171 1: I 1s i1 'I I — I — — —i (c oma. A- 1-- ____I_ (E) HOSE BIBB I I I I TO REMAIN 2 a NN ) WSP USA Buildings Inc. 999 3rd Avenue,Suite 3200 Seattle,WA 98104 JOB Project Number i\I ( (206)342-9900 0 20 0 wsp.com DATE 08/17/2018 iz-N C PLUMBING PLAN - LEVEL 1 SEGMENT B SHEET 114 - I-0" PLAN p 02 . 00113 NORTH CORGAN 0 ISSUES 1 08/17/2018 ISSUE FOR PERMIT& BIDDING I I I D IIII dd III IIIIIII IIIIIII III - REV�( I�SPRQIOp,. NS I ______---)) ...------- i 1 ( I I 1111 1 � p d 1 11 1 1 r r 1 __---) _ ' ❑ II I1II I EIii IIII IIII/ d L i L J L J L J b �� si4 G1 N \-\- <(',,, ° ,,......., ., , 7 4 9D•A4/O•N r ._._,„,„_°....,...,_,,,„„_____..."--.1.-.1.11 sr=a sr=a sr a=sr a=sr=a sr a=sr=a sr a=sr a=sr a=ar=a sr=a sr=o or u=sr a=sr=o sr 1:1=3-1==13 SC 0=12 iC M=13-1=a=sr=a sr=a sa•a=sr a=sr=a sr a=sr a=ar a=sr=a sr a=sr a=Jo.,.--.-.....--.. 1.* O' rt/ . ./ 8 J . MP 1 • °• a A a f•- •._ a ^ a4 c!a •d a• s•_a d' •" ^ 1 . - - ` ' A - ,'Ba. . . a-. e _ .• 4.1 • • / . •+d ,d .q, - Q , • i• • ale _d-- . .. ! �aa A a'.a� -'�• + �p L a•": _ _� d/ 08/17/2018/ _ ; , � a • .. •. m . • TI PACKAGE a I I I I ElI Q•a. • •,. { r 7 I • a b !1 I4•'--•_ a — - - - - 1 I L — i I I // I °da 4.4 I I I ` 1 ' a L J ai a e ,d• _ d '21L — • d . h . Ia 1 _ _f1 is 4 �'. Ct d • d d 0 .. — _ VAULT ADDITION _ — _ — n 4 ' — – a. ; - ;¢ : a, — — _ — I `UNDER SEPARATE 7 _ 1 — — _ _ — I - = r r ; '.. � � � I PERMIT �, — I _ — — — •d r� , 4 �■ Ill I 1 I I I tia f I ---- — J I� II • •a. • r ` -1.1'. w •, "1 - : _ , , : • :• ' i ) l'. •.' .-'. ......: ‘: -.2 •" - . 4., ..-: :7 ill•I il II II. . . . . Can 9 HI I I " - Z ❑ 0 I I I : .d , d' ° --- \ \ I I _ — — _ ---._ I 1 I da° . .I CO(11) W CO a N I • x°••,.' �,•`�a•• a•- -a �,• 1 I _ �1 I •'aI ._Ja ,•f ° 4; •4 7 O \ \ / / W 0 / --__ . ,- •• • . . -. ° + a - I� i1 d' •:,. ••,:_'- P+j ed II I I' _,- _ _ ° flit —/ ____ _____ I L _ _ I I--� IllJ I I a <._ I - _4 d ¢ Q , On II11 _ _.. ._I y . • CIP VAULT . _9 , COCK 0 4 4 d` • .. . . 1400 ,.. . ° _ III 0 r d �I_•� t•••"'_' �+a a • 4•y• II < Z 0 d' d • I I 11— ° ° O O �,. _ i n _.._�_ an 110 < L 1 d a a 0 H I I I ' :: • I 1 — 71 1 a . I..d •. - - f , ° d a 1 _ 1 - r: .: ° d KEYPLAN U / ______ -hi ' - , Q 4 4' �_ �•• • °- • .: - _- •-•'4• G. • +^ _ 1. . e '• . �� ` �a4 a- -S.•a __ �. ��- T� �. �I } ❑ •'ate ♦•. - .F 9. - a -� ._ _ . . ° d _ - _ ''''/MC z [� I 4 Fr 0LLI / I � I l) VESTIBULE 1000— — — — I' I ]: / A w I I _I �� [: �� L �f - f t}.I�, I 1 2" SAN UP 2" I 2" SAN UPI Ls) J 2" SAN UP I—' I I mo" !_iV — –I 7 L _ _ _I L 02 V UP nn�r�r i ..NN STAY _ PUBLIC k I PET I d� 4 I� -4 1002 TOILET I OILS I CI_ 1 I 1 1003 WC-1 11011E 1 1" CW TO RPBP-3 FOR 1/2" <1=_1� 2" 2 SAN UP LINAC CONTROL ii )Z I I WCp2". J I I CONNECTION TO LINACCI 1104 WC1 0-17 m L1 1 �� 2" I I L 1 AUTOMATIC COOLANT STORAGE I I - - -� -- - --- SWITCHOVER PANEL. SEE 1102 I I _ _ PLUMBING PLAN • - _ - _ �� 1 SHEET M5A2. MS-1 I I o _ 0 _ ELECTRICAL ._ _ __ T__ ,,i. - _ _ _ 1 1105 LEVEL 1 SEGMENT d LOBBY 2 STORY I 1�2" I I 19ECH I{� ik U OPEN ATRIUM p 1001 — j I / 1 / - C L—__ I _ PAT. LI 2" SAN 1103 • �_ 1 �L ��I N �, . , — �, . . d -V `;1112" STORAGE DN •I _i � 1ao 112" 11 W L- 110o I 1 II. r+- WCO %���������������������� r� I 1 ' 1 1 �1 112" I 2" SAN DN I 1 2 L 3/4" - fl 1" ' I i WSP USA Buildings Inc, I 34, Si I ) 999 3rd Avenue,Suite 3200 N WAITING ROOM "` NN CORRIDOR Seattle,WA 98104 JOB Project Number 342- N 1004 1107 E1-0 \ �wsp corn mo0o DATE 08/17/2018 ti PLUMBING PLAN - LEVEL 1 SEGMENT C SHEET �'J 114 - 1 0 co 1 PLAN p02 .0. 0 -11c, NORTH CORGAN 0 ISSUES 1 08/17/2018 ISSUE FOR PERMIT& BIDDING • I I I I I I I • A REVISIONS I I I I I I I I i I I I I I I I I I I I I E I I I I I I I ! I I I • i I i r ,,,coo PROOF ss I I I I I I 5 kr ��� 1 N F � /�v ct 90. 4' r —\ / i ,a//ON <v I I I I I I I I I '� iv i w VAULT ADDITION UNDER SEPARATE I I I I I I I PERMIT 08/17/2018 • TI PACKAGE I I I I I I I I I I I I f Limi CKI I I I I 1211.1j r . 1 (i) I— < >- 0 _ _ ----,t- n - - Q u, Y Y rn _ t --A a Y t - r-- J — ___}(--A H Z bo 11 -1 _1 J1_411 11,-. --j4 - OL--. 