Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans (23)
M EC2019-00268 a a O 0 (6 37 2aN ,_ cc-] m 1- ,, E cc' c" RECEIVED H IC W v MECHAItALSYMBOLS MECHANICAL SYMBOLS � -► APR 29 2019 ,� z Q I) THESE PLANS ARE SCHEMATIC IN NATURE AND ARE INTENDED TO DEPICT Z o .. GENERAL SCOPE OF WORK. ALL WORK TO BE PERFORMED PER ALL CITY OF TIGARD z 2 LOCAL AND STATE COPES AND REGULATIONS. BUILDING DIVISION o 12"0 NEV ROUND RIGID DUCTWORK. s- D4 s GATE VALVE o 2) COORDINATE WORK WITH ALL OTHER TRADES. n f 12"x12" NEV RECTANGULAR DUCTWORK. s r CHECK VALVE (n o_ 3) PROVIDE ALL REQUIRED OFFSETS AND TRANSITIONS A5 NECESSARY TO W n m 2 D AVOID OBSTRUCTIONS. m • RECTANGULAR DUCTWORK TRANSITION s :+, s GAUGE COCK o w Cr 0 [] 4) PROVIDE FLEXIBLE CONNECTIONS ON ALL SUPPLY AND RETURN DUCTS c d SQUARE TO ROUND DUCTWORK TRANSITION. s �'a s SOLENOID VALVE CONNECTING TO AIR HANDLING UNITS. Z ca fc ■ � 0 ::-1:- . ' T R I f RISE. s s ISOLATION VALVE. 5) FSRN WN ONAND INSTALL DRAWINGSL ALL VANIZED STEEL DUCTYVORK AND DUGTYVORK SHALL B CONFORMANCE5Q0co WITH CURRENT SMAGNA STANDARDS RELATIVE TO GAUGE, BRACING,°' + II lid coo�o DROP s D�4 s TWO-WAY CONTROL VALVE, JOINTS,ETC. SUPPORT HORIZONTAL RUNS OF DUCT FROM STRAP IRON - zHANGERS ON CENTERS NOT TO EXCEED 8' D". DO NOT SUPPORT GELLINGi� N . I f RECTANGULAR q0° ELBOW WITH TURNING VANES s s THREE-WAY CONTROL VALVE. GRID,CONDUITS, PIPES, EQUIPMENT, ETC. FROM DUCTWORK. HVAC SIZES ON W °� a PLANS INDICATE CLEAR INSIDE DIMENSIONS. DUCTWORK SHALL BE MADE LO a) 413 LARGER A5 REQUIRED TO ACCOMODATE ACOUSTIC LINING. _�. CONICAL SPIN-IN WITH MANUAL VOLUME DAMPER s + BALANCING VALVE. 'i b) RECTANGULAR DUCTWORK SHALL BE ASTM C�10 GALVANIZED STEEL: ASTM s CCT] s BALL VALVE. A 653/A 653M, DUCT-MATE AND/OR TDF QUALITY FLANGED WITH GASKETS. a)ci -pc— • —F SQUARE MANUAL VOLUME DAMPER o STRAINER. 1) ALL DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE AT1ON OF A DUCT WITH SMAGNA STANDARDS,MANUAL ISD. ALL SUPPLY AIR DUCT PRESSURE .� DUCTWORK/DEVIGE TO BE REMOVED OR RELOCATED BACKFLOW PREVENTER SHALL SE THE SAME AS THE EXTERNAL STATIC PRESSURE (ESP) OF THE THE p`CTIDET�C-SCR SHA D -a EQUIPMENT SUPPLYING THE DUCT, THE EQUIPMENT (ESP) SHALL BE THE SMOKE IS18LE p'H A v c°a) I ROUND MANUAL VOLUME DAMPER s �, PIPE DOWN PRESSURE GLASS FOR THE ENTIRE SUPPLY DUCT SYSTEM. A TE UPERv�SORY CT • �VA AUp�gLE S STp,NTLY °.'....\\: CD CD 3) CONTRACTOR SHALL PERFORM TEST READINGS ON UNITS, FAN TERMINAL L A� A GON o s ° PIPE UP UNITS, ETC. AND ADJUST EQUIPMENT TO DELIVER SPECIFIED AMOUNTS OF SIGNA ED LOCATION �/ Q SUPPLY AIR GRILLE AIR. A TESTING AND BALANCING REPORT LOG SHALL BE MADE SHOWING ATTEND rn s _ s ALL AIR SUPPLY QUANTITIES, FAN AND UNIT TEST READINGS, ETC.,AND TWO 6p6' 5^ V SUPPLY AIR DIFFUSER - PIPE TEE DOWN COPIES OF THE FINAL COMPLETION OF DATA SHALL BE SUBMITTED TO THE AMSC o ENGINEER FOR EVALUATION. AIR FLOWS SHALL BE BALANCED TO WITHIN RETURN OR EXHAUST AIR GRILLE s PIPE GAP PLUS/MINUS 10% OF DESIGN REQUIREMENTS. ALL EQUIPMENT SHALL SE lei : ADJUSTED TO OPERATE AS INTENDED BY THE DRAWINGS. �;-c G.IN.S. cS'/0 Lnl ACCESS DOOR. - " BLIND FLANGE CONNECTION q) ALL THERMOSTATS AND CONTROL DEVICES SHALL BE ADJUSTED TO Ce .r730P;.:1E 9r. . OPERATE A5 INTENDED. ADJUST FANS, ETC. FOR PROPER AND EFFICIENT / �� +^ �� MANUAL VOLUME DAMPER. X FIRE SUPPRESSION SPRINKLER HEAD OPERATION. CERTIFY TO ENGINEER THAT ALL ADJUSTMENTS HAVE BEEN MADE AND THAT SYSTEM 15 OPERATING SATISFACTORILY. ADJUST ALL �RGIV AIR DEVICES TO SUPPLY THE AMOUNT OF AIR SHOWN ON THE DRAWINGS. �,� tc— • © MOTORIZED CONTROL DAMPER. FURTHER ADJUSTMENTS SHALL SE MADE TO OBTAIN UNIFORM TEMPERATURE ��. ' �3 � DEVICE TYPE�_ _i IN ALL SPACES. CALIBRATE, SET, AND ADJUST ALL AUTOMATIC �44r.