Loading...
Plans (36) M EC2019-00329 • OFFICE COPY OFFICE CONY COMMON WORK RESULTS FOR 17. THE CONTRACTOR SMALL COORDINATE THE LOCATION OF CEILING GRILLES, M. SLEEVES 3. EXAMINE DEVICES.DEAD DJUST DOR PROPERAND ATING LOAD CONDITIONS ALIGNMENT AND LOADING. AVOIDEN SELECTING 3. EXCEPT WHERE OTHERWISE INDICATED, CONSTRUCT DUCT SYSTEMS TO THE REGISTERS AND DIFFUSERS WITH THE ARCHITECTURAL REFLECTED CEILING .I. THE CONTRACTOR SHALL PROVIDE SLEEVES TO PROTECT EQUIPMENT OR "GROUNDING" THE ISOLATORFOLLOWING PRESSURE CLASSIFICATIONS: HEATING VENTILATING $ AIR PLANS. FACILITIES IN THE INSTALLATION. EACH SLEEVE SHALL EXTEND THROUGH IT'S SEQUENCE OF OPERATION FOR HVAC SUPPLY DUCTS: 2" W.G., POSITIVE RETURN AND EXHAUST DUCTS: 2" W.G., 4. CHECK HANGER ROD SIZE FOR ALLOWABLE LOADS AT THE ISOLATING DEVICE CONDITIONING 18. DUCTWORK SHALL NOT BE LOCATED OVER THE TOP OF ANY ELECTRICAL RESPECTIVE FLOOR, WALL OR PARTITION AND SHALL BE CUT FLUSH WITH AND AT THE UPPER AND LOWER ATTACHMENTS TO STRUCTURES, DUCTS, SYSTEM NEGATIVE. l PANELS OR EQUIPMENT. EACH SURFACE EXCEPT SLEEVES THAT PENETRATE THE FLOOR, WHICH SHALL EQUIPMENT, ETC. • SECTION 230500 EXTEND 2" ABOVE THE FLOOR. CONTRACTOR MUST COORDINATE THROUGH THE SECTION 230gg3 EXCEPT WHERE OTHERWISE INDICATED, USE DUCT SEALANTS OF THE 4) CO (q. DESIGN OF THE NON-DUCTED RETURN AIR PLENUM CEILING IS BASED ON LANDLORD ANY CORE DRILLING OR CUTTING OF OPENINGS IN MASONRY 5. CONSULT MANUFACTURER FOR APPLICATION DATA. FOLLOWING PRESSURE CLASSIFICATIONS: • ••14 117:1 ) THE REQUIREMENT THAT ALL MATERIALS IN THE RETURN AIR PLENUM FLOORS OR WALLS. A. SEQUENCE OF OPERATIONS SUPPLY 2"DUCTS: CLASS B - 3" W.G. RETURN AND EXHAUST DUCTS: CLASS A. NOTE: CEILING ARE ALL LABELED AS PLENUM RATED AND MEET THE FLAME 4 2. ALL SLEEVES AND OPENINGS THROUGH FIRE RATED WALLS AND/OR FLOORS B. FLEXIBLE CONNECTIONS C - W.G. WC • ri SMOKE PPRO SPAL OF REQUIREMENTSFOR PLENUM THE INSTALLATION AND THE SHALL BE FIRE SEALED WITH CALCIUM SILICATE, SILICONE "RTV" FOAM, "3M" I. THE ENERGY MANAGEMENT SYSTEM (EMS) HAS A BUILT IN TIME CLOCK WHICH I. ANY REFERENCE TO TENANT'S OR OWNER CONSTRUCTION MANAGER OR APPROVAL OF A RETURN AIR PLENUM FROM LANDLORD. IF THE I. FLEXIBLE COLLARS IN ALL CONNECTIONS BETWEEN VIBRATING EQUIPMENT IN ACCORDANCE WITH THESE CONSTRUCTION AND SEALANT PRESSURE �� CONDITIONS CANNOT BE MET, TTHE CONTRACTOR SHALL STATE THE FIRE RATED SEALANTS OR EQUAL, SO AS TO RETAIN THE FIRE RATING. (FANS, AIR HANDLERS, ETC.) AND DUCTS OR CASINGS. FLEXIBLE SHALL BE SET FOR OCCUPIED AND UNOCCUPIED HOURS. THE EMS SHALL CLASSIFICATIONS, MAXIMUM DUCT AIR LEAKAGE WILL NOT EXCEED 5% A55 FURNISHED BY ANY OF THE ABOVE REFERS TO OWNER. AMOUNT TO BE ADDED TO THE BASE BID FOR A TOTALLY DUCTED RETURN CONNECTIONS WHERE DUCTS CROSS BUILDING EXPANSION JOINTS. CONTROL EVERY PIECE OF PRIMARY HVAC EQUIPMENT. UPON A LOSS OF SIGNAL REQUIRED FOR FINAL AIR BALANCE APPROVAL. 3. SLEEVES IN BEARING AND MASONRY WALLS FLOORS, AND PARTITIONS SHALL AIR SYSTEM. FROM EMS, THE CONTROL BOARD IN EACH PIECE OF PRIMARY HVAC EQUIPMENT 2. DRAWINGS AND GENERAL PROVISIONS OF CONTRACT, INCLUDING GENERAL BE STANDARD WEIGHT STEEL PIPE FINISHED WITH SMOOTH EDGES. FOR SHALL MAINTAIN A SET POINT OF 71°F IN THE COOLING MODE, AND 68°F IN THE 4. ROUND DUCTWORK SHALL BE GALVANIZED STEEL WITH SPIRAL LOCK SEAM 0 AND SUPPLEMENTARY CONDITIONS AND ALL OTHER SPECIFICATION 20. CONTRACTOR IS RESPONSIBLE TO INQUIRE WITH THE LANDLORD'S OTHER THAN MASONRY PARTITIONS, THROUGH SUSPENDED CEILINGS, OR FOR 2. FLEXIBLE CONNECTIONS SHALL BE CONSTRUCTED OF NEOPRENE- COATED HEATING MODE. THE EMS SHALL CONTROL THE LIGHTING AS WELL AS THE HVAC CONSTRUCTION FOR ALL SIZES 14" DIAMETER AND LARGER. ROUND DUCTWORK SECTIONS, APPLY TO THIS AND THE OTHER SECTIONS OF DIVISION 23. REPRESENTATIVE ON ANY SMOKE EVACUATION SYSTEM IN USE AT THE CONCEALED VERTICAL PIPING, SLEEVES SHALL BE NO. 22 U.S.G. GALVANIZED FLAMEPROOF FABRIC. PROVIDE ADEQUATE JOINT FLEXIBILITY TO ALLOW FOR UNIT(5) AND SHALL BE EQUIPPED WITH TWO HOUR OVERRIDE PUSH-BUTTON TO SIZES 13" DIAMETER AND SMALLER MAY BE SNAP- LOCK CONSTRUCTION. ALL MALL AT THE TIME OF THE BID. IF THE SAID SYSTEM IS NOT ADEQUATELY STEEL MINIMUM. MOVEMENT AND PREVENT THE TRANSMISSION OF VIBRATION. TURN THE LIGHTS ON DURING UNOCCUPIED HOURS. EMS SHALL ALSO HAVE A EXPOSED ROUND DUCTWORK SHALL BE SPIRAL LOCK SEAM REGARDLESS OF V 3. THE CONTRACTOR FOR THIS DIVISION OF WORK IS REQUIRED TO READ THE DESCRIBED ON THE DRAWINGS THE CONTRACTOR IS SPECIFICATIONS AND REVIEW DRAWINGS FOR ALL DIVISIONS OF WORK AND RESPONSIBLE TO INFORM THE GENERAL CONTRACTOR AND INCLUDE THE N. FINAL HVAC INSPECTIONS C. FLEXIBLE AIR DUCT LAN CONNECTION FOR REMOTE MONITORING AND CONTROLLING, SIZE. ALL SNAP LOCK SEAMS SHALL BE SEALED AS DESCRIBED IN THESE COST AS A SEPARATE LINE ITEM IN THE BID. NO ADDITIONAL MONEYS SPECIFICATIONS. ROUND FITTINGS SHALL BE GALVANIZED STEEL WITH SPOT IS RESPONSIBLE FOR THE COORDINATION OF THE WORK AND THE WORK SHALL BE AWARDED FOR TIE-IN REQUIREMENTS TDA LANDLORD'S SMOKE I. ASIDE FROM NORMAL INTERIM INSPECTIONS OF WORK IN PLACE, OWNER SHALL I. FLEXIBLE AIR DUCT SHALL BE 1" INSULATED CLASS 1 AND RATED FOR THE 2. SENSOR OPERATION: EACH UNIT SHALL HAVE TEMPERATURE SENSORS. THE WELDED AND BONDED CONSTRUCTION. DUCTWORK SHALL BE AS OF THE SUBCONTRACTORS WITH ALL DIVISIONS OF WORK. IT IS THE EVACUATION SYSTEM THAT IS IN EXISTENCE AT THE TIME OF THE BID, HAVE AN INDEPENDENT HVAC CONTRACTOR INSPECT THE FINISHED HVAC OPERATING PRESSURE OF THE SYSTEM. DUCT CONSTRUCTION MATERIAL TEMPERATURE SENSOR SHALL AVERAGE THE SPACE TEMPERATURE AND SHALL MANUFACTURED BY UNITED MCGILL, SEMCO, OR APPROVED EQUAL. CONTRACTORS RESPONSIBILITY TO PROVIDE THE SUBCONTRACTORS WITH WITHOUT HAVING IDENTIFIED A SEPARATE LINE ITEM FOR THE SMOKE INSTALLATION UPON COMPLETION FOR COMPLIANCE WITH THE PLANS, (PLASTIC, CLOTH, ALUMINUM) MUST ADHERE TO LOCAL CODES AND HAVE A DEAD BAND SETTING OF +/-I.F. THE SENSORS ARE NOT CONTROL PM 1 A COMPLETE SET OF BID DOCUMENTS. EVACUATION SYSTEM AT THE TIME OF THE BID. SPECIFICATIONS AND CODES. THE INSTALLING CONTRACTOR WILL BELANDLORDS REQUIREMENTS AND BE INCLUDED AS SUCH IN THE BID. DEVICES, THE EMS WILL CONTROL THE UNIT(S). 5. ROUND SPIRAL GALVANIZED STEEL DUCTWORK MAY BE USED IN PLACE OF RESPONSIBLE TO BRING ALL ITEMS REPORTED BY THE INDEPENDENT HVAC2. FLEXIBLE AIR DUCT MAY ONLY BE USED IN VERTICAL APPLICATIONS WITHOUT RECTANGULAR DUCTWORK WHEN ABOVE CEILING CLEARANCES PERMIT AND Cid 4. THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULING THE COMPLETION AND 21. THE CONTRACTOR SHALL FURNISH AND INSTALL CONTRACTOR UP TO PLANS AND SPECIFICATION REQUIREMENTS. PRIOR APPROVAL FROM OWNER CONSTRUCTION MANAGER UNLESS NOTED 3. COOLING MODE: DURING OCCUPIED HOURS, THE SALES AND NON-SALES AREA EQUIVALENT FREE AREA IS MAINTAINED, WITH THE FOLLOWING EXCEPTION; INSPECTION OF THE WORK AND THE WORK OF HIS SUB- CONTRACTORS IDENTIFICATION ON ALL ROOFTOP EQUIPMENT. PROVIDE PLASTIC SHALL BE MAINTAINED AT A TEMPERATURE OF 71°F. DURING UNOCCUPIED ALL SUPPLY AND RETURN DUCTWORK WITHIN 15 FEET OF THE AIR HANDLER WORK TO COMPLY WITH THE OWNER SCHEDULE AND THE PROJECT LAMINATED PLATE OR STENCIL WITH 2" HIGH BLACK LETTERS, INDICATING 2. CONTRACTOR SHALL PROVIDE CERTIFICATES OF INSURANCE TO TENANT AND OTHERWISE. �. HOURS, ALL AREAS SHALL BE MAINTAINED AT 80°F. AIR CONDITIONING UNITS MUST BE RECTANGULAR WHERE ROUND DUCT SUBSTITUTION WILL TAKE COMPLETION DATE. TENANTS NANTSD.NAME AND SPACE NUMBER. VERIFY ACTUAL REQUIREMENTS WITH LANDLORD. SUBMIT TWO COPIES OF ALL TEST REPORTS TO THE TENANT AND 3. FLEXIBLE DUCT SHALL NOT EXTEND OVER 5'-0" IN LENGTH AT ANY ONE SHALLMODULATETO SATISFY ROOM THERMOSTAT SET POINT. EQUIPMENT PLACE, SUBMIT A SKETCH AND CHART SHOWING EQUIVALENT ROUND LATWO TO THE LANDLORD. LOCATION. SERVING VIDEO WALL MONITORS AND CABINET TO BE SET TO OCCUPIED MODE CONVERSIONS OF RECTANGULAR DUCTWORK TO OWNER FOR APPROVAL PRIOR 5. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTAL OF BID TO 22. COORDINATE THE EXTENSION, MODIFICATION, FINAL CONNECTION AND 4. NO FLEXIBLE DUCTWORK UPSTREAM OF VAV BOX DURING ALL HOURS OF THE DAY. TO FABRICATION OR INSTALLATION. DETERMINE CONDITIONS AFFECTING THE WORK. ANY ITEMS WHICH ARE TESTING OF ALL UTILITIES OR INTERFACED SYSTEMS WITH THE NOT COVERED IN THE BID DOCUMENTS SHALL BE BROUGHT TO OWNER'S LANDLORD'S FIELD REPRESENTATIVE. GENERAL DUTY VALVES4. HEATING MODE: DURING OCCUPIED HOURS, THE SALES AND NON-SALES AREAS 6ABERCROMBIE& FITCH CO. ATTENTION. THERE ARE NO SUBSTITUTIONS. SUBMITTAL OF BID SHALL IDENTIFICATION HVAC PIPING AND . AS A MINIMUM SHALL BE MAINTAINED AT 68°F. DURING UNOCCUPIED HOURS, ALL AREAS SHALL ' CROSS BREAK ALL FLAT SURFACES OR REINFORCE WITH A„ " 6301 FITCH PATH SERVE AS EVIDENCE OF KNOWLEDGE OF EXISTING CONDITIONS AND ANY 23. PROVIDE ACCESS FOR ALL LANDLORD AND TENANT COMPONENTS SECTION 230523 BE MAINTAINED AT 65°F. AIR CONDITIONING UNITS SHALL MODULATE TO BEAD APPROXIMATELY 3/8 WIDE X 3/16 DEEP ON 12" CENTERS TO PREVENT MODIFICATIONS WHICH ARE REQUIRED TO MEET THE INTENT OF THE REQUIRING PERIODIC INSPECTION AND SERVICE THAT ARE LOCATED WITHIN EQUIPMENT SATISFY ROOM THERMOSTAT SET POINT. VIBRATIONS, REGARDLESS OF DUCT GAUGE. NEW ALBANY, OHIO 43054 SECTION 230553 614-283-6500 DRAWINGS AND SPECIFICATIONS. FAILURE TO VISIT THE SITE DOES NOT THE SPACE OR REQUIRE ACCESS THROUGH THE SPACE. DEMONSTRATE A. VALVES 7. INSTALL FACTORY MANUFACTURED DOUBLE THICKNESS TURNING VANES IN ALL RELIEVE THE CONTRACTOR OF RESPONSIBILITY IN PERFORMANCE OF ACCESS TO ALL HIDDEN COMPONENTS FOR THE LANDLORD'S FIELD 5. VENTILATION AIR MODE: DURING OCCUPIED HOURS, THE TOILET EXHAUST RIGHT ANGLE ELBOWS OVER 36" IN LENGTH. INSTALL FACTORY MANUFACTURED WORK. REPRESENTATIVE PRIOR TO OCCUPANCY. I. BALL VALVES UP TO AND INCLUDING 2" SHALL BE BRONZE, ONE PIECE BODY, A. EQUIPMENT LABELS/PIPE MARKERS SYSTEM SHALL OPERATE UNDER EMS TIME SCHEDULE. DURING UNOCCUPIED SINGLE THICKNESS TURNING VANES IN ALL OTHER ELBOWS. 24.CONDENSATE DRAIN FROM RTU. MINIMUM DRAIN SIZE TO BE 1". CONDENSATE FULL PORT, 600 PSI, STAINLESS STEEL BALL, PTFE TEFLON SEATS AND 1. FURNISH AND INSTALL PIPE IDENTIFICATION MARKERS ON ALL PIPES HOURS, THE TOILET EXHUAST SYSTEM SHALL REMAIN SHUT. 6. REFER TO RESPONSIBILITY SCHEDULE ON THIS SHEET FOR INFORMATION IN DRAIN TO BE TRAPPED WITH A TRAP DEPTH OF 1.5 X UNITS TOTAL STATIC STEM SEAL, LEVER HANDLE AND BALANCING STOPS, SOLDER OR THREADED8. INSTALL RIGID ROUND AND RECTANGULAR METAL DUCT WITH SUPPORT REGARD TO RESPONSIBILITY OF WORK OR ITEMS WHICH MAY AFFECT BID. INSTALLED UNDER THIS CONTRACT. MARKERS SHALL BEA MINIMUM OF SYSTEMS INDICATED IN SMACNA STANDARDS. SUPPORT HORIZONTAL DUCTS ENGINEER: PRESSURE, MINIMUM 5" DEEP. DRAIN SHALL TERMINATE AT MOP BASIN ENDS WITH UNION. 1-1/2" X 8" AND IDENTIFIED IN ACCORDANCE WITH THE BACKGROUND AND 6. FRESH AIR WITH HEAT RECOVERY: DURING OCCUPIED HOURS, THE FRESH AIR " u DAMPER SHALL BE DRIVEN OPEN, AHU SHALL ENERGIZE AND CONTINUE TO WITHIN 2 FEET OF EACH ELBOW AND WITHIN 4 FEET OF EACH BRANCH B. SCOPE OF WORK WITHIN TENANT SPACE. SUPPORTS FOR CONDENSATE LINES TO BE 4nx4 xi2 LETTER COLORS ISSUED BY THE AMERICAN NATIONAL STANDARDS INSTITUTE TREATED BLOCKING SET IN MASTIC ON MODIFIED BITUMEN PAD. PIPE 2. BALL VALVES LARGER THAN 2 1/2" OPERATE. SUPPLY AIR WILL RECOVER SOME HEAT FROM EXTRACT AIR FLOW INTERSECTION USING DOUBLE STRAP HANGERS ON EACH SIDE OF FITTING. SHALL BE BRONZE, TWO PIECE BODY, (ANSI). MARKERS SHALL BE MANUFACTURED BY CHAMPION AMERICA INC. SUPPORT VERTICAL DUCTS AT A MAXIMUM INTERVAL OF f6 FEET AND AT I. RESPONSIBILITIES SHALL INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING: SUPPORTS TO BE SPACED NO MORE T1-IAN 800-521-7000, OR EQUAL. AN 6'-0" APART. ROOFTOP/EXTERIOR FULL PORT 600 PSI STAINLESS STEEL BALL PTFE TEFLON SEATS AND THROUGH AIR TO AIR HEAT EXCHANGER INTEGRAL WITH AHU. HEATING TO BE A. HVAC UNITS, EQUIPMENT, AND APPURTENANCES (UNLESS NOTED PIPING TO ROOF DRAIN SHALL BE COPPER. REFER TO DETAIL ON PI.1. STEM SEAL, LEVER HANDLE AND BALANCING STOPS, THREADED ENDS WITH SUPPLEMENTED BY AN ELECTRIC HEATING COIL WITH STEP OR THERMISTOR EACH FLOOR. NO WOOD SHALL BE USED TO SUPPORT OR BRACE DUCTS.CONTROL TO MAINTAIN SET POINT OF 52'. ELECTRIC HEATER SHALL BE PROVIDE SWAY AND SEISMIC BRACING AS REQUIRED BY STATE AND LOCAL / the OTHERWISE UNION. 2. PIPING SHALL BE IDENTIFIED AS FOLLOWS: CHILLED WATER RETURN, _ E. CODES CHILLED WATER SUPPLY, CONDENSATE, HOT WATER RETURN, HOT WATER PROVIDED WITH A FAN RUN ON TIMER TO DISSIPATE AND RESIDUAL HEAT CODES OR BY LANDLORD. B. DUCTWORK,)FITTINGS, DAMPERS, AND INSULATION. I. ALL WORK SHALL CONFORM TO THE LANDLORDS' CRITERIA, THE STATE'S, 3• SWING CHECK VALVES, 2-INCH AND SMALLER: CLASS 150, CAST BRONZE SUPPLY CONDENSER WATER RETURN CONDENSER WATER SUPPLY BEFORE SHUTDOWN. DURING UNOCCUPIED HOURS THE OUTSIDE AIR DAMPER D. CURBS, ROOFING, AND STEEL FRAMING FOR SUPPORT (AS BODY AND CAP CONFORMING TO ASTM B 62 WITH HORIZONTAL SWING q. WHERE DUCTS PASS THROUGH ROOFS AND FLOORS, PROVIDE AS MINIMUM -7 -1 1 COUNTY'S, CITY'S AND LOCAL CODES AND ORDINANCES, SAFETY AND ' REFRIGERANT LIQUID, REFRIGERANT SUCTION, AND DIRECTION OF FLOW SHALL REMAIN FULLY CLOSED AND AHU DE-ENERGIZED. I-1/2"XI-I/2" XI/8" STEEL ANGLE FRAMES AT EACH SIDE OF OPENING. THE APPLICABLE, REFER TO PLANS). HEALTH CODES, NFPA CODES, ENERGY CODES AND ALL OTHER APPLICABLE Y-PATTERN, RENEWABLE BRONZE DISC, AND HAVING THREADED OR SOLDERED ARROWS. ALL IDENTIFICATIONS MUST BE VISIBLE AT EQUIPMENT. 5 'LGP/.Y :�'j:;" c:•c••. • E. TESTING, ADJUSTING, AND BALANCING. ENDS. 7. MORNING START-UP MODE: FOR ONE HOUR BEFORE OCCUPIED ANNULAR SPACE BETWEEN DUCT AND ANGLE FRAMES SHALL BE CAULKED CODES AND REQUIREMENTS. THE CONTRACTOR SHALL INQUIRE INTO ANDHOURS, THE EMS WITH SILICONE SEALANT OR FIREPROOFED AS REQUIRED BY ASSEMBLY FIRE COMPLY WITH ALL APPLICABLE CODES, ORDINANCES, AND REGULATIONS. 3. FURNISH AND INSTALL EQUIPMENT IDENTIFICATION PLACARDS OR PAINTED SHALL CALL FOR THE START UP CYCLE. DURING START-UP CYCLE, THE 130 E. CHESTNUT ST., SUITE 303 2. BEFORE STARTING WORK THE CONTRACTOR SHALL VISIT THE JOB SITE AND4. SWING CHECK VALVE, 2-1/2 INCH AND LARGER: CLASS 125 CAST IRON BODY RATING. ' THE CONTRACTOR 51-1ALL INCLUDE ANY CHANGES REQUIRED BY CODES IN STENCILS ON ALL EQUIPMENT INSTALLED UNDER THIS CONTRACT. PLACARDS LINIT(S) WILL RUN ONLY IF COOLING AND / OR HEATING IS CALLED FOR TO COLUMBUS, OHIO 43215 EXAMINE THE ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL AND BOLDED CAP, HOF BEINGNGL SWING, RENEWABLE BRONZE DISC, FLANGED 10. ALL JOINTS AND SEAMS SHALL BE SEALED WITH 2" WIDE GLASS- FIBER THE BID AND IF THESE CHANGES ARE NOT INCLUDED IN THE BID, THEY ENDS AND CAPABLE OF REFITTED WHILE THE VALVE REMAINS IN THE / STENCILS SHALL BE A MINIMUM OF 3" LETTERING AND IDENTIFIED IN REACH DESIRED SET POINTS. FRESH AIR AHU SHALL REMAIN DE-ENERGIZED. , PLANS AND SPECIFICATIONS TO SEQUENCE, COORDINATE, AND INTEGRATE THE (614) 224-3331 VARIOUS ELEMENTS OF THE HVAC AND EQUIPMENT WITH MUST BE QUALIFIED AS A SEPARATE LINE ITEM IN THE BID. AFTER LINE. ACCORDANCE WITH THE BACKGROUND AND LETTER COLORS ISSUED BY THE FABRIC REINFORCED TAPE. JOINTS ALSO SHALL BE RIVETED OR CONNECTED RECEIVED SYSTEM, ,MATERIALS, CONTRACT 15 ISSUED, NO ADDITIONAL COST DUE TO CODE ISSUES SHALL AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)/ASME 13.1. MARKERS 8. EMERGENCY HEAT MODE (IF PLENUM SENSOR INSTALLED): IF THE PLENUM WITH SHEET METAL SCREWS. LIQUID SEALANTS BY UNITED MCGILL CORP., OTHER CONTRACTORS TO AVOID INTERFERENCES AND CONFRONTATIONS. 5. COMBINATION BALANCING AND SI IUTOFF VALVES: CIRCUIT SETTER WITH SENSOR REPORTS A TEMPERATURE UNDER 50°C THE EMS SHALL GO INTO DOW CORNING, MIRACLE ADHESIVES AND SUREBOND INC. WILL BE ACCEPTED IN BE REIMBURSED BY OWNER TO THE CONTRACTOR. SHALL BE MANUFACTURED BY BETON NAME PLATE CORP, W.H. BRADY, 3M, 3. RELOCATION OF EXISTING DUCT MAINS OR BRANCHES TO MEET STORE DESIGN LOCKING SET POINT. A CIRCUIT SETTER BALANCE WHEEL MUST BE INCLUDED OR EQUAL. STENCILS SHALL BE PAINTED WITH BLACK SEMI-GLOSS ENAMEL ALARM AND TURN ALL THE LIGHTS ON IN THE SPACE. LIEU OF TAPE. MAY 1 6 2019 CRITERIA MUST BE INCLUDED IN BID PROPOSAL. F. LICENSES, PERMITS, INSPECTIONS & FEES WITH 0 t M MANUAL. REFER TO MECHANICAL DETAIL SHEETS. ON LIGHT BACKGROUND OR WHITE ENAMEL ON DARK BACKGROUND. II. SOFT ELASTOMER BUTYL GASKET WITH ADHESIVE BACKING SHALL BE USED CITY OF TIGARD 4. 9. SMOKE ALARM: IF ANY SMOKE DETECTOR SIGNALS SMOKE, THE EMS SHALL GO TO SEAL FLANGED JOINTS. BUILDING DIVISION 1. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LICENSES, PERMITS, 6. CONTROL VALVES: IDENTIFY AIR DUCT AND PIPING A MAXIMUM 20' ON CENTER, AND EACH SIDE INTO ALARM. C. EQUIPMENT FURNISHED BY OWNER INSPECTIONS, AND FEES REQUIRED OR RELATED TO HIS WORK. a. CONTROL VALVES 2" AND SMALLER SHALL BE EQUAL PERCENTAGE OF PENETRATING WALL AND A MINIMUM OF ONCE FOR EACH FLOOR RISER 12. DUCT TRANSITIONS SHALL NOT EXCEED 30 DEGREES SLOPE EXCEPT AS 2. FURNISH TO THE OWNER CONSTRUCTION MANAGER ALL CERTIFICATES OF CONTROL VALVES. 5. AND IN EACH ROOM. SPECIFICALLY NOTED OTHERWISE. I, THE FOLLOWING EQUIPMENT IS FURNISHED BY OWNER AND INSTALLED BY THE INSPECTION AND FINAL INSPECTION APPROVAL AT COMPLETION OF b. TWO-WAY MODULATING: 5 PSID OR TWICE THE LOAD PRESSURE DROP, ? CZCONTRACTOR UNLESS SPECIFICALLY NOTED OTHERWISE. REFER TO PROJECT. WHICHEVER IS MORE. PROVIDE A VALVE TAG, MINIMUM 2" DIAMETER BRASS, FOR EACH SHUT-OFF OR COMBINATION REFRIGERATION PIPING AND 13. PROVIDE ACCESS TO ALL MOTORIZED DAMPERS, FIRE DAMPERS, CONTROLS, y p w AND OTHER ITEMS IN DUCTWORK THAT REQUIRE SERVICE OR INSPECTION. IF W u-tv > RESPONSIBILITY SCHEDULE AND PLANS FOR APPLICABILITY. e. THREE WAY MODULATING: TWICE THE LOAD PRESSURE DROP, BUT NOT BALANCE AND SHUT-OFF VALVE IN EACH SYSTEM; CONDENSER, CHILLED, HEATING HOT WATER, THE ACCESS PANEL LOCATION IS EXPOSED TO THE SALES AREA, IT MUST BE NC < p- A. RTU'S, AHU'S, VAV BOXES, ROOF CURBS, MIXING BOXES, POWER G. TRADE NAMES, MANUFACTURERS AND SHOP DRAWINGS MORE THAT 5 PSID. STEAM AND CONDENSATE RETURN. TAG SHALL INCLUDE SYSTEM IDENTIFICATION AND SEQUENCE SPECIALITES SECTION 23230013 APPROVED BY OWNER CONSTRUCTION MANAGER PRIOR TO INSTALLATION. }- EXHAUST FANS. I. WHERE TRADE NAMES AND MANUFACTURERS ARE USED ON THE DRAWINGS 7. ACCEPTABLE MANUFACTURERS BY WATTS, APOLLO, RECITE OR EQUAL. NUMBER. PROVIDE A FRAMED COPY OF VALVE TAG CHART AND SCHEDULE IN CHILLER ROOM, LAY-IN SUPPLY AND RETURN AIR DIFFUSERS, GRILLES AND REGISTERS WITH tL w Z 13. TOILET EXHAUST FANS, RELIEF FANS, RETURN AIR FANS. OR IN THE SPECIFICATIONS, THE EXACT EQUIPMENT SHALL BE USED. THE MAIN AIR HANDLING UNIT ROOMS (MEZZANINE AND 2ND FLOOR), AND 1 COPY FOR LANDLORD'S A. REFRIGERANT PIPING: PLASTER FRAMES MAY BE USED AS ACCESS LOCATIONS WHEN WITHIN 3'-0" OF C� Q 0rd w C. BASEBOARD, CABINET AND ELECTRIC UNIT HEATERS. USE OF ANY UNAUTHORIZED EQUIPMENT SHALL BE SUBJECT TO REMOVAL 6. USE. COORDINATE NUMBERING SYSTEM WITH LANDLORD. 1. THIS CONTRACTOR SHALL FURNISH AND INSTALL A COMPLETE REFRIGERANT DEVICE. > Q > oz AND REPLACEMENT AT THE CONTRACTOR'S EXPENSE. HANGERS AND SUPPORTS A PROVIDE PERMANENT-- � N L HAN QUIPMENT SCHEDULED. PIPING SYSTEM BETWEEN THE INDOOR FAN UNITS AND OUTDOOR FAN UNITS, 14. ALL DUCTWORK SHALL BE INSTALLED WITH INSIDE CLEAR DIMENSIONS AS Esu Z cy.v ° 2. GENERAL CONTRACTOR SHALL SUBMIT ONLY SUBSTITUTION REQUESTS TO SECTION 23052C1 - ATTACH LABELS TOIT�QU �1° I I`�� � 5IF APPLICABLE. NOTED ON DRAWINGS. WHERE DUCTWORK SIZE IS LARGER THAN CONNECTED Z -1 < z _� p D. GENERAL REQUIREMENTS OWNER CONSTRUCTION MANAGER FOR APPROVAL. SUBMISSIONS SHALL j 2. DEVICE (IE. VAV BOX, DIFFUSER, REGISTER) SMOOTH DUCT TRANSITIONS ARE o Ca ES w w `� BE MADE EARLY ENOUGH IN PROJECT TO ALLOW FOUR (4) WORKING DAYS BALANCING PIPING: m �' Q - I. THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, FOR OWNER'S CONSTRUCTION MANAGER'S REVIEW WITHOUT CAUSING A. HANGERS AND SUPPORTS A. REFRIGERANT PIPING SHALL BE TYPE "L" HARD DRAWN COPPER TUBING TO TAKE PLACE JUST PRIOR TO DEVICE CONNECTION. REFER TO DETAILS. cael; i SERVICES, TOOLS, TRANSPORTATION, INCIDENTALS AND DETAILS DELAYS OR CONFLICTS TO THE JOB'S PROGRESS. SUBMITTALS SHALL TUBING 230583 (ASTM B88). TUBING SHALL BE CLEAN, CAPPED AND NITROGEN CHARGED. 15. TRANSITION DEVICES SHALL BE INSTALLED AT MANUFACTURER'S tx Q NECESSARY TO PROVIDE A COMPLETE MECHANICAL SYSTEM A5 SHOWN ON BEAR THE STAMP OF THE GENERAL CONTRACTOR AND THE SUB- I. HANGERS SHALL INCLUDE ALL MISCELLANEOUS STEEL SUCH AS ANGLE IRON, TESTING, ADJUSTING, AND BALANCING B. ALL FITTINGS AND JOINTS SHALL BE WROUGHT COPPER OR CAST BRONZE RECOMMENDED POSITIONS. THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED CONTRACTOR SHOWING THAT THEY HAVE REVIEWED AND CONFIRMED THAT BANDS, C-CLAMPS WITH RETAINING CLIPS, CHANNELS, HANGER RODS, ETC., (ANSI B16.22). ALL COPPER TO COPPER JOINTS SHALL BE BRAZED WITH A BY JOB CONDITIONS. ALL WORK NOT SPECIFICALLY NOTED AS BEING BY THE SUBMITTALS ARE IN CONFORMANCE WITH THE CONTRACT DRAWINGS NECESSARY FOR THE INSTALLATION OF WORK. COPPER-PHOSPHORUS ALLOY AND ALL OTHER JOINTS SHALL BE BRAZED WITH B. MEDIUM PRESSURE DUCT THE LANDLORD OR OWNER SHALL BE PROVIDED BY THE CONTRACTOR. AND SPECIFICATIONS OR INDICATE WHERE EXCEPTIONS HAVE BEEN TAKEN. 2. HANGERS SHALL BE FASTENED TO BUILDING STEEL, CONCRETE, OR MASONRY, 1. TESTING, ADJUSTING AND BALANCING OF ALL WORK SHALL BE MADE BY SILFOS-5 ALLOY. BUT NOT TO PIPING. HANGING FROM METAL DECK IS NOT PERMITTED. AN INDEPENDENT CONTRACTOR WHO IS A CURRENTLY LICENSED C. ALL ELBOWS ARE TO BE LONG RADIUS TYPE. I. WHERE DUCTWORK IS SPECIFICALLY NOTED AS MEDIUM PRESSURE, IT SHALL 2. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH 3. PROVIDE 6 COPIES OF SHOP DRAWINGS, PRODUCT DATA, EQUIPMENT HANGERS MUST BE ATTACHED TO UPPER CHORD OF BAR JOIST. WHERE ASSOCIATED AIR BALANCING COUNCIL (AASC) OR NATIONAL 3. INSTALLATION: BE CONSTRUCTED IN ACCORDANCE WITH SMACNA STANDARDS FOR A OTHER AND ANY MATERIAL OR LABOR CALLED FOR IN ONE SHALL BE CUTS, PERFORMANCE CURVES, SOUND DATA, DIMENSIONS, SERVICE INTERFERENCES OCCUR, AND IN ORDER TO SUPPORT DUCTWORK OR PIPING, ENVIRONMENTAL BALANCING BUREAU (NEBB) BALANCING CONTRACTOR. NO A. PRESSURE RATING OF 6 INCHES WATER COLUMN MINIMUM OR GREATER AS SUCTION LINES SHALL HAVE ADEQUATE LIFT TRAPS AND/OR DOUBLE SUCTION tO FURNISHED AND INSTALLED EVEN THOUGH NOT SPECIFICALLY MENTIONED CLEARANCE REQUIREMENTS, WEIGHTS, ETC. FOR ALL SCHEDULED THE CONTRACTOR MUST INSTALL TRAPEZE TYPE HANGERS OR SUPPORTS OTHER BALANCE REPORTS WILL BE REVIEWED OR ACCEPTED. ALL RISERS TO MEET THE REQUIREMENTS OF FIELD CONDITIONS AND EQUIPMENT REQUIRED BY LANDLORD. z IN BOTH. ANY MATERIAL OR LABOR WHICH IS NEITHER SHOWN ON THE EQUIPMENT, FIXTURES, DEVICES, ETC. WHICH SHALL BE LOCATED WHERE THEY DO NOT INTERFERE WITH ACCESS TO BALANCING WORK MUST BE COMPLETE AND DONE IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. 2. ALL GAUGES AND REINFORCEMENT MUST MEET WITH THE LATEST EDITION OF 0 DRAWINGS NOR CALLED FOR IN THE SPECIFICATIONS, BUT WHICH IS FIRE DAMPERS, VALVES, AND OTHER EQUIPMENT. HANGER TYPES AND THE MOST RECENT STANDARDS OF THEIR SOCIETY. PAYMENT OF ALL SMACNA STANDARDS FOR MEDIUM PRESSURE DUCT AND WITH THE OBVIOUSLY NECESSARY TO COMPLETE THE WORK, AND WHICH IS USUALLY 4. ONE (1) ELECTRONIC COPY MAY BE PROVIDED AT CONTRACTOR'S OPTION INSTALLATION METHODS ARE ALSO SUBJECT TO LANDLORD CRITERIA. COSTS FOR TESTING AND BALANCING SHALL BE INCLUDED IN THE BID. 8. BRAZE ALL JOINTS WITH SILF05-5 STARTING AT THE INDOOR UNIT AND LANDLORD'S CRITERIA. INCLUDED IN WORK OF SIMILAR CHARACTER, SHALL BE FURNISHED AND FOR SUBMITTAL. HANGERS FOR ALL INSULATED PIPING SHALL BE SIZED AND INSTALLED FOR TESTING AND BALANCING CONTRACTOR TO BE LANDLORD APPROVED. WORKING TOWARD THE OUTDOOR UNIT. THE SEALS ON THE OUTDOOR UNIT OC INSTALLED AS PART OF CONTRACT. SHALL BE BROKEN LAST. A NITROGEN BLEED SHALL BE USED DURING ALL 3. CONNECTIONS TO THE LANDLORDS MEDIUM PRESSURE DUCTWORK SHALL BE 5. PROVIDE TWO COPIES OF OPERATION AND MAINTENANCE MANUAL FOR 3. THE OUTER DIAMETER OF INSULATION. INSTALL 6" LONG SPLIT CIRCLE 2. FINAL TESTING, ADJUSTING AND BALANCING REPORT MUST BE COMPLETE SOLDERING AND ANY TIME THE SYSTEM IS OPEN. ALL OPEN LINES SHALL BE MADE WITH "LO-LOSS" SADDLE TEE TAPS BY UNITED MCGILL CORP., OR AS 3. WHERE THE DRAWINGS OR SPECIFICATIONS CALL FOR ITEMS 1A11-11C1-1 EXCEED EACH PIECE OF EQUIPMENT, INCLUDING CONTROL DIAGRAMS, INTERNAL GALVANIZED SADDLE BETWEEN THE HANGER AND THE PIPE INSULATION. AND TURNED OVER TO OWNER CONSTRUCTION MANAGER 3 WEEK PRIOR TO CAPPED AND SEALED BEFORE LEAVING THE SITE DURING CONSTRUCTION. OTHERWISE REQUIRED BY THE LANDLORD. CODES OR THE LANDLORD'S TENANT CRITERIA, THE CONTRACTOR IS WIRING DIAGRAMS, ETC. TO THE LANDLORD AND TENANT (4 COPIES 4. HANGERS AND PIPING OF DISSIMILAR METALS SHALL BE