Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans (25)
E LC2019-00777 fel; ,/, RECEIVED OCT• 2019 V �' i3OR a • CITY OF TIGARD /*/,,,NinF29651- ,.. LANDLORD woRK . AT TIGARD TowNE SQUARE BUILDING DIVISION a, , ,; • TILAND iOFFICE COPY -- SC IMIDT A�eCWITleCTs, �� • IN PREPA RA TION FOR FUTURE TENANT IMPROVEMENTS 11 s�k�E AVE. PORTLAND,OR 91239 16200 SW PACIFIC HIGHWAY (503'220-551 1 FAX(503)220-8518 TIGARD OR 97224 . . PROJECT TEAM : OLLNER/LANDLORD : CIVIL/STRUCTURAL ENGINEERS : HELSIN HOLDINGS VLMK ENGINEERING b DESIGN JOHN BELANIGH BRIAN DURAL (CIVIL) NESLIN HOLDINGS, INC. STEPHEN STENBERG (STRUGT_) 23421 SOUTH POINTE DRIVE, SUITE 210 3933 SW KELLY AVE 217 LAGUNA HILLS, CA 92653 PORTLAND, OR 91239 P: 949 291 4460 X 304 P:503-222-4453 F: 949 297 4453 JOHNmHESLiNHOLDINGS.GOM LU WWW_HESL INHOLD INGS.COM 1:1C ARCHITECT : MEP ENGINEERS : TILAND/SCHMIDT ARCHITECTS, P.C. IME 4 ASSOCIATES umumiklig PRANK SCHMIDT AIA HANK BARLEEN (ELECTRICAL) 99 3611 SW HOOD AVENUE, SUITE 200 STEVE KU se ii/ PORTLAND, OR 91239 (PLUMBING/MECHANICAL) Ilia P:503-220-8511 6915 SOUTHWEST MACADAM AVE, F=503-220-8518 SUITE 200ell * PORTLAND, OR 91219 P�j \ P:503-592-1155 Q CO GENERAL NOTES SHEET INDEX : LU ZFL„ 1. ALL WORK AND MATERIALS SHALL CONFORM WITH THE 5. IF THERE ARE TRENCHES OR EXCAVATIONS FIVE FEET 21, CONSTRUCTION DUST CONTROL: DURING CONSTRUCTION � ®r SWDURHAM RD 0� APPLICABLE STANDARDS OF THE 2014 OREGON STRUCTURAL (5'-0'), OR MORE IN DEPTH INTO WHICH A PERSON IS DUST CONTROL MEASURES SHALL BE REQUIRED. GRADING - lit SPECIALTY CCODE, A COPY SHALL BE MADE AVAILABLE AT THE REQUIRED TO DESCEND, CONTRACTOR SHALL OBTAIN WILL. BE DISCONTINUED DURING FIRST-STAGE SMOG �' Q4 '0 PROJECT SITE AT ALL TIMES BY THE GENERAL CONTRACTOR, NECESSARY PERMIT FROM THE STATE OF OREGON OSHA ALERTS AND SUSPENDED DURING PERIODS OF HIGH WIND TITLE SHEET C.) J AINCLUDING AMERICAN WITH DISABILITIES ACT (ADA.) PRIOR TO ISSUANCE OF BUILDING PERMIT. (1,E_ OVER 15 MILES PER HOUR). ALL HALING TRUCKS 10.0 00 CC SITE 5 �,��' REQUIREMENTS, OREGON PLUMBING SPECIALTY CODE, OREGON SHALL HAVE LOADS COVERED OR WETTED AND LOADED a MECHANICAL SPECIALTY CODE, OREGON ELECTRICAL 10, CONTRACTOR SHALL VERIFY, IN FIELD, ALL ELEVATIONS, BELOW THE SIDEBOARDS TO MINIMIZE DUST. (APPLIES TO 1641.1 CIVIL / SPECIALTY CODE, AND LATEST EDITIONS AND OTHER APPLICABLE STATE 'AMENDMENTS AS ADOPTED BY THE FLOW LINES, EXISTING CONDITIONS, AND POINTS OF DEMOLITION, GRADING 4 CONSTRUCTION) CONNECTION WITH ADJOINING PROPERTY. ANY C10 NEW WATER SERVICE PLAN AND DETAILS 1111111 GOVERNING CITY OR COUNTY, AS WELL AS LOCAL GOVERNING DISCREPANCIES SHALL BE CALLED TO THE ATTENTION OF 22. THE CONSTRUCTION SHALL NOT RESTRICT A FIVE-FOOT I� N AGENCY ORDINANCES, LAWS, RULES, REGULATIONS AND PROJECT THE ARCHITECT BEFORE PROCEEDING WITH WORK CLEAR AND UNOBSTRUCTED ACCESS TO ANY WATER OR • ARCHITECTURAL CONDITIONS OF APPROVAL_ NOTHING IN THESE DRAWINGS SHALL CONTRACTOR SHALL OBTAIN WRITTEN AUTHORIZATION POWER DISTRIBUTION FACILITIES (POWER POLES, cl oft,cc z R N VICINITY MAP BE CONSTRUED TO PERMIT WORK NOT CONFORMING TO THESE FROM TWE ADJOINING PROPERTY OWNER PRIOR TO PULL-BOXES, TRANSFORMER, VAULTS, PUMPS, VALVES, rick, CODES, STANDARDS OR REQUIREMENTS. 