� ,,,,,Q' HO a TEMPERATURE SENSOR.C = CEILING MOUNTED �- 24"x26" AIR DEVICE DESIGNATION, TEMPERATURE CONTROLS. CHECK PROPER SEQUENCING OF ALL INTERLOCK 0 = DUCT MOUNTED. DEVICE SIZE SYSTEMS,AND OPERATION OF ALL SAFETY CONTROLS. � :�,G1Za DEVICE TYPE—_ 5p-i THERMOSTAT INLET SIZE~ 2010 AIR DEVICE DESIGNATION. 10) ALL TESTING AND BALANCING WORK SHALL BE PERFORMED BY A TESTING CFM�� AND BALANCING AGENCY CERTIFIED BY NESS OR AASC. THE CONTRACTOR SHALL PROVIDE PROPER CERTIFICATION TO THE ENGINEER 9 1 NEW PIPING. m AND THE OWNER PRIOR TO ANY TESTING AND BALANCING WORK. THE © EQUIPMENT DESIGNATION. REPORT SHALL INCLUDE CERTIFICATION DOCUMENTATION. ALL BALANCING sCA + COMPRESSED AIR AND TEST REPORTS SHALL BE SUBMITTED ON STANDARD AASC FORMS OR ## PLAN NOTE DESIGNATION. EQUIVALENT FORMS BY NESS OR SMACNA. CD CONDENSATE DRAIN. II) THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTORS CONNECT TO EXISTING. SAFETY PRECAUTIONS OR TO MEANS,METHODS, TECHNIQUES,CONSTRUCTION s---CHWR—s CHILLED WATER RETURN. 41) SEQUENCES, OR PROCEDURES REQUIRED TO PERFORM HIS/HER WORK. A. SECTION/ELEVATION REFERENCE NUMBER. SECTION/ELEVATION SHEET NUMBER s GHWS 4) CHILLED WATER SUPPLY. SCOND s STEAM CONDENSATE PIPING s HPGW s HIGH PRESSURE CONDENSATE vVASTE MECHANICAL NOTATION$ s---LPC s LOW PRESSURE CONDENSATE ARF ABOVE RAISED FLOOR. s LPCW s LOW PRESSURE CONDENSATE WASTE AFF ABOVE FINISHED FLOOR. UNO UNLESS NOTED OTHERWISE FO/ FC FAIL OPEN/ FAIL CLOSE s- LPS—s LOW PRESSURE STEAM AD ACCESS DOOR s MPC s MEDIUM PRESSURE CONDENSATE WASTE AR) AIR HANDLING UNIT CHINS CHILLED WATER SUPPLY s -PW—s PUMPED WASTE (THREADED) CHAR CHILLED WATER RETURN MIME CD CONDENSATE DRAIN FD FIRE DAMPER JH UNIT HEATER EF EXHAUST FAN FB COMBINATION FIRE/SMOKE DAMPER FD FIRE DAMPER MVD MANUAL VOLUME DAMPER Ill FTU FAN TERMINAL UNIT (11101) CWS CONDENSER WATER SUPPLY GWR CONDENSER WATER RETURN SOD BOTTOM OF DUCT ELEVATIONIMIL SOP BOTTOM OF PIPE ELEVATION OC ON CENTERUM PD FLOOR DRAIN RG RETURN GRILLE CITY OP TIGARD TB TRANSFER GRILLE REVIEWED FOR CODE COMPLIANCE O SD SUPPLY DIFFUSER Approved: 1 SG SUPPLY GRILLE OTS . i I . , ,..9 XVAV EXISTING VAV TERMINAL UNIT VAV VARIBLE AIR VOLUME Pcrmlt#i r s.r a a i 9 - (In A CU AIR COOLED CONDENSING UNIT Address: csfre REIM2 REFERENCE DESIGNATION ‘21.1.,-) '� ,s,'„ �� t ,. ( I + SHEET NUMBER Suite#: -1 U J DETAIL/PLAN NUMBER B}►: � Date: J al N W (� 0 I- a N Q ❑ ti SPECIAL NSPECT10 i REG UIRED co State of Oregon Stru turas Sr eciaiiy Code . J c'n Ce Z a x ofy Q ❑ Ccr±creta and Reinforcing Steel Ci) W o C7 Z ❑ Bolts Ir st�l�in Concrete Q rt ' ~ ❑ Sp$riaf Moment-Resisting Concrete Frame REVISIONS �i 00 Reinforcing Steel Prestre sing Steel Tendo, ,� Str�;ctc�t71 WIFIPdBrre:e g Rin -S:raalgiting' ❑ Structural Monry❑ Reinforced GumConcrete❑ InslatingCote FlU❑ Spray Applied -Resistive Materlais CHECKED BY: 0 Pilings, Drilled Pi,srs and Caissons ISSUE DATE: 2-20-2019 ❑ Shotcrete PROJECT NO.: 18-6206-0 0 Special Grading, Excavation and Filling (1) ❑ Smoke-Control s,srsrr,§ MECHANICAL z ❑ Other Inspections NOTES & Q SYMBOLS o 1- 0 Ct (N.1 M 0 0 I LJJ N CL N a _.-... a N .s.n >_ c:ii Ta zr) H c\JL.- 0 L 20 Lo 5 • u W _ oil] T0 0 0 0 0 D �� Z 2 T T I I I 200'-0" I I E k'I I I I I I 1r0 Ll J U --- 0 30'-0" 30'-0" 30'-0" 20'-0" 30'-0" 30'-0" 30'-0" LC , .b I I I I I I I I w 2n I E I I I I I i LU C. Z Pn CI\ WI};. s I I I I � >O OC I I I I I I Q oZ i I I I I I U a ° Z L I I I I I I a I I I I I I c°°' fLL I I I f I 1 I I I I I I l / ,, STAIR S1 / m 1010-1 I ` c \' I r I i I M , - � ' I I I f1 - I I I 1 I I I I I I .6 o II I I 1 I II I I 1 - 9 Q I - - ��l-`�h a � . 