DI- ELECTRICALLY MERCHANDISING DATE. PRESSURE TEST FOR LEAKS WITH AN INERT GAS AT TO 410 PSIG. REDO 4. ALL OTHER ITEMS FROM METAL DUCTWORK SPECIFICATION SECTION APPLY TO RESPONSIBLE FOR FURNISHING AND INSTALLING THE SYSTEM WITH THE TOTAL), ALL BOUND INTO 3-RING BINDERS. EACH BINDER SHALL SEPARATED. LEAKING JOINTS AND RETEST UNTIL SYSTEM IS TIGHT. EVACUATE ENTIRE THIS SECTION, WITH THE EXCEPTION THAT ALL MEDIUM PRESSURE DUCTWORK MORE STRINGENT REQUIREMENTS AS DESIGNED AND DESCRIBED ON THESE INCLUDE WARRANTIES STORE NAME NUMBER ADDRESS INSTALLING 3. THE CONTRACTOR SHALL BE PRESENT FOR AIR BALANCE TO VERIFY SYSTEM TO 200 MICRONS OF MERCURY. CHARGE SYSTEM WITH 25 PS( OF ' ' ' 5. PROVIDE DOUBLE LOCK NUTS ON ALL TREADED RODS. WHEN UNISTRUT IS R-22 AND A INERT GAS TO 410 PSt AND RETEST SYSTEM WITH HALIDE LEAK MUST BE WRAPPED INSULATION, NOT LINED. pa, DRAWINGS, UNLESS SPECIFICALLY NOTED OTHERWISE. CONTRACTOR, AND SERVICE CONTACT INFORMATION. USED SQUARE WASHERS ARE ALSO REQUIRED. ACCESSIBILITY TO ALL DEVICES, VERIFY ALL OPERATING SEQUENCES AND •- 8 INSTALL NEW FILTERS IN ALL UNITS JUST PRIOR TO THE AIR BALANCE. DETECTOR. ALL LEAKING JOINTS MUST BE COMPLETELY RESEALED UNTIL NOP F. 4. ALL MECHANICAL WORK SHALL BE INSTALLED SO A5 TO BE READILY H. GUARANTEE THE COMPLETE AIR BALANCE SHALL TAKE PLACE WITH OUTSIDE AIR LEAKS EXIST. TURN ON CRANK CASE HEATERS 24 HOURS PRIOR TO STARTING DIFFUSERS REGISTERS AND GRILLES 6. SEE SHEET M1.01 FOR SEISMIC HANGER DETAILS AND SPECIFICAITONS AS ACCESSIBLE FOR OPERATING, SERVICING, MAINTAINING, AND REPAIRING. DAMPERS IN MINIMUM POSITION, EXCEPT AS NOTED OTHERWISE. COMPRESSOR TO BE SURE ALL REFRIGERANT LIQUID 15 OUT OF THE p THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING SUFFICIENT SERVICE THED RCONTRACTOR ISCON SHALL GUARANTEE ALL MATERIALS AND PK PROVIDEDATIREQUIRED. CONTRACTOR SHALL ALSO INSTALL A NEW SET OF FILTERS EACH MONTH COMPRESSOR. SECTION 233713 a) ACCESS TO ALL EQUIPMENT. UNDER HIS CONTRACT AND SHALL MAKE GOOD, REPAIR OR REPLACE AT HIS W OWN EXPENSE, ANY DEFECTIVE WORK, MATERIAL, OR EQUIPMENT WHICH MAY B. DUCT HANGERS 4. l tIRift#t lCOTA T1 lID?Li TIDY£6 RZIQRITFONM€F -I0FIDT G,.INDICATED C. UPON COMPLETION OF TESTING, BUT BEFORE THE REFRIGERANT PIPING A. AIR DEVICES • c,; BE DISCOVERED WITHIN A PERIOD OF 12 MONTHS FROM THE DATE OF ON THE DRAWINGS. ANY REQUIRED CHANGES IN SHEAVES, BELTS OR INSULATION 15 APPLIED, THE PIPING MUST BE INSPECTED BY A 5. ALL WORK SHALL BE PERFORMED IN A NEAT PROFESSIONAL MANNER USING , i' > GOOD ENGINEERING PRACTICES. ACCEPTANCE (IN WRITING) OF THE INSTALLATION BY OWNERS CONSTRUCTION 1, HANGER SPACING PULLEYS NEEDED TO ACHIEVE SPECIFIED FLOW RATES SHALL BE REPRESENTATIVE OF THE LOCAL GOVERNING AUTHORITY AS NECESSARY. I. PROVIDE DIFFUSERS GRILLES AND REGISTERS AS SCHEDULED. DEVICES MANAGER. EXTENDED WARRANTIES ARE AS SPECIFIED WITH INDIVIDUAL PERFORMED BY THE HVAC CONTRACTOR WITH NO ADDITIONAL COST TO D TO BE COMPLETE WITH DAMPERS FRAMES AND ALL ACCESSORIES. FINISH 0 tX DUCT FACE AREA FROM 0 TO 4 SQ. FT. HANGERS q8" O.C. MAX INSULATE THE REFRIGERANT SUCTION LINES AND CONDENSATE LINES ONLY W EQUIPMENT. THE OWNER. AS INDICATED. co H. 6. UNLESS SPECIFICALLY NOTED OTHERWISE, MATERIALS, PRODUCTS, AND DUCT FACE AREA FROM 4 TO 10 SQ. FT. HANGERS 72" O.C. MAX WITH RUBATEX OR ARMSTRONG I INCH THICK PIPE INSULATION WITH FLAME Ce (� < EQUIPMENT, INCLUDING ALL COMPONENTS THEREOF, SHALL BE NEW, 2. OWNER SHALL PROVIDE A COMPLETE 12 MONTH WARRANTY FOR ALL PARTS ON DUCT FACE AREA FROM 10 AND GREATER HANGERS 48" O.C. MAX 5. ALL CONTROL SEQUENCES SHALL BE TESTED (INTERLOCKED EQUIPMENT, w w CEILING PLAN.SPREAD RATING OF NOT MORE THAN 25 AND A SMOKE DEVELOPED OF NOT 2. INSTALL ALL AIR DEVICES AS LOCATED ON THE ARCHITECTURAL REFLECTED 0 1- UNDERWRITERS LABORATORIES LISTED AND LABELED AND SIZED IN EQUIPMENT PROVIDED BY OWNER, INC. AND OWNER VENDORS. THE SMOKE DETECTORS, SMOKE EVACUATION, ECONOMIZER, ETC.) AND MORE THAN 50 IN ACCORDANCE WITH INDUSTRY STANDARDS. DO NO © Vy N CONFORMITY WITH REQUIREMENTS OF STATE AND LOCAL CODES, CONTRACTOR SHALL NOT BEAR ADDITIONAL WARRANTIES BEYOND A 2. WHERE DUCTS ARE LESS THAN 2 SQ. FT. IN FACE AREA, HANGERS OPERATING STATUS RECORDED IN THE REPORT. INSULATE THE HOT GAS (LIQUID) LINES OR ANY HOT GAS BYPASS LINES IF 3. APPROVED MANUFACTURERS: TITUS IS SPECIFIED. NO SUBSTITUTIONS. Q < WHICHEVER 15 MORE STRINGENT. COMPLETE WORKING SYSTEM, AND AS SUCH, NO ADDITIONAL MONEYS SHOULD SHALL BE NOT LESS THAN 1"x1/16" STRAP STEEL. APPLICABLE. APPLY 2 COATS OF U.V. PROTECTANT/SEALER ON ALL CT) M M BE INCLUDED IN THE BID. INSULATION EXPOSED TO WEATHER. 7. THE CONTRACTOR SHALL PROVIDE ALL MISCELLANEOUS SUPPORTING 3. WHERE DUCT ARE GREATER THAN 2 SQ. FT. IN FACE AREA. HANGERS HVAC EQUIPMENT STEEL, ETC. FOR THE PROPER INSTALLATION OF THE MECHANICAL I. RECORD DRAWINGS " " 4. INSPECTION: x SHALL BE NOT LESS THAN I xi/8 STRAP STEEL. CV 6. THREE COPIES OF THE BALANCE REPORT SHALL BE SUBMITTED THROUGH A. CONTRACTOR MUST PREPARE AND SUBMIT A COMPLETE PIPING SCHEMATIC TO SECTION 238000 �,, X SYSTEMS. , I. THE CONTRACTOR SHALL MAINTAIN ONE COPY OF DRAWINGS ON THE JOB SITE THE GENERAL CONTRACTOR TO OWNER'S CONSTRUCTION MANAGER FOR THE LOCAL EQUIPMENT MANUFACTURER FIELD REPRESENTATIVE FOR 4. WHERE DUCT ARE 8 SQ. FT. IN FACE AREA. HANGERS SHALL BE CD 8. THE CONTRACTOR SHALL COORDINATE FLOOR, WALL AND ROOF TO RECORD DEVIATIONS FROM CONTRACT DRAWINGS, SUCH AS: BRACED BY 1"xl"xl/8" STEEL ANGLES ALL AROUND, SPACED NO APPROVAL. THE GENERAL CONTRACTOR SHALL VERIFY THE COMPLETENESS APPROVAL PRIOR TO BEGINNING INSTALLATION. UPON COMPLETION OF PIPING, A. HVAC EQUIPMENT T- PENETRATIONS, LOUVER SIZES, ETC. WITH GENERAL TRADES. A. LOCATION OF CONCEALED PIPING VALVES AND DUCTS. MORE THAN FOUR FEET ON CENTERS. OF THE REPORTS PRIOR TO SUBMITTING TO OWNER. SUBMIT ONE COPY OF THIS CONTRACTOR MUST CALL THE LOCAL EQUIPMENT MANUFACTURER B. REVISIONS, ADDENDUM5, AND CHANGE ORDERS. FINAL APPROVED AIR BALANCE REPORT TO MALL GENERAL MANAGER. INSPECTOR FOR FIELD INSPECTION OF WORK PERFORMED AT ASF EXPENSE. T' 9. THE CONTRACTOR SHALL VERIFY ALL CLEARANCES PRIOR TO FABRICATION C. SIGNIFICANT DEVIATIONS MADE NECESSARY BY FIELD CONDITIONS. a ALL ITEMS FOUND TO BE INADEQUATE FOR PROPER PERFORMANCE BY I. MECHANICAL STARTUP: 0 I D. APPROVED EQUIPMENT SUBSTITUTIONS. 5. WHERE DUCTS ARE OVER SIDES WIDE. THE HANGERS SHALL BE BROUGHT 7 THE BALANCING CONTRACTOR SHALL PERFORM ALL APPLICABLE TESTING EQUIPMENT MANUFACTURER FIELD REPRESENTATIVE MUST BE CORRECTED AT a. GC WILL SCHEDULE A REPRESENTATIVE FROM HVAC SUPPLIER TO START OF ANY WORK. DOWN UNDER THE DUCT 4" AND FASTENED TO THE BOTTOM. AND BALANCING FUNCTIONS REQUIRED FOR THE SYSTEM DESIGNED ON NO ADDITIONAL CHARGES TO ASF. UP UNITS PER THE CONSTRUCTION SCHEDULE/FITCH TRACK. THE PURPOSE E. CONTRACTOR'S COORDINATION WITH OTHER TRADES. 10. THE CONTRACTOR MUST HAVE A SENIOR FOREMAN WITH OF THE MECHANICAL STARTUP IS TO VERIFY PROPER OPERATION AND A MINIMUM OF 6, SELF-TAPPING, SHEET METAL SCREW THESE DRAWINGS. ALL SYSTEMS UNABLE TO BE COMPLETELY BALANCED w X AT THE TIME OF ORIGINAL BALANCE MUST BE BALANCED IN FUTURE AT NO SET UP OF THE EQUIPMENT. X FIVE YEARS COMMISSIONING EXPERIENCE IN BOTH HVAC AND CONTROLS 2. AT COMPLETION OF THE PROJECT AND BEFORE FINAL APPROVAL, THE ADDITIONAL EXPENSE TO OWNER. THE BALANCING CONTRACTOR SHALL HVAC AIR DISTRIBUTION b. FAILURE TO HAVE A REPRESENTATIVE FROM THE HVAC SUPPLIER AT �"7 x PRESENT AT STARTUP. C. PIPE HANGERS CONTRACTOR SHALL MAKE ANY FINAL CORRECTIONS TO DRAWINGS AND RECHECK ANY ITEMS THAT OWNER DEEMS NECESSARY AT NO ADDITIONAL STARTUP WILL VOID THE MANUFACTURERS WARRANTY AND GENERAL ". 11. THE CONTRACTOR SHALL FILL OUT COMPLETELY AND SUBMIT TO THE CERTIFY THE ACCURACY OF EACH PRINT BY SIGNATURE THEREON. ONE COPY COST TO OWNER. SECTION 233000 CONTRACTOR WILL BE RESPONSIBLE FOR ALL WARRANTIES PURCHASED BY 0.. Z CONSTRUCTION MANAGER THE MECHANICAL SUPPLIER STARTUP CHECKLIST OF THE MOST RECENT SET OF DRAWINGS WITH TEMPERATURE CONTROL HANGER SCHEDULE DUCTWORK INSULATION ASF. CO FOR EACH RESPECTIVE PIECE OF EQUIPMENT INSTALLED PRIOR TO DRAWINGS INCLUDED SHALL BE STAMPED "DO NOT REMOVE" AND SHALL BE A. SUPPLY AIR TAKEOFF FITTINGS < SCHEDULING THE HVAC CONTROL STARTUP. PLACED IN A DRAWING TUBE LOCATED NEXT TO THE ELECTRICAL PANEL. SEE COPPER PIPING - TYPE L SECTION 230713 2. ALL EQUIPMENT SHALL BE COMPLETE IN EVERY RESPECT WITH ALL DEVICES, 0 ARCHITECTURAL DRAWINGS FOR EXACT TUBE LOCATION. PIPE SIZE ROD SIZE MAX. SPACING I. CONICAL OR "BELL-MOUTH" TAKEOFFS W/ DAMPERS FROM MAIN DUCTWORK TO APPURTENANCES AND ACCESSORIES PROVIDED TO MEET THE DESIGN INTENT CC c) 12. MECHANICAL SHOP DRAWING SUBMITTALS TO BE SENT TO OWNER'S A. DUCTWORK �ISULATION ROUND BRANCHES. INSTALL PER MANUFACTURER'S INSTRUCTIONS AND AND OPERATION OF THE SYSTEMS SHOWN ON THE DRAWINGS AND SPECIFIED CONSTRUCTION MANAGER. 