41.0 SITE PLAN • 0 N, COMMENCING ANY WORK WHICH REQUIRES USE OF, OR ANY METERS, APPURTENANCES, ETC.) OR THE LOCATION OF1,. IMPROVEMENTS TO THEIR PROPERTY, HOOK-UP. THE CONSTRUCTION SHALL NOT BE WITHIN TEN W NTS ® ® 2, A SEPARATELY BOUND PROJECT MANUAL / SPECIFICATIONS AND FEET OP ANY POWER LINES-WHETHER OR NOT THE LINES 44.1 PROPOSED FLOOR PLAN • L__141 ► ' + TWE OWNER'S SCOPE OF WORK ARE A PART OF THESE DRAWINGS II, PROVIDE FIRE EXTINGUISHERS AS REQUIRED BY IBC AND ARE LOCATED ON THE PROPERTY. FAILURE TO COMPLY A42 PROPOSED REFLECTED CEILING PLAN 0 (1 W AND CONTRACT DOCUMENTS. INCLUDING THE OWNERS, SMART t LOCATE PER FIRE MARSHALL'S DIRECTION, (I) FIRE MAY CAUSE CONSTRUCTION DELAYS AND/OR ADDITIONAL A4,3 PROPOSED ROOF PLAN • I ` soift O FINAL INC.,'GENERAL CONDITIONS OF THE CONTRACT FOR EXTINGUISHER PER 3,000 5.F, OF BUILDING, AREA WITHIN EXPENSES. CONSTRUCTION'. LATEST EDITION, WHICH 15 MADE A PART OF 15'-0' TRAVEL DISTANCE BETWEEN EXTINGUISHER THESE DRAWINGS AS IT APPLIES TO THE OWNER, CONTRACTOR, EXTINGUISHERS UL RATED-4A 23_ ALL APPROVED SEISMIC GAS SHUTOFF VALVES WILL BE A5.1 EXTERIOR ELEVATIONS • [► IICC CI AND ARCHITECT AND ALL MATTERS PERTAINING TO THE INSTALLED ON THE FUEL GAS LINE ON THE DOWN STREAM a. CONSTRUCTION WORK IMPLIES FULL ACCEPTANCE OF THESE 12, MAINTAIN STRUCTURAL AND FIRE RESISTIVE INTEGRITY AT SIDE OF THE UTILITY METER AND BE RIGIDLY CONNECTED A6,4 WALL SECTIONS AND DETAILS • ' 14.41. 114k CC GENERAL REQUIREMENTS. EXT. AND INT_ WALL PENETRATIONS FOR MEGH, ELECT, TO THE EXTERIOR OF THE BUILDING OR STRUCTURE PLUMBING AND COMMUNICATIONS CONDUITS, PIPED AND CONTAINING THE FUEL GAS PIPING. COMMERCIAL 3. CONTRACTOR SHALL VISIT THE SITE, FAMILIARIZE HIMSELF WSTURCTURAL WITH SIMILAR SYSTEMS PER INTERNATIONAL BUILDING CODE ADDITIONS AND WORK MAY REQUIRE SEPARATE O 0 EXISTING CONDITIONS AND REVIEW AND UNDERSTAND THE SECTION 1. APPLY APPROVED FIRE STOPPING MATERIAL PLUMBING PERMIT 4L REQUIREMENTS OF THE CONSTRUCTION PLANS AND OF THE WHERE REQUIRED TO MAINTAIN FIRE RESISTIVE INTEGRITY 50,0 STRUCT.NOTES 4 PARTIAL • c4 r.i .ft CONTRACT DOCUMENTS_ CONTRACTOR IS RESPONSIBLE TO OF RATED ASSEMBLIES. 24. LUMEN ARCHITECT AND CONSULTING ENGINEERS DRAWINGS FRAMING PLAN I O F VERIFY ALL EXISTING ON-SITE AND OFF-SITE CONDITIONS AND STANDARDS DIFFER, TWE MOST RESTRICTIVE SHALL 510 MVAC ENLARGED FRAMING ' • CC 113 INCLUDING ALL DIMENSIONS, GRADES, ELEVATIONS, SOILS AND 13. CAULK AND SEALANTS - USE PRIMERS AS REQUIRED BY PREVAIL, UNLESS THE G_C. OR HIS SUB-CONTRACTORS PALNS 4 DETAILS EARTHWORK CONDITIONS WITH RESPECT TO THE WORK MANUFACTURER. BACKING RODS OR TAPE AS BRING THEM TO THE ARCHITECT'S ATTENTION DURING THE DESCRIBED ON THESE CONSTRUCTION DRAWINGS THROUGHOUT RECOMMENDED BY MANUFACTURER. USE POLYURETHANE BID PROCESS. THE DURATION OF CONSTRUCTION_ ANY DISCREPANCIES AND/OR SEALANTS AT CONCRETE FLOOR AND SIDEWALK JOINTS. MECHANICAL/PLUMBING/ELECTRICAL 0 I.