'I OCA OCA (f) UJ I'IJwCq � O IV THERAPY IV THERAPY i N THERAPY IV THERAPY IV THERAPY SHOT ROOK ' I CONSULT I Itgl� I c �o AP OFFICE Q U 2205 2204 2203 2202 2201 22000 f 1 1 2100 b EXAM RO IMI-' 6 EXAM ROOMriiir EXAM ROOM Qui° 6 EXAM ROOM 6 EXAM ROOM OS PH FFIC 2107 2 Z 1 0 2101 n 2102 2103 Q 2104 0 2105 t- 2106 I I- 0 k I D P I? P P C0 W I s I P) — r I I p I I � W 0 Il 1I I I ICK � p a +1 I W ' II I I . VJ f `, I I I I OFFIIC�02S I ♦A I j I CORRIDOR I JD ONC INFUSION ' MED ROOMATTING CORRiDOF� I_ Q vJ 2207EWAITING ROOM , I I 2151 I 21 O 1k r I I 2001 I u_I0O — 'k. - 2000 I ! h , (A 0- uw.viuuviiii,ulivuiriiuirr........,............................ ' El- r — —I rA / / / / / / / / / / / r-:14. ■ J I I S�I ,r'r": —_—— qii J ■I � I�ii�4ii � —1- - I- ch I I I 3 f i h t ,I ��_ 0 / / / 0/ / L J i .... , Ii I ■ J '+.,',,1a _J 1 , L 1-1.-- _L L CNI TI- - - PPZTIEfif '1;! CORRIDOR KKKppp [ / r .—I� ■ - - :;:'-c P. � I�1` =T ii d PHYS SANS N -HD CL AN/ HD TOILET I;k _���• TEN IT I , � i EXAM i UM 06 1 EX4M ROOM 07 9 CORRIDOR EXAM ROOM 08 I RI 20 - - __ _ / ■ I I �� I 2149 I D OFF/ 03 Z / 1 R1 CM_ _�1Fani Rn nk J _f22' r�� _ 2208 pi, TOILET( ■ CORRIDOR r I 'p u I I 21� q I 2147 q 2146 2145 I � 2109 (.J �F rcis'1--- -�- • l - - -�� I L 2209 I ■ 2002 ' u �---- I I I • MIN NM IBM •• I I 14[:,a _.,i , l I iri I_ I , ■ 3H .I-I, IV THERAPY I_ •- -- -- T :f ' _' MASTAT1ON1 1 i ■ ■■ ■■ ■■ r I i '_ 0 < _' ■ i s I 1 ' �' �� n L T II 2210 ■ ; - o` -,y� 1 I i 2140 I 1 14. ■ - r 7 1 r1 I 7 i 17 . 0 I LJ \ ] Y I / I i , ■ __ STAIR B101C I Y / % L- I :" �! PHYS/ N5 -i ■ y 1T CLOSET4). ELEV. JC �TORAG _ ELEC 4 CONSULT k PROCEDURE 01 i STAIRS CORRIDOR ANTE \ i 2015 LIN 1 [I j3 �, I IOFF/ 04 2302 _ l ■ _ 22 ill % RESEARCH 2003 2004 - 2005 2006 1 I 2007 2008 ;,.'P / 2142 2143 i/ 2016 I I 2144 2110 ,� ; I / KITS I I , _ n k __ a r • — _ _ -- - — — I - u ��E — — — __ __ _ __ �I — — J. 'R + - — 2213 W � I� ,in 'IId r I ■� L // ��� I CB l I -VI I I I I I NURSE STATtbN d Coil I/DORI • \/ F- -1 "� I 12 FTE �o �o �o o I I PHYS NS rI ' o I ■ LLT I I II 2215 I n y - - CORRIDO OFFICE 05 iI n - I y J I _ I . 2139 I (• ` ��■ l L'I I �+ [: ,„<r'CORRIDOR I RESEARCH IIlLY=1., I I --�--- 2111 { PHARMACY MACY } r 2114 IV THERAPY WORKROOM �Q III MEI &I.'''. i� _ II _ ;,l • ,i� - -` _J n TIT- , 2211 2212 I 23Q3 CORRIDOR iI L'lt N L - PUS — I '� ;*� I - KEYPLAN 2220 IV STOR.I I 3, 7 r - I CONFERENCE 4 i;l�i' TOIL T EXAM ROOM 09 I E)IAM ROGM 11 m EXAM ROOM 11 STORAG k PHYS TANS . AN / k # .: a4.i I _/CONSULT _ _ I I 1 D I o H OFFIoe 06 '_ - - ILI _-� _ _ ___-_ j -- �e, 137 I 2136 21351 2134 2133 1 Nu__ o� oC I, 2218 I I iI aFi(3CIAL FIf� L �� T M w .. ___ 212 - -- ___ y _ 7': :L--■o■ II I q i q I k 2112 I- -1- TY - - - II o il = 2012 ,. '' - t _ �- H [ C J J 4 2013 MA STATIO I - T I a _ 11. , .., . —— �L o I ' / H 2126 ■ IL I ' i h I � 'I k , ��• ' --- _,' rat- _ _ "NT- ,� TTCII� I II • I k PVT INF ROOM _ ..[77.----===-7-7I I� n [ [ ,--� I I �”' .I I!' .i h I I o 1 h i I I -,. = T INF ROOM OILE � .. fL. o PATIENT - r1 12128 I a I EXAM ROOM 12 o XAI ROOM 13 a EXAM ROOM 14 SY1 F TOILED ,I PHYSICIANS p 2223 ! I I / EDUCATION I [•: :;---; i 1= J 0 fl N I I OFR*07 v ~ 2222 _ . 2221 2I_.' I ., A - - I , CV _,. L L_ — n3 �� / 2011 �i� P 1 2129 p I 2130 p I I 2131 �13 C.L=JIL21 iNi , , ._,•...._ . --ril::. I W.. n u n „:„.Z Z/, ,/,-/./.,-7/-1../...�./.J ,,. - Lam. 4q' f �y' IC''' - rh �' — 2t�i7 MI.'i / I j"r3 ..ef1.7Jli� J �., — —I I I 1 — I _, Z CORRIDOR ! 1 1 I I CORRIDOR I I PHYS h4NS ' ' 2226 230 II IL I 119 ., OFFiOt�08 Cl. '�' or- HI — 1/ i L_ I N h a 2114 jr F' d . r Ea 7 AJI s _ ._ . J1006 d I d d PLUMBING PLAN — 2 IV THERAPY FAMILY I �� PALLIATIVE CARE CONSULT/ TRIAGE 1/ CONSULT EXAM RO M EXAM ROOM 18 D EXAM ROOIA 17 0 _EXAM ROOM 16 o XAM ROOM 15 D PHYS OFFICE n IV THERAPY s IV THERAPY IV THERAPY I _ I OFFICEa EXAM ROOM I- 1 p 9 I p 0 p J 2228 2229 I 2232 I SCHEDULING [ 2124 _ / 2123 2122 I q 2121 q , r 2120 I q 2118 q 2117 q 116 LEVEL 2 CL • 2224 2225 2227 § I 2231 - i''' 2014 1 I �o AP OFFICE a-' 1—- I I I _ i, I I �j i74 _ 2115 1 ,' -- ;ail; -/ / / % / / 7 / / / / / / / / / Fr.Lrq !/ / /o / / 'r ':_,: _ — — _--�— ■ — o� � oc � . F-t - i i _ _,, k —4 f - –0 1.— -a a ,------ L. , , h,____ 1 i ,, , . ? 4 4—,—I —i—,. —1,_„.