Permit CITY OF TIGARD BUILDING PERMIT
' COMMUNITY DEVELOPMENT Permit#: BUP2020-00183
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 9/9/2020
Parcel: 251010001600
Jurisdiction: Tigard
Site address: 7790 SW HUNZIKER RD
Project: The Fields Apartments-Building 3 Subdivision: FIELDS APARTMENTS Lot: None
Project Description: Building 3-Clubhouse: In-ground swimming pool.
Contractor: BLUE MOUNTAIN POOLS INC Owner: FIELDS, FRED W REVOCABLE LIVING
13121 S WARNOCK RD 111 SW 5TH AVE#3675
OREGON CITY, OR 97045 PORTLAND, OR 97204
PHONE: 503-760-4554 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: MF
Class of Work: OTR Type of Const: Ig Permit Fee-COM-New Construction 09/09/2020 $556.56
Occupancy Grp: U Occupancy Load: 0 12%State Surcharge-Building 09/09/2020 $66.79
Plan Review 08/17/2020 $361.76
Dwelling Units: DC Provision Review,COM TI-Ping 09/09/2020 $102.00
Stories: Height: ft Info Process/Archiving-Lg$2.00(over 09/09/2020 $8.00
Bedrooms: Bathrooms: 11x17)
Value: $52,200 Info Process/Archiving-Sm$0.50(up to 09/09/2020 $6.00
11x17)
Tigard CET-Non-Residential-Admin 09/09/2020 $20.88
Floor Areas: Tigard CET-Non-Residential-AH 09/09/2020 $501.12
Total Area:
Accessory Struct:
Basement:
Carport:
Covered Porch:
Deck:
Garage:
Mezzanine:
Total $1,62311
Required: Required Items and Reports (Conditions)
Fire Sprinkler: Parapet: 1 Special Inspection(see plans)
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking:
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR,9{5522-0001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. /
Issued By: .4/�Q.. C�Y Permittee Signature: 1�/�L l C�-1-70N
Call 503.639.4175 by 7:D0 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Building Permit Application RCCEIVE , Al
Commercial C FOR OFFICE USE U'I
• City of Tigard JUL 2 8 2020 Received Pi .��) permit No.:
k '2c� c u , ,." .. ®!,�
1111 -- " 13125 SW Hall Blvd.,Tigard OR 97223 Plan Rerie
Phone: 503-718-2439 Fax: 503-598-19 GITYOFTIGARD Date/B : -a . . p Related Permit:
Inspection line: 503-639-4175 boUILDING DIVISION Date ReadyBy: - Juns: H See Page2for
TIGARD
Internet: www.tigard-or.gov Nodfied/Method: 1 50 ( Supplemental Information
r-7-1 ,rr l.- _ .f 1-L/.-:-
TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING
New construction ❑Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
❑Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
Valuation: $
❑ 1-and 2-family dwelling ❑Commerciallindustrial
ElAccessory building El Multi-familyNumber of bedrooms:
❑Master builder ( Other: ?Mt Number of bathrooms:
JOB Slit INFORMATION AND LOCATION Total number of floors:
5-
Job site address: 77 96 ' T-(U/'Z 1 l�"(Z 4/ , New dwelling area: square feet
City/State/ZIP: 7&gk0 a '. 9 7a.23 Garage/carport area: square feet
Suite/bldg./apt.#: Project name: 77 ! `/6%4.47 j /4 Covered porch area: square feet
Cross street/directions to job site: Deck area: square feet
Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: Lot#: Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
Tax map/parcel#: equipment,materials,labor,overhead,and the profit for the
,,'/�6t7 DESCRIPTION OF WORK work indicated on this application.
ea1 GTLY Qc ,7N-cypvLI'U.,0 Geer/-> 6-lrl/h1/Fi/1/4 Valuation: $ -��
(a .G Existing building area: square feet
New building area: 76,6 square feet
0 PROPERTY OWNER 0 TENANT Number of stories:
Name: Type of construction:
Address: Occupancy groups:
City/State/ZIP: Existing:
Phone:( ) Fax:( ) New:
0 APPLICANT or CONTACT PERSON BUILDING PERMIT FEES*
(Please
Business name: C ezha--T,4/,>\/ refer(or fee schedule)
d
�l
c / �S Structural plan review fee(or deposit): 3 4, %,.
( t "
Contact name: o?lG�l/G� /70-6-7/
{ ' J n / FLS plan review fee(if applicable):
Address: /o3/d't'/ d �/�fz,/aG/, - /1�.