3. TWO COPIES OF THE "AS-BUILT" REDLINES SHALL BE PROVIDED TO THE THRU 3/4 IN 3/8 6 1 INSULATION PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S WRITTEN DETAILS ON SHEET MI.3 HEREIN, UJ Q 13. MECHANICAL EQUIPMENT NOTED IN THE MECH. RESPONSIBILITY SCHEDULE CONSTRUCTION MANAGER FOR INCLUSION IN THE FINAL AS-BUILT SET. INSTRUCTIONS, AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY Q HAS BEEN PRE-PURCHASED BY THE OWNER THE CONTRACTOR IS TO 1 IN 3/8 63. EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE OBTAIN5 OWNER SUPPLIED MATERIALS ERIOWS (05T) SCHEDULE TO ARRANGE PRACTICES. INSULATION MUST COMPLY WITH NFPA 90A. B. DAMPERS MANUFACTURER'S INSTRUCTIONS. ALL AIR CONDITIONING EQUIPMENT MUST BE J. DISCREPANCIES IN DOCUMENTS 1 1/4 IN 3/8 8 RECEIPT, OFF LOADING AND MOVING OF ALL OSM TO THE JOBSITE. ALL I. MANUAL LOCKING QUADRANT VOLUME CONTROL DAMPERS WITH HANDLE TRAPPED IN ACCORDANCE WITH MANUFACTURER'S DATA. CONTRACTORS EQUIPMENT SHALL BE DELIVERED TO THE JOBSITE ADDRESS, UNLESS I. DRAWINGS (PLANS, SPECIFICATIONS, AND DETAILS) ARE DIAGRAMMATIC AND 1 1/2 IN 3/8 8 2. DUCT SIZES SHOWN ON DRAWINGS ARE INSIDE CLEAR DIMENSIONS. ALL OPERATORS AS SHOWN ON PLANS TO FACILITATE AIR BALANCING. INSTALLING DAIKIN EQUIPMENT SHALL BE DI CERTIFIED. OTHER ARRANGEMENTS ARE MADE THROUGH OWNER'S PURCHASING INDICATE THE GENERAL LOCATION AND INTENT OF THE MECHANICAL SYSTEMS. 18" CI) ce REPRESENTATIVE PRIOR TO THE START OF CONSTRUCTION OR I WEEKDUCTWORK IN EXPOSED CEILING PLENUM SPACES SHALL BE EXTERNALLY 2. OPERATING HANDLES ON ALL DAMPERS SHALL BE TAGGED WITH A MINIMUM WHERE DRAWINGS, EXISTING SITE CONDITIONS, SPECIFICATIONS OR OTHER 2 IN 3/8 q4. COMPRESSORS SHALL BE FULLY HERMETIC SCROLL TYPE WITH FACTORY PRIOR TO THE SCHEDULED O5M SHIPPING DATE. INSULATED WITH A MINIMUM OF 1 1/2" THICK, 1# DENSITY (R=5.6) DUCT LONG ORANGE MARKER TAPE. COLLARS MUST BE INSTALLED OVER EXTERNAL SPRING-SHOCK MOUNTED OR SPRING MOUNTED FOR VIBRATION ISOLATION. TRADES CONFLICT OR ARE UNCLEAR, ADVISE THE GENERAL CONTRACTOR IN Z N WRITING, PRIOR TO SUBMITTAL OF BID. THE GENERAL CONTRACTOR IS 2 1/2 IN 1/2 q WRAP WITH VAPOR BARRIER. VAPOR BARRIER IS TO BE MAINTAINED INSULATION TO ALLOW FREE MOVEMENT. SEE ADDITIONAL DETAILS ON ALL COMPRESSORS SHALL HAVE CRANKCASE HEATERS AND SAFETIES FOR 0 w 14. CONTRACTOR SHALL ENSURE THAT ALL EQUIPMENT, PIPING ANDTHROUGHOUT DUCT SYSTEM. ALL JOINTS MUST BE TAPED 50 THAT NO MECHANICAL DETAIL DRAWING. cc 0 N RESPONSIBLE TO ADVISE OWNER'S CONSTRUCTION MANAGER, IN WRITING, OFHIGH AND LOW HEAD PRESSURES. r,. 5G DUCTWORK, NOT BEING USED OR SHOWN TO REMAIN, IS FULLY REMOVED 3 IN 1/2 10 INSULATION FIBER IS VISIBLE. EXTEND DUCTWORK INSULATION WITHOUT ,Q" I-' AND NOT ABANDONED. VARIATIONS TO CONTRACT DOCUMENTS PRIOR TO SUBMISSION OF BID. W CD INTERRUPTION THROUGH WALLS, FLOORS, AND SIMILAR PENETRATIONS. 3. NO VOLUME DAMPERS UPSTREAM OF VAV BOX. 0 OTHERWISE, OWNER CONSTRUCTION MANAGER'S INTERPRETATION OF CONTRACT 4 IN 1/2 10 5. SECONDARY DRAIN PANS ARE REQUIRED TO BE STAINLESS STEEL AND 15. COORDINATE THE EXTENSION, MODIFICATION, FINAL CONNECTION AND DOCUMENTS OR CONDITIONS SHALL BE FINAL WITH NO ADDITIONAL EXPOSED DUCTWORK IN OPEN CEILING SPACES NEED NOT BE INSULATED. 4. ALL RECTANGULAR DAMPERS IN OUTSIDE AIR, RELIEF AIR, OR RETURN AIR INSTALLED BENEATH INDOOR AIR CONDITIONING EQUIPMENT (ACU) USING U�"� (I Z Z TESTING OF ALL UTILITIES OR INTERFACED SYSTEMS WITH THE COMPENSATION PERMITTED. 3. ALL INSULATION SHALL HAVE A FLAME SPREAD RATING OF NOT MORE DUCTS ARE TO BE OF OPPOSED BLADE TYPE. ALL OUTSIDE AIR DUCT WATER AS THE REFRIGERANT. SECONDARY PANS ARE TO PROTECT ENTIRE CI) CO _ /ti Z LANDLORD'S FIELD REPRESENTATIVE. HANGER SCHEDULE - STEEL PIPING THAN 25 AND A SMOKE DEVELOPED RATING OF NO HIGHER THAT 50 WHEN DAMPERS MUST ALSO BE OF THE LOW LEAKAGE TYPE. UNIT. PROVIDE CONDENSATE PUMPS, A5 REQUIRED. CONDENSATE SHALL SE ♦�•R/ K. PHASING REQUIREMENTS DIRECTED TO A TUNDISH ADJACENT TO A MOP BASIN OR AS SPECIFIED ON ...J U) 0 16. PROVIDE ACCESS FOR ALL LANDLORD AND TENANT EQUIPMENT, SUCH AS, PIPE SIZE ROD SIZE MAX. SPACING MAX. SPACING TESTED IN ACCORDANCE WITH ASTM C 411, OR AS REQUIRED BY LOCAL ,G Z < (f)FIRE 4 SMOKE DAMPERS, SMOKE DETECTORS, BALANCING DAMPERS, VAV I. THE CONTRACTOR IS TO INCLUDE IN THE BID ALL NECESSARY SERVICE CODES. C. FIRE DAMPERS PLANS. SECONDARY PANS ARE NOT REQUIRED FOR ANY DUCTLESS TYPE UNIT. Q W 0 BOX CONTROLS, ELECTRICAL JUNCTION BOXES REQUIRING PERIODICFOR WATER FOR STEAM, IF A DUCTED ACU IS PLACED OVER A SALES AREA, SECONDARY DRAIN PANS 0 el INSPECTION AND/OR SERVICE THAT ARE LOCATED WITHIN THE OWNER'S REQUIRED TO KEEP THE OPERATING PHASE OF THE STORE'S HVAC, PLUMBING I. PRIMARY FIRE DAMPERS WHERE INDICATED OR REQUIRED BY CODES. DAMPERS SHALL BE DESIGNED FOR HORIZONTAL OR VERTICAL FLOW OF AIR ARE REQUIRED NO MATTER THE TYPE OF REFRIGERANT USED. IF ANY ACU •"-� .� I`-" SPACE OR REQUIRE SERVICE ACCESS THROUGH THE OWNER'S SPACE. IN AND SPRINKLER SERVICE IN OPERATION. CONTRACTOR MUST SCHEDULE IN GAS OR AIR 4. EXTERNALLY LOCATED DUCTWORK THERMAL INSULATION SHALL BE � WEATHER-PROTECTED. INSULATION FOR THE TOP SURFACE OF AS REQUIRED. FIRE DAMPERS SHALL BE UL LABELED AND MEET ALL CODE IS PLACED ABOVE ELECTRICAL EQUIPMENT SECONDARY DRAIN PANS ARE ZE AS-BUILT DOCUMENTS, LABEL ACCESS DOORS AND PANELS, 24x24 MECH. WRITING WITH OWNER'S CONSTRUCTION MANAGER AND THE LANDLORD ONE HORIZONTAL DUCTS SHALL BE FACTORY PREPARED TO PROVIDE A FALL REQUIRED REGARDLESS OF REFRIGERANT USED. �"' GRILLES UTILIZED FOR ACCESS WITH THE NAME OF THE EQUIPMENT WEEK PRIOR TO ANY SHUT DOWN OF THE HVAC, PLUMBING OR FIRE ' 1 IN 3/8 7 q REQUIREMENTS. Q (� Z d ACCESSIBLE AT THAT POINT. DEMONSTRATE ACCESS TO ALL LANDLORD PROTECTION SYSTEMS. OF 1:25. THE MINIMUM THICKNESS OF INSULATION SHALL BE MAINTAINED, TT L. 6. THREE SETS OF FILTERS SHALL BE USED DURING CONSTRUCTION. CHANGE ..i.. •••,•• CC Z I 1/4 IN 3/8 10 q INCLUDING AT ALL FLANGES AND SUPPORTS. FINAL FINISH SHALL BE 2. FIRE DAMPERS SHALL HAVE THE BLADES OUT OF THE AIR STREAM AND A Cy HIDDEN EQUIPMENT FOR THE LANDLORD'S FIELD REPRESENTATIVE PRIOR FILTERS JUST BEFORE COMMISSIONING AIR BALANCE AND AFTER FINAL STORE 0 ;•• U) 't'- < Ili TO CLOSING IN THE CEILING. THE CONTRACTOR SHALL COORDINATE THE L. DEMOLITION I 1 1/2 IN 3/8 10 q ALUMINIUM SHEETING AS REQUIRED. SPECIAL CARE SHOULD BE TAKEN TO 165°F FUSIBLE LINK, TYPE B, AS MINIMUM. FURNISH AND INSTALL ACCESS CLEANING. J LOCATION OF CEILING GRILLES, REGISTERS AND DIFFUSERS WITH THE AVOID ELECTROLYTIC CORROSION. THE JOINTS USED ON ADJACENT METAL DOORS AS NECESSARY. W Q U ARCHITECTURAL REFLECTED CEILING PLANS, REFER TO A4.2 CEILING I. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE SHEETS SHALL BE SELECTED FROM ONE OF THE TYPES SHOWN IN SMACNA M al > 0) 1""' V) DEVICE PLAN TO LOCATE AIR DIFFUSERS AND GRILLES. DEMOLITION OF EXISTING WORK. 1 2 IN 3/8 10 13 STANDARDS. BLIND REVETS OR SCREWS SHALL BE SPACED NOT MORE 3. ALL NECESSARY FRAMING AND SLEEVES FOR DAMPER MOUNTING PER UL AND 7. FILTERS PROVIDED ARE TO MATCH TYPE AND SPECIFICATIONS OF THE OEM. 2. THE CONTRACTOR SHALL INCLUDE, AND WILL BE HELD RESPONSIBLE FOR, THE 2 1/2 IN 1/2 12 13 THAN 4" APART. AT THE JUNCTION BETWEEN PRE-FORMED INSULATING CODE REQUIREMENTS. THE ACTIVATION OF A DUCT REMOVAL OF ALL EXISTING FIRE PROTECTION, PLUMBING FIXTURES, PIPING, MATERIALS ANS FIXED STEELWORK, THE JOINT SHALL BE PACKED WITH 8. FILTERS ARE TO BE EASILY ACCESSIBLE. 