__44 k I I I I (6)I I I I i I I l ` a WSP USA 0 Cry Seattle,WA 98104 s (206}342 990D NN S I ) 999 3rd Avenue,Suite 3200 JOB Project Number CN `� 4 �0 gC-) 9 i. 0� w . DATE 08/17/2018 ZS 0 0 0 0 SHEET rn--)l) -...___, N. PLUMBING PLAN - LEVEL 2 1/8” = 1'-01" PLAN po2 _ 02 NORTH CORGAN 0 ISSUES I I I 1 08/17/2018 ISSUE FOR PERMIT& BIDDING I SPILL RAINLEADER TO THROUGH TILT PANEL ABV CEILING: CONTRACTOR SHALL LINACC VAULT ROOF. REVIEW PROPOSED PENETRATION W/STRUCTURAL r ; i[ " I (E) 3" STS UP TO (E) RD-1 OFFSET SINK WASTE ABOVE FLOOR/IN / / \ ENGINEER PRIOR TO STARTING WORK. \ \ I AND DOWN TO FIRST CASEWORK BASE AS NECESSARY TO , I / FLOOR. CLEAR STRUCTURE BELOW. TYP. 5 /1 [ CONNECT TO (E) 3" RL IN CEILING EXAM ROOM SINKS. I 1/2" HW& CW DN TO EA SINK 3 c�1 SPACE. ROUTE TO EXTERIOR. ! 111: 2 E :i ir rri- ,, 1 ,, 1 r :-I\, :' 1 I Ii[ r i II I. i t S-1 _- -- � �F -- -- -,rr'� ,_ -- -- �' -- -- _ -- -- n ,-� 0 REVISIONS IEW • OC _ � P L ', 11 S-1JL S-1 L- — — S-1 — - - 5-1 �_i�l` ! oC - � - ��4" - 112 - 112" I II1 I 2" VDN 1�l ii C _ Co CONSULT I 'i Ili ii i' �� ii 1� ti v AP OFFICE Ill m a a I I D I ., 2100 r EXAM ROOM 1 - L EXAM ROOM 02 I EXAM ROOM 03 EXAM ROOM 04 N EXAM ROOM 05 PHYS OFFICE 2107 di I L 2101 in 2102 2103 6-1 2104 �. I---314" 2105 2106 12" I - I I 1 1 i ri— r I_ 1 Li LI Cr U II (-1 -1 : 1 I I t I PHYSII1' S I OFR_-" 1 CORRIDOR �-2" MED ONC WAITING I 2151 r-3/4" 211= ROOM = - 2001 - I I 1" --7_ , • I i __I_--- — - -- - -� M..* 5����D PROFESS/ __cr_ r71,, ] _ J 1 ler - j II — n n o - 1 ' I a , _ _ _ I I SS1 S=1 S=1 I j • too I ii - ! , u 1 112^ 0 n ,../7a.//' ?1 {I O ON r I !I � � . • <v • 1 I j 2149 I EXAM R(Q 06 n1 EXAM ROOM 07 CORRIDOR EXAM ROOM 08 !r PHYSICIANSIlrots ' S �� • i i C ! Iul OFFICE 03 J . MAR Th • LIJ I 21�8 ^ 2147 2146 2145 I n CORRIDOR El l 1 I I I L2" I I��314 2109 : I I � — � _ I I I !� 2002 E WC 1 ! _ I II u r � - - - . iJI I II 08/17/2018 ° i i i II I II II I . I . Itl . l .l- . . . . . . . . . . . . . . ■1t I 314° ' _ 1 -. MA STATION 01IL [HIP 1.�1" 0, • ,r+ !I 2„ j __, TI PA KA E ■ ■ 2140 UL J 1r2" w DN TO (E) : n I I I �_ • In o i, T - _ MOP SINK u S-1 ''�' �, o - 1 + C . : : LI=#� n : ELEV. JC I I STORAGE ELEC :II CONSULT I I PROCEDURE 01 STAIRS I I CORRIDOR PHYS S I • t 2005 2006 I " 2007 2008Ik 2142 - -I 2143 a .. 2016 I 2144 OFFIC 4 o I 1 2112"�-I � 2110 1• • . n - I C I �■ 1■ ■■ ■■ I I / . u J I • (E) 1" G UP TO MECH. 1 i^ 112^ 7- Lili:: _ - - . UNIT AC-A-2. _ 1 i-I3- 0 ■ _E_, �■ 1■■ ■■■ ■■■ .■ ■■ \ :Fr -I ■IT {�. ■■[ 11■ : 1— 3 --ITI L =IL:HJ; 2L:2. 'iWm. ribiblIENEIMMINIM \ /. - D tom ■■ •• 1■ II 'I ■■ ■■ 1■ ■■ •• ■■ 1■ ■1 • 1 ill Ill No 112"— ' I I I1 1 r2" 2" 112" NIn (1) H >1- 112" Olt poR I 2" SAN DN � u 1"C n Dlb I 9 CORRIDOR I 4" V UPTO 4" VTR PHYSICIAS C7 FilmZ o O I I I OFFICE 05 J 2139 2111Cri) m M J EWC-1 1 I I I I I - I f tII N 1 [Intl• 1 [Intl• I1 I. 1 tl• 1 MI 11 tttttlt 1 [Intl• II I rT " „ 11 r �. - W N 1 W 0 � , ;: lik � 1112HWDN N. �, . I e me T Pi: 1RI I� W0 = Zv -�.I so . 314" HWR DN - o -CSA T - �, 17 . �r� � __ r -L - r��,.,�,�.�I,Ip�p .,.._.. - - I- p z r = = ad, ip 1 II II r - I 1I .� S-1 r I S-1 SS-1 = W O r� 1 III i' I LJ ` I� , p I I 1. . Q Q I m 1:t - V J -7I „ 1 PUBLIC 11 i. I 1 112 2.. CW DN r 1jL_= _ TJ I I 1 i I I �! C ry ;-` _ (� ! TOILET I WC-1 2" 2" proTrITi„ ILET, EXAM ROOM 09 EXAM ROOM110 J EXAM ROOM 11 u STORAGE �" I- <_�� L i 213! I 136 L 2135 1 2134 Ld 2133r CONFERENCE ! '� PHYSIOI, S w (� —L-1 I 2 I ' 11. —1- L�pDlS1ILt - r _ _ I nn - _ OFFICE 06 n O F._- Ci- -L-1 ! -- , 1 -- _ -- 21z5 -- -- -- -- - -- -- �w: : /-1n 2„ I I 1 112" 1 1 2112 — 112" 1r2" u �uWC-1 I - 11 0 nI 2" VDN - 2 TA.._, ,: , - 1 --�- - I 7 I - - - T - - - II - - I I ' MA STATION2_ _ I I I I I 1r < Z 1 I ! t o _ f1 I I I ' � - n 2126 1" LSI - �`,r WC-1 I I -1 114" -I 1„ -1,..,, .�� (.9 < I ! UI IWC-1I -r.' I 1 1 - 0 I HZrITIENTTOILETJHI IH1— = EXAM ROOM 12 �[ I XAM ROOM 13 ( EXAM ROOM 14 Si-TA€tFTILE • aS PATIENT L --1 1 ! L 1_ C PHYS EDUCATION n ^ ` I 2129 2130 I 2131 2132 I OFFI p7 2011 I iii I I I - 2113 } u " _ L-1 I S-1 S-1 I h S-1 IVB I-- rim" _ .