‘ UNEXPECTED CONDITIONS THAT EFFECT OR CHANGE THE WORK ALL OTHER LOCATIONS USE POLYSULFIDE OR SILICONE_ 26. A COPY OF THE EVALUATION REPORT AND/OR CONDITION DESCRIBED HEREIN SHALL BE BROUGHT TO THE ARCHITECT'S OF LISTING SHALL BE MADE AVAILABLE AT THE JOB SITE. MTOD TITLE SHEET • I k tt J. ATTENTION IMMEDIATELY UPON NOTICE. CONTRACTOR SHALL NOT 14. VEHICULAR ACCESS MUST BE PROVIDED AND MAINTAINED PROCEED WITH ANY OF THE WORK IN THE AREA OF SERVICEABLE THROUGHOUT THE ENTIRE CONSTRUCTION 21_ STOREFRONT, SPANDREL, AND ELECTRIC SLIDING ENTRY DISCREPANCIES UNTIL ALL SUCH DISCREPANCIES ARE PERIOD. ALL CONSTRUCTION WORK PROVIDED FOR HEREIN DOORS SHALL COMPLY WITH THE REQUIREMENTS OF PLO PLUMBING SCHEDULE 4 DETAILS • CI RESOLVED. IF THE CONTRACTOR CHOOSES TO DO SO, AND FAILS IS TO BE CONSTRUCTED AND FINISHED IN EVERY PART IN INTERNATIONAL ENERGY CONSERVATION CODE, SECTIONS P2-1 PLUMBING DEMO FLOOR PLAN 0 TO NOTIFY THE ARCHITECT IN A TIMELY MANNER, THEN IT 15 A GOOD AND SUBSTANTIAL MANNER AND IN ACCORDANCE C303 AND 0402, PRODUCTS SHALL HAVE NFRC RATINGS. P4.1 PLUMBING FLOOR PLAN • Z UNDERSTOOD, THAT THE CONTRACTOR SHALL BE PROCEEDING WITH THE DRAWINGS AND SPECIFICATIONS, THE FULL INTENT 111X Neu. AT HIS OWN RISK AND WILL ASSUME ALL LIABILITIES AND INCUR OF THE SAME. ANY WORK REQUIRED BY LAW, BUT WHICH 25, IT SHALL BE THE GENERAL CONTRACTORS SOLE MLO HVAC SCHEDULES I DETAILS • ALL COSTS TO RESOLVE THE ISSUE TO THE ACCEPTANCE OF THE MAY NOT BE SPECIFICALLY MENTIONED HEREIN, SHALL BE RESPONSIBILITY TO ENSURE THAT ALL PERMITS ARE 0 • ARCHITECT, OUJNER AND/OR GOVERNING AGENCY. WRITTEN PERFORMED BY THE CONTRACTOR IN ACCORDANCE WITH ATTAINED AND ALL APPLICABLE CODE REQUIREMENTS M2.I HVAC DEMO FLOOR PLAN • -= _ - DIMENSIONS SHALL TAKE PRECEDENCE OvER SCALE ON THE THE LAWS OF CITY, COUNTY, DISTRICT, OR STATE UNDER AND REGULATIONS ARE MET FOR MECH., ELECT, AND M4.1 I-1VAC FLOOR PLAN • 's DRAWINGS_ DO NOT SCALE DRAWINGS. CONTRACTOR SHALL BE WHICH JURISDICTION WAY COME AND COST SHALL BE PLUMBING WORK. THE OWNER WILL PAY FOR ALL OTHER M42 HVAC ROOF PLAN 0 SW DURHAM ROAD RESPONSIBLE FOR ALL CORRECTIONS AND REPAIRS REQUIRED BORNE BY THE CONTRACTOR ANY SUCH EXTRA WORK CHARGES, FEES, OR COSTS CHARGED BY THE BUILDING DUE TO MI5 FAILURE TO DO 50, COST OF CORRECTING WORK SHALL BE PERFORMED IN CONFORMANCE WITH THE PLANS, AND CONSTRUCTION DEPARTMENTS, UTILITY AGENCIES OR Ell, ELECTRICAL PLAN C:1 - wilan _ BASED ON MISINTERPRETATION BY CONTRACTOR OF BOTH A5 TO THE MANNER AND APPEARANCE. ALL WORK PRIVATE COMPANIES WHICH REQUIRE SUCH COSTS PRIOR I a° M '- UNREPORTED DISCREPANCIES SHALL BE BORNE BY THE , SHALL BE PERFORMED IN ACCORDANCE WITH CURRENT TO INSTALLATIONS. V l I i I I I 1 I f I I I I 1CONTRACTOR. EDITION OF I.C.C. A5 REQUIRED BY GOVERNING AGENCIES. FOR REFERENCE ONLY i L29_ REPETITIVE AND TYPICAL WALL SECTIONS, FINISHES, AND 4. CONTRACTOR SHALL VISIT THE SITE PRIOR TO COMMENCING WITH 