790PE r I I I LOBBY ...__, F°1 STAIR S3 � � � � � � � � � ' � - 7I 1 030-1 101 I = WAITING OFFICE OFFICE 7-12"xp" *9'90.1 OREGON, SWOWER I VEST 1576.39 SF I 116 1 ., 117 I I 118 I 1 1 UP 1 1 1 La WOMENS 112 112.96 SF 132.96 SF 740 ELEC 85.95 SF - I JI - v I= OF 15 r-12"0 1 109 1 i = 157.17 SF " = OFFICE/LAB b I rr/. 11. �4 I G' [-1:=117,0..)"N = (4)WC&(2) LAV = JAN 128.07 SF I I I 7a I 122-123 43'MUA-IA' 531'1//3 Cr 14"0 1 102 T 'MUA-IB' j VEST I I I 1133.72 SF 48"x24" UP I - • 14 ! 103 I I I67 I 5D-I - _ (2)WC, (2) U &(2)LAV '-' OPENlLAB r48"x24EE 2811x24" I iAi5 - 7. MENS 89.27 SF I I I I 124 I -� 14300 MECH SHOWER I I I 410 EQUIP .F GFM CFM las qa. 7q0 ---i® 14"0 108 I 107 I I _ I I 872.64 SFci - I 24"x22''., FM 1 148.64 SF VEST I I 8 1o" = I 73.28 SF 83.86 SF 1 105 I 1 Q4 I = r to - - - - - - - - o 3ILL '-I6"x1811 I ' 7 ------ �7 p� - /�A `---- -----"`--- _L-- J� A)�-- -- ----- --------------- -----^t-----..— I�� L.I'1V � /LT4V\ n Iii i� i.11 i i i © l J , .14"4) / 0 _ 7 j HALL I I 1 I STAIR S2 11 J 14"0 -- f 128 '� ' 1 020-1 117 10 9 1 I i I i I 10"0 24"X24" l,,4 EMS -..L Imo I 11 , ® r !NO ® EAV 440 — _ E F OEM AFM r.FM 7q0 C 0 i I II I4°� ®® -NO STORAGE! n GFM ] 12".p- ,----20"0 14" 24"x20" 0 CFM = I 126 "Iq0 (') 1 5D-I ,..- --"N`411L .' i"�l OFFICE = OFFICE/LAB I GFM 440 n 20 215(21. C � I r''''' I 142 i I 129 I 258.29 SF i I .I--- 14 x� 38"x2411 b B ■ TILAB tn ll o (TYP, \ I f r- 1 I 14��0 I M. ■125 r I �� X1411 EAV ♦330.14 SF 572.92 SF IS v, ■ 15 I m 14I0 „.. ® 7q0 7qo 7q0 DI 2 2i� �" .- - / f CFM ' CFM CFM 12 ) , e 12"0 CFM 410 4"m I I I�:i ,/ C OM `II C `� G= 1- 5 I I I �• UIIIIC� 7010 -` I 7qo 7qo 'MO Y4o 15 j = 710 I I 1 14 t 18"x15 CORR �i4"� . ........ GFM 0 %C 15 GPM GFM 0 ���� 'X120 CFM GFM N @� U GPM I 127 c..) C-1,- C Imo Nog � C I I I j I (____ SPRINK I 15 yS°,�ti.'``�,�``' 12"� '®14"0j 14'4 15 I GF 2 190.68 SF I 144 I 115 S I I IML - a 50-1 - - - - - _ 4,500 J - If - - - - - - - - - - STOR ILL f50"x2411 CFM 1,15 I (TYP 2) .. = 22"x221' UP i 143 f ! I12I I I 11 ' --18,"(1) 0 x'`� k rXr x 26"x24 BREAK RM 12"0WAREHOUSE '_ 0 1 — I I .. 131 I 1133-135 1 6750,'_ _•=_=)." =_- = 6,7� I I CFM GFM OFFICE/LAB 1 I I 381.18 SF 132 EAS _I 15 2964.63 SF Cle m I I - I — c3 55-I 56-I o J le) 700.94 SF wide 30 xo' b Mr I zoo s 25o n, C5 I I I -- i I1� ��` I W 0 E I I U 1 l 7 f I E a a I I GM 161CCI Q i N m I oRI J, 16"0-'1 12II 0 ' I g Z 400 GFH I 400 CFH I I 1 ] , Z ° ¢ NATURAL GA5 NATUR�IL 6A5 I I 1 -�T 'MUA I2' � I 15 ¢ H 1GFM±E I� GFM V I6 cr.14q0 lq0T.--7 C/V) I I f I I 1 I I I 1 2 I REVISIONS I I I I I I I 'lier® 24"x20" I 4,500 340 GFH 1101 GFM 0 FIRST FLOOR PLAN - er,,,% NATURAL GAS MECHANICAL NEW WORK 4w PLAN NOTES= SCALE: IIS"=I`-O" I INSTALL EXHAUST DUCT TO SERVE NEW KEI AUNEE 6' SUPREME AIR FUME HOOD. 9 INSTALL EXISTING MAKEUP A1R UNIT RELOCATED FROM PREVIOUS LAB BUILDING LOCATION. 15 INSTALL EXHAUST DUCT TO SERVE RELOCATED DOWNDRAFT HOOD. REPLACE FAN MOTOR IN EXISTING UNIT WITH NEW 7,5 HP MOTOR TO PROVIDE 6,750 CFM 2 INSTALL EXHAUST DUCT TO SERVE RELOCATED LABGONGO b' PROTECTOR FUME HOOD. AT 2.0" EXTERNAL STATIC PRESSURE. PROVIDE NEW MOTOR WITH VFD AND VARIABLE 14 INSTALL NEW TRANSFER GRILLE TO TRANSFER MAKE-UP AIR FROM WAREHOUSE TO SERVE CHECKED BY: SPEED CONTROLS. PROVIDE NEW DX COOLING COIL SECTION AND REMOTE CONDENSING FUME HOODS IN LAB AREA THAT WAS FORMERLY KITCHEN. ISSUE DATE: 2-20-2019 3 INSTALL EXHAUST DUCT TO SERVE RELOCATED LABGONGO 4' PROTECTOR FUME HOOD. UNIT. ROUTE NATURAL GAS PIPING FROM NEAREST ADEQUATELY SIZED LINE TO SERVE } REFERENCE SHEET M001 FOR ADDITIONAL GENERAL NOTES. iNEW UNIT, ROUTE CONDENSATE DRAIN TO GRADE. INSTALL MAKE-UP AIR UNIT AND 15 INSTALL CONSTANT