�_tet __ ----_ - j` g - - -` - . I ' ��� I -- ., r - -- - _- - - I - - MIME - °fir____ — I • r 1 I I ` I © o - i' n'I n - 314" L112. I KEYPLAN - u' u I I i n - QORRIDOR I I �"JI Q I t I I PHYSI ANS 2119 C Z C ] I I _ OFFICE 08 -- � ; t I I � � � ' � rl I 7 � T-- 0 2114 I o f I I V — w W oll- 7� �- ,d t o n n 'N I j_1 G - G' - LJ u �' I / _ .... WI 1 I 6 lr d Lir J ! [ I Ini I Z TRIAGE 1- - CONSULT EXAM ROOM 9 1 EXAM ROOM 18 EXAM ROOM 1) - EXAM ROOM 16 EXAM ROOM 15 PHYS OFFICE 2124 0 2123 2122 ' H 2121 m I - 2120 m 2118 Q 2117 X2116 / n iM II I L r• II �� L [* II 11 c 0- O SCHEDULING i i � �I i I _ ill - L - C - 0 t. Z 2014 I LJ 112" I I I AP OFFICE Fc, �f- ] _ I 1 112" _ I S_1 314" •I s-1 E S-1 112 1 112" -• 1 -, - 2115 - PLUMBING PLAN - _, .._ I1:1 1 - I� - I - 11 � , . _ _ . . _ _ . . � _ ,, �_ -.III _ � �, -= D � LT �L LEVEL 2 SEGMENT a � �� _, . !i-_,EN-1 . s_i -- LiJ- I _J 1 CJI I. L _i__�_� � -- -- -- -- ,_T 7- -- -- LI 1 I 1 1 I I 1 1 I I I I I I 1 I 1 N �: 11 ii i�--- % 7I II �� �} i; `— ii 1. :I l i II r r 4 ---Ir It tl - t :� EI �� -4 It at it '''\ A 0 \ 1/2"i 112 3/4h \ C� a (E)3 STS UP TO (E) RD-1 OFFSET SINK WASTE ABOVE FLOOR/IN (E) 3" STS UP TO (E) RD-1 �-- AND DOWN TO FIRST CASEWORK BASE AS NECESSARY TO CLEAR 7- AND DOWN TO FIRST o_ \6i FLOOR. Cii) STRUCTURE BELOW. TYP. 5 EXAM ROOM SINKS. t�9 FLOOR. 1 0 WSP USA Buildings Inc. 01NN S I ) Seattle,Avenue, 98104uite 3200 (206,342-8900 JOB Project Number CNI wsp.com cr7 DATE 08/17/2018 op c7) SHEET PLUMBING PLAN - LEVEL 2 SEGMENT A ' 71i-)) N. "'J 114 11-0" CO PLAN p02 - 02A NORTH CORGAN I I I 0 ISSUES 1 08/17/2018 ISSUE FOR PERMIT& BIDDING I I I (E) 3" STS UP TO (E) RD-1 (E) 3" STS UP TO(E) RD-1 " 1f ' 1 i AND DOWN TO FIRST AND DOWN TO FIRST FLOOR. FLOOR. 1 I 1 �� II i r;_ !: 1 I i -- �� '� F- 1 �E 1 ,� I ,f _ - _ - - �- - �T, - - - L.„_ :-.E ____% I � I . 1 _ Is_1 -_ 1 A REVISIONS f 0/ % % � M . IV THERAPY IV THERAPY I IV THERAPY IV THERAPY I IV THERAPY SHOT ROOM IP 4 . I 2205 2204 2203 2202 2201 2200 11 - �J 0 ~ = I I - I I Z L- -J a(��1 1 1 I I ] I I INI r r i �_ IIII I :I r r .d r i 0 I -I r -43-1 I -I I flICE MACHINE ■ L _ - -I� CORRIDOR I11� 1f �I _ LINSTALLATION I 2207 I I �- � _ _ i 112 - II112„ MED ONC INFUSION _- -1 WAITING ROOM 4 S iiiiiaiaiiririiiiarirriiiiaiaiiriiiiiiiir,riaiiiiiiiaii ririaiiiriiiiiiairiiiaiiiaiiiiiiaiiiiiiiria/iiiiiiiaiiiiiiiariaiiiiiriaiiiiairiiiiiriiiiiiraiii/r IIT— rm � 2000 'w� �— r i - - - 7 ti EI I o I 1 j I I e —1 ! I I� I. I • ��R�� PROF�SS 1 I I Ii.t r 11 1 1 na. m . m >= �, %, 112 HW DN I = �� GINE rp i C _ C 0 C 0 C C 0 ..,.,,,,,.,.,,...„.., .. -.rr�sY,,,,,;r,;;;,:y�� ririi�i/ ii . 'p lJ 1 i I r— it a - - C .=_ DO - g. f s - so''' ' L - - - � - - - -- � I 1112' V I I _ , 1 I 1 ` / i I . r /' \� 1 „ I I I PATIENT I ri I CORRIDOR „ I %. I �� I L-1- I■ I /�4 O' ON ` . , 1 314 112 I I 11 TOILET WC 11 I I 1 112” 314 314 , „ -I J - I • %r. T-3/4"/-1/2" � _ = J L a I 2208 112 HW DN - , f1 __ 1— --- n f „ (1 PATIENT r 112 HWR DN I TOILET I # CORRIDOR 1_4-I1 —-2201 - - - -- 3 0 - ali- -I 0�� — Ion �II I. - T='i' I 1 CW DN I - 2209 I I: 1 2002 L. 1 1 127i n I I .,i 1 II II II II II II II II II i .1 I 1-11- �___. 7L —1-7•__ _ J . 08/17/2018 CWC-1 I I 1 112 r. 112" � � � T1 - Ii l_ 1 �1 1 1 IV THERAPY it 2 V_ ,: n �� 314" HWR DN - • I 1 112" CW DN I u I l'1:''--= . ,, T I PAC KAG E I r 1 I (-f2" zzla 1 ' lel I � �� 1„ HWDN �• -illi 1 I 1 C � � o ., I I P05-01' J 1 r - - - 7__=� STAIR ' 1 1 ! L_ - J \\ I • 2015 BIO/D R [� fl I I IT CLOSET - RECEPTION I ANTE \\ 1 ' LIN': I 41) ` 1 (E) 1” G UP TO MECH. 2003 2004 LJ 2302 . _ a _ _ _ J • ■ ■■ i• ■■ ' 22-61 n UNIT AC-A-3. _�- (E} 1" G UP TO • 1 MECH. UNIT AC-A-1. - / -- ',; y n RESEARCH I Um' CK N. i N■ ■■ ■■ ME ■■ ■■ ■■ IS ■a 1 --- i -I �I ■rI KITS' 213 I , ... . -..... _. _.._ ■ ■■ ■■ II i■ ■■ ■ ■■ ■■ ■■ I I - - - - _1- • - - - - - - - - - - -- - - - - - - - - - - - B 1 1 1 . ■■ ■ti ■f i■ ■Y ■ ■■ ■ti {■ ■■ ■■ ■■ ■r m `■-- o of%de�<<f�/v�'//,7,,:rlFll/0�09�if91 wv',':, G,hY�ozw,-,:if.'//ilim%"LffPEfi.'',^%////////!///%fll//Y�//l//ll.%r/,:: ■■ _ _ 0 (E) 1-1/2 G DNr I I I 1 1 /Io,:_ I ■r■■1■�■ Ill I I r Y/ 1 Ir 7`J - L-2-_-1, I I ' C - 70 C O C - D C4 0 (/) H >I mi L - NURSE STATION T3- 1 112" GAS J' e 1 1/2" GAS1" I Q V 5 Arr ;� E G 1 G 1 G ,� 1"G v i � _ �, o � �I TOILET I I I i 2215 • / Zo I , I 2219 . 0 O _ ,' ;� I 112" V DN _1 I I I riraiaaririri/407 I I m �,.