Loading...
Permit Support Document FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 1 li 1! Transmittal Letter r l c A RI) 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: DATE RECEIVED: DEPT: BUILDING DIVISION FROM: p c U e L- leU S cI IZ 7�2 �- COMPANY: * U COS+OM CoA)S-i-/2JCttoid IkEP A 2020 PHONE: 36 0 .s zr G'4 aY BUILDING OF IGARDIVISIgPV 77 EMAIL: P L 6 4 6 7 Cp Yah o e , C cMI RE: / aOBO.SUJ UcewCRec+ Cf ,S+" 2o/q-o©/S0 (Site Address) (Permit Number) g'5IAm`&S rn' Aspe A.) I- 1 dg e Lc.)#4 / (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: 'Copies: Description: Copies: Description: Additional set(s) of plans. < Revisions: p L oN 4-e 1 (3 o X Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other(explain): REMARKS: FOR OFFICE USE ONLY Routed to Permit Technician: Date: 1/3ci Initials: - Fees Due: ❑ Yes ❑No Fee Descri tion: Amount Due: Special Instructions: Reprint Permit(per PE): ❑ Yes ❑ No ❑ Done Applicant Notified: Date: 1/0/ 71 014.4.1 Initials:', �73 0.doc I:lBuildinglPorms\Transmittal]_etter-R isions°073 20.doc City of Tigard 1,1 n COMMUNITY DEVELOPMENT DEPARTMENT rlcnxD Building Permit Review — Residential Building Permit #: N. CC: `i--• C L-3C Site Address: jL0.0 ,'‘„si V\tiicrtll' C4 Project Name: Ls�-,,l zi-- , f;A t Lot #: 1 (New dwelling=subdivision name,Addition or Alteration=last name of owner) Planning Review `� ,,t , �-v,a------( s: -4e4., P�m oral: WO SF w,17, S7vvmc.4r�z•-/I•vrh� ( Verify address/suite#active in Accela. IId In River Terra V No 0 Yes,River Terrace Review Addendum Sit,Plan Elements: V'r.sion Control 53 .pies of site plan on 8-1/2"x 11"or 11 x 17"paper PI • ained trees with drip line and tree protection measures C li awn to scale(standard architect or engineer scale) l tprint of new structure(including decks)and FFE Lit, .rth arrow [ 'Utility locations&easements (required for new and additions) address,project or subdivision name and lot number tdewalk/driveway approach J. plicant information(name and phone number) FT .cation of wells/septic systems Z' •t dimensions and building setback dimensions to'tr t tree size,type and location F- quare footage of buildings to be demolished I;: eet names Cxisting structures on site V omer elevations(2'contours if more than 4'diffe tial) fill-Lot area,building coverage area,percentage of coverage and >1,000 sf of impervious area created or replaced? 11 ❑No im rvious area(applicable if R-7,R-12,R-25&R-40) If yes,is a storm water quality facility shown? 10S/es ❑No [ 'Clean Water Services—Service Provider Lettttetof platted prior to 9/10/1995): wired: ❑ Yes,applicant was notified rr'No Received: ❑ Yes 0 No Cam' Public Facilities Improvement(PFI) Permit: uired: 0 Yes,applicant was notified 1 'No Applieded For: ❑ Yes 0 No,stop intake ,L✓_,_J,J�nd Use Case #: il' _° C—000(0 (G Toning R-1..5 LU' quired Setbacks: Front: 2.t) Rear. t Side: S Street Side: WI- Garage: � Ild" B 'ding Height: Max.Height: 3' Actual Height: 2 i— Landscape ea: 20 % 1'I,at Coverage Max:____�� �'' ?(} Entrance C't back no more than 8'from street-facing wall �,LEJ4arallel to street or offset 45 degrees or less Windows um 12%of area of all street-facing facades (3-, 5,7 Garage Garage-door is behind widest street-facing wall ❑ Yes No,one of the following is met Door extends no more than 5'from wall and there is a covered porch extending beyond garage. Door extends no more than 5'from�wand there is a 12 sq ft.window above garage on 2.d floor. Garage door width is ❑ 12'or less lld 50%or less of facade 0 60%or less and includes 7 of following 0 Covered porch 0 Recessed entrance ❑ Wall offset ❑ 1'Roof cave 0 Roof offset 0 Fire shingles 0 Lap Siding 0 Roof pitch ❑ Gable,hip,or gambrel roof 0 Dormer 0 Accent siding I Window trim 0 Window recess 0 Window projection 0 Balcony visual Clearance :r Urban Forestry]n Ud Sensitive Lands: ❑ Yes !i No Type: VI Conditions t prior Fo issuanc,•e of building permit es: (Lh l'v.4 L Gt. Mt M� �c pt/'t..(4- ( vld. Approved By Planning: f617,1%, Date: it-ij7ll Revisions(after Building Submittal only) Zeviewer / ate Revision 1: pproved 0 Not Approved h/ �I 3 rate Revision 2: 0 Approved 0 Not Approved f Revision 3: ❑ Approved 0 Not Approved I:\Building\Forms\BldgPem»tRvw_RES_O22l 19.docx Building Permit Submittal Original Submittal Date: Lt11� Site Plans: # aj Building Plans: # Building Permit#: EY Enter building permit#above. Workflow Routing: ['Planning R"Engineering C Permit Coordinator Building Workflow Sign-off. S Sign-off for Planning(include notes from planning review) Route Application Documents: [ Engineering. (1) copy of permit application, (1) site plan,(1) building plan and original plan review routing form. Q Building: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: Date: t' .'VA Engineering Review ❑ Slope at building pad: Zit ❑ Conditions "Met"prior to issuance of building permit ❑ Easements (encroachments)per engineering conditions of approval and plat�/� ❑ Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes ❑ No Assess Water Quantity Fee in-lieu: ❑ es ❑ No tr/FLIDA Facility on lot: I Yes ❑ No inal Plat Recorded: ❑ NOT Approved by Engineering: Date: Notes: h Approved by Engineering: Date: c,,�y//i Revisions (after Building Submittal only) Iewer Date Revision 1: C'Approved 0 Not Approved j Za Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review 0 Conditions "Met"prior to issuance of building permit ❑ Approved, NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: IKSDC Fees Entered: Wash Co Trans Dev Tax: 'Yes ❑ N/A Tigard Trans SDC: 27yes 0 N/A Parks SDC: ❑ A LIDA Yes Zed • OK to Issue Permit l Approve by Permit Coordinator: Date: to 44/ >!� -- /3/20 I:1Building\Forms\BldgPeimitRvw_RES_022819.docx Branden Taggart From: Branden Taggart Sent: Thursday, September 3, 2020 12:45 PM To: 'pl6467@yahoo.com' Subject: Estates at Aspen Ridge Lot 1 Revisions: MST2019-00150 - 12080 SW Viewcrest Ct. Importance: High Hi Pavel, The site plan revisions for lot 1 of Estates at Aspen Ridge are ready to pick up. No fees are due. I will place these revisions in the Permit Center conference room, adjacent to the outer Permit Center lobby, for pickup between the hours of 8:00 a.m. and 5:00 p.m., Monday through Thursday. We are closed on Fridays. Thank you, Branden Taggart r City of Tigard •a• Senior Permit Technician Community Development 13125 SW Halt Blvd Tigard, OR 97223 (503}718-2449 brandent@tigard-or.gov 1