3 IN 1/2 12 ISD. TOILET EXHAUST SYSTEM SMOKE DETECTOR SHALL HVAC UNITS, REFRIGERANT RECAPTURE, EXHAUST FANS, ETC. AND MINERAL FIBRE TO ACCOMODATE DIFFERENTIAL THERMAL MOVEMENT. THE q. AT THE END OF CONSTRUCTION THE CONTRACTOR SHALL PROVIDE A LIST ASSOCIATED ROOF CURBS NOT TO BE REUSED ON THIS PROJECT, UNLESS 4 IN 5/8 14 17 CLADDING SHALL BE ADDITIONALLY SECURED WITH METAL BANDING AT 18" IDENTIFYING THE UNITS AND CORRESPONDING FILTER TYPES AND P (�VALIDITY OF PERMIT ACTIVATE A VISIBLE AND SPECIFICALLY NOTED OTHERWISE. CONTRACTOR MUST VERIFY WITH THE ON CENTER. THE BANDING SHALL BE SELECTED TO COMPLEMENT THE I. ALL DUCTWORK AND/OR CONNECTIONS TO LANDLORD SYSTEM NECESSARY FOR SPECIFICATIONS TO THE AIF PM. (clioc, G N ``�44THE ISSUANCE OFA PERMIT LANDLORD ALL PRESUMED ABANDONED EQUIPMENT PIPES DUCTWORK AND SHEET CLADDING AND NOT CONTRIBUTE TO DI-ELECTRIC CORROSION. A COMPLETE TOILET EXHAUST SYSTEM. CNSAUDIBLE SUPERVISORY 72873EQUIPMENT PRIOR TO REMOVAL. ROOF CURBS SHALL BE REMOVED AND THE 5. I0. FILTER RACKS OF STANDARD SIZE ARE TO PROVIDED FOR ALL DUCTED BASED ON CONSTRUCTION SIGNAL AT A CONSTANTLY ROOF PATCHED. ALL EXTRANEOUS ITEMS IN THE SPACE OR ON THE ROOF VIBRATION CONTROLS HVAC PIPING $ EXPOSED DUCTWORK SHALL BE INTERNALLY LINED CLOSED CELL DUCTWORK UNITS. y . �3<< DOCUMENTS AND OTHER ATTENDED LOCATION NOT APPLICABLE TO THE NEW WORK MUST BE REMOVED AND ELASTOMERIC FOAM DUCT LINER. DATA SHALL NOT PREVENT OMSC ROOF/WALL/FLOOR PATCHED/REPAIRED TO MATCH EXISTING STRUCTURE. EQU I PMENT II. CONDENSATE DRAIN FROM INDOOR AIR CONDITIONING UNITS. MINIMUM DRAIN4. �� THE CODE OFFICIAL.FROM 606.4.1 a. MANUFACTURER: ARMSTRONG WORLD INDUSTRIES INC. MODEL SECTION 233113 q�, �o. REQUIRING THE CORRECTION EXISTING ABANDONED PIPES, DUCTS, OR EQUIPMENT IN THE FLOOR, SIZE TO BEI". CONDENSATE DRAIN TO BE TRAPPED WITH A TRAP DEPTH OF s� CN 11 Oat, OF ERRORS.OSSC 105.4 EMBEDDED IN CONCRETE, OR OTHERWISE INACCESSIBLE ARE TO BE CUT OFF SECTION 230545 AP ARMAFLEX SA DUCT LINER. OR DURKFLEX FE. 1.5 X TOTAL STATIC PRESSURE. DRAIN SHALL TERMINATE AT CLOSEST 4'q�LJ'CH�0 AND SEALED BELOW OR WITHIN FLOOR OR WALL LEVEL WHEN THEY ARE NOT b. INSULATION: NFPA 90A/qOB SELF-ADHERING CLOSED CELL A. METAL DUCTWORK - NO FIBERGLASS DUCT ALLOWED 1.5TUX UNITS'H WITHIN TENANT SPACE. PIPE SUPPORTS TO BE SPACED NO MORE TO BE REUSED IN TH15 PROJECT. IF REQUIRED BY LANDLORD OR CODES, ELASTOMERIC FLEXIBLE INSULATION MEETING ASTM 0177 OR , ABANDONED PIPING AND/OR DUCTWORK MUST BE REMOVED TO POINT OF A. VIBRATION ISOLATION DEVICES C518, ASTM E-96 25/50 SURFACE BURNING, ASTM E-84 I. NO DUCTWORK SHALL BE FABRICATED PRIOR TO JOB SITE VISIT AND THAN 70" APART. CITY OF TIGARD I EMRATM0613WtP ORIGIN. CONFIRM THE EXTENT OF DEMOLITION PRIOR TO BID AND INCLUDE IN I. VIBRATION ISOLATION DEVICES WITH SUPPORTS BETWEEN VIBRATING MICROBIAL GROWTH, ASTM CI071, ASTM G21 AND G22, ODOR APPROVAL BY THE GENERAL CONTRACTOR. A SKETCH MUST BE SUBMITTED BID PROPOSAL. EQUIPMENT AND THE STRUCTURE (FANS, AIR HANDLERS, ETC.). EMISSIONS ASTM 0665. INDICATING SIGNIFICANT DEVIATIONS FROM DESIGN AND MUST BE APPROVED FOR CODE COMPLIANCE C. K VALUE MAXIMUM 0.25 AT 75 DEG. F, 0.037 AT 24 DEG. C. BY OWNER'S CONSTRUCTION MANAGER PRIOR TO FABRICATION OR Approved: J 1 10.19.004.21972 d. WATER VAPOR TRANSMISSION MAXIMUM OF 0.05 PERM-INCHES. INSTALLATION. 2. VIBRATING EQUIPMENT HUNG FROM STRUCTURE SHALL BE ISOLATED WITH UTC: - . 2. EXCEPT AS OTHERWISE INDICATED, FABRICATE AND INSTALL RECTANGULAR j SHEET RUBBER AND SPRING DEVICES. VIBRATING EQUIPMENT SUPPORTED FROM 6. INSULATION SHALL BE AS INSTALL PER APPROVED AND ROUND DUCTWORK WITH GALVANIZED STEEL, IN ACCORDANCE WITH ° Pcrmit f-C A n 9 ^ t )e )_ c -1 FLOOR OR DECK SHALL BE ISOLATED WITH HOUSED SPRING MOUNT DEVICES. MANUFACTURER'S GUIDELINES. SMACNA "HVAC DUCT CONSTRUCTION STANDARDS" OF THE LATEST EDITION. •,S Address c�.�°G 1 w�.s1,•,rff'�"►�, � •. WHERE OTHER CODES ARE ENFORCED, (IE. UMC, BOCA, ETC.) USE THE MOST FvllOO 6. INSULATION SHALL BE AS MANUFACTURED BY ARMSTRONG, JOHNS MANVILLE, STRINGENT CODE FOR DUCT CONSTRUCTION STNDARDS. Suite#: R, f 1 KNAUF OR CERTAIN TEED. By: Date: L---0:),-) 111111111111111111111. .1111111111•11111111111111111111111. MINK 111111MMINUM Plot date: 19 April 2019 Design Parameters: t City Name Portland `/ Location Oregon C Latitude 45.6 Deg. Longitude 122.6 Deg. "MI 1•1110 SCS- EDULE - SALES AREASlevation 39.0 ft Summer Design Dry-Bulb 90.0 F • Summer Coincident Wet-Bulb 67.0 °F WM • Summer Daily Range 21.6 °F Winter Design Dry-Bulb 22.0 °F SIZE (mm) Winter Design Wet-Bulb 18.4 °F 5 ..ig MAX PRESSURE MAX NOISE Atmospheric Clearness Number 1.05 REFERENCE MAKE MODEL TYPE DROP (IN. W.G.) CRITERIA (NC) MOUNTING FINISH NOTES Average Ground Reflectance 0.20 FACE NECK Soil Conductivity 0.800 BTUI(hr-ft-`F) 0 Local Time Zone(GMT+1-N hours) 8.0 hours Consider Daylight Savings Time No 5D-1 KRUEGER PLQ PLAQUE DIFFUSER 245x24" j" 0.1 25 LAY-IN T-BAR F23 44-BRITISH Wl-IITE PROVIDE WITI.1 I.1CF23 MOUNTING FRAME Current Data iulation stherrData 2001 ASHRAE Handbook fY' Design Cooling Months January to December Air System InformationUlf Air System Name VAV-55 Number of zones 2 Equipment Class PKG ROOF Floor Area 3107.0 ft' Air System Type VAV Location Portland,Oregon RG-! KRUEGER 585 FIXED DEFLECTION 36"x14" - 0.1 25 LAY-IN T-BAR F23 44-BRITISH WHITE PROVIDE WITH[ NCF23 MOUNTING FRAME Sizing Calculation Information loin STEEL GRILLE Calculation Months Jan to Dec Zone CFM Sizing Peak zone sensible load Sizing Data Calculated Space CFM Sizing Individual peak space loads Cd Central Cooling Coil Sizing Data Total coil load 6.6 Tons Load occurs at Jun 1400 / Total coil load 79.2 MBH OA DB/WB 88.4166.8 °F Sensible cal load 64.2 MBH Entering DB/WB 79.2164.7 °F Coil CFM at Jun 1400 2463 CFM Leaving DB J WB 55.0/53.7 °F Max block CFM at Jun 1500 2463 CFM Coil ADP 52.3 °F Sum of peak zone CFM 2463 CFM Bypass Factor 0.100 Sensible heat ratio 0.811 Resulting RH 54 % CFM/Ton 373.0 Design supply temp. 55.0 'F ABERCROMBIE& FITCH CO. ft'7Ton 470.6 Zone T-stat Check 0 of 2 OK BTUI(hrft') 25.5 Max zone temperature deviation 1.0 °F 6301 FITCH PATH Water flow 10.0°F rise WA NEW ALBANY,OHIO 43054 Supply Fan Sizing Data 614-283-6500 Actual max CFM at Jun 1500 2463 CFM Fan motor BHP 0.00 BHP ' SCH D U# (�� �{ p � Standard CFM 2459 CFM Fan motor kW 00 L- V L 1\ Actual max CFM/IF 0.79 CFM/R' Fan static 0.00 in wg Outdoor SIZE (mm) esiVentilationflooCM Air Data 0 CFM CFM/person 0.00 CFM/person ENGINEER: REFERENCE MAKE MODEL TYPE MAX PRESSURE MAX NOISE MOUNTING FINISH NOTES CFMHt' 0.00 cFM/ft' FACE NECK DROP (IN W.G.) CRITERIA (NC) I DESIGN COOLING DESIGN HEATING e3 tli,nze44.4.1 SD-2 KRUEGER PLQ PLAQUE DIFFUSER 245x24" 085 0.1 25 LAY-IN T-BAR F23 44-BRITISH WHCOOLING DATA AT Jun 1400 HEATING DATA AT DES HTGITE COOLING OA DB/WB 88.4°,166.8°F HEATING OADBIWB 22.0'FI18.4'F Sensible Latent Sensible Latent [---- SINGLE DEFLECTION ZONE LOADS Details (BTWhr) (BTU/hr) Details (BTU/hr) (BTUIhr) - _ %a RG-2 KRUEGER 585 24"X24" - 0.1 35 LAY-1N T-BAR F23 44-BRITISH WHITE Window&Skylight Solar Loads Oft' 0 - Oft' - - GRILLE Wal Transmission 0 ft' 0 - 0 ft' 0 - ...J.v.°:°e,- Roof Transmission 3107 ft' 5382 - 3107 6' 14772 - SINGLE DEFLECTION Window Transmission oft' 0 - Oft' 01 - EG-I KRUEGER 585 12"X12" 06" 0.1 35 SURFACE MOUNT 44-BRITISH WHITE 130 E. CHESTNUT ST.,SUITE 303 Skylight Transmission 0 ft' 0 0 it' 01 GRILLE Door Loads Oft' 0 - on' of - COLUMBUS, OHIO 43215 !Floor Transmission 3107 ft' 0 - 3107 6' 0i 1Partitions oft' 0 -1 0 ft' o (614) 224-3331 Ceiling O fto -I 0 w 01 - Overhead Lighting 276 W1 747 0 01 - Task Lighting 2130 W 6067 -1 0 01 - I Electric Equipment 4344 W 13729 _! 0 of - People 75 14881 15000 0 p 0 !Infiltration - 0 0 - 0 0 Miscellaneous - 0 0 - 01 0 Safety Factor 10%0%o% 4081 0 10% 14771 0 >>Total Zone Loads - 44887 15000 - 16249 0 • Zone Conditioning - 51621 15000 - 0 0 Plenum Wall Load 0% 0 - 0 01 - O w AIR DEVICE SCHEDULE Plenum Roof Load 70% 12558 0 o[ - !Plenum Lighting Load 5% 47 0 01 Y LLI V > SCALE: NONE (L A !Return Fan Load 2463 CFM 0 25 CFM IV Ventilation Load 0 CFM 0 0f 0 CFM 0f 0 )- U }- Q� Supply Fan Load 2463 CFM 0 - 25 CFM Di - U Lel � O a Space Fan Coil Fans - 0 - 0 Duct Heat Gain/Loss 0% 0W 0° Cl L> LU >>Total System Loads 64226 15000i - 0 0 M k.5.