15. SOLELY AS A CONVENIENCE TO THE OWNER, THE DETAILS ARE NOT INDICATED EVERYWHERE THEY OCCUR R2.1 DEMO FLOOR PLAN • 1111:::( THE WORK TO DETERMINE IF ANY UTILITIES ARE REQUIRED TO BE ARCHITECT MAY INCLUDE DOCUMENTS PREPARED BY ON PLANS, ELEVATIONS AND SECTIONS. REFER TO I R22 DEMO REFLECTED CEILING PLAN • � REMOVED AND RELOCATED AND SHALL NOTIFY, IN WRITING, THE CERTAIN OWNER'S CONSULTANTS / VENDORS (OR DETAILED DUrGS. CONTRACTOR TO PROVIDE AS IF DRAWN '' '3 I ARCHITECT AND UTILITY COMPANY. CONTRACTOR SHALL FIELDR23 DEMO DUCT WORK PLAN l INCORPORATE TI-4E RECOMMENDATIONS OF SAID IN FULL. P.. , �j J I VERIFY AND INCLUDE ANY AND ALL DEMOLITION NECESSARY TO CONSULTANTS / VENDORS IN DOCUMENTS PREPARED BY R2.4 DEMO ROOF PLAN • I . / / . - r ` COMPLETE ALL IMPROVEMENT WORK IN THE CONTRACT AND THE ARCHITECT) WITH IN THE SET OF DOCUMENTS ISSUED 30.CONTRACTOR TO FRAME ROOF OPENINGS FOR HVAC AND R3.1 DEMO ELEVATIONS • I // / SHALL OBTAIN ALL NECESSARY PERMITS TO PERFORM THE BY THE ARCHITECT± IT BEING EXPRESSLY UNDERSTOOD OTHER MECHANICAL OR ELECTRICAL WORK WHERE Rbl DEMO/EXISTING ROOF STRIJGTi1RE • PROJECT WORK OPERATION AREA A PART OF THIS CONTRACT, THAT, BY SAID ISSUANCE, THE ARCHITECT ASSUMES NO REQUIRED. CONFIRM W/ STRUCTURAL ENGINEER SHOULD Ry2 DEMO/EXISTMG Bl11LDNG SECTIONS CITY OF TTGARD LIABILITY FOR THE SERVICES OF SAID CONSULTANTS / UNITS MOVE FROM LOCATIONS NOTED. R '3 DEMO/EXISTING WALL SECTIONS REVIEWS D FUI. 5. THE PLUMBING, MECHANICAL, ELECTRICAL, REFRIGERATION, AND VENDORS. rlll. COMPLIANCE / DECOR DRAWINGS ARE SUPPLEMENTARY TD THE 33. ALL OPENINGS TO BE CAULKED, SEALED, OR RB,I UTILITY PLAN • 'Approved: ;[t t .., / ARCHITECTURAL DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF I6. CONTRACTOR TO REFER TO OWNER'S CONSULTANT'S / WEATHER-STRIPPED_ ALL FLASHING AND ARCHITECTURAL R52 UTILITY PLANE DETAILS • [ PTHE GENERAL CONTRACTOR TO CHECK WITH THE ARCHITECTURAL VENDOR`S DRAWINGS FOR COORDINATION AND SHEET METAL TO BE MINIMUM 24 GA. PRE-FINISHED 40'-0' OTC.: [. / DRAWINGS SEFOREREFRIGERATION,THE INSTALLATIONEOF PLUMBING, OR DECOR. RESPONSIBILITY OF WORK UNDER HIS CONTRACT. LENGTHS, PER SMACNA MANUAL UNLESS OTHERWISE NOTED. • Permit #: SGC 2 / 7 - �� / ANY DISCREPANCY BETWEEN THE ARCHITECTURAL AND THE I1. ALL FLOORS IN PUBLIC AREAS SHALL BE OF NON-SLIP 34_ GLAZING IN LOCATIONS SUBJECT TO HUMAN IMPACT SUCH CONSULTANTS' DRAWINGS SHALL BE BROUGHT TO THE SURFACE IN COMPLIANCE WITH DEPARTMENT OF HEALTH AS PANES IN DOORS, GLAZING WITHIN A 24' ARC OF A Suitec55. ��d ��"� �4 • ARCHITECT'S ATTENTION FOR CLARIFICATION, AND WORK SERVICES CODES OF THE STATE OF OREGON. DOOR OPENING, GLAZING WITHIN IS' OF THE FLOOR (AND IS Suite #: INSTALLED IN CONFLICT WITH THE ARCHITECTURAL DRAWINGS OVER 5 SQ. FT, PER PANEL) SHALL BE TEMPERED GLASS By: D�tc: SHALL BE CORRECTED BY THE GENERAL CONTRACTOR AT HISIS. ALL CONTRACTORS, SUB OR GENERAL BIDDING OROR LAMINATED SAFETY GLASS PER IBC SECTION 24063/-------4 / / / OWN EXPENSE, AND AT NO EXPENSE TO THE OWNER, ARCHITECT, CONSTRUCTING ANY PORTION OF THIS PROJECT SHALL BE I III ® .