Loading...
Plans PLM 2019-00406 CITY OF TIGARD Approved [ • Conditionally Approved [ l OFFICE COPY See Letter to: Follow [ l Attached , PermitNt(mb�r: PLM XIV.-OC4O6 1, Address: Sig), (Ai t St.kck. By: .Date: 1°--(Cr- .,-bfe.r?al- Pi L6;... RECEIVED OCT 9 2019 CITYlins { OFTIGARD = design group BUILDING DIVISION 22251asI Ra1Mo155A Fold.Slice AMO Arlington.Teus 76011 A 17.633.4200 p • 017.633.4153 f m M..mee fl. a rem.a FAS.4.1 wr Studor Vent to be located within I Ail .- kiosk,if required by Code KLMEK MAWS 1 ALL PIPING CONCEALED IN WALLS i HEL1BERG DIAMONDS Weizers Pretzels (SHOWN FOR CLARITr) Washington Square 2. O- 2 23 24 t!`a-1 ,Irca .S W WOepn - T .._ I. -... 0 Sguf:le,Space#GIS-5 A. -I_ . : I Pailartd,OR 97223 '� r� -� it °r , �� '.JoJ r� r_ Ili-- C I �1 Il it - ♦ J LJ L__ . — 1I, -- DJ LJ L–JAI l "Ask-i _COW1 01 I1. fiat "1' FS-10-1 ID '� I SERVICE AREA1 -CLQ-1.12r 0 ' ( 3 A!a Dole XX-)000( RarvNane JO 1 1 I I WH-1 _ 1-0. I r 1, !%��� One 8f I l 16 ((:1_ �� ! �� I I IN �d \ 11 L e NE0 NESPRESSO Q _ IF4"sewer location from LL 1"water location from LL 1 L. 0 Hot And Cold Water Plumbing Plan Waste And Vent Plumbing Plan SCALE 1/41= T-Ce 101 SCALE 1/4e= 1_0' U) 0 1§ m 0 / /404/ ANN /^� 34 I O5 a e N -4:-.."V---."/4 11 \ / V a CW in god ..4,-k.... ` j ^R�'OJ firi JL: \ �S/4 \ / i HS.1 I ,�r—t ry I ry • /j/' t SWING SPOUT �` /FR A HW \ �,�/ / I ' "G1� 1 O L / 11 oNr y�✓ Ir rt • PRE RINSE-' �/` . \ US-1 \ , ® �' Q w 0 // ��'44 114t�t cot&xW t r .h , V► 3 LL / 1 O Ili 45 4 .} , I 3 F5-1(3') 3 L\/ \T\2 O N I s�" I t!1 0 4 3�1 3 4411 . Tp GREASE INTERCEPTOR CALCULATION i+ ll - f! ° �••� CO 4 V(3 COMP.SINK) = (18 w 18 x 12)% 3 = 11,864 CUBE INCHES 1.0 di 2.1;;,,4V(MOP SINK) = 16 x 20 x 10 = 3.200 CUBIC INCHES di SAIITPIPING TO BE SLOPED A ® 4' 'SANITARY MMINIMUM OF 1/4' PER FT. V(HAND SINN) 12.5 x 9.75 x 5.6 = 686 CUBIC INCHES .�3 A(GALLON) = 11.684+ + 686 231 CI - 67.3 GALLON iGkiON F O = 67-3 GALLON , 33L7 2 4 Domestic Water Riser Diagram © SSCALE: NONE Waste Riser Diagram . SCALE: NONE GREASE INTERCEPTOR REOkNRm 33.7 GPM Ili) . GREASE INTERCEPTOR PROVIDED 50 GPM DANIEL A. REEVES, PE � 222s t=Waft MIL RD PLUMBING CALCULATIONS I PLUMBING FIXTURE SCHEDULE GENERAL NOTES KEYED NOTES;i; ► AgxW,UN.TA Icon MARC • CiUANF111Y SAN.F.0 SAN.F.0 C.W KU Wt1L MAD RLHI66NOOOrF♦[C110N5 DE'S N 1. 'VERIFY IN FIELD'OR 'EO(ISTINC•MEANS THE CONTRACTOR IS TO CONFlRM THE 1. CONNECT TO EXISTING DOMESTIC WATER PIPING LANDLORD EXTEND AS {y17,-4809 EACH TOTAL GAOL TOTAL MM/X MAN UFACTURER AAOOa FROVM BY ACCESSORIES TEEM SHOWN ON THE DRAWING {I.E, EQUIPMENT,WIRE.ETC.