� J 7 • 1 --WC-1 J�� re t<>I>I 1 1 1 I I Cl Irl. 1Cf) lijW N O I ( I F<>I>" hj -2"_ CORRIDOR I H IV THERAPY 2114 I I Z J I 1 PHARMACY l n I ■ -1I I . I — — - I I 222 1 I. .':I '' L - _ 1303 1 _ 11 C� .e j ' I n I I W _ r 0 LJ CORRIDOR J I : 3" ! N • I I C I - J LI 1 Ct W O 2220 (E) 3" - 1 . o ,. I - -1 PUBLIC. �j CI V J �- S 3 4 I I' UPTO VTR . 1 1 l I I I -✓ TOILET• H Q 0 ill 1 05-01 „ 2218 i ' 1 % f J1 2010 O - '--� 314 G U P - ,� o C � o C � _ J _ , 0 LI-I0_ OC - � OC - u - TO AC A-4 -1 1/2" 2" 2" 2 . i 1 I • C E �' w il FIN CNSL 0—. _ u "1 " _ '.— r4-T-- -/ I I I I.. G WORKER2012 --I I 1r- B-� 7 . o I f2013 I O 1 1I ■I ■■ II II % zCt 0 v I 1 G r f I I IIIr - -1111111:5;1 = S-1 314" 1 I 1F11/2" L - �, - 1 - 0 - III e �101/M, griar,, .i I i,K WIMP lar/gr�lik�f If"' -,67010, S-1 1111 Imriarti 1 i ;,, " (7 --------'N 0 < - V 1 1 II PVT INF ROOM J 112" L_1 f1 ATIENT L I I 314" I u mi C) 2223 PVT INF ROOM 1/2"- f 314" 01 C-1 1 1 : 1 I 1 1/2' L - 2222 L_ 1314" 2221 I I I I It 0 PATIENT 1314 -�1 , ,! EDUCATION L -L - - I � - - I I I 2011 I. i! lil 1 ' r 0 OC - C I OC = C OC = C r - � ' 314" HWDN -�.� U I r 1 114" CW DN ' I L - t i S_1 I %;rrrrrrrrr,,,rr,,,r„r,,,rrr„rrrr„rrrr,J�,, ,,o,. , I - I ..------7! I -1I KEYPLAN CORRIDOR I I - I .� --� t _ I LET I I 2226 II 22WC-1 r I CO I41i1HI I i 2" W 7 7 j� 1 - ' rl 1-4 E /T 0 I. 1 I " 2v A N co WB-1 - - - - -- 1112" W IIII" I I Hca - I :7;''' w i 314 IV THERAPY IV THERAPY IV THERAPY FAMILY 314" 1 - r -? PALLIATE CE ARE I4 EXAM ROOM C - - -I Z IV THERAPY % 2228 2229 1 I 112 11 I t 2224 r 2225 , 2227 "2231 11 2232 FOR FIXTURES 3 112 I 1 II 1 I `P05-02' THIS AREA I —_ _ - I II I SCHEDULING Z 0 __�� I --J--- -- 1 —1_ ) L - - J 2014 Ea % % % l 1 —y _ _ . - . • - . . - - _ . . _ - 2 L s 1 -. PLUMBING PLAN ��� S �1 112" c —I I DSP-1 , 1 I I LEVEL 2 SEGMENT CO II � 11 I . ,, —��C ,I 93 - f-..---�; -' I II- - - II _ �I _11 _ � II r' t' C B c) (E)3" STS UP TO (E) RD-1 - (E) 3" STS UP TO (E) RD-1 i,., 1� illAND DOWN TO FIRST 4 AND DOWN TO FIRSTCIO ,, a . FLOOR. FLOOR. WSP USA Buildings Inc. T. 999Seattle,3rd AWA 97n9ue, 6104Suite 3200 JOB Project Number (206)342-9900 N wsp.com DATE 08/17/2018 co E. PLUMBING - LEVEL 2 SEGMENT B SHEET CV 1/4" = 1'-0" tili-)1) PLAN p 02 - 02 g NORTH `- r ate _-_ =--_--- ----- ----------.7.---_- -.__— amAhit= �cbRGA1N T __ _ _ - - 0 ISSUES 1 08/17/2018 ISSUE FOR PERMIT&BIDDING A REVISIONS •S¢EO PRO,c�ss F 'a//ON 0- ` . � T'• v: . � ' S J . MARS 08/17/2018 TI PACKAGE I I I i I I I LLJ C3V V ow -, if i \ / AIT i 41 4I 44 1 i i ! 1 I — — — — — — -- — Cii) >- _ Ac Fillilli0' I I I I I , Z11 o O 1 1 WN O i 2 Z I , , I I I II C I � � z co li.1 Ct w O • F. Cl- I I I I I 1 zw U) I c:DLJ.J < COt:IN I I ICO I ! I O I Z I I , IN., I I , 0 e „l< — 1 _.�. riii H _ _ _ r _ .. I I I I I I I KEYPLAN I I I I I I I C I I I I I f I B A L'- I I I I I I oo 1 w , z 0 I i I 1 I i I 0 I Z Fii PLUMBING PLAN - i I I I I 7 I 1 a. I I �, ROOF Cr) _ • P' ; [_ `` I1 I f __ _ _I N �' a I T.h�.. d,,,. T I I T T M .h� _ I 1_CL WSP USA Buildings Inc. 999 3rd Avenue,v� VA 'hoii I , Seattle,WA 98104 JOB 3200 N 4 5 0 8 9 10 (206)342-9900JOB Project Number co cri — DATE 08/17/2018 ,7")1)‘ N 11 PLUMBING PLAN - ROOF SHEET L.---- ____ , v 1/8" 1'-0" PLAN FD0 2 _0 3 NORTH --_T =_ ...-= ==_ I ::_:::: 4:a' ±-1:7; I 0 ISSUES 1 08/17/2018 ISSUE FOR PERMIT&BIDDING I v ` i I I I 1 I I 1 I - - - / EA ..))- ___ I I A EVISIONS 01I 1 i I I I C I I I 1 I I I I 1 I I I �D PROF I I 1 �tiR Fss (0<0 ,�G t N k- /o Q 90•- 4- 'A / '*z 'il-//ON • A ,,,S, . _ • -I kr• • • • 1 08/17/2018 1 TI PACKAGE 1 I - • ••k•. - ,P,, _.r. -- - -- I I I I W0\ Ct(E) 1" G TO AC-A-2 0 mg— u..1 _____ _ _ 4 — (11) H >" I I I Fn. Z 1 0 (9 o 0 I —' I 4" VTR I °° co .1C/) tiW N O I ¢ ° U WO = z 1 I � � I- W O I it W ° ci I I --- I = Q LI-10 — a. I Ct Cf) CON I I I O < Z- 0 __ ci) I 1 II (.9 < - H I I 1 1 ► 1 1 I KEYPLAN I 1 I a I C H 1 1 ' // C9 1 B o I coI 0 0 ct s a. 1 Z cli PLUMBING PLAN - ._ ROOF SEGMENT A M 431 �' ! 0 9 i _ 0 a- I - J v i� [L NN WSP USA Buildings Inc. di\ih \ ^ , - -- 999 3rd Avenue,Suite 3200 NI- Seattle,WA 98104 JOB Project Number 68/ 9 El0� (Wsp.m2990°03 DATE 08117/2018 i.