�� ® ���; OR CONSULTANTS. SUBMITTED HELD RALLIOTHER DRAWINGS ANDBLE TO REVIEW D SPECIFICATIONINCLUDE IN ANYS 35 JURISDICTIONAL V DEQ ACODES.ZING RI BULAT DC AND LO TS SHALL CAL LAND USE REVIEW INFO gild 4.' (I`3 1[ 11 ` ® ����® / 6. ABBREVIATIONS THROUGHOUT THE DRAWINGS ARE THOSE N WHICH FORM A PART OF THESE CONSTRUCTION DOCUMENTS BE CLASS 40 GLAZING WITH LOW ARGON GAS. PROJECT NO. ° _ 1 " ° "I ' ` COMMON USE. ARCHITECT WILL DEFINE INTENT OF ANY QUESTION. INCLUDING, BUT NOT LIMITED TO ARCHITECTURAL GENERAL MINOR MODIFICATION LAND USE REVIEW - RECORD 'MMD2019-00012 • _% E NOTES, STRUCTURAL, AIR CONDITIONING, PLUMBING, AND 36. VAPOR BARRIERS - CONTINUOUS APPROVED VAPOR 19105 1, ALL COST FOR NON-STRUCTURAL RELATED INSPECTIONS, AND ELECTRICAL AND EQUIPMENT PLAN AS MAY APPLY TO BARRIERS SHALL BE INSTALLED ON THE HEATED SIDE OF IV____ - r. TESTS SHALL BE THE RESPONSIBILITY OF THE GENERAL SAID TRADE. ALL THERMAL INSULATION INSTALLED. NO KRAFT FACED DATE -1////// / % I CONTRACTOR UNLESS NOTED OTHERWISE IN THE SPECIFICATIONS INSULATION ALLOWED_ 5-n-2't9 Y ///// / /// / . DRAILN t9Y / _ / PROJECT MANUAL. 19, PROVIDE SECURITY AND SAFETY BARRICADES AS REQUIRED_ 31. PRE FORMED WEATHER BARRIERS SHALL BE PROVIDED NEES GI-4EGKED BY/ 8. CONTRACTOR SHALL PROVIDE PUBLIC PROTECTION TO AT ALL PENETRATIONS SUCH AS ELECTRICAL JUNCTION FMs PERSONS AND PROPERTY DURING CONSTRUCTION AS 20. DO NOT SCALE DRAWINGS. THE CONTRACTOR SMALL USE BOXES, HOSE BIBS, ROOF DRAIN OVERFLOWS, ETC_ NECESSARY PER CITY OR COUNTY CODE REQUIREMENTS, DIMENSIONS SHOWN ON THE DRAWINGS AND ACTUAL FIELD REVISIONS CONTRACTOR SHALL ASSUME SOLE AND COMPLETE MEASUREMENTS. NOTIFY THE ARCHITECT IF ANY RESPONSIBILITY FOR ALL JOB SITE CONDITIONS INCLUDING THE DISCREPANCIES ARE FOUND, i :� SAFETY OF PERSONS AND PROPERTY AND THEIR PROTECTION��f��* �� FROM DAMAGE, FIRE, INJURY OR LOSS, INCLUDING COMPLIANCE WITH APPLICABLE 0.5J-IA. SAFETY STANDARDS_ THIS REQUIREMENT SHALL INCLUDE SUCH PRECAUTIONARY MEASURES TO PROVIDE AND CONSTRUCT TEMPORARY CONSTRUCTION FENCES, COVERED WALKWAYS, (AS REQUIRED BY THE CITY) BARRICADES, SCAFFOLDING, ETC. AND SHALL APPLY PROJECT DURING LIMITED TO NORMALWORKINGNOURS.N OFIT AND NOTIS = e • I UNDERSTOOD THAT THE ARCHITECT AND CONSULTANT' JOB SITE • OBSERVATIONS ARE NOT INTENDED TO INCLUDE THE ADEQUACY 19105 'rL OF THE CONTRACTOR'S SAFETY MEASURES. THE CONTRACTOR Q SHALL DEPEND, INDEMNIFY AND HOLD THE OWNER AND ARCHITECT HARMLESS FROM ANY AND ALL LIABILITY, REAL OR I I ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON ""� ' THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE LOCATION PLAN ? R T4 SOLE NEGLIGENCE OF THE OWNER, ARCHITECT, OR ENGINEERS. NTS ® ® 0.0 1 v fi i� ❑ f [ 1111 U 0 ° U C C . O U Mill if — m . 1 11 1Pi; P iii il ii 1 11 T ' 12 y "42 ii '42 a 'JP _ G arti $i yin 1 -- . : i , -- ir --i—N , iv i al 6 pi 6" it 0 I 1 i i 1 1 4" : - -- if .,J• ¢1 fill I il Ilit gin :t ---11-‘-‹ II' Ifyqiii - I if a E 8 I 1! III g lir i F ii - ig q - Ii ill ' I , 4 I iI it - il I 'i 1.