> -1 > tY Central Cooling Coil - 64226 15002 - 0 0 (j U Z W 0 Q >>Total Conditioning - 64226 15002 - 01 0 O II W Lu Q Key: Positive values are cig loads Positive values are htg loads - Q Negative values are htg loads Negative values are clg loads Cl3 CC1 Ct 4--- -f 5 I 1 I i Q o 6. o PARALLEL =Ak POWERED BOX SC--IEDULE ct' o (BASED ON CARRIER UNLESS NOTED OTHERWISE) MAXIMUM MINIMUM FAN PERFORMANCE ELECTRIC HEAT VOLTS UNITMFR., INLET PRIMARY MOCP MCA WEIGHT NO. MODEL NO. UNIT SIZE SIZE AIR FLOW AIR FLOW EXTERNAL FAN FAN POWER HEAT REMARKS B MECHANICAL LAD CALCULATIONS (CFM) (CFM} STATIC MOTOR MOTOR INPUT OUTPUT STAGES CFM PHASE (AMPS) (AMPS) (lbs) SCALE: NONE {IN W.C.) AMPS NP (KW) (MBH) Z FPB-I 45M 3 8"0 q00 150 0.5 0.9 1/10 5.0 17.07 2 450 208 20.0 18.85 167 3 COMMISSIONING FPB-2 45M 3 854) '4)0 150 0.5 OA1/10 5.0 17.07 2 450 208 20.0 18.85 167 D. PM SITE VISIT #2 - MECHANICAL REVIEW 3 COMMISSIONING D.3. AUDIT THE GC CONTROLS FIELD INSTALLATION VERSUS THE ALC SHOP 208 A. GENERAL DRAWINGS. THE REVIEW SHALL INCLUDE BUT NOT BE LIMITED TO: FPB-3 45M 4 10" 1300 150 0.5 2.8 174 5.0 17.07 2 500 3 20.0 19.72 175 A.I. ALL REFERENCES TO THE TERM "OWNER" REFER TO ABERCROMBIE 4 FITCH, D.3.I. EQUIPMENT INSTALLED (EMS PANEL, SENSORS, ETC.) A$F, OR HOLLISTER. D.3.2. CONTROLS CABLE PULLED * LABELED A.2. ALL REFERENCES TO THE TERM "VENDOR" REFER TO THE OWNER SUPPLIED W D.3.3. NOTIFY ASF IMMEDIATELY IF CABLE IS NOT INSTALLED OR T ta m HVAC 4 CONTROLS COMMISSIONING VENDOR. INSTALLED CABLE IS NOT WHAT ALC PROVIDED ? LI A.3. ALL REFERENCES TO THE TERM "PROGRAM" REFERS THE HVAC 4 CONTROLS Q D.4. PRODUCE HVAC 4 CONTROLS INSPECTION REPORT TO BE SAVED IN JOB'S p COMMISSIONING PROGRAM. Q SITE VISIT FOLDER. W A.4. ALL REFERENCES TO "ALC" REFER TO THE ASF OWNER SUPPLIED ENERGY E a MANAGEMENT SYSTEM VENDOR AUTOMATED LOGIC CONTROLS. Cl w U E. PM VISIT #3 - EQUIPMENT START UP AND AIR/WATER. Q w w E.I. AUDIT THAT ALL DEFICIENCIES IN THE PM SITE VISIT #2 REPORT ARE C I Ce PROVIDED BY FACTORY: PROVIDED BY OWNER $ INSTALLED BY OTHERS: PROVI.pED AND INSTALLED BY GC: B. PURPOSE p RESOLVED DURING PM VISIT #3. IF ALL ITERMS ARE NOT COMPLETE PM Q 1. NOTE 2. NOTE 3. NOTE - B.I. A$F HAS IMPLEMENTED AN OWNER SUPPLIED HVAC it CONTROLS CZ SHOULD REVIEW WITH THE GC'S SITE SUPERINTENDENT BEFORE LEAVING THE w w - LOW PRESSURE DROP FILTERS - PARALLEL FAN POWERED VAV (BASED ON 45M CARRIER MODEL) - VAV UNIT SUPPLY SHALL BE BALANCED TO CFM IN SCHEDULE COMMISSIONING PROGRAM TO GUARANTEE ALL NEW STORES ARE 100% 0SITE. - MOTOR STARTER REHEAT CONTACTS FLOW RINGS - VIBRATION ISOLATORS COMMISSIONED AT THE PUBLISHED STORE TURNOVER DATE. - E.2. REQUEST OBTAIN A COPY OF THE HVAC EQUIPMENT STARTUP REPORT(S) Q - 44 VAC TRANSFORMER WITH CONTROLS ENCLOSURE (NO CONTROLS) - AIR BALANCER TO CONTACT ALC AT 678-797-5088 TO CALIBRATE MIN OA IN Q WITH SIGNATURE OF MANUFACTURER'S REPRESENTATIVE WHO PERFORMED [n M M - ELECTRIC HEAT (KW BASED ON LOAD CALC) SOFTWARE C. EXPECTATIONS THE STARTUP FROM GC $ SAVE TO STORE FOLDER IN NOT COMPLETE UNTIL - HANGERS - EQUIPMENT TO BE INSTALLED PER MFG SPECIFICATIONS. STARTUP SHALL BE AFTER PM VISIT #3 PM TO OBTAIN REPORT AS SOON AS STARTUP 15 X COMPLETED BY THE GC AND PROVIDED TO THE ANF PM C.I. THE VENDOR IS EXPECTED TO WORK IN A METHODICAL AND PROFESSIONAL COMPLETE. CV X - DOOR INTERLOCKING DISCONNECT SWITCH MANNER. h. X C.2. THE VENDOR SHALL FOLLOW ALL LOCAL, COUNTRY, LANDLORD, 4 A$F CO N RULES/REGULATIONS. • N C.3. THE VENDOR IS REQUIRED TO PROVIDE ALL NECESSARY LABOR, MATERIALS, COMMISSIONING 3 4 EQUIPMENT TO COMPLETE THE PROGRAM. THE VENDOR IS RESPONSIBLE F. COMMISSIONING SITE VISIT U FOR COORDINATING ALL SITE VISITS WITH THE GENERAL CONTRACTOR. m C.4. THE VENDOR IS RESPONSIBLE FOR ALL TRAVEL ARRANGEMENTS. F.I. CO AUDIT THAT ALL DEFICIENCIES IN THE PM SITE VISIT #3 REPORT ARE W x C. 5. THE VENDOR IS RESPONSIBLE FOR ACCESSING AND DOWNLOADING THE RESOLVED BY THE FIRST DAY OF THE SITE VISIT. IF ALL ITEMS ARE NOT U X , LATEST REVISION OF SHOP DRAWINGS, EQUIPMENT SUBMITTALS, AND CONSTRUCTION DOCUMENTS FOR EACH SITE VISIT. COMPLETE, IMMEDIATELY REVIEW THE DEFICIENCIES WITH THE GC' CONSTRUCTION SITE < <C SUPERINTENDENT AND CONTACT ASF. C.6. THE VENDOR SHALL MAKE ONE 517E VISIT FOR EACH STORE. THE VISIT F.2. CONTACT ALC'S CUSTOMER SERVICE LINE (PHONE #: (678) 7q7-5088) AND LU CO SHALL COORDINATE WITH THE ASF CONSTRUCTION SCHEDULE. COMPLETE A POINT-TO-POINT AUDIT OF THE CONTROLS SYSTEM WITH ALC. (2) < C.7. THE VENDOR SHALL REVIEW THE CONSTRUCTION SCHEDULE ON A WEEKLY C, Ct o BASIS TO PLAN AND COORDINATE TRAVEL TO SITES A5 REQUIRED. CC F.3 TERMINATE ALL CONTROLS CABLES INTO THE EMS PANEL AND CONTROL 0 C.B. THE VENDOR SHALL CHECK IN OUT WITH THE GC SITE SUPERINTENDENT DEVICES PER THE ALC SHOP DRAWINGS $ HVAC EQUIPMENT SUBMITTALS. Z W V) EACH DAY OF THE SITE VISIT. THE FOLLOWING IS A LIST ITEMS TO TERMINATE. ITEMS SHALL INCLUDE < C Q C.q. THE VENDOR SHALL REVIEW, IN PERSON, ALL DEFICIENCIES WITH THE GC'S BUT NOT LIMITED TO: EXI-A U ST FAN SC-E D U L E SUPERINTENDENT PRIOR TO LEAVING THE SITE EACH DAY. F.3.1. EMS SPACE TEMPERATURE SENSOR(S) (o C.10. THE VENDOR SHALL SUBMIT A DAILY SITE VISIT REPORT VIA EMAIL TO THE F.3.2. EMS RELATIVE HUMIDITY SENSORS) LU 0 A$F CONSTRUCTION TEAM. .J i CC C.II. THE VENDOR SHALL COMPLETE AN HVAC 4 CONTROLS INSPECTION REPORT, F.3.3. EMS SUPPLY AIR TEMPERATURE SENSOR(S) CO TOTAL STATIC ELECTRICAL DATA OPERATING FORM DEFINED BY AGF, THAT LISTS ALL DEFICIENCIES WITH PHOTOS OF F.3.4. EMS OUTDOOR AIR SENSOR(S) Q w Z N TAG MANUFACTURER MODEL NO. SERVICE FAN TYPE CFM PRESSURE 'VOLTS REMARKS EACH DEFICIENCY. REVIEW THE REPORT WITH THE CC'S SITE Q F.3.5. PROGRAMMING EQUIPMENT MANUFACTURER GATEWAY. CV civic) WATTS WEIGHT (LBS) SUPERINTENDENT AND HAVE THEM SIGN THE REPORT. SUBMIT THE REPORT Z W r..... Y PHASE VIA EMAIL TO THE ASF CONSTRUCTION TEAM WITHIN 24 HOURS OF LEAVING > F.3.6. EMS CHILLED, HOT, AND CONDENSING WATER SENSOR(5) = Q Co Y 124 THE JOBSITE. F.3.7. EMS CURRENT OPERATED SWlTCH(ES) n C9 TEF-I LOREN COOK GN168 TOILET ROOM INLINE 150 .25 110 12 1,2 C.12. THE VENDOR SHALL WORK WITH THE GC, ALC, HVAC EQUIPMENT z F.3.5. EMS CONTROLS WIRE AND POWER: FOR ALL NON-DAIKIN HVAC co C Z z i EQUIPMENT. THIS WILL INCLUDE, BUT NOT LIMITED TO, C _ 0 Z MANUFACTURERS TO RESOLVE ALL DEFICIENCIES. p CARRIER, TRANE, YORK, LENNOX, ETC CO CD N F.3.q. EMS CONTROLS WIRE: FOR ALL THIRD PARTY EXHAUST, 'Q Z Q REMARKS: D. PM SITE VISIT #2 - MECHANICAL REVIEW W a I. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. PROVIDE VIBRATION ISOLATORS. f SUPPLY OR CIRCULATION PUMPS. t CD C CC 2. CONTROLLED BY OCC SENSOR. D.I. AUDIT THE INSTALLED HVAC EQUIPMENT VERSUS THE APPROVED GC E F.3.1O. ALL MODBUS CONNECTIONS v-■ .0 Q p CZ SUBMITTALS. Z ( w w D.2. AUDIT THE GC FIELD INSTALLATION VERSUS THE CONSTRUCTION DOCUMENTS. 0 Q 0 Z 6 a F.4. NOT INCLUDED IN SCOPE: Z. (/� z4 THE REVIEW SHALL INCLUDE BUT NOT BE LIMITED TO: = L _ cr Z F.4.I. ELECTRICAL OR POWER TERMINATIONS TO THE EMS PANEL AND C3 4 D.2.1. HVAC EQUIPMENT (INDOOR * OUTDOOR) L. Cl) Q J LIGHTING CONTACTORS E D.2.2. ROOF CURBS 4 PENETRATIONS .(D <ir a) cl U F.4.2. INSTALLING THE EMS PANEL, UNITARY PANELS, OR SENSORS G D.2.3. PIPING (REFRIGERANT, CONDENSER, CONDENSATE, CHILLED F.4.3. PROVIDING OR INSTALLING THE COMMUNICATION OR CONTROLS 0) I= to LU WATER, POTABLE WATER, STEAM, NATURAL GAS, ETC.) CABLE 0 D.2.4. DUCTWORK � F.4.4. FIRE PROTECTION OR FIRE ALARM SYSTEMS CZ 11- D.2.5. SEISMIC HANGARS (IF APPLICABLE) tL D.2.6. VIBRATION ISOLATORS F.5. THE VENDOR IS TO REMAIN ON SITE UNTIL THE STORE HAS BEEN 100% Q D.2.7. AIR DEVICES (DIFFUSERS, GRILLES, VCD'S, ETC.) COMMISSIONED. VENDOR SHALL NOT LEAVE THE SITE UNTIL 100% REQ PRE`. D.2.8. INSULATION (DUCTWORK, PIPING, ETC.) COMMISSIONED UNLESS APPROVED BY A$F'S PROJECT MANAGER. , ,'��rf.. �gtl��h, w� `4'' D.2.q. MAINTENANCE ACCESSIBILITY (FILTERS, COILS, MOTORS, 72.973PE ISOLATORS, ETC.) F.6. PRODUCE HVAC 4 CONTROLS INSPECTION REPORT DAILY AND HAVE THE _ t .'