% r co N (1 PLUMBING PLAN - ROOF SEGMENT A SHEET rp 0 2 _03A ` `- 1/4 - 1 -0 ,;S-))' 00 PLAN NORTH -= -= - _- - - _ - _ I I ! 1 I I I 1 1 1 0 ISSUES 1 08/17/2018 ISSUE FOR PERMIT&BIDDING 1 II II \ I 4 4 4 , , \ _ _ _ _ _ (----- 0 1 , k) ..._........./ I I I I A REVISIONS I 1 1 1 1 I I 1 I 1 1 1 1 1 1 I I I I I I A S O PROFFss 9�' �G1N /0 ir 90•,447- ‘"P : 1 __ __ __ _ __ _ .: 1 ,,,.70,- /--/oN .. i . 4, ., ., . , . -- __ , ' SJ . QRS I I I 1 1 I _ ; C ; I 08/17/2018 I I : ) I I I I = I I T I PACKAGE I I = I I I I (E) 1" G TO AC-A-1 ,////1- (E)3/4" G TO AC-A-3 -/ 1 II I 1 Ct I � ow . _ - - - — — — — -- — — — — — — — — — — — — — — — — — - - - B � I 1 1 W F— >- 1 I H Q 0 U o 0 - I I I m ch 0.1w NU.J(in W > N O 2z I I I (E)3" VTR I I I Q coz w O w 0i: Ct w Q V/ I I = tt (i) I I 1 I0 W _ � < I i O 3/4" G TO AC-A-4 M N_ (") I I I I I I . Ct0 I 1 I I 0 < . (...) F— } i i I 1 ! I I KEYPLAN I I I I co C I— I 1 1 ! '/; /� w /). W B A co 0 ! ! ! I w S a- ! I I 1 z Ei PLUMBING PLAN - a. I 1 I I ROOF SEGMENT B 0 N r1 0 o . / °- J 1 -,; ---I - -�; -�I - ., {a. WSP USA ^ - ^ - •- N - -- , \ 99 3rd Avenue ings Inc. Seattle,WA 98104 c20�>�429900 JOB Project Number ry0 0 0 4e 3200 wsp.com co 6 08/17/2018 DATE N ® PLUMBING PLAN - ROOF SEGMENT B SHEET ,�, : -..)) - • PLAN Po 2 _ 0 3 B NORTH -_,.---------_—_—___-= -----=7-,---- ___ _------. ...„----_,..:-..:__--=—_,-__ _=7 - Y tom = __-_ _ -- ,-_,-,-7-„,- --r--_-._nom=` '\ a $mss . .� 9 = �- - ,.. ".ria-_�g�. , ii::::: _ -__ -:-=71-- -----3-7_:-.7_ -,714.710 M 7_-Vr. ------'" .--Tilc-'"=---,'T,:------7-` -.4IV G-„,„ ----,- ._.III=--W E ..- 1S$v &BIDDING _ 1712018 'ISSUE FOR PERMIT ° I a....r xr , -- -- _ n ______- _ , . L ,,� .„.. 7 n n n _ , u u 'I -11-:='' tq a 11 u 1 ,._------- . _ 1 .„1„..00---'''' .r '=Q may% 1 'N 11 u jt. -1T IL �%..- ►I '%'' Z►i1" „wr �[ ,,� .3L 31_ .1L : may-..-� r 1 i► a ,+ ::±1041c=r1:241::::ICl - 1I -. 11 1► �� .- n11 n it „ '"6 r, t1'�'''' QE \ ' � �--_ 1 It n .-- r► 11 i ii no n -:::.-- u n n u II u u u ..-- t► „ • It►t 11 %'' n 1► n it 11 11 n i{ •-•\ --��'JC-� {i►1 ►t '''� n it n n ii n 11 ►r 1► 1 �1 - i. '----'''- 11 „11 1` --„�-i%'''' 11 t1 1` t N. 14111 + 1t ” 1� n t II ` %''- �1 it 1I Ir .....- 0 it 1l." -a -� Ir'- II 1{ 1rfr1,:yt ►u �t ;ir- - -. =ff� ___ U " It itYh co c,it - r'11 Ii 11 U 11 { III CO 40 it i' ...,. 1,,111 ry uV n ' it ►► ,t 117 • - iit I 90•. 4' t It 11 t�o+ "'' II Ii 1< 11 n �, n U ■�/ / { ..,„„ 1.0 ,.1&.,/, n n it /0- 14 , n Y „ , 11 r1.... J'' 11 rl ..., 11 ►► 11 1 _= 11_ 0 1\8i�: - <<> 11 11 n „ ti 11 rO tt i rt._, ____ "� it it 11 ; S J , N� ‘s, - ------ \ ti u it n u 8 0 �t \.. 1:1611- ;,, i ti \ . 11 It 11 I{ 1► 11 11 ►t 11 '- sf, {1 i0811712°1 °18 it ► n n n n n 481712 • ,t U n n U n r ° Ii 11 ►► ' 1l t ' KAGE II u u 'i 1 n u tt ��... `� _ iI� it it n it , I► „ n -�'I PAC u u i n i u u 'a _, It It 1 I I I II II It - II i 11 I I I 1 t l U U U U 1 U It 4 I I t t — >.• 1:: Xiv'''- l _ 1t 1 11 1 1 1 1 It 11 1 11 II It 1 1 1 tt tl ` C) ill 11 1 ll tt T i I II 'v"r+ 1 1 it II i I d t t (tin i I t - 1 \ 11 1 Ii t l - a 0 I I I I ' _., .J e • l II t I 1� iii‘ WN n I I I t I I I 4,0) I 1 i I 0 0 e. } ttI �' Wco kJ' \ I , I 'I i W C7_ (n i 4 1 1 1 I Ciiiii (n 19, 0 ,2 1 11 i 11 Q 2 SEGMENT -----� Umil (2 I I 11 l ANENT - I.,- 1 I t tco PLUMBING S 1 1t1, �t.s: '1f�' - 7 t 1 c�+ r- ,,, 1.4:0, (-)z:e t t 'r'' l i ,�► n It \ ►► t I V �.- - •iii-'- it I Il li u u 'n t 1 n Il I I i t �,-ll�= a U I 1 ►► I IICIIIILI - l 1t ►► 11 t 1 II II 11 -5.1:- I -s%''. „ u II i ll ll '�► ti t 0 1 lI tt -• u u n t 1 a t I 100,,,, :i I .:%�'' it ti 11 11 1 \ n 1 t %'''' 11 Ir t -.'- 0 '''''' 11 1t 1 II I l t I It t �—' I 1 11 u I �.!,.r====l- -- '” a -__.fr 'i tt I t r{ It 111.1.111. 1 1 1 ut tt 11 -.:; -�= , �:_ �__ it tl tt ' t I 1 t 11l u - ►� 1 I u n it iiG I t! n 1 t I t 11 _� .: n i i n u n u I l u1 l t I{I n 11 ik - I u I u U n n rr 1 I I I Ii t ----\ t 1 --:r-'- -� i u t {{ u tib rl 'i 1 t t t I I --,A u u I n 1 n '' '� r \II ►► 1 I t i--- -- t1 1 -- utl i It t ►1 hil 11 11 1n ►► \ t l t 4,..„...... _ .__ _ 'u �{ It t it tl II r .n 'n l t t r""". I 0 - r N 11 rt tt Ir 1 it 11 1 i{ r` K\--E-;ii-D-CAN 11 it ','ice' 1 " it „ tl '!