- 1 ik-7 1 liu I 1.1.• I VI 13- i ' = 11 6 if I A I ,Cf i ,if g 3.1',1 i ,11 — 1 . g 1 2r r a _. Ili Q 1f I il 1 1 2 ifil l i11 %r ii IS s 1 :1 li ii 11 111 I !A f.1 0 q 1 J w _ M 1 mi i i g \ - a ir n t g 1 11 1 k:1.i R" 1 i I §I i I 4 s 4 1 4 14 $ a -a g IaIT F t I ' 1 u r k/ 1 i I 1 111 li I ! II 1 '11 I sI Ai 9 Ik 11- li iii i ii . �..� I I r /141 i 11 I I 41 1 1 ii II il i _ II 1 0 UI 3 0 IIIa1 1 1 1. i 0 a ii I a 1 *i i t ti I i 1 1 1 - 1 I 1 - 0 0 4 A ril 1 111 I I Of / !till " 1 II O [[ [ T. « t ❑ s To . . Y N� f u N� i I iltI d iiii I � I p iiihi I iii 1 Hi 1111 01. 111 i f 2 l ii if i iiii it ''i 0 11 1 iiii ' la I li 1 itti l': 1111f1 Oil Hi i 1 Poi poi 1!, I , li 1 li i 11 liii! 9iIIi9I1hiu Ii9IIUA 2 2{1 11a ki j i3 is ill11 tifi 21 ! ill ?.. d4 1 d4 i ii1113 1 III ;� i ill lw41- id li ;1 111 II hw pi 1 i pi 1 ii-r- i 14 ITi - iiiW Ili 1 IV 11 i 111 11 I II' ii 0 ii 17' ii II I ii li I if II 1- 1 ii i li il i ii 1 1 I, 1 i U Ila it 1 1 0 /1 1I11 0 i w f c t ° tt t ❑ tt t ❑ tt c ❑ 2t t i1 I l' 1 li 1 plc 1 If C)* IN iii 7 1; I Hit insiii IL I �� _ J11111111 mItt ! 1 in 1 , 1, 1, , III I 1 iiii 1 11 IH li i qiii . ill Rg • i 5 iir ' .R i o qii a� i 1 ai 1 il I "' I agli ill l figlb - lag -- las1 Erg ii R1 tiii it it II hII' 1ifs }jI .„. it i# ii I lig 1 liw _ ,i a 1[1 I l9 hi I ell � � a I !! isi hi II i oi it i iv: it 1 iv I 1 1 ii I IV I to g 1 0 1 a a pi- it ii 1fti ifii ft ii ii 1 1 a 1, is iIt x 1 II t i i i ! !! x i_ li a w r ri ! s r ! 1 i U ❑ ❑ ❑ T. ❑ t t t t �' ❑ tt -+ P Y w Y u w Y N 4 -. 111 1 UC Iill I ° ili1 i i 1 1 iI 11 t i . d 6 1' 1 R� 1)111111 R 111111 1! lit = 1 P El lw 1 III i III 4 - alit 1 hi I pa Milt _ I ip 1 ' ' i I " - 1 - 1 ir I' ' 1Pb " 1 qi • nh ' Ill i qr ' 1 l 1 _ 11 I i 1 is ti IiiilII IP 11 1111 1! ii i i ' . i I 1 11 p till rid pi II lli2 ii * i I 1 1 l' I Izi I 1, 1 11 11 2.1gf 11 h i I f I il i Pi 1 13 41 h l I i I 1 11 s iii , 1 b I Ili i li 1 i 1II ; Pi i ii.-:- i 11 il I i 7 iii as ii I 11.' ' II H i i 1 k 1 ! 1 'II 1 li 11 1 1 I 1 I li 1 ii f 0 I t 1 , ii 1 1 il 11., I, 1 1,1il11 i 1 ti I ' II 1 1 it % q 1 Ri 1I I ii a ❑ ❑ ❑ ❑ t t ❑ ° it N0 "Milrilif 1 iii 114 1 I CD I q 1 (j 1 ° °I l ° i I ° l I 114 I ii I t I 11111111111014 = III ' i . . 'P � . � � � ,1ii ;11 Ai .. fig11 I ilt I ti .. #� � -' l ' li iii . .1 ii f ill 1 ti! it ii fall 1111 1 1 !If i 1 , . l 1 111 Q Ii 1 p I hi i1 I iik:1 i ii!q a 1 is 1 RI I Il I il 1 1 /I I -I ‘ "I 1 1 : IS 1 I 1 a 3 id 11 I ' 1 IP 1 i i I i ii it : i ii 1 III 9, :it R 1 i tt I 1 z II i --I - • i 93 i 11 ii: I R I iI i i 1 ii I ii II I It 1 i iri 1 1 i ii. 1 ti _I I! i �I I ig { It I , i f/ i i, a 1 it0'i il !m 1 r,. ..,, , 8 i 4- ( mm N ° — _a LANDLORD WORK A T TIGARD TO WNE SQUARE a T 0 m IN PREPARATION FOR FUTURE TENANT IMPROVEMENTS X r - =r 3 ,o � .. � � �,10 n 3z.�� N tr o 16200 SW PACIFIC HIGHWAY �� �,�` a v � �V y w� U TIGARD OR 97224 TA 11 ° , (eG,P,,,,.--,--„-,...