�f D.2.lO. FIRE DAMPER(S) REPORT SIGNED BY THE SITE SUPERINTENDENT OR DELEGATED PERSONNEL 3''"' 'RI OREGON e D.2.11. CONTROLS '� �, 10 A. GC CHARGE BACK j 1 � A.I. A $2000.00 BACK CHARGE WILL BE APPLIED TOWARDS THE GC CONTRACT �•40E, O0 FOR ALL ADDITIONAL DAYS REQUIRED ON SITE DUE TO GC ISSUES. TO Irvrili Siiliill fili�(■itt-' INCLUDE BUT NOT LIMITED TO COSTS TO CHANGE FLIGHT, HOTEL, AND PER DIEM. 10.19.004.21972 SHEET r ., c MECHANICAL EQUIPMENT SCHEDULES I D COMMISSIONING SPECIFICAITONS M1.20 SCALE: NONE SCALE: NONE Plot date: 10 May 2019 Ci) • .1.4 ••ra$ win • 10•4 5 vow C c CB Ci-lt ;1•14 1 i I lori) I I e Ct 1 1 � I 5D-2 I SD-2 I l ABERCROMBIE& FITCH CO. l 150 150 6301 FITCH PATH 8"mIX \I I NEW ALBANY, OHIO 43054 '' 614-283-6500 5D-�Z II 11 I ( I 125 II II ( RG-2 L' ENGINEER: RG-2 CX ,// I 1 . . , EG- 6.0011 Q , _1 ,(-FPB-3 f ! $"01 --- J i'I I ( SD-2 8"O r` ;i -' ) f \,I ID , / ( sD2\ _ - ' 125 10 r ` \ j 150 12"x10" 18"x12" 1 SD-I U j I 1 1 # I , ,300 % I 130 E. CHESTNUT ST.,SUITE 303 - _ COLUMBUS, OHIO 43215 0E-5-- \1 • c I (614) 224-3331 I 14EG-I . RG-I—41©n 1-I II II II 11 ' ' II it 11 ii 1 1iii 11 11 11 it a 11 0FPB-2 II 11 II II I i it II 0 !I II i � III II II 1111 I 11 11 II 0 r I r ' w a Lu A F L = =1 = — I <_ CI. i Y > Q v �) h16.00 M6.00 I I 2 5SD I H w wH o Nz oSD-I 15 1A---\ 0 z 30 co_ w 100 IA08Zo z Q • in)P Q Q o 6 - — —24"x24" RETURN AIR GRILLE TO BE USED I- -' 10"0 1 FOR ACCESS TO FPB. COORDINATE EXACT (TIP) B - LOCATION OF FPB WITH FINAL LOCATION P.00 /FPBI �` / `\ II OF ACCESS PANEL. TYPICAL OF 3. (TYP) RG-1 r►— f _ 7_-_- 7.-_J FA l0"x!0" I4"x12" z 1 ;RG-I I 0 " ( { E F (TIP) ©� ( 14"x12" I IO"x1O'Ai I I E C 10 I\ 6.00 016.00 FPB-2 10"O ' A (TIP) 116.00 FPB-I O 10"fi SD-I <1 � 2251) ION) = = _a = _ _ IA ©_ _ � 5D-I = _�_ = I —�.r f I I © i0 225 of c o CO in I_ I SD-I to 225 Z D 1 W o II ctl LI; -tt L.L.I _ -Jn C— — �� = _..._ fl = I= o �..1" LL Li. - - .I H . r r I .1 r r r — _ �'II 1� rrIII r II II II I1 , II Il II i! II , 11 it it it ! 11 II li II in o Q Q II Il Ii II 11 II II II 11 t If it 13 11 I ' - - - 11 11 I, 1— — — 1 m I I _ N x x r,,, x N T Y Q = CO U r V x Q X co z cc 0 P MECHANCIAL PLAN w cn E =114" - 1'-0" Q p 0 i. CO cc CO Ez WZN GENERAL NOTES MECHANICAL PLAN NOTES MECHANICAL PLAN SYMBOL LEGEND Z OC 0 cm_Y Q < 0 O) 1. COORDINATE ROUTE OF DUCTWORK WITH SUPPORTS FOR LIGHTING IN ALL Oi OWNER VENDOR TO LOCATE REMOTE SENSOR WHERE SHOWN. SYMBOL DESCRIPTION SYMBOL DESCRIPTION . 0 Z Z SALES AREA. REFER TO ELECTRICAL LIGHTING PLAN FOR FURTHER _ cc Z INFORMATION. 0 LANDLORD EXISTING MEDIUM PRESSURE DUCT TO REMAIN. 1--. SPIN-IN FITTING 7..] 9= 8 U 2. TEMPERATURE SENSORS TO BE MOUNTED 48" AFFL UNLESS OTHERWISE 0 EXTEND NEW MEDIUM PRESSURE DUCT FROM NEW TAP AND CONNECT TO NEW \ ####CFC'( MECHANICAL EQUIPMENT TAG Q "� Z Q W 0 NOTED. FAN POWERED VAV BOX AS SHOWN. BALANCING/VOLUME DAMPER V *a) 0 CC _ �� �� II-- 0 ® CONTACT GENERAL CONTRACTOR PROJECT MANAGER FOR MVAC CONTROL SHOP SD-X--.DESIGNATION RETURN AIR DUCT RISE / DROP 'E o 3. ALL EQUIPMENT SMALL BE LABELED "ANF-RTU-XX". SEE SPECIFICATIONS DRAWINGS SHOWING WIRING PULLS, SENSORS AND CONTROL PANEL MOUNTING DIFFUSER DESIGNATION �,,/� I� ( Z C3 w FOR PERMANENT LABELING REQUIREMENTS. LOCATIONS. XXX CFM Q 0 Z Q 0 _ .�- SUPPLY AIR DUCT RISE / DROP = L- I � � 4. PROVIDE HUMDISTAT AT EACH TEMPERATURE SENSOR WHERE REQUIRED. 05 STUB DUCT TO OPEN AREA ABOVE RESTROOM FOR EXHAUST FAN MAKE UP AIR. .> ><:::j r,. Q � H _ SUPPLY AIR DIFFUSER GRILLE V q) ,Q i 1..! V V STRAP HANGER TRAPEZE HANGER WRAP INSULATION CONCENTRIC HANGER STRAPS - :/.777,7HANGER SWAPS - 4" SPIN-IN FiT GV /, �' •,� MIN. STRAP, ANGLE, - OR ROD------„..O 3 tI) C113 _I 0 Li_ LL POUND SHEET METAL ac " " • 1.5" `= 11•4 Wit DiM • B Q VANES PRE-ASSEMB ` ON PLATE S' GAUGE AS DUCT DUCT WITH WRAP 1.25xDIM "B" • WIIII :_...:.: . INSULATION. 4 RUNNER PLATES • VANE •E-ASSEMBLED ON REQU RED I REFIRE RATED r; ,/ / PLATE SAME GAUGE AS DU RU PLATES EQUIRS ONLY. 5 wow ROUND DUCT (FLEX ONLY IN GALVANIZED VANES FOR STUB SHEET METAL DUCT b" UP SAME • •I Li VERTICAL) USE GALVANIZED VANES FOR ALVANiZED OR ALUMINUM SIZE A5 NECK OF GRILLE.SIZE BOLTS) GALVANIZED OR ALUMINUM DUCTS 0 ---�-- -- -�--- - FOR LOAD _� DUCTS <4\r°‘ ii• SUPPLY DUCT RECTANGULAR TO ROUND DUCT 4 SHEETMETAL ` :..:= M{NIMUMLESS THAN .41 l l i l l ii l i t l l l iSCREWS PER 36 TURNING 1.114 EQUAL TO BAND CLAMP AND DUCT HANGER (MIN.) ANGLE -DCIBLE LOCK NUT / " THE FLEX THREE SHEET METAL 3 r `� VANES al) I DUCT / 1 SCREWS THROUGH ! . } CONCENTRIC TEE ECCENTRIC TEE HANGER RODS, WIRES r �►� LENGTH RETURN AIR REGISTER (LAY-IN FRAME) DIAMETER ,'- HELIX OF FLEXIBLE c� OR STRAPS # INSTEAD IX) DUCT LINER (TYPICAL) --Ti FITTING Q FITTING / v ro DUCT SIZE FIRE DAMPER WHERE INDICATED SPIN-IN FITTING: WITH - ON PLANS. tCLG. STEEL MOUNTING Cd DAMPER, EXCEPT IN + / `i PLASTERBOARD CEILINGS, I ' T'' FRAME REQUIRED FOR DRYWALL DAMPER IN NECK / -FLEXIBLE DUCT: R=SOmm CEILING INSTALLATION SEE DETAIL \ } I INSULATED, ONLY IN 4 0 "C"C THIS SHEET. a ..r - .... -jiAL _ OVER 3b" IN LENGTH UN 36" IN LENGTH 41)----- ♦ / '. WRAP CEILING DIFFUSER: SET / \ SQ. EL`• . WITH TYPE "A" SQ. ELBOW WITH SI • E NON-DUCTED RETURN SYSTEM THROW AS SHOWN ON DOU; THICKNESS VANES THICKNESS VANES ABERCROMBIE& FITCH CO. INSULATION ►- ) 6301 FITCH PATH ABOVE THE PLANS I NEW ALBANY, CEILING FLAT OVAL DUCT BRANCH i' TAKE-OFF SIMLAR OHIO 43054 DIFFUSERS �' --"'-' % 614-283-6500 SUPPLY DUCT RETURN OR EXHAUST DUCT , � ENGINEER: A DIFFUSER MOUNTING DETAIL B BRANCH DUCT TAKE OFF DETAIL C DUCT HANGING DETAIL P TURNING VANES DETAIL RETURN GRILLE MOUNTING DETAIL M2.00 SCALE: NONE M2.00 SCALE: NONE M2.00 SCALE: NONE 2.00 SCALE: NONE SCALE: NONE COOK MODEL ` ' TR INTAKE OR AIRCURTAIN EQUAL �» �T ,;- e,.1' 4" MIN 8" MIN DUCT COLLAR TURNED • ACCEPT �4 FLANGE OF GRILLE ' ' FLUSH SECURE BASE • CURB ;`; ^=• \ • 130 E. CHESTNUT ST., SUITE 303 APPEARANCE. W LAG SCREWS ' O.C. = + \.' COLUMBUS OHIO 43215 25 1/4", 21 1/4", iq 1/4" OR 13 1/4" NOTE: ROUGH-IN OPENING SIZES: - SUPPORT FROM STRUCTURE RE NT GASKET = i ;,;, + -I- : ' / OUTSIDE DIMENSION NOMINAL i2"x 1224...,=.12241/21;2%12241/21/020 ABOVE MiNIMUM OF 2 PER •E - • • (614) 224-3331 -- ( a \+ NOMINAL 24"x NOMINAL 24"x 12" = 24 1/2"x 12 1/2" \ - _ \ NOMINAL 18"x 16" = 18 1/2"x 18 1/2" .., � PREFABRICATED ROOF =, . , , , ., NOMINAL 20"x 20" = 20 I/2"x 20 1/2" CURB '� _ AIR FLOW z • `: 23", 1q" 17" OR 11" �- " THERMAL INSULATING BLANKET , ` FASTENER (MIN.) l 0 SHEET METAL *$ REQUIRED FOR FiRE RATED DUCT r�` i tow INSIDE DIMENSION DUCT MAIN PLENUM BOX. CEILINGS ONLY. Z7) ``` "C" CHANNEL L- i / ROOFING , p w r--25 1/4", 21 1/4", / !� REINFORCING BY CZ > iq 1/4" OR 13 1/4" , , LL U f I t 1 1 I t��.' 1 Y \ 7 > < 0 G.C. AROUND < OPENING `s" RETURN SUPPLY 41V cL4 w w z > GASKET DRYWALL CLG. STEEL MOUNTING - - _� _ - -_ .'`''j" U Q w - ki w MOUNTING SCREW OPPOSED BLADE DAMPER RETURN AIR REGISTER FRAME REQUIRED FOR DRYWALL , �' �; z Q 0 (LAY-IN FRAME) CEILING INSTALLATION SEE DETAIL / I z O FIELD INSTALLED "C" THIS SHEET. METAL DECK SECURE CURB TO DECK I Z o 11-1 Q w w p N� WI SCREWS fit" D.C. MiN. 9 0 m a 1- ILI p _ I• + + + + DRYWALL CEILING " DUCT INSULATION OF 2 PER SIDE "il Q Ci �.i PP - f0 OR MAX THAT SEE �W p 24" 20", 18" OR 12" 11/2"`~ -' ' CLEARANCE ALLOWS. SPECIFICATION I �j 1= 6 _i NOTES: �� 11 3"x3"x1l4" ANGLE FRAMING ,,,'' A I. GAUGE OF SHEET METAL SHALL ;E SUCH THAT l' ‘` STEEL MOUNTING DUCT COLLAR 15 ABLE TO SUPP0 WEIGHT OF 4) SIDES ' li' r ( / FRAME GRILLE t DAMPER AND BE LEVEL. NOTES: '' -;:. I. ' RACTOR TO COORDINATE INSTALLATON WITH ROOFER FOR PROPER 2`4 I 1/8" .EQUENCE TO PERMIT FLASHING AND COUNTERFLASHING INSTALLATION. co g F DRYWALL MOUNTING FRAME DETAIL OPEN CE CG SUPPLY REGISTER DUCT COMECTION DETAIL H RESTROOM RETURN GRILLE MOUNTING DETAIL AIR INTAKE/EXHAUST HOOD DETAIL - AIR CURTAIN DETAIL › M2.00 SCALE: NONE 2.10 SCALE: NONE _ M2.00 SCALE: NONE - 2.10 SCALE: NONE 2.00 SCALE: NONE - A IN OUTSIDE AIR MIN. ) 0 GALVANIZED MIN. Y2"4) GALV' ; P CONNECT TO NEW STEEL ALL-THREAD / STEEL ALL- � 'EA - CENTER BACHET GATEWAY IN ENCLOSURE COOK OUTSIDE AiR HANGER ROD HANGER ' i LABEL NOTING EVERY AIR CONDITIONING UNIT SERVED BY REMOTE CONTROLLER AKE DUCT SIZE AS 18'(7YP) . G G SPRING HANGER WITH UNIT TO ' iNSTALL� i . ATED ON SHEET RUBBER SNUBBER. SIZE EACCU POWER4 VAC FROM EMSP 7v a P R LEVEL I2' HIGH PR :RICATED EQUIPMENT DAIKIN PANE J M2.'. IELD VERIFY FOR 120% OF WEIGHT OF SUPPORT PAT ••DEL ES5B TO to DdJ CE ,e. ION. SUSPENDED LOAD. SPAN AT LEAST ' (2) aVVA D STEEL �., A --9 IN NI _ 0 (TYPICAL). LOCATED 3FT MIN. FRO FLEXIBLE STRUCTURAL MEMB' • UNIT A ` OPEN A► COUNTER '°�' "`"2 RC- SQUARE WASH ' , 1 RUB BWfT\HU --� CONNECTOR APPROX. 9'-0". FIELD 'IFY AND m2� I (TYPICAL). 1 . PROVIDED WITH r_ -(TYPICAL) COORDINATE EXACT LOC' WITH �, I /�SHING _ > -- �{ `i MALL OPERATIONS MANAG - - SPRING VIBRATION 6" ���_i� 1. O �0.. �J SPRING HANGER 1=i it - _