� 1 'ti " 1 --...' I II tt i► til it '' t ° It +r�► I t o it It tti n I it a rr► u _ G (-� I , iit t t► „1 tii � I tt I` t1 11 „ All �,-- - n i II 11 li 11 a -- '„'� . 1".:: --ki _�► It ��' a 1,11%11,1%,11 to :-' 11 t tt rt ►► -___ul i�n.� M u _Irr 'j i ' i n n rl , i1► i ► it t I` 1 ►► {t rl 11 ��� It 11 IIII 0 ._._. t II 1 {{ U fi 1u i 1� ►t ►► n s ,am .IIall ,I it 1I = ' H n I ,I ` Ii tl 1 %i I► n 4 „ J / n u i 11 ►► a 1t '� i � � ♦ �,,,,,��1� '1 it I it iI Si It 11 { ----.- „_ L s r ou...) i� .0 p '0 n 11 it { I, 11 n .,1 1F ♦ 11 ►t 11 II I1 11 II rl ` it n II it 11 ` • 1r 11 11 1► It ti/ e ce. _ _I' 11 ►► II i Mg�NG r �1 t1 it P�—uRISER . 1►t .% n tt 0\11: ►ANN '�t tt, M I tilt 11111111111,-Jo p t PkGR ` ..�,,,•• ,,,� .,, SEGS E1\11” ik .project Number guilainSs r Joe 1$ Q _ - - WSP USA Suite 32�� (IS/1712018 �1 7124 Z 999 3rd Av990Q I-- 1) ui _ x9$10 axle NN Beattie W 12as)�2- wsp.com 514EET / W (n -� ---�' 04_0 . Q ENT A 4 iEVEI. 1 SEGM�- t.ii Pt�MB1NG SAN ENT r - Z u1 to ----" Z J a •0 of 2 .....-- o..a 0 zo N o N i`- • 1� 0 _______,...7------Y ;,,,_ ,-:::3-1,......1:___,.:::, ________- 7,77.-,__-__---74---z-.:--:-;,,„—___Z-___,.... _,,I..1:::77-v--f---:7--_,,:---fi _ _ {l r„,,--,r,-. ..i:__.4._-.„,-:,- --.-- ,. ,,,_,J-e ta :::-,-= ------------- �� PERMIT &BIDDING - ag)1712a�� ISSUE�C)R ------------- ,, Evl R ir A 1, it n - -- 11 ,---- �_-'-- �---- +11{11-- n I II- n • t1 it n 141 11 ►' ItII it 11 U -' - It 11 it 11 11 1 rte .-'- �� c�-,e _===: aaLl`R..7711y�►'' 11 11 n 11 tt ir0 n u u n ► i� ►1 n n 1 ...*- ' u ..:.111:4-.1:1111111-12-11::::::/..\11-1 i In �;=�' 111 u n it +{ rn tt -\:1 I I- + n u It n ► ,lr +u r► tl tt \‘...... n 11 ti / + n 11 It „ani ae- .t1�L_ r`�`�=-= = ter' - �[ '� r{ it n i �` r 1111 t -"" f ►-'ice1 I s''{`' tr 11rrjIgliC*1... 1+ ��� + 11 +' .jII '' ++ rr 11 It T 1 n I ..... 11 r n Ir rt u i t1 1► ti�PRDFESs rr ►► n 11 , tr Ir i, ,��`t` �D „ u u u u r Gx NFF 4 Jiii ,► ++ n 1t 1 it 11 1/.4 c; 11 !r11 viii&t,./ it + n It =�c 'a . n 11 �; tt , n N Lir 90.4 ir /D n „ 1' n JA, �, , it .`' I1 11 j1 it u \,.. '� tlI S J . �,,4 it 1 ttI‘ 1 !n j I n „ to 11 GE ►, . • �� i �, v �� tv g� 7120 $ ,....... ► �-1. , 1 0 I 1 1 1°1111111PA KA _ _ 11 11 1 i l %r% t \ 1 I i - 1 I I I i 1 Utill (Ye I t I I I 11 1 I 1 11C) 1 1 11 1 I 11 � 1 I 11 rr� t'� _--'' V I 1 I 1 1 d. t� 0 1 i 1 1 Vow° p —j I 1 to co 1 1 WN 0 11 11 — ?ea). 0 1 1ill 0r O �` 1 1 t°'o 0 11 11 ----`— a w 1 1 11 OC., o (.� i 11 T. 4 4-141. t 1 1 lial }- C- - LEVEE 2 SEGMENT B I 11 NNEN'r 11 1 -i- t 0 011 1 ,:_ - 7C,\1:. 0 ct It t I 4 For r„-,�r , ,, . r-i- 1 i +i g 1� 0......., is t 1 1 ' __ L.,:-- -- f- ......, 1ti n0 1 1 1 nI 1 01 I r 11 1 +_ jam_-='� a 111 to n to II II '�„ I 1 -- n L n 11 ...... "liF I , reP 1,1,11„ {4Villillisis 1 1 ---_, - ii 1 u___1 - n i I n no n 1 II ti ii i � II i " •11 I i i \ .... .,. - IIi I 1 I i, i \ \ -'- a 1 1 n °1 I 1 = = - -- �r _ `, k •rte ------\ I 1 it r'�:-'' 11 t r-____, . • I. _-.--.31..,„ ---=1:0° n I - 1 r• _amu,.'..�_ n {, {I ►t le \ t{ 0 11 �.r�.- r te- __1 rl It U 11 ,, ,;:- II I r-I- n tt ++ q 1t a ��EYpi,.A 11 II it tt 11 11 11 rr I 1 '.'ti► ►i �� t� It n it I it ti it U n n 23 /. 1 ++U it it ii �� 'o n �' u ' ii ii U I! n u n it n n ►► A ss ,, , 11 n {r �_ • .....,-.." 1 1,,, ,, v 4« I--""1\111111 111.1 11 „ ,/ 111 rt tt n tl Il /�' I 11 0000 Ayrj nr it 11 n n I6 +110 rr rr 11 rr I + rt1tr u nu 1u1 IO 11 �tr I” %,,... 1( \,- 11 ,,, t{ •i' ei �� n i{ Ili .21 1 ,_ i , - Wit_ •g ..... .:,... ..� nIQ U1\111311\10 *,,, N ENS :.�� p,N GRAM - �-- DIA SEGM EMT B __-- rojeot Number (� W5P Avenue, 3200 Q ilSA en„,+951r�c• J o V F'" __________ 1 p04,..02, Battle,WA Side "� S i \999 Std 88104 (1$ 1 0 ' 1 �'^'O 1 svieeT 5 342_9900 /k T�"*.. ° (206) /'1 U i NI% wsp.com D ,� ,,, to ._ _ ..,,, ... GMENT 6 . _ 0.106114Gct ui c0.106114GSA ui Z. 4. V) Z. to - --i N p O 4 -^ ' �— L �� - ----'" 2 o- Lo 0. co ii7 to N J~ F--- 00 :::--------z- s.,7- 77. :--'';------:.-7-=-7--- ---7------:-_------=7--;-_1 ------ -----7------1-1---7- ---' 0 ISSUES 1 0811712018 ISSUE FOR PERMIT&BIDDING A REVISIONS ..,...........7,,, . .,_ ....„,„,,,,„_ _____.74.T.MINftm. ..,.. # I �_ � I%i. . ..�+ r*���r .-..,,,...... +„1_- �� ,x,,...13^'7"•"3. �.