Report fl Cc - -3E2Ct, edoo0 00-h pd. COMcheck Software Version 4.1.3.0 ErriNAfil Mechanical Compliance Certificate Project Information RECEIVED Energy Code: 90.1 (2016) Standard JUN 2 3 2020 Project Title: Boiler Replacement Location: Portland, Oregon CITY OF TIGARD Climate Zone: 4c BUILDING DIVISION Project Type: New Construction Construction Site: Owner/Agent: Designer/Contractor: Tigard Swim Center Clifford Hood 8680 SW Durham Rd. Hood-McNees, Inc. Tigard, OR 97224 1923 SE Stark St Portland, OR 97214 (503) 231-7825 Mechanical Systems List Quantity System Type& Description 2 Boiler, B-1: Heating:Hot Water Boiler,Capacity 850 kBtu/h,Gas,with Two-pipe changeover system Proposed Efficiency:97.00%Et, Required Efficiency:80.00%Et Mechanical Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans. specifications,and other calculations submitted with this permit application,The proposed • echanical systems have been designed to meet the 90.1 (2016) Standard requirements in COMch ck Ver ion 4 .3.0 a to comply with any applicable mandatory q re lis in t Insp tion hecklist. /f? t►` 4,- ' '— fr 5- o Name- e Signature Date Project Title: Boiler Replacement Report date: 05/29/20 Data filename: J:\proj\2249a Tigard Swim Cntr\BOILER.cck Page 1 of 9 • - COMcheck Software Version 4.1.3.0 Inspection Checklist Energy Code: 90.1 (2016) Standard Requirements: 100.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plan Review Complies? Comments/Assumptions &Req ID 4.2.2, ;Plans,specifications, and/or ❑Complies Requirement will be met. 6.4.4.2.1, calculations provide all information ❑Does Not 6.7.2 with which compliance can be Location on plans/spec: N/A-Equipment Replacement [PR2]1 ;determined for the mechanical systems and equipment and ❑Not Applicable document where exceptions to the ;standard are claimed. Load 'calculations per acceptable engineering standards and handbooks. 4.2.2, Plans,specifications, and/or ❑Complies Requirement will be met. 8.4.1.1, calculations provide all information ❑Does Not 8.4.1.2, with which compliance can be DNot Observable Location on plans/spec: M1 8.7 determined for the electrical systems [PR6]2 and equipment and document where ❑Not Applicable exceptions are claimed. Feeder connectors sized in accordance with approved plans and branch circuits sized for maximum drop of 3%. 6.7.2.4 Detailed instructions for HVAC DComplies Exception: Requirement does not apply. [PR511 :systems commissioning included on ❑Does Not ;the plans or specifications for projects >=50,000 ft2. ['Not Observable ONot Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Boiler Replacement Report date: 05/29/20 Data filename: J:lproj12249a Tigard Swim Cntr\BOILER.cck Page 2 of 9 Section # Footing/ Foundation Inspection Complies? Comments/Assumptions & Req.ID 6.4.3.7 Freeze protection and snow/ice Complies Exception: Requirement does not apply. [FO9]3 melting system sensors for future ElDoes Not connection to controls. ❑Not Observable; ONot Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 21Medium Impact(Tier 2) IALow Impact(Tier 3) Project Title: Boiler Replacement Report date: 05/29/20 Data filename: J:\proj\2249a Tigard Swim Cntr\BOILER.cck Page 3 of 9 Section Mechanical Rough-In Plans Verified Field Verified I • # Complies? Comments/Assumptions Req.ID Inspection Value Value 6.4.1.4, HVAC equipment efficiency Efficiency: Efficiency: ❑Complies See the Mechanical Systems list - 6.4.1.5 verified. Non-NAECA HVAC ❑Does Not for values. [MEl)2 equipment labeled as meeting 90.1. ❑Not Observable ❑Not Applicable 6.4.3.4.1 Stair and elevator shaft vents ❑Complies Exception: Requirement [ME3]3 have motorized dampers that ❑Does Not does not apply. automatically close. ['Not Observable ❑Not Applicable 6.4.3.4.2, Outdoor air and exhaust systems ElComplies Requirement will be met. 6.4.3.4.3 have motorized dampers that ❑Does Not [ME4]3 automatically shut when not in Location on plans/spec: use and meet maximum leakage ! ❑Not Observable N/A-No revisions to air rates. Check gravity dampers ❑Not Applicable systems where allowed. 6.4.3.4.5 j Enclosed parking garage ❑Complies Exception: Requirement (ME3913 ventilation has automatic , ❑Does Not does not apply. contaminant detection and capacity to stage or modulate ❑Not Observable fans to 50%or less of design ❑Not Applicable capacity. 