\\.,..., te. 1&. Ill Ic T T 0 (i) V 0PANEL SCHEDULE ,....1 � PANEL: HMKE8AS5OCIATES,INC. MOUNTING: SURFACE ' I I I I i FED BY: METER'MAI'I BUS!MAMN: 100A MLO `"1��� I . I I I V • LOC: ELECTRICAL ROOM VOLTS PHASE WRE I °0 D I 120/208 3 4 TILAN D / (E)�i(� S C N M I D T C DESCRIPTION VA A? No. ABG No. AT VA DESCRIPTION C \ L I I I f . 1600A TERMINAL • 1 L-EkTERi0R 640 2Q'1 1 2 40/3 2000 PANELISPINKLER 5 ARCHITECTS, C. ` SECTION 1 I I I 5 R TELECOM 200 201 3 4 2000 5 J/ 3611 SUI I400p AYE. SPARE 201 5 6 2000 • 5 SUITE 200 O TELECOM TERMINAL /1000A METER/MAIN SF TIO E1 0 E1 0 I SPARE 201 7 6 SPACE PORTLAND,OR 91239 (503)220-861 O 500KVA PGE XFMR �� �+ -1 (PLANET FTN:SS) () SPARE 2011 9 • 10 SPACE FAX (503)220-8618 O 1 2 2.9 �/ SPARE 2d'1 11 12 SPACE Ell [ ECTION EI I I I{E) O I I I I SPARE 251 13 14 SPACE H- . - (E) I 11 I SPACE 15 16 SPACE I r(E) FIRE ALARM PANEL I (E)O I 8 HOUSE METEF/©� SPACE 17 18 SPACE ! H- MAIN I �(� (E)O _ I •I tl R I' - F' LOAD CODE NA1 PHA PH B PH C TOTAL(VIII FACTOR CODE LOAD FIRE RISER ROOM I ' I I 1 1.LIGHTS' 640 0 0 640 125 800 E) BRANCH PANEL t0 14 HOUSE PANEL I i i I I o 2.RECEPTACLE: 0 0 0 Cl 0 DISCONNECT SERVICEO ► 3.HEATING: 0 0 0 0 1.00 0 I I i 4 (N) (3) 4"C EMT 4.KITCHEN: 0 0 0 0 100 0 �� 5.EQUIPMENT: 2,000 2200 2000 6,200 1.00 6,200 • I I I I I I I 11 6.MOTORS: 0 0 0 0 0 i I I I 7.MISC. 0 0 0 0 1.00 0 • 4 ' TOTAL IVA): 2.640 2,200 2,000 66 840 77 000 I I I d I I I I I ' I I II LARGEST MOTOR: 0 VAl TOTAL LOAD: 19 A CODE DEMAND: 19 A I i { I I I #KITCHEN EQUIPMENT 0 NOTES: FIRST 10 KVA+5pg6 OF THE BALAN " 125%OF THE LARGEST MOTOR+THCEt BALANCE - - - - - - - ; - - - - _ _ - - - - - - _ - ;° - - - � - - - - - - - - - - - - - - -(11) LIU ! I I I ; I I ! CC I ► i I I O (E.i p ') '' mitilikiliZC I I I I I I I 1 laraiii I I E I I y eit I i I o, I I I ! I i I i' i I14 (4) '. I I ;; Z W I I I I I I I - - - - - - - - - - - - - - - - - - - - - - � - - - - - - - - y�-- - - - - - - -�- - - - - ! - - ....z • cr,-, _,.... I I I O O I I GENERAL NOTE: I ..„ 1 ; LUMINAIRE SCHEDULE: Fa 1, ALL ELECTRICAL COMPONENTS WITH PROJECTED TENANT SPACE SHALL BE TYPE A 8" ROUND LED DOWNUGHT. 120V. 2500LM. 4000K. a REMOVED AND DISPOSED OF OFF-SITE. MEDIUM WIDE DISTRIBUTION. CLEAR ALZAK. L GOTHAM EVO 40-25-SAR-MWD-LS. cl1•■■ N E I I I I TYPE AE SAME AS TYPE 'A' EXCEPT PROVIDE EMERGENCY BATTERY cc z z 2 N I I I • PACK WITH REMOTE TEST SWITCH. Q W = KEYED NOTES:0 CD W V'i ►6 k�yyrr I ' I I I 1. PROVIDE 'HOT' CONDUCTOR TO EACH BATTERY IN LUMINARIES ` CC O 't TO PROVIDE POWER 24/7. icx y 2. EXTEND 120V CIRCUIT TO HOUSE PANEL IN ELECTRICAL ROOM. ❑ 1 ^ I I I PROVIDE ELECTRONIC SINGLE ZONE TIME CLOCK FOR CONTROL - - - - - - - - - - - L - L - - - - - CJ CONNECT TO NEW 20A/1P BREAKER. CC d I I ) I I I I 3. REMOVE EXISTING RECESSED LUMINARIES AND REPLACE WITH OI)PNEW LED LUMINARIES. PATCH AHD PAINT CEILING AS DIRECTED � r BY ARCHITECT. LI O 0 y 4. MAINTAIN EXISTING FRCP R MONITOR FLOW E TAMPER O EXISTING FIRE RISER. COORDINATE WITH OWNER TO PROVIDE ,tl I I I IOFF-SITE MONITORING. O 0 I I ! Iran S. EXISTING LUMINARIES TO BE CONNECTED TO NEW 120VIOC rz. I CIRCUIT. CONTROL VIA NEW TIME CLOCK. ELECTRONIC SINGLE CIRCUIT TIME CLOCK, TORO EIO1P6. O S I C 6. EXISTING 500KVA TRANSFORMER TO BE MAINTAINED. • i I I i I I I I I I I 7. REMOVE WALL MOUNTED DISCONNECT AND ASSOCIATED CONDUIT k tti. $ AND CONDUCTORS. 