Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permit
CITY OF TIGARD MECHANICAL PERMIT 2'' COMMUNITY DEVELOPMENT111 Permit#: MEC2020-00487 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 9/10/2020 Parcel: 2S101BD00105 Jurisdiction: Tigard Site address: 12805 SW 77TH PL Project: Artistic Auto Body Subdivision: None Lot: None Project Description: Replace(6)RTUs on roof and ground, like for like,and replace(2)split A/C units,like for like. Contractor: REITMEIER MECHANICAL Owner: TIGARD77TM LLC 19570 SW 90TH CT TIGARD77DM LLC TUALATIN, OR 97062 ASAP VENTURES LLC ET AL 7585 SW HUNZIKER ST PHONE: 503-603-0205 PHONE: FAX: 503-603-0150 FEES Specifics: Description Date Amount Type of Use: COM Permit Fee 09/10/2020 $1,986.21 Class of Work: ALT Type of Const: VB Plan Review 09/10/2020 $496.55 Occupancy Grp: B Occupancy Load: 12%State Surcharge-Mechanical 09/10/2020 $238.35 Stories: 1 Info Process/Archiving-Sm$0.50(up to 09/10/2020 $15.50 11x17) Project Valuation: $75,000.00 Fuel Air Handlers Fuel Types: Electricity Units< 10000 cfm: Gas Pressure: Units> 10000 cfm: Furnaces Boilers&Compressors Furnaces< 100K BTU: 0-3 HP: Furnaces>=100K BTU: 3-15 HP: Floor Furnaces: 15-30 HP: Unit Heaters: 30-50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: Appliances Vent Fans: Vent Systems: Total 52,736.61 Hoods: Comm Incinerators: Woodstoves: Gas Fireplaces: Required Items and Reports(Conditions) Clothes Dryers: Other Mech Units: Gas Outlets: Other Desc: Duct Work: 6 Fire/Smoke Dampers: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions toOUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: T�I 1 ✓f/1 Vn n�� (� ' ` Q Permittee Signature: ]� owl t c- ' ���[[[MMM VWW1�C���� lll»>UUU 1 CallN 503.639.4175V by 7:00 a.m.for the next available Inspection dater'r This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. EIVED 7 i Mechanical Permit ApplicatiE� L City of Tigard n is: 7//Y/w 40 Permit N+ME . ']v�f0-DOI-�81 13125SWHallBlvd.,Tigard,OR14 , 97223 JUL 4 2020 r /� 7 (r v v Phone: 503.718.2439 Fax: 503.598.1960 Plan Review/ Other Permit: -'-� Inspection 503.639.4175 CITY OFTIGARD Date/Re: Z q - 47� /arts: t I i�;,l��,3 P I��ff Dale Ready/By: ® See Page 2 for Internet: www.tigard-or.gov RI I�I DING n�U�Sl�I� Notified/Method: r�/y/2e?,,�7) Supplemental Information TYPE OF WORK t COMMERCIAL FEE* SCHEDULE- USE.CHECKLIST Mechanical permit fees*are based on the value of the work ❑New construction Addition/alteration/replacement performed.Indicate the value(rounded to the nearest dollar)of all ❑Demolition ❑Other: mechanical materials,equipment,labor,overhead,and profit. Value:$ 7 r-Orte, CATEGORY, OF CONSTRUCTION RESIDENTIAL EQUIPMENT/SYSTEMS FEES* ElEGO 1-and 2-family dwelling t.ommerciallindustrial 0 Accessory building For special information use checklist. ❑Multi-family ❑Master builder ❑Other: Description Qty. Ea. Total JOB SITE INFORMATION AND LOCATION Heating/cooling: Air conditioning (requires site plan showing placement) 46.75 Job site address: �L�dG ty c.J 7iy Furnace 100,000 BTU(ducts/vents) 46.75 City/State/ZIP:")q�� r ©� q7 223 Furnace 100,000+BTU(ducts/vents) 54.91 Suite Bldg./apt.no.: `I Project name: A/Z.7— /s n c .41,c j-0 sa y ao Heat pump r (requires site plan showing placement) 61.06 Cross street/directions to job site: Duct work , 23.32 Hydronic hot water system 23.32 Residential boiler(radiator or hydronic) - 23.32 Unit heaters(fuel-type,not electric), in-wall,in-duct,suspended,etc. 46.75 Subdivision: I Lot no.: Flue/vent for any of above 23.32 Other: 23.32 Tax map/parcel no.: Other fuel appliances: DESCRIPTION OF WORK Water heater 23.32 ,, Gas fireplace/insert 33.39 �L(` ...-0-Lt: S i X 0.0, K1-1-pS Ltt,. try- LIYW Flue vent for water heater or gas fireplace 23.32 12--121 is'VC.C 14 D (-1i. (PO S- rL- L'ti'( - L. Lr'tr Log lighter(gas) 23.32 Wood/pellet stove 33.39 Wood fireplace/insert 23.32 �❑ PROPERTY OWNER I .1TENANT Chimney/liner/flue/vent 23.32 �., �� Other: 23.32 Name: ie.: Environmental exhaust and ventilation: Address: Range hood/other kitchen _ equipment 33.39 City/State/ZIP: Clothes dryer exhaust 33.39 Single-duct exhaust(bathrooms, Phone:( ) Fax:( ) toilet compartments,utility rooms) 23.32 ❑ APPLICANT 0 CONTACT PERSON .