VOLUME EXHAUST AIR VALVE. VALVE AIRFLOW SHALL BE ADJUSTED PROJECT NO.: 18-6206-0 4 INSTALL EXHAUST DUCT TO SERVE RELOCATED HAMILTON 6' SEAFAIRE FUME HOOD. CONDENSING UNIT ON CONCRETE PADS. IN THE FIELD TO PROVIDE AIR VELOCITY THROUGH THE SASH OPENING OF 100 FEET PER 2) EACH FUME HOOD IS TO BE CONNECTED TO CONSTANT VOLUME EXHAUST AIR MINUTE WITH SASH OPEN TO HEIGHT OF 1511. VALVE. VALVE AIRFLOW SHALL BE ADJUSTED IN THE FIELD TO PROVIDE 100 n INSTALL EXHAUST DUCT TO SERVE RELOCATED HANSON 6' FUME HOOD. 10 INSTALL NEW VARIABLE SPEED MAKEUP AIR UNIT WITH NATURAL GAS HEATING AND DX FIRST FLOOR 0 FEET PER MINUTE WITH SASH OPEN TO HEIGHT OF 15". COOLING. ROUTE NATURAL GAS PIPING FROM NEAREST ADEQUATELY SIZED LINE TO I6 INSTALL EXHAUST DUCT TO SERVE 61 FUME HOOD. Z G INSTALL EXHAUST DUCT TO SERVE RELOCATED HANSON 4' FUME HOOD. SERVE NEW UNIT. ROUTE CONDENSATE DRAIN TO GRADE. PROVIDE CONCRETE PAD FOR 5) PROVIDE EACH HOOD WITH AIRFLOW MONITOR/ALARM AND STATIC MAKE-UP AIR UNIT. I? INSTALL EXHAUST DUCT TO SERVE 4' FUME HOOD. MECHANICAL Q PRESSURE/AIRFLOW SWITCH. MONITORING STATION SHALL ALARM AND 7 PROVIDE AND INSTALL GRILLE TO PROVIDE MAKE-UP AIR TO LAB AREAS. INDICATE HOOD FAILURE IF AIRFLOW THROUGH VALVE 15 BELOW SETPOINT. 1 II 1 PROVIDE AND INSTALL NEW BUILDING STATIC PRESSURE SENSOR TO CONTROL SUPPLY FAN 18 INSTALL EXHAUST DUCT TO SERVE 6' FUME HOOD. TIE NEW EXHAUST DUCT INTO EXISTING NEW WORK cc S PROVIDE AND INSTALL EXHAUST DUCT TO SERVE AGILENT MSD UNITS, ROUTE 4" FLEX SPEED OF MAKE-UP AIR UNITS MUA-IA AND MUA-IB. EXHAUST DUCT SERVING HOODS ON EAST WALL OF ROOM 142. INSTALL INLINE DUCT FAN ID 4) CONTRACTOR TO MODIFY AND RELOCATE EXISTING SYSTEMS A5 REQUIRED DUCTS FROM MSD EXHAUST DEFLECTOR UP TO EXHAUST DUCT TRUNK ABOVE CEILING. SOLER PALAU TD-315 TO PROVIDE 770 CFM AT 0.5" STATIC PRESSURE. 1- FOR INSTALLATION OF NEW LABORATORY EXHAUST AND MAKE-UP AIR INSULATE MSD EXHAUST DUCT WITH 2" THICK MINERAL FIBER INSULATION. BALANCE DUCT 12 INSULATE ALL SUPPLY DUCTWORK INSTALLED OUTDOORS WITH DUCT LINER. PROVIDE 2" - °' SYSTEMS. CONTRACTOR TO FIELD VERIFY. TO PROVIDE TOTAL OF 300 CFM EXHAUST. THICK,MINIMUM R-8 INSULATION. 0 o Et W N Cl– a o o i D m.,E, a N N LJ 0 L2 w " zi Z O 2 m 0 o W O V/ 0 B 0 CD) aL0r- wo I N ~ - - - _ _ I I I i 4.1 z. ,),,,, 0 0o o tin -E- u'Q pZ I I I I I _v a0 OFFICE OFFICE OFFICE OFFICE OFFICE OPEN OFFICE OFFICE I C ❑ n 220 I 221 I I 222 I I 223 I I 224 I I 227 I I 228 Iw cc) a ! I I I I ❑ L0 122.43 SF 132.96 SF 132.96 SF 132.96 SF 132.96 SF I 413.49 SF 122.43 SF _ _ = CiI I I "a' ',(11H STAIR S1 I I I I 1010-2 I a I I I I N i u, OPEN OFFICE J COMPUTER I I I I 1 225 I I 226 I ., I I I I a OFFICE Q I 219 I 351.69 SF 444.53 SF I I I I I I a 102.70 SF I I I I I 1C.,„.9,.. ��c ci*,,, p ------ RES ASSIST 10270 I\ � $ 04 I I I ! I HALL I i .5790PE f. I - I DN VW 1 _ _ LOBBY OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OREGON STAIR S2 I 201 I 240 I I 241 I 242 I I 243 I I 244 I I 245 I I 246 I I 247 I I 248 I CC)�,,�'� Q2 I 'Y 13 ,S` 030 2 I I GUNGE 1 WOMENS VEST 130.22 SF 132.96 SF 132.96 SF 132.96 SF 132.96 SF 132.96 SF 132.96 SF 132.96 SF 166.65 SF � 4ES C.\INA' I 20 (1,, 8 I 576.72 SF (tH. �P i I 230 I' I 207 Iq�� i0 1 1 OPEN OFFICE 1 14f106- A° I 218 I 60.83 SF I 157.17 SF ii 2193.88 SFLI i JAN HALL I I VEST I 202 I I I 262 I rtri , . I I I 209 IIs I I F I 0"x24" SUPPLY ! 89.27 SF I 1 1 U5Pd DN 231 7MENS ' SUPPLY PRINTER 98.68 SF I 206 I I_MECH-ELE I 261 I I 265 I OFFICE I VEST I 204 I I I 217 I 148.26 SF 205 134.56 SF 170.57 SF - - - - - - - - 127.65 5F RES ASSIST � ' I I 1 I I I 269 I 1 I rt 7 1 I I STAIR S2� OFFICE I I OPEN OFFICE I I 1020-2 I 216 I j j I 210 I NI I I 1 I I 138.35 SF 514.17 SF HALL 1. 