4 8. PROVIDE 120V, 20A DEDICATED CIRCUIT TO NEW HOUSE PANEL I I I a I I ill { I I 9. MAINTAIN ALL TELECOM EQUIPMENT AT POINT-OF-SERVICE TELECOM TERMINAL C:11 0 H-2 I I I cc 10. MAINTAIN EXISTING BRANCH PANEL PROVIDE NEW FEEDER FROM 1 ) 1 NEW HOUSE PANEL. .[- 1-- • i #10 A .) , AE, y I �F I�! AE i aA 11. (4) #8, (1) 010 GRD, IN 1-1/4' EMT. 0 J O 0 mil I '� I I I 0 O I I 12 RATING.If NEW 100A, 12O/208Y, 30 METER/MAIN. 42,000 AIC a AE, XII 111111011111 0 gium r 0 `AE 011 13. PROVIDE CODE TAP OF NEW SWITCHGEAR AND EXTEND (4) #3, cli ---J_ - - o I oj� ' O 1 E6 GRD, TO NEW METER/MAIN AND HOUSE PANEL. V ► �. 0 SSI � I I I I 14. SEE PANEL '14' PANEL SCHEDULE. I I I I CC 111111111111 N BUILDING ELECTRICAL PLAN i , (1) SCALE: 1" = 10'-0" J TIME CLOCK 0 5' 10' 20' /7.7\.„ 10OA 12O/208V H-2 NLYMETER/MAIN r---I OM ° PANEL I FIRE I GROUND BUS n 'H' I RISER I .I 1 7 • i 13 ® 11 I PANEL V -L f I -- GRD 14 10 i 0 c.> .v ,o - C> ,BUSSED SECTION 10 rr �\ �/ *I 4111.KEYED NOTES - NEW: 0 NATURAL , GAS BLDG. uFER 36 1. PROVIDE NEW 1600A 777 / 4110Y,30 TERMINAL SECTION. INSTALL AT STEEL GROUND SAME LOCATION AS REMOVED TERMINAL SECTION. TERMINAL SECTION FIRE WATER PROJECT NO. (NEW) 2. PGE EXISTING SECONDARY CONDUCTORS (5) SETS OF #300KCM AL SPRINKLER UNE 2000A, 120/208V, 30 GENERAL NOTES: CONTRACTOR TO COORDINATE WITH PGE TO DISCONNECT FROM SYSTEM GRROOUND--" 1G1O�j TERMINAL SECTION 1 EXISTING TERMINAL SECTION AND RECONNECT AT NEW TERMINAL. DATE 1. POE CONTACT FOR PROJECT IS TRAVIS SMALLW00D: Q COORDINATE WITH TRAVIS SMALLWOOD AT PORTLAND GENERAL 7RAVIS.SMALLWOODOPGN.COM O ELECTRIC: (503) 672-5428. 3-15-20I41 O O (503) 672-5428. B FUTURE DR.nux BY DG 0 METER/MAINS 3. PROVIDE 800A 30, 4W METER/MAIN SECTION FOR NEW PLANET FITNESS TENANT. BRACE AND PROVIDE EQUIPMENT TO GENERAL NOTES: B,- , KEYED NOTES - DEMOLITION: O WITHSTAND AVAILABLE FAULT CURRENT PER PGE. 1. SIZE CONDUCTORS PER NEC 250. NB O O 1. EXISTING 2000A, 12DV, 30 TERMINAL SECTION TO BE REMOVED. BOOR /3P 4. NEW MAIN DISTRIBUTION PANEL WILL HAVE 100% BUSSING FOR 2. CONDUCTORS TO BE COPPER. REVISIONS 0 PLANET FITNESS 2. REMOVE EXISTING 2000A/3P FUSED 'PRINGLE SWITCH SECTION. FUTURE EXTENSION TO ADDED SECTION. WV 5. PROVIDE (3) 4'C EMT TO PLANET FITNESS SPACE. KEYED NOTES:0 3. REMOVE EXISTING GROCERY BREAKER SECTIONS. 1. SIZE THE GROUNDING ELECTRODE CONDUCTOR PER SERVICE 2000A/3P ••• 6. PROVIDE BAKELITE NAMEPLATE TO READ 'MAXIMUM DEMAND SIZE AS FOLLOWS: 400 AMP = #2 CU., 600 AMP = #1/0 FUSED SWITCH _ O AMPERES PER PGE WILL BE 1388 AMPS" CU., 800 & 1,000 AMP = #2/0 CU., ALL SERVICES 1,200 GND AMPS AND LARGER = #3/0 CU. 2 SWITCHGEAR - DEMOLITION3 SWITCHGEAR -- NEW 4 GROUNDING DETAIL El.0 SYSTEM VOLTAGE:120/208V, 30, 4W E1 .0 SYSTEM VOLTAGE: ,30, 4W El .0 SCALE: NTS 194-Eb E E