- ' Attic/crawlspace fans. 23.32 Other: 23.32 Business name: (a.„,c-CI-NA-4- ay` Fuel piping: Contact name: ( C --_ i2 L/(L� S14.15 for first four;S4.03 for each additional Address: ( 1 S7a so q0 �� Furnace,etc. ` Gas heat pump City/State/ZIP: 'V,,N_V A_e ,.J ink— ell o lD".- Wall/suspended/unit heater Phone:(Cer?) 603 mar Fax: :( ) Water heater �. 1 Fireplace E-mail: (-(A q,,�- l/ G'eAtW d\err lam'IAD i_o'ti Range �,, CONTRACTOR Barbecue Clothes dryer(gas) Business name: Sm- `4- Other: Address: MECHANICAL PERMIT FEES* City/State/ZIP: Subtotal - Minimum permit fee($90.00) Phone:( ) Fax:( ) Plan review(25%of permit fee) • CCB lie.: /J 3 770 0 State surcharge(12%of permit fee) TOTAL PERMIT FEE This permit application expires if a permit is not obtained within 180 Authorized signatur . days after it has been accepted as complete. Print name: Nei Date:Date: 7 12/Z ro * Fee methodology set by Tri-County Building Industry Service Board I:\Building\Permits\MEC-PermitApp.doc 03/07/12 440.4617T(I 1/02/COM/WEB) Mechanical Permit Application - City of Tigard Page 2 - Supplemental Information Commercial & Multi-Family Fee Schedule: Total Valuatio ,a Permit Fee: $0.00 to$500.00 Minimum fee$69.06 $500.01 to$5,000.00 $69.06 for the first$500.00 and $3.07 for each additional$100.00 or fraction thereof,to and including $5,000.00. $5,000.01 to$10,000.00 $207.21 for the first$5,000.00 and $2.81 for each additional$100.00 or fraction thereof,to and including $10,000.00. $10,000.01 to$50,000.00 $347.71 for the first$10,000.00 and $2.54 for each additional$100.00 or fraction thereof,to and including $50,000.00. $50,000.01 to$100,000.00 $1,363.71 for the first$50,000.00 and $2.49 for each additional$100.00 or fraction thereof,to and including $100,000.00. $100,000.01 and up $2,608.71 for the fast$100,000.00 and $2.92 for each additional$100.00 or fraction thereof. Note: All new commercial buildings require 2 sets of plans. I:\Building\Pemnts\MEC-PermitApp.doc 03/07/I2 2 m. City of Tigard IPIa COMMUNITY DEVELOPMENT DEPARTMENT s Building Permit Review — Commercial - No Land Use TIGARD Building Permit #: /1 E6 Zo 2-0 - UON a-7 Site Address: A2g 0 7 s j/ 9714 M. Suite/Bldg#: Project Name: ' -- 1 77cr7e. -T .,A (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review f /� Proposal: Plev-e/j'p4a ci /Xe e-1t.rnICJ UeS l — on r - e_n„e en—("V Existing Business Activity: k)4 Propo ed Business Activity: / " Verify site address/suite#exists and active in permit syst IJ10 t.•er Terrace Neighborhood: ❑ Yes No 1 Zoning: 1—L. 1114 ermined Use: 0 Yes 0 No 0 Spec Space T. Confirm no land use required. easiness License Exists: Yes 0 No, applicant was provided a business license application Notes: Approved by Planning: --—— %!t Date: 7//�/ Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved 0 Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: 0 Approved 0 Not Approved Building Permit Submittal Original Submittal Date: 7// '// z2 Site Plans: # 2- Building Plans: # Building Permit#: [ nter building permit#above. Workflow Routing: Planning ❑ Permit Coordinator ceding Workflow Sign-off: D-Sign-off for Planning(include notes from planning review) Route Application Documents: - tIilding: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable, etc. Notes: By Permit Technician: ,,9 efee.4--) Date: 7/2f/ZU 1:\Building\Forms\BldgPermitRvw_COM_NoLandUse_111819.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved, NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: ❑ SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes ❑ N/A Tigard Trans SDC: D Yes ❑ N/A Parks SDC: ❑ Yes ❑ N/A ❑ OK to Issue Permit Approved by Permit Coordinator: Date: 1:\Building\Forms\BldgPermitRvw_COM_NolandUse 111819.docx