1 I I 266 I i JmQI .I __L j 1JOPEN OFFICE 92.75 SF I 1 N 251 I I I 111 4672.88 SF I II ,.,,,4 I I OFFICE 1 OFFICE OFFICE OFFICE OFFICE OFFICE BREAK 1 I ili 215 214 I 213 212 I I 211 I I 268 I 264 I I I jl i I I I 260.87 SF 271.40 SF 2044.92 SF 199.44 SF 132.96 SF 130.22 SF 83.35 SF • I (s) - I I ILL ----- r - - - - - - - - - - _ - - - - - - - - - - - - - - - - - - - - - - - _.- _--4 - - - - - - - - - - - - - - - - - - -_-- L� I LL El I i X22"x22" UN 1 � I0 CONFERENCE I I 267 1 I I 490.33 SF I I (III9 I 1 I I I v 1J � I I IH. -7- Ce COD w � I I - - - E. p � N I i i DECK OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE Q Q p 1267A I I 260 I I 259 I I 258 I I 257 I I 256 I I 255 I 254 I I 253 I I 252 I CL Z CO 1 I u O I 1 I 125.00 SF 122.43 SF 132.96 SF 132.96 SF 132.96 SF 132.96 SF 132.96 SF 132.96 SF 132.96 SF 166.65 SF Q a II () g w a ¢ cn CL r . - i 1 I 1 1 1 1 I 1 i 1 1 I REVISIONS 0 SECOND FLOOR PLAN - 4% MECHANICAL NEW WORK • PLAN NOTES: SCALE: I V=I'-O" 1 ROUTE EXHAUST AIR DUCT THROUGH SECOND FLOOR SPACE. ROUTE DUCTS A5 CLOSE TO COLUMNS AND WALLS AS 15 FEASIBLE, CONCEAL DUCTS INSIDE GYPBOARD CHASE. CHECKED BY: ISSUE DATE: 2-20-2019 I) REFERENCE SHEET MOOT FOR ADDITIONAL GENERAL NOTES. PROJECT NO.: 18-6206-0 C!) w 2ND FLOOR z MECHANICAL Q NEW WORK o 1- N LLJ o M 1 02 e, CL N N 2/20/2019 © Copyright protected.See design agreement.For use on this project only.Unauthorized reproduction of any part of this material is prohibited. I I I I _________4___________________ C.G. I I I I I � � I I I I I g , I I x.-. I I z I I / I I I ,,Y' I I I I I I g g N I N I I �� o 0 IMI E _ —_____ __CD ________I________________________________________________ _ ______________________________int li 0 wrif co 0 M I !1n o MIEN MIEN - 4e IP -r IP 1 I i 1 , i , 1 1 , 1I 1 , , , , 1 1 , 1 1 , i 1 1 X 1 1 I - - - -L - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -1 - - - - - - - - - - - - - - - - -1-------------------------------- ----------- 0 I I i I I I 00 11, 1 1 11 1 1 11 1 , 1 1 I I I I I CI I I I I I I :___. 1 K Xi 1 1 1 - - m O j I -Io rn - _ m 1 I 00 rn I I I 3 = Z � I I I I $ . I I I i n > j I I 1 g > Z j I I j r PO ' I I I i i 1 CA Z 1 1 1 M i i 1 1 6 * _______ r_______ MI I I N I I I I I I 0 OD AN 1 1 1 1 1 1 1 I 1 j 11 U I 1 0O I i ,�• zrn r e � � 1N I N ,, N 1N I I Z 88 IN I 1 1z 1 - r Z I I I 740 1 j 1 Oin e 1 I 1 D- O 1 i , r° m I I I gCn I 1 1 a .. o I I I ,0 rn I I I 1 I I I I I lZ 1 1 1 1 1 1 1 1 00 1 j 1 j j j j j 1 1 1 1 j j j j I j j 0 Gi:D0 0 é m m 0 m27 j m SANDBURG OFFICE TI tiit A _ - C D m APEX LABORATORIES, LLC. a #Q.. � .�, „, ,, ppp��� '1,,, 1 ,1 , N! i ite G rou o rn �lllo ���,�� �'9RN^t�IWlnmhhd�u �'I,�. CD O Z r- 6700 SW SANDBURG t, n w o -0 /;7 ;;' OM '�'I"`' DEDICATION. DESIRE. INTEGRITY. X 5. D TIGARD, OR 97223 w `,T 2 -'u crr``r 15 82ND DRIVE, SUITE 30 PHONE:(503) 222-2044 Cda D Z N N �''� r ....... , �, "Jx''� GLADSTONE, OR 97027 I— rnO a "1y N N O O 0 (O O PERMIT DRAWINGS _ -o cu ;r7, a o L 2 n co >_.. ,_ :J !T. r NOZZLE SIZED TO MAINTAIN4.. EXHAUST FAN SCHEDULE EXISTING FUM E HOOD SCHEDULE 0 s .� Q W 0 3,500 FPM OUTLET VELOCITYLI TM MANUFACTURER MODEL DESCRIPTION OPERATING CFM ESTIMATED ' EST. BRAKE MOTOR DATA NOTES } MANUFACTURER MODEL SASH WII7 H .AASH HEISFR SASH AREA GFM• MIN PRESS. NOTES 1- zo WELDED STAINLESS STEEL NO. WEIGHT EXT.5P. FM fp Z = IK Wb. RPM RPM / VOLTS PHASE NO. FT. FT. FT? 100 FPM HP I OWES , a EXHAUST STACK / *i LL1 c3: CD s EF-IA,EF-IB CANARM BI-36AW FUME HOOD EXHAUST 141 LBS. 14,300 3.0 838 10.35 1'750 15 HP 460 3 I,2,3 1 LABCONCO SUPREME AIR 6' 15' q' 711 1.41" I 1" GALVANIZED STEEL STRAP SECURED TO EXHAUST STACK EF-2 CANARM BI-16 FUME HOOD EXHAUST 162 LB5. 