}EXISTS AT THE SHOWN AND COORDINATE EESTI LOCATIONWTERP TNG LANDLOR WITH STUB—IN.DSK W THAI! _ V CW HW SITE AND IS IN GOOD WORKING CONDRON.SHOULD THE CONTRACTOR FIND MANUFACTURER. PLUMBING CONTRACTOR SHALL. FIELD VERIFY EXACT LOCATION 1 3—COM MOP SINK SINKS 1 (3 SINKS) 2x33S1NK5) 6 3 3THAT THE EQUIPMENT,ftT,DUCT,WIRE,ETC. IS NOT THE EQUAL TO THAT SHOWN PRIOR TO BIDDING OF WORK AND ADJUST PIPING AS REQUIRED. 1 BFP-I WATTS LF009 GC - 3/4' - 3/6' - AR REDUCED PRESSURE SYSTEM)PREVENTER(FOR ON THE DRAWING.R IS TO BE REPLACED,F THE CONTRACTOR MS ANY EO PROF CONNECTION OF SODA SYSTEM) QUESTION ABOUT WHETHER IT IS EQUAL TO WHAT IS SHOWN ON THE DRAWING, 2. SINKS ARE PROVIDED BY KIOSK MANUFACTURER WITH KIOSK. PLUMBING P ¢I -fsSi MOP SINK 1 3 3 3 3 - THE CONTRACTOR IS TO CONTACT THE DESIGN ENGINEER AND TENANTS CONTRACTOR SHALL PROVIDE AU.PIPING AND MAKE FINAL CONNECTIONS. i HAND SINK 1 1 1 2 2 — _ _ _ _ _ EXPANSION TANK(3.2 GAL) PROJECT MANAGER FOR NCMFY FLOOR SINN 1 2 2 0 0 FT-1 AARROL ST-8 GC 3/4• PROJECT MANAGER AND DESIGNENG1NEE�R�1N�OWRWTINB OF ALL REPLACEMENT 3 PLUMBING NCONTRACTOR SHALL FIELD�EXACTARY ELOCATION PRIOR LANDLORD B TO BIDDING—IN. Al E, SODA DISPENSER 1 1 1 1 1 _ — — _ — F'VC FLOOR CLEAFIQUT PIAS PRIOR TO CONSTRUCTION, OF WORK AND ADJUST PIPING AS REQUIRED. L" FCO-1 ZURN CO2449 GC 4• 2. PROVIDE CLEAN--OUT'S AT THE ENDS OF RUNS. 4. WATER HEATER PROVIDED AND INSTALLED BY TGC. PROVIDE DRAIN PAN WITH OREGON.. TOTAL 13 9 — — — DRAIN UNE.T.G.C. SHALL VERIFY CLEARANCE REQUIREMENTS AND ADJUST O Nis ,• 4.• FS-1 ZURN FD2370-PV#-D5-H GC SEEDONE STRAINER, FAF GRATE FVC FLOOR SINK 3. IT IS REQUIRED THAT THE PLUMBING CONTW.CRM IAUST'ASR THE JOBSITE TO LOCATION A5 REQUIRED. ��Fc a R��y SERVICE CONNECTION SIZE SAN. 4� WATER 1" I PLAN - FAMILIARIZE HIMSELF WITH MAJOR ITEMS SUCH AS STRUCTURAL ELEMENTS AND 1 CC SEE - 2' - PROVIDE WITH EXTENSION RINGS AS REQUIRED GREASE TRAP(BELOW GROUND) OTHER EXISTING JOB CONDITIONS THAT IMT AFFECT HIS WORK.ADD€TIONALLY, 5. CONNECT NEW VENT TO EXISTING VENT UNE LANDLORD STUB-IN. PLUMBING GT-I SCHIER -� PUN 50 GPM, 127.6 LB GREASE CAPACITY PLUMBING CONTRACTOR SHALL VERIFY EXACT LOCATIONS AND DIMENSIONS OF CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION PRIOR TO BIDDING OF WORK I RENEWAL DATE:X/r;l/z SUCH ITEMS AS WASTE.VENTS,WATER UNES,ETC. AND ADJUST PIPING AS REQUIRED. 