6.4.3.4.4 Ventilation fans>0.75 hp have ❑Complies Exception: HVAC systems (MEW :automatic controls to shut off fan ❑Does Not intended to operate when not required. continuously. ❑Not Observable ❑Not Applicable Location on plans/spec: N/A-No revisions to air systems 6.4.3.8 Demand control ventilation ❑Complies I Requirement will be met. [ME6]' I provided for spaces >500 ft2 and ❑Does Not >25 people/1000 ft2 occupant Location on plans/spec: density and served by systems ❑Not Observable N/A-No revisions to air with air side economizer,auto ❑Not Applicable systems :modulating outside air damper ;control, or design airflow >3,000 I cfm. 6.5.3.2.1 I DX cooling systems>=75 kBtu/h', ❑Complies Exception: Requirement (ME4012 (>= 65 kBtu/h effective 1/2016) ❑Does Not does not apply. and chilled-water and evaporative cooling fan motor hp ❑Not Observable -See the Mechanical Systems list >= V4 designed to vary supply ❑Not Applicable for values. fan airflow as a function of load and comply with operational requirements. _ 6.4.4.1.1 Insulation exposed to weather ❑Complies 'Requirement will be met. [ME7]3 protected from damage. ❑Does Not Insulation outside of the ❑Not Observable Location on plans/spec: conditioned space and associated ❑Not Applicable N/A- No exterior insulation with cooling systems is vapor pP retardant. 6.4.4.1.3 HVAC piping Insulation thickness. in. in. ❑Complies I Requirement will be met. [ML9)2 Where piping is installed in or ❑Does Not under a slab, verification may ❑Not Observable Location on plans/spec: need to occur during Foundation in Inspection. :❑Not Applicable . 6.5.2.2.1 Three-pipe hydronic systems ❑Complies Requirement will be met. [MESO]2 using a common return for hot ❑Does Not and chilled water are not used. DNot Observable Location on plans/spec: ❑Not Applicable Ml 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Boiler Replacement Report date: 05/29/20 Data filename: J:\proj\2249a Tigard Swim Cntr\BOILER.cck Page 4 of 9 Section 1 Mechanical Rough-In Plans Verified ' g Field Verified • # Inspection Value Value Complies? Comments/Assumptions &Re .ID 6,5.2.2.2 Two-pipe hydronic systems using ❑Complies Requirement will be met. • [ME51]2 a common distribution system ❑Does Not have controls to allow a ['Not Observable deadband >=15 QF,allow 1 operation in one mode for at ❑Not Applicable least 4 hrs before changeover, and have rest controls to limit heating and cooling supply temperature to <=30 QF. 6.5.2.3 Dehumidification controls ❑Complies Requirement will be met. [ME19]3 provided to prevent reheating, ❑Does Not recooling, mixing of hot and cold Location on plans/spec: airstreams or concurrent heating ❑Not Observable N/A-No revisions to air and cooling of the same ❑Not Applicable systems airstream. 6.5.2.4.1 Humidifiers with airstream ❑Complies Exception: Requirement [ME68]3 mounted preheating jackets have ❑Does Not does not apply. preheat auto-shutoff value set to activate when humidification is ❑Not Observable not required. ❑Not Applicable I 6.5.2.4.2 ',Humidification system dispersion ❑Complies Exception: Requirement [ME6913 tube hot surfaces in the ❑Does Not does not apply. airstreams of ducts or air- handling units insulated >= R- ❑Not Observable 0.5. ❑Not Applicable i 1 6.5.2.5 :Preheat coils controlled to stop EComplies Requirement will be met. [ME70]3 I heat output whenever ❑Does Not mechanical cooling, including ,4 Location on plans/spec: economizer operation, is active. ❑Not Observable N/A-No revisions to air ❑Not Applicable systems i 6.5.2.6 Units that provide ventilation air i ❑Complies Exception: Requirement [ME10613"Ito multiple zones and operate in EDoes Not does not apply. conjunction with zone heating and cooling systems are Not Observable prevented from using heating or ['Not Applicable heat recovery to warm supply air above 60°F when representative building loads or outdoor air temperature indicate that most zones demand cooling. 6.5.4.2 HVAC pumping systems with >= ❑Complies Exception: Requirement [ME25]3 3 control values designed for ❑Does Not does not apply. variable fluid flow (see section details). ❑Not Observable ❑Not Applicable 6.5.6.1 Exhaust air energy recovery on ❑Complies Exception: Requirement [ME56]1 ;systems meeting Tables 6.5.6.1- ' Does Not does not apply. 1, and 6.5.6.1-2. ❑Not Observable ❑Not Applicable 6.5.7.2.1 Kitchen hoods >5,000 cfm have ❑Complies Exception: Requirement [ME32]2 make up air>=50%of exhaust ❑Does Not does not apply. air volume. e ❑Not Observable DNot Applicable 6.5.7.2.44 "'Approved field test used to ❑Complies Exception: Requirement [ME49]3 I evaluate design air flow rates ❑Does Not does not apply. and demonstrate proper capture and containment of kitchen ❑Not Observable ;exhaust systems. ❑Not Applicable 1 High Impact(Tier 1) 2. Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Boiler Replacement Report date: 05/29/20 Data filename: J:lproj12249a Tigard Swim Cntr\BOILER.cck Page 5 of 9 Section Mechanical Rough-In i Plans Verified ; Field Verified 1 # & Re ID Inspection Value Value 1 6.5.8.1 Unenclosed spaces that are ❑Complies Exception: Requirement - [ME34]2 heated use only radiant heat. ❑Does Not does not apply. ❑Not Observable ❑Not Applicable 6.4.3.9 Heating for vestibules and air .0Complies Exception: Requirement [ME63]2 curtains with integral heating '❑Does Not does not apply. include automatic controls that shut off the heating system when ❑Not Observable outdoor air temperatures>45F. ❑Not Applicable Vestibule heating and cooling systems controlled by a thermostat in the vestibule with heating setpoint<= 60F and cooling setpoint>= 80F. 6.5.10 Doors separating conditioned ❑Complies I Exception:Alteration [ME73]3 i space from the outdoors have ❑Does Not 1project to existing building. controls that disable/reset heating and cooling system when Not Observable open. ONot Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) r&I Medium Impact(Tier 2) Low Impact(Tier 3) Project Title: Boiler Replacement Report date: 05/29/20 Data filename: ):\proj\2249a Tigard Swim Cntr\BOILER.cck Page 6 of 9 Section # Rough-In Electrical inspection Complies? j Comments/Assumptions & Req.ID 8.4.2 At least 50%of all 125 volt 15-and ❑Complies Exception: Requirement does not apply. [EL10J2 20-Amp receptacles are controlled by '❑Does Not an automatic control device. ❑Not Observable ❑Not Applicable 8.4.3 New buildings have electrical energy ❑Complies Exception: Requirement does not apply. [EL11]z use measurement devices installed. ❑Does Not Where tenant spaces exist, each tenant is monitored separately. In ❑Not Observable buildings with a digital control system ❑Not Applicable the energy use Is transmitted to to control system and displayed graphically. 10.4.1 Electric motors meet requirements ❑Complies Requirement will be met. [EL9P where applicable. ❑Does Not ONot Observable Location on plans/spec: M1 ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) Medium Impact(Tier 2) Low Impact(Tier 3) Project Title: Boiler Replacement Report date: 05/29/20 Data filename: J:\proj\2249a Tigard Swim CntrkBOILER.cck Page 7 of 9 Section • • # Final Inspection Complies? Comments/Assumptions & Req.ID 6.4.3.1.2 Thermostatic controls have a 5 °F ❑Complies Requirement will be met. • [F13)3 deadband. ❑Does Not ❑Not Observable Location on plans/spec: N/A-No revisions to air systems ❑Not Applicable 6.4.3.2 Temperature controls have setpoint ❑Complies Requirement will be met. [F120]3 overlap restrictions. ❑Does Not ❑Not Observable Location on plans/spec: N/A-No revisions to air systems Not Applicable 6.4.3.3.1 HVAC systems equipped with at least ❑Complies Requirement will be met. [FI21]3 one automatic shutdown control. ❑Does Not ❑Not Observable Location on plans/spec: N/A- No revisions to air systems ❑Not Applicable 6.4.3.3.2 Setback controls allow automatic ❑Complies Exception: Systems designed for continuous operation. [F122)3 restart and temporary operation as ❑Does Not required for maintenance. ❑Not Observable ❑Not Applicable 6.4.3.6 When humidification and ❑Complies Requirement will be met. [FIE]3 dehumidification are provided to a ❑Does Not zone, simultaneous operation is DNot Observable Location on plans/spec: N/A-No revisions to air systems prohibited. Humidity control prohibits the use of fossil fuel or electricity to ❑Not Applicable produce RH > 30%in the warmest zone humidified and RH < 60%in the coldest zone dehumidified. F i 6.7.2.1 Furnished HVAC as-built drawings ❑Complies Requirement will be met. [F1713 submitted within 90 days of system ❑Does Not acceptance. ❑Not Observable ❑Not Applicable 6.7.2.2 Furnished O&M manuals for HVAC OComplies Requirement will be met. [FI(3)3 systems within 90 days of system ❑Does Not acceptance. ❑Not Observable ❑Not Applicable 6.7.2.3 I An air and/or hydronic system ❑Complies Exception: Requirement does not apply. [F1911 balancing report is provided for HVAC ❑Does Not :systems serving zones >5,000 ft2 of .conditioned area. ❑Not Observable ❑Not Applicable 6.7.2.4 HVAC control systems have been ❑Complies Requirement will be met. [FI10]1 tested to ensure proper operation, DDoes Not !calibration and adjustment of controls. :Not Observable Location on plans/spec: Ml ❑Not Applicable 10.4.3 ,Elevators are designed with the ❑Complies Exception: Requirement does not apply. [FI24]2 proper lighting,ventilation power, and ❑Does Not standby mode. ENot Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) Low Impact(Tier 3) Project Title: Boiler Replacement Report date: 05/29/20 Data filename: J:\proj\2249a Tigard Swim Cntr\BOILER.cck Page 8 of 9 Project Title: Boiler Replacement Report date: 05/29/20 Data filename: J:\proj\2249a Tigard Swim Cntr\BOILER.cck Page 9 of 9