City/State/ZIP: (7/7G� L1/TY (,-ye. Q7e246 Total fees due upon application:
Amount received:
Phone: 3) rs7, _J// ) Fax: :( )
6��GI)(y 3 5 siOUAJr115t/N?oves 610.44PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
E-mail:
Commercial and residential prescriptive installation of
CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System.
Business name: d C AA.€ -' 9(N /i $G Submit two(2)sets of roof plan with connection details
/ and fire department access,along with the 2010 Oregon
Address: /�/A/ $ () A/l4( 12( . Solar Installation Specialty Code checklist.
City/State/ZIP:ope4647 (l/?y og. 97 I/J Permit fee(includes plan review $180.00
! and administrative fees):
Phone:(gd3) 7�_ _`f/ Fax:( ) State surcharge(12%of permit fee): $21.60
CCB Lic.: 02,39573 Total fee due upon application: $201.60
Authorized signature' -7 /�1 This permit application expires if a permit is not obtained
e within 180 days after it has been accepted as complete.
Print name: �67 ( 1f fJ�( „( Date: %� a+ * Fee methodology set by Tri-County Building Industry
7 Service Board.
I:\Building\Permits\BUP_COM_PernitApp.doc Rev.04/21/2014 440-4613T(1 I/02/COM/WEB)
City of Tigard
illqRI COMMUNITY DEVELOPMENT DEPARTMENT
_ Building Permit Review — Commercial - With Land Use
TIGARD
W1
Building Permit #: /7iA.P ZD 2-4 - 001 e3
Site Address: 7790 SW Hunziker Rd. Suite/Bldg#:
Project Name: Fields Apts
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review
Proposal: Swimming Pool at Community Bldg
X Verify site address/suite# exists and active in permit system.
X River Terrace Neighborhood: ❑ Yes X No
X Land Use Case#: PDR2017-00004
X Plans Match Approved Land Use:
X Site Plan 0 Landscape Plan 0 Other:
0 Urban Forestry Plan 0 Elevation Plan
NA Building Height: Maximum Height Actual Height
NA Conditions Met: 0 Prior to Submittal 0 Prior to Permit Issuance
X Business License:
Exists: 0 Yes 0 No,applicant was provided a business license application
X Public Facilities Improvement (PFI)Permit:
Required: 14 Yes,applicant was notified 0 No Applied For: X Yes 0 No, stop intake
Notes:
6,2- JA. Ta
Approved by Planning: Date: 8-12-20
Revisions (after Building Submittal only) Reviewer Date
Revision 1: 0 Approved 0 Not Approved
Revision 2: 0 Approved ❑ Not Approved
Revision 3: ❑ Approved 0 Not Approved
Building Permit Submittal�/2.f)
te!�
Original Submittal Date: a/
Site Plans: # 3
Building Plans: # 3
Building Permit#: 8'Enter building permit#above.
Workflow Routing: ffi Planning C- gineering E--resmit Coordinator wilding
Workflow Sign-off: -1�S -off for Planning(include notes from planning review)
�
Route Application Documents: L�Building: original permit application, site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: �.(�� ` .4_.. Date: S//`'/zei
I\Building\Forms\BldgPermitRvw_COM_W ithlandUse_11 1819.docx
Engineering Review
[ -Slope at building pad: C2
❑ PFI Permit#: ),w .00vcfQ
B,'/Conditions "Met"prior to issuance of building permit
I Easements (encroachments)per engineering conditions of approval and plat (not typical on SDR/CUP)
Water Quality/Quantity Facility:
Assess Water Quality Fee in-lieu: ❑ Yes ❑ No
Assess Water Quantity Fee in-lieu: ❑ Yes 0 No
LIDA Facility on lot: 'Yes 0 No
0 NOT Approved by Engineering: Date
Notes:
Approved by Engineering: _ rf r �51+ Date: el g- -2-0
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved _
Revision 2: ❑ Approved ❑ Not Approved _
Revision 3: ❑ Approved ❑ Not Approved _
Permit Coordinator Review
I"t Conditions "Met"prior to issuance of building permit
0 Approved,NOT Released: Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant: _
Revision Notice 2: Date Sent to Applicant: _
Revision Notice 3: Date Sent to Applicant: _
SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes N/A
Tigard Trans SDC: 0 Yes N/A
Parks SDC: ❑ Yes g N/A
tg—OK Issue Permit
Approved by Permit Coordinator: j� Date: 8 l 2-10
I:\Building\Fonns\BldgPennitRvw_COM_W ithLandUse_111819.docx