1 _1 _ - KIOSK VENDOR - 1-1/2" - t/2' 1/2• ADVANCE TABOO K-62 FAUCET WITH AERATOR WITH WALL MOUNTED HAND SINK 4. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO THE BUILDING WATER HEATER DEMAND CALCUALTION MAX. 1.8 GPM,AND MIXING VALVE(Mx-1) (BY TGC) STRUCNRE,GRADE BEAMS.OR BUILDING UTILJTIES CAl15FD BY ANY SLAB kbNumbar { — — — — — — — HOT WATER DISPENSER PENETRATIONS. IT IS RECOMMENDED THE FLOOR BE X—RAYED PRIOR TO ANY t401fS9 HWD KIOSK VENDOR1/2" SLAB PENETRATIONS. Pipe Legend NAVE f ROME GNI TOiAI GPM Drovrn By EQUIP VENDOR — — — 1/2" ICE MACHINE W/CE SIBLE STORAGE BIN', INSTALL VALVE D. 5. PIPE AND DPAIN LOCATIONS ARE FOR REFERENCE ONLY.ACTUAL LOCATIONS HAND SINK 1 5 5 IM — — TF41T IT IS ACCESSIBLE WHEN UNIT IS INSTALLED. — — KB SHAT BE COORDINATED IN THE FIELD WITH CABINET LOCATIONS BY MOP SINK 1 J 7 _ KIOSK VENDOR 3' — 2• 1/2" 1/2" FAUCET(W/VACUUM BREAKER), HOSE W/HANGER FLOOR MOUNTED MOP SINK I TENANTS GENERAL CONTRACTOR' — COLD WATER(CR) APpJd BY MS—I — DNI 6- CONTRACTOR SHALL SCHEDULE PLUMBING CONNECTIONS TO THE BUILDING MAINS — HOT WATER(NW) 3-COMPARTMENT SINKS 1 19 19 GC - 3/4' - 3/e• - NR GAP FITTING REDUCED PRESSURE BACKFLOW PREVENTER(FORI WITH THE LANDLORD REPRESENTATIVE PRIOR TO CONNECTION. ——_— Shell rote F1FP-1 WATTS LFDD9 CONNECTION OF SODA SYSTEM} — FILTERED WATER(FW) GALLONS PER HOUR DEMAND 31 1 — — — — 7. - DRY PIPING TO BE SLOPED A MINIMUM OF 1/4•PER FOOT. _ _ _ VENTED Plumbing Mans,Riser ALLOWANCE FOR SINGLE SERVICE UTENSILS 0.8 1 SD — — EQUIP VENDOR 1/2" PROVIDE WITH EDUCED PRESSURE BACKFLOW SODA DISPENSING SYSTEMDiagrams&Notes PREVENTER 8. ALL 1 COR SINKS AND FLOOR DRAINS SHALL BE INSTALLED FLUSH WITH FLOOR. SANITARY SEWER (W) TOTAL GALLONS PER HOUR DEMAND 25 -- -- - - - - -- GAS PIPE(G) 3C-1 _ KIOSK VENDOR1/2• 1/2" PRE RINSE SPRAYER (W/ INTEGRAL VACUUM 3-COMPARTMENT SINK KW INPUT=(25x86 DEG F x 8.33 LB/GALLON}/{0.96 x 3412 BN/KW) = 5.4 KW BREAKER).SWING SPOUT CONNECTKItI 17(�IS[I[� V D { (grease trap below ground A Ir'y l]J, Number WH-1:AO SMITH JOEL 40,40 GALLON WATER HEATER, B Kw (SIMULTANEOUS) wc0-1 ZURN c02530 Gc s - PROVIDE 47H BRONZE CLEANOUT PLUG WALL CLEANOUT I by Tenant PLAN (ZURN Z747D,OR EQUAL) WF-1 AQUA-PURE(3M) ICE 190-5 GC - - - 1/2" - - WATER FILTER: 50PM FLOW RATE, Mace rich TC UP TO 54,000 GALLON CAPACITY 7.18.19 P TA 1 WH-1 AO SMITH DEL-4O GC — 3/4" — 3/4• 3/4• TAP RELIEF VALVE,EXPANSION TANK AND DRAIN 40GALLON eW SIMULTANEOUS) NEATER, 208/3P,8 KW