Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans (57)
M EC2019-00235 I I I I Q N. REVISIONS BY '7'O *- OEEICE COPY MECHANICAL CRITERIA MECHANICAL CRITERIA (CONT.) MECHANICAL SYMBOL LIST .. Ot-9: ::.....t: 01/28/19 TrAL M C �� 1. BEFORE SUBMITTING A PROPOSAL,THE MECHANICAL CONTRACTOR SHALL VISIT THE 14. FABRICATE AND INSTALL GALVANIZED SHEET METAL DUCTWORK FOR VELOCITIES LESS "' C7 CITY OP TIGARD SUPPLY AIR DUCT UP - • U SITE OF WORK AND FAMILIARIZE HIMSELF WITH ALL SITE CONDITIONS.MECHANICAL THAN 2000 FEET PER MINUTE AND STATIC PRESSURES LESS THAN 2"WATER GAUGE IN d' C7 � v r REVIE D FOR CODE COriiPL.TAI+t CONTRACTOR SHALL CAREFULLY EXAMINE ALL CIVIL,ARCHITECTURAL,STRUCTURAL, ACCORDANCE WITH THE LATEST EDITION OF THE"LOW VELOCITY DUCT CONSTRUCTION ° :- -1 m Z Co O3 PLUMBING,MECHANICAL AND ELECTRICAL CONSTRUCTION DOCUMENTS.SUBMISSION STANDARDS"AS PUBLISHED BY THE SMACNA,PROVIDE ELBOWS,BRANCHES AND TEES LI SUPPLY AIR DUCT DOWN i A • OF A BID WILL ACKNOWLEDGE THE MECHANICAL CONTRACTOR HAS VISITED THE SITE IN SUPPLY AND RETURN DUCTS WITH TURNING VANES PER SMACNA STANDARDS. ISI RECEIVED ____=_ Z w Approved: I AND EXAMINED ALL CONSTRUCTION DOCUMENTS AND BID INSTRUCTIONS.THE INSULATED FLEXIBLE DUCT SHALL BE'THERMAFLEX"TYPE MK-E.DUCT SIZES SHOWN V I RETURN AIR DUCT UP _ __ _ 3 fl OTC: - MECHANICAL CONTRACTOR'S BID SHALL INCLUDE ALL MECHANICAL WORK IN THE ON THE DRAWINGS ARE SHEET METAL SIZE AND INCLUDE DUCT LINER AS SCHEDULED - U CONSTRUCTION DOCUMENTS,INCLUDING MECHANICAL WORK RELATED TO EQUIPMENT ON THE DRAWINGS.DUCTWORK WITHOUT AN INSULATION TAG IS NOT LINED OR Q RETURN AIR DUCT DOWN APR 9 2019 W O w z Permit#: .F.c.., 0 } C - CI a PROVIDED BY OTHERS. EXTERNALLY INSULATED.THE MECHANICAL CONTRACTOR SHALL PROTECT ALL DUCT ® EXHAUST AIR DUCT UP • _ Zy. O Address: -�^�-Z ��. i�•�' -� SYSTEMS AND MECHANICAL EQUIPMENT OPENINGS FROM CONSTRUCTION DUST AND CITY OF TIGARD .i.�ir %. 2. MECHANICAL CONTRACTOR SHALL REQUEST CLARIFICATION ON ANY ITEM(S)OF THE DIRT.FOR MECHANICAL EQUIPMENT OPERATED DURING CONSTRUCTION,PROTECT BUILDING DIVISION f"°"4 Z Z Suite Q EXHAUST AIR DUCT DOWN #: �� CONTRACT DOCUMENTS THAT ARE NOT UNDERSTOOD OR WHERE CONFLICTS MAY EACH RETURN AIR DUCT OPENING WITH MERV 8FILTERS AND INSTALL MERV 8 � _ � � � � ■ � By; EXIST.CLARIFICATIONS MUST BE PRESENTED AS A"REQUEST FOR INFORMATION"(RFI) FILTER(S)IN EQUIPMENT FILTER RACK.UPON COMPLETION OF CONSTRUCTION, — CHANGE IN DUCT SIZE m i i 1 Date -�3_ '<'1 IN WRITING PRIOR TO SUBMITTING A BID.RFI SHALL BE PRESENTED A MINIMUM OF FIVE REMOVE CONSTRUCTION FILTERS AND REPLACE EQUIPMENT FILTERS WITH NEW p r- ~ °' o J 1 (5)WORKING DAYS BEFORE THE BID DATE.OBTAIN THE RFI FORM AT FILTERS. TURNING VANES ZM O O o0 00 ,o �.GANDWENGINEERING.COM/DOCUMENTS.SUBMISSION OF A BID WILL r r ~C- Q N 6 NG ACKNOWLEDGE THE MECHANICAL CONTRACTOR UNDERSTANDS THE SCOPE OF WORK, 15. ALL JOINTS AND SEAMS OF NEW DUCT AND DUCT BEING RE-USED SHALL BE CLEANED - FLEXIBLE DUCT CONNECTION �"'� <"`t ~ >` ' m o MEANS AND METHODS OF INSTALLATION,EQUIPMENT AND MATERIALS TO BE USED.RFI AND SEALED.SEAL NEW DUCTS TO THE FOLLOWING SEAL CLASSES ACCORDING TO •"'co- z (S) 05 1 ,2 ,h THAT HAVE NOT BEEN CLARIFIED PRIOR TO BID,WILL BE PROVIDED BY THE SMACNA"HVAC DUCT CONSTRUCTION STANDARDS-METAL AND FLEXIBLE":SEAL ♦---- HORIZONTAL LIFE SAFETY DAMPER 7 0 `� oe n n "-` MECHANICAL CONTRACTOR,AS DIRECTED BY THE ENGINEER OF RECORD,AND THE DUCTS WITH"FOSTER"32-14 SEALANT PER MANUFACTURES INSTALLATION 0 N �: �i MOST STRINGENT MATERIALS,EQUIPMENT,AND SCOPE OF WORK SHALL APPLY.NO INSTRUCTIONS FOR ALL JOINTS IN LOW AND MEDIUM VELOCITY DUCT. ----- VERTICAL VERTