Loading...
Plans Building Plans for City of Tigard Building Permit Application Customer: The Fountains at Summerfield condominiums HOA 15685 SW 116th Ave., #105 Tigard, OR 97224 Contact- Paul Brock, 858-212-9105, pbrock987@gmail.com RECEIVED Contractor: Jon Erickson, 503-730-9220 APR 3 2020 jon.eveniobs@gmail.com CCB 162397 C! Y OF TIGARD BUiLL". G D Vi LION Scope of Work— Repair Decks • Replace perimeter joists with PT • Repair joist and soffit dry rot OFFICE COPY • • Replace 42" guardrail and infill to comply with CITY OF TTGARD IBC multi-family code REVIEWED FOR CODE COMPLIANCE Approvcd: .---Ni OTC: I Permit#: aupao — pd i 10 File Name: Foun s Deck Permit Plans REVISED.pptx Address: j S 95 . 1 , G-f' VALIDITY OF PERMIT suite#: 3 THE ISSUANCE OF A PERMIT Br Date: Q.=a9_ Zp BASED ON CONSTRUCTION DOCUMENTS AND OTHER DATA SHALL NOT PREVENT THE CODE OFFICIAL FROM REQUIRING THE CORRECTION OF ERRORS. OSSC 105.4 3/19/20 Fountains at Summerfield - Deck Building Plans 1 Typical Deck Construction and Size — 102 SF < > Brick col. 114.5" isxiis F� Imbedded 6x6 PT -I — i 1 E� 4x4 PT Posts AL - < 2 x 8 PT blocking between joists attached with - Three 16D 3-1/2"n HDG < >E--)< > Ref: 2014 Oregon Structural 43" 15" 56.5" Specialty Code—Table 2304.9.1-29 Blocking supports Simpson Rim joist attached to 1 2"x8"Joists 16" OC Tension Ties DTT2Z. Two lateral joists with C / DTT2Z brackets required for Three 16D 3-1/2"n HDG L-------, posts in this position. See Beam " 6"x10" Simpson Wood Connection Ref: 2014 Oregon Connectors 2018-18 Deck Structural Specialty i'^ n Tension Ties—page 337 Code—Table a; rNi 2304.9.1-29 `--1 House— Brick exterior 43" < > Scale— 12"/increment V I LL' 3/19/20 Fountains at Summerfield - Deck Building Plans 2 Water Penetration Remediation — Cross Section Posts—4x4 PT / Flashing 2" x 3" L� Resurfacing material 3/4" exterior plywood decking Y N 0 E E CE co x N Hardi-plank Fascia 9.25" x .25". Applied with exterior adhesive and secured with post bolts. Wicking protection for soffit provided by%" extension. Pre-paint before adding flashing 1/2" plywood soffit Scale— 1" increment 3/19/20 Fountains at Summerfield - Deck Building Plans 3 Guard Rail Post — Simpson Tension Ties Posts—4x4 PT Simpson DDT2Z Attach to lateral joist with N8 SDS 1.5" screws 1/2" x 6" Machine Bolt DTT2Z supports 1800 lb. HDG with nuts and tension load. Meets IBC washers Code for multi-family deck cc 'oLA guardrails. x E Refer to attached Simpson catalog - Deck Tension Ties Lateral Joist page 337 N���������������������� Also refer to Simpson code compliant Guardrail Post Connection bulletin T-C-GRDRLPST17 Scale—1 increment 3/19/20 Fountains at Summerfield - Deck Building Plans 4 Typical Guardrail and Infill Section — 50" max. between posts Simpson Strong Drive i ` _ Wide Screw SDWS 4", Railing 2 x 4 TKC D 2 3/8"TL. Two per Cap Rail—Trex ', etdi/ end, three in mid span 1" x 5.5" I attached to Railing with I exterior adhesive. Ln N Railing Support a 2x4TKC . a 00 Attached to 1 Ni Railing and X Installation of Posts with a balasters and rails adhesive and per mfg installation Simpson instructions. Strong Drive Wide Screw SDWS 4", 2 3/8"TL. Railing 2 x 4 TKC Railing Infill - DecKorator aluminum 2.75" space balaster%" x 32". — • • Spacing 3.75" DecKorator Scale 1" increments • 9CodeCompliance Research Report " " " " " " I CCRR-0161 3/19/20 Fountains at Summerfield - Deck Building Plans 5 of 5