��"-. �.. I 1 •I +"+-'�"~+~,r + 1i I1. II. ...„...„........,I rIIII .r. ",s.:..1..„11.1.0.-.1.1-1--. . .-1' ,- 1 # ' 1 1 1 s �= ---- __ .. _...._ :1:....::4. 1-,..1„i11 60.* ,; _ I itt"."'"""-------- AlMin.......c.a...... I : I I "1 ............................. FE.,... AP L 1 1 �----n -/' i i ..i*+ "s . ''"'....,--"JL---� 1-"'-'-'11,-- II II ' II 1 r I 1 1 I E `.. . �� I tl tl N s'�i'.!.,,,..• .. :GI) PRpFFI # � _ s# t , 1 �`:�s/„ 1i ..-.-•'"'/'"'err �Ga� l tU�c �/O te"''" 1 N C� 1 II - 1 1 .00""" IIi '' I 1 1 i 1 1 11 II I I II ..:.....- reI 11 I 1 1 I 11 I II 1 /�Y� �> O'�ON II 11ii : , II I IttI I I I I r III , 1 I liv I11 1 ' I 1 I ; ' I 08/17/2018 ii �ii ri I TI PACKAGE . II PLUMBING WATER - LEVEL 2 SEGMENT A WI Ct CI iimi■ w (i) H ›-Q H00 0 0 _1 Uit) W mM .1 0 WN N `� -- Q O V -- W 0 = ZZ _-- ~:%%•I � ix '�,,,,./% �rrsr _-T_'_ _ --- r , --- it+- -.'�`"...'u++�. Cs �W;f O TCO __ . 1- 1: o cc...ilea....... .../. ...." T.....1 t CO -zj >/ H . .,-:..,.........,.. 1 .-.1.• __ __ _ ___-,...-.0".".. Ill � CO r,".r 4 I T -- •- Liar 0 O F- Ct (116) Cr) sIessefteaztraftriatitrzrataapt ---__...,.. .... ----i-ii....------„__ i ,....H.,...............-- ..,_ ----a-----,-.1.117. ......1%---- ----- I I < Z 0 ............. _ .o......"'...... ..." u r r'~-+- i , .,.•►mss _ - , �`.-- -=='—_•�.`ti I , 0 ( al< ire_ . .% III -�"> -..- 1 '=-IP r-'•-• _ _ sir 1' _, s>" ff,.. I rr ,,,...., ��:f +mil:a.sae- III ss� y.,. ".00. — ,� >sGs' /� :� + �,,j� i! ia.t 1 sem.>s101"..1°i�� q ' N - >> /� ,'_ = ==" a. i "` . %`�"'�- 1 is r , y i�' � �s>f�ts'��"' 1 1 1 r 1 — ."� .�,2,ri iC. 1 1 t 1 = _. I I r 1 � # 1 I I I I 1 I 1 II 1 I 1 1 t 1 I 1 1 N I I I U II I I 1 # 0 I 1 1 1 1 I 1 I # F- ' 1 N I t i 1 Z 1 I KEYP LAN 1 I I I W I 1 # 2 1 I # i 1 I 1 1 I N II 1 W I I I I r CD r I I C I I M 1 I I Ir II I I II I 0 °://// /T II B 0 ccI W TT T cc r W F— s z ® PLUMBING WATER - LEVEL 1 SEGMENT A CO PLUMBING WATER 2 CL RISER DIAGRAM - M SEGMENT A O O CL 999 3rd Avenue,Sa X X Si I ) WSP USA Buildings Inc. O Seattle,WA 98104uite 3200 (206)342-9900 JOB Project Number `N wsp.com DATE 08/17/2018 _ 00 SHEET . ________ -- TT T , - ::__ ______. -•% a-yL�� ______ ____________ _._____ ___=_,_ _ ___ EYEWASH l -_- --.'11 u - = , . -gam - --tet. _ � ,-- / —- = J / _ 0- _ ] _ - - 1-1/2"V _ = =-am=m ® 3/$" O.D.COPPER TUBE 1/2"CW , C-4110- R G `A 1- 3/8" OD.COPPER TUBE COLD WATER OUTLET =- - - s , WATER INLET ON CHILLER SHUT OFF VALVE BY OTHERS, \ 4 / ICE MACHINE 1 -_ / WB-1 0= + _ _]_( - 7.- / - - — a issues o / _ 3/8"DW 1 08/17/2018 ISSUE FOR PERMIT&BIDDING - t •fJD !_3 / RPBP-2 i 1 WF-1 --- 12" (305mm) 1 `/ MIN. L 1 kHI - (x1 DEPTH / BLACK WALL LINE / 1-1/4" I. - (32mm) ii I \ WASTE TUBE A REVISIONS CIVIO (f' ' _ // FURNISHED 2 J/e- CIW C -*------... . 1 ---.. ..--t.------. / NOTES: / 4 PROVIDE PPP MODEL P2-500 TRAP PRIMER&1/2" 27" 1W I / SHUT-OFF VALVE. PIPE TO FUNNEL (686mm) — / WATER FILTER DRAIN. ADA REQUIREMENT / ELECTRICAL --, / INLET / FINISHED 1 FLOOR i / NV C-1 DETAIL TS TS EQ Op AKER • INSTALLATION DETAIL ��. V' ! N�ssz,�Q ca 'C F iv LZ- � j790444. 'A �, /��JF�. O"7ON ' • tti TO BUILDING FIXTURES 'o Ufa : \�.r �9S J MP�S� 4 HW 120° —2 7 —; ISOLATION VALVE(TYP.) ,/ Tr 08/17/2018 —V' ,ii QHWR Ti PACKAGE / 1/2"TRAP PRIMER a_ t CIRCULATION FROM TRAP it f PUMP PRIMER MANIFOLD DRAINAGE SUMP jr041 THERMOSTATIC MIXING THERMOMETER �� �� VALVE ASSEMBLY --- -� NNI -\ a .. NOTE: MIXING VALVE TO BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS. COORDINATE Q 2"DRAIN TAILPIECE&TRAPMOUNTING HEIGHT Ct 5 HW 1400 lo.- I 1 I7 _ WITH ARCHITECT smiiiiiiiiiiiii 111.1 1-1/4" (f) 1--- >-- I HWR-- - o O 1 ....... (f) OL1 M f''� cW—..- N 0 FINISHED FLOOR N., 1-1/4" Unil 0 = Z � 0 z coHW� O > Q ° O) Lu 5 TMV-1 INSTALLATION DETAIL 2 WB-2 INSTALLATION DETAIL = w Cl) 12 - 1 -0 NTS a W F._00 u) w' a. 1: C.) cy,N r N < Z 0 0 < — C.) FINISH FLOOR FLOOR SINK 1 1 --c O I i KEYPLAN CLAMP DEVICE 1 1-1/2"V -\ III° C MI r- -...--) \- TRAP r---1Y PRIMER CONNECTION B A 3"SANITARY J F- W 0 Z PLUMBING 0 ® FS-1 DETAIL a NTS DETAILS N O U, 0 Ct. a ` 99P USA .Buildings Inc. 999Avenue,Suite 3200 d Seattle,WA 98104 �2os,342-9900 JOB Project Number 'SI I ) wsp.com DATE 08/17/2018 E) SHEET N h c