4,500 2.5 1450 2.0 1725 5.0 HP 460 3 I,2,3 2 LABCONCO SUPREME AIR 6' I.5' 1' 110 0.40" I W o 2 (11) a NOTES: NCtu co N 5 LABCONCO SUPREME AIR 6' 1.5' 1' 110 0.40" I so GUY WIRE (4 REQUIRED) I. PROVIDE WITH VARIABLE FREQUENCY DRIVE AND STATIC PRESSURE SENSOR. 3. PROVIDE FAN WITH VENTED WEATHER COVER AND POLYETHYLENE POWDER COAT z 1E yFINISH. 0 2 4 LABGONCO SUPREME AIR 6' 1.5' 1' 110 0.40" I0 D 2. PROVIDE FAN WITH MONITORING ALARM SYSTEM TO PRODUCE AUDIBLE ALARM ATDRIP LIP • • WELDED APPROVED LOCATION WHEN FAN 15 NOT IN OPERATION. 0 5 LABCONCO SUPREME AIR 6' 15' 4' 740 0.40"JOINT I tir) -E_ L-10 Q z o TRANSITION(AS REQUIRED) 6 KEWAUNEE SUPREME AIR 6' 1.5' 6' 1210 1210 I Q N o a N 1 LABCONCO PROTECTOR 6' 1.5' 6' 1210 1210 I W °O a o FLEXIBLE CONNECTION 10 � _ r. "■ a C.7 LL 8 LABCONCO PROTECTOR 4' 1.5' 6' 1210 1210 i EXHAUST FAN lAIR DEVICE SCHEDULE• �, ■ 4 HAMILTON SAFE AIRE 6 I5 6 1240 1240 IEdrn IINOMINAL 10 TJERNLUND V5UBI2 6' 1.5' 6' 1290 1290 ITA6 MANUFAGTUR>ER MODEL WIDTH HEIGHT NEGK TFIROW AT TOTAL NG NOTES o, �-- Ili ).----DRAIN I/2" NO. SIZE GFM 100 Ppm PRESSURE �� / WELDED (MAX) II TJERNLUND V5UBI2 6' 1.5' 6' 1210 1210 a> I \ i COUPLING cn / \ 5D-1 TITUS TDG 24 24 21"x21" 1,380 25 FT 0.08" 22 I, 3, 4 ��__�'� i 12 KEWAUNEE SUPREME AIR 6' 1.5' 6' 1210 1290 `BLANK PLATE i zal d __:- / SECURE 5G-I TI 30ORL 30" 18" NA 2,250 48 FT 0.01" 30 2, 3, 4 NOTES: 2 / STACK TO SECURE GUY 0. I. PER OWNER,HOODS WITH INTEGRAL FANS SHALL BE WIRED 50 THAT HOOD FANS ARE Z / ROOF(TYP) WIRE TO 5G-2 TITUS 300RL 18" 18" NA 1,300 35 FT 0.08" 26 2, 3, 4 CONTROLLED IN GROUPS OF THREE. EACH SWITCH SHALL ENABLE\DISABLE THREE FANS. T \ ROOF(TVP) a / \` TG-I TITUS 350RL 20" 20" NA 1,600 NA 0.10" 24 2, 3, 4LS 2. EACH HOOD SHALL BE PROVIDED WITH AIRFLOW STATIC PRESSURE/AIRFLOW SENSOR --------.7.-----, ROOF /� �� ie. J` AND MONITOR/ALARM. MONITORING STATION SHALL ALARM AND INDICATE HOOD ` --, � I NOTES: J'0';-,..,- FAILURE IF AIRFLOW THROUGH HOOD 15 BELOW SETPOINT. .- ' - 0 I. PROVIDE DIFFUSER WITH LAY-IN BORDER. 4. PROVIDE WITH FACE ACCESSIBLE MANUAL BALANCING DAMPER. t' '*$ ;,t, ` ` '^OPE 0 EXHAUSTSTACK DETAIL 2. PROVIDE AIR DEVICE WITH SURFACE MOUNT BORDER. 2120/ NO SCALE 3. PROVIDE AIR DEVICE WITH WHITE FINISH. . OREGON, �.qq�"! 13 �4� AIR VALVE WITH REHEAT SCHEDULE - �.�iv-. Wog: . ,°120 VALVE VALVE INLETETP�O M R,TINS PRESSURE ANsE MAXIMUM WIDE OPEN RANSE TM NO. DESCRIPTION MANUFACTURER MODEL SIZE GFM CFM PRESSURE DROP CFM NOTES EAV-I HOOD EXHAUST PHOENIX ACCEL II CEV IO"(P 740 50-1000 0.6' 0.6"-3.0" 4 i , :- . - FUME HOOD EAV-2 HOOD EXHAUST PHOENIX ACCEL II CEV 8"O 410 35-100 0.6" O.6"-3.0" 4 . - /.. FUME HOOD AIR FLOW MONITOR NOTES: RE: SPECIFICATIONS I. PROVIDE WITH FIXED FIELD ADJUSTABLE KNOB CONTROL. 2. PROVIDE VALVE WITH HERESITE BAKED PHENOLIC/EPDXY COATING. LIGHT SWITCH 9 0G� COMPRESSED AIR 00 0._..----VACUUM 0 ----- GOLD WATER RECEPTACLES 0 DI WATER MAKE-UP AIR UNIT SCHEDULE TA6 MANUFACTURER MODEL GPM ESTIMATED OPERATING HEATING 1 GOOLIN6 MOTOR DATA FILTER DATA NOTES NO. 1 EXT. SI'. WEI6PIT CAPACITYE.A.T. L.A.T INPUT HEATING' EFFICIENCY I DLG. TYPEH.P.AT DB EAT WB LAT LAT WB EFFICIENCY RPM HB.H.P MOLTS FLA MCA MOCP PHASE FILTER FILTER MAX. VEL. TY P. FUME HOOD DETAIL IN. W.6. HTC. TYPE (MBH) (°F) (°F) (MBH) STAGES (Et) (°F) (°F) (°F) (°F) SEER WIDTH EFFICIENCY (rpm) D0MUA-EIA CAPTIVEAIRE A3-IBT-400-G18 6,750 2.0 - GAS 508 51.0 91.0 400 MOD. 11% EXPANCT SION `15 61 70.0 61.0 14.0 1163 1.5 16.10 460 1.6 - 20 3 2" MERV 13 500 I, 4 SCALE: NONE MUA-EIB CAPTIVEAIRE A3-I5T-400-G18 6,150 2.0 - GAS 308 51.0 91.0 400 MOP. 1190 DIRECT EXPANSION 15 61 10.0 61.0 14.0 1165 1.5 16.10 460 1.6 - 20 5 2" MERV 13 500 I, 4 • MUA-E2 GAPTIVEA IRE A3-IBT-400-24P 4,500 1.5 2,101 LBS. GAS 212.0 23.0 18.1 340.0 MOD. 80% DIRECT 15 61 61.6 60.2 14.0 1163 10.0 6.3 460 12.2 15.3 25 3 2" MERV 13 500 2,5,4 MENNII EXPANSION NOTES: I. EXISTING UNIT. PROVIDE WITH NEW FAN MOTOR FROM MANUFACTURER AND VARIABLE FREQUENCY 3. PROVIDE NATURAL GAS BURNER WITH STAINLESS STEEL HEAT EXCHANGER. DRIVE CAPABLE OF CONTROLLING SPEED OFF OF BUILDING STATIC PRESSURE SENSOR. PROVIDE NEW DX COOLING COIL AND REMOTE CONDENSING UNIT. 4. PROVIDE WITH DISCHARGE AIR TEMPERATURE SENSOR AND STAND-ALONE CONTROLLER. CONTROL LLI UNIT TO PROVIDE 15 DEGREE AIR IN COOLING(ADJUSTABLE),70 DEGREE AIR IN HEATING 2. NEW UNIT. PROVIDE WITH MOTORIZED OUTSIDE AIR INLET DAMPER,UNIT 15 100%OSA CAPABLE UNIT. (ADJUSTABLE). LI)U ILLO . TYPICAL 6A5-FIRED PIPE REDUCER FROM BRANCH MAKE-UP AIR UNIT PIPE SIZE TO UNIT CONNECTION MOUNTED ON GRADE SIZE AT UNIT CONNECTION. CID GROUND JOINT PIPE UNION oe PVC ADAPTER ON CONDENSATE WASTE PRESSURE TEST TEE WITH J CONNECTION(5) I/2"BRANCH,1/2"x I/4"BUSHING, = J AND I/4"PIPE PLUG PRESSURE REGULATOR 133 11. 0 E co GAS SHUT-OFF COCK mBRANCHPLAN PIPE.SEE Q g' m ccl r IIIf"F" FOR SIZE. g Z O ROUTE CONDENSATION PIPE AWAY FROM UNIT,DISCHARGE _�,,E m (n Q TO GRADE. EQUIPMENT CURBI u X �y W O a CONCRETE SLAB--/ co a o PROVIDE 6"DIRT LEG a co l- FULL SIZE OF BRANCH REVISIONS PIPING ARRANGEMENT SHOWN 15 SCHEMATIC. VERIFY CONNECTION LOCATION BEFORE INSTALLING PIPE RUN. CONNECTIONS TO MAKEUP AIR UNIT NOT TO SCALE CHECKED BY: ISSUE DATE: 2-20-2019 PROJECT NO.: 18-6206-0 CO 0 MECHANICAL z SCHEDULES & DETAILS w 0 cs CC Lu a C- RECEIV �� APR 2019 0 B (:..,1 � 0 0 CI OF TIGgRty T 0 fi WING DIVISION 1 j j I Ij I 1 I I I j 1 I I I I I I I RECEIVED iAPR 292019 I I i - ---- -------- --- ( I j CITY OF TIGARD IBUILDING DIVISION I I o I o j 0 1 ° j I I I I (E) OWJ j 1 1 1 I I I I I I I I I j 0 i I I j o . � (E) OWJ (OPEN WEB JOIST) I i BLOWER ON OPPOSITE SIDE OF (E) GIRDER TRUSS. I I I I I REFERENCE 1/SK-4 FOR GUY WIRE ATTACHMENT. THIS I I I MAY REQUIRE ADDITIONAL L4 4x3/8 L4x4 ANGLES (E) GIRDER LIN I i L4x4x1/4, j i I L4x4x1/4, > REF. 1/SK-6 ---------------------R-E liSK-G-- ---------- -- - - - - - - - - - - - - - - ----------------------- -- I I 1 ----- ,. EF 1A a I j o EXHAUST FAN SHALL HAVE NO THERN I o 0 L4x4x3/S EDGE (CURB) ON (E) GIRDER TRUSS REFERENCE 1/SK-2 FOR ATTACHMENT. (E) OWJI ' k__---(E) OWJ I 1 I j I . ! j I j I I N I I f I DEMO ROOF DECK FOR NEW 50" x 24" OPENING. jI EACH SIDE/EDGE OF DECK SHALL BE FULLY \' 30"x24°� BLOWER ON OPPOSITE SIDE OF (E)jGIRDER TRUSS. SUPPORTED BY L4x4x1/4 ANGLES (ANGLES NOT I I 50"x24" DIV I I SHOWN). USE 1/SK-1 FOR ALL ANGLE \ /REFERENCE 1/SK-4 FOR GUY WIRE �4TTACHMENT. CONNECTIONS, TYPICAL. �\� THIS MAY REQUIRE ADDITIONAL L4x�4 ANGLES / H �L4x4x318 I L4x4x1/4, (E) GIRDER LIN I I I I I L4x4x1/4, - - - ._ -_ _ • REF. 1/SK-6 7 j I I — _ - - - - - -REF�1/ K _____ I 0 IN' t EF-1B 1 EXHAUST FAN SHALL HAVE NORTHERN L4x4x3/8 3o"x24"� EDGE (CURB) ON (E) GIRDER TRitJSS. j j REFERENCE 1/SK-2 FOR ATTACHMENT. I I I Alik AnkI I I I i I TYP. ® TYp I DEMO ROOF D CK FOR NEW 22" x 22" OPENING. EACH SIDE/EDGE OF DECK SHALL BE FULLY j I SUPPORTED BY L4x4x1/4 ANGLES (ANGLES NOT I EMI=(E) OWJ ,-/* j (E) OWJ I I SHOWN). USE 1/5K-1 FOR ALL ANGLEIlm- j CONNECTIONS,]TYPICAL. W (E) GIRDER LINE L4x4x 1/4, 0 I 1 1 I REF. 1/SK-6 1 • :Vx22"12N LINE - - - - - - - - - - - - - - - - - -----s, - - ------ - - _ - - - - _ - 1 Um I j `� 2.,_ _ L4 ' : :22"'�21:_4X L4x4x3/8 L4x4x1/4, REF. 1/SK- 1r l I j ' T. EF-2 1 (e _ - BLOWER ON OPP SITE SIDE OF (E) OWJ. 0 r REFERENCE 1/SK- FOR GUY WIRE ATTACHMENT. L4x4x1/4,/4, L4x4x3/8 L4x4x3/8 THIS MAY REQUIRk ADDITIONAL L4x4x1/4 ANGLES REF. 1/SK-6 L4x4x1/4, RCe I I EF. ,11SK-6 ! U REFERENCE 1/SK-2 FOR EXHAUST FAN AND CURB I 1 co cri ATTACHMENTS. I (E) OWJ I _w C7 j i i 1 ( � m E) OWJ In O CO I I j jI I p d � (E) OWJ'/ I IZ m u) O 1141( c) Ci CL I I i i 0 1CO Q � F= I j I j j i ROOF PLAN \(c,9 PROP izt I.495PE • ille ilir I GON `ei :` 18 \9�10c1 I EXPIRES 12-31 -19 I 10 i-B0� p 0 0 iTh _F 0 - - - - - 0 i I I i I I I i I OFFICE OFFICE OFFICE OFFICE OFFICE OPEN OFFICE OFFICE I 220 I 221 I I 222 I I 223 I I 224 I 227 I I 228 I I I I 122.43 SF 132.96 SF 132.96 SF 132.96 SF 132.96 SF { 413.49 SF 122.43 SF • _ _ _ 6lin). I I I I I I ! I I I I , ■ rii) 7STAIR SI I I I I I 1010-2 I I I I I I I I I OPEN OFFICE I COMPUTER I I 1 1 I 225 I i I 226 I v OFFICE W16x31 WIDE FLANGE I I I I I 219 �E� � 351.69 SF 444.53 SF BEAM. DO NOT DAMAGE 102.70 SF BEAM DURING FLOOD DEMO i j I I (--2 RES ASSIST --� _�._� - --- ------------------------------- \ I 270 I I i HALL I • 0 (E) OWJ (OPENjWEB JOIST) I 229 I 1 DN _ i ,-- - LOBBY OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE STAIR S2 I 201 I 240 I I 241 242 I I 243 I I 244 I 245 I I 246 I I 247 I I 248 I 1030-2 I . I 1 VEST `' OUNGE i WOMENS I 208 I 576.72 SF 130.22 SF 132.96 SF 132.96 SF 132,96 SF 132.96 SF 132.96 SF 132.96 SF 132.96 SF 166.65 SF - LIP ,, 230 Ii I 207 I I I OPEN OFFICE DEMO FLOOR SLAB FOR NEW i I i 218 i 60.83 SF I 157.17 SFrim lir) I 4 rll"----) IP) 50" x 24" OPENING. CORE- I 2193.88 SF JAN HALL1 DRILL 3"-DIA. HOLE IN EACH I /L4x4x1/2 LI VEST I 202 I ! I 262 I I I CORNER AND CUT TOWARDS -" K I 1 I I HOLES. DO NOT OVERCUT. I 1 V L4x4x3/8. `SAME ANGLE IS REQUIRED ON I 209 I F ...: ., I_� i I I I I ,_. DO NOT DAMAGE ANY (E) '"x24" OPPOSIT SIDE (WEST) IF SLAB EXTENDS ASUPPLY I 89.27 SF I I I JOISTS OR BEAMS. BEYOND ( ) WF BEAM 6" OR GREATER. ' Il 231 IMENS ' SUPPLY PRINTER 98.68 SF ! I 206 I MECH-ELE I 261 I I 265 OFFICE 1 VEST "'- I 204 I I i - - - - I 217 I - - - - - - - - - - - - -14826 SF I 205 - - - - - - - - 134.56 SF 170.57 SF - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - .65 SF IIIPTYP. 10 RES ASSIST (E) (2) #6 REBAR (CHORD BARS) ' I I 269 I AT ALL SLAB EDGES/OPENINGS. \---L4x4x1/2 DO NOT DAMAGE REBAR I I I I STAIR s2 ,,,,,___DURING FLOOR DEMO. OFFICE 71 OPEN OFFICE I I - 1020-2 I GPR (GROUND PENETRATING I 216 I I I I 210 I l I ! I REBAR), X-RAY, ETC. SHALL BE USED TO ENSURE BARS 138.35 SF 514.17 SF HALL I I I I ARE NOT CUT. 266 I \--] I I 92.75 SF i i I IDEMO FLOOR SLAB FOR NEW OFFICE i OFFICE OFFICE i OFFICE OFFICE OFFICE BREAK 22" x 22" OPENING. CORE- la 215 I I 214 I I 213 I I 212 I 211 I I 268 I _J _ 264 I DRILL 3"-DIA. HOLE IN EACH i I CORNER AND CUT TOWARDSLi) 260.87 SF 1271.40 SF 204.92 SF I 199.44 SF 132.96 SF 130.22 SF 83.35 SF . L4x4x1/2 HOLES. DO NOT OVERCUT. I I DO NOT DAMAGE ANY (E) JOISTS OR BEAMS. LL -------------------------------- ----------- Q4 1 NIJ L4x4x3/8. SAME ANGLE I REQUIRED ON LL OPPOSITE SIDE (WEST) ! SLAB EXTENDS I I i CONFERENCE BEYOND (E) OWJ 6" OR GREATER. 0 I I I I 267 L4x4x 1/2/ ilk 0 490.33 SF �TYP. I I i (E) OWJ----------` (E) OWJ j . ,j'irT I I CleU .K______TL) . ,dij. ----____ 'Kill-) M J CD I I I w 0 � N DECK OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE 0 O m ti I i 267A I I 260 I I 259 I I 258 I I 257 I 256 I I 255 I 254 I 253 I 252 I O Z Z a coo 125.00 SF 122.43 SF 132.96 SF 132.96 SF 132.96 SF 132.96 SF 132.96 SF 132.96 SF 132.96 SF 166.65 SF m I I I I U) CSI 0 CD Cn IQ ti � j I I I I I I I I I I I I l I I I I F LO 0 R P LA N Aot..,,,,,,„ rcic..O PROFpss ' I' 495PE LOP r plr o ‘'e/ RCON 1 e, . 18 ' o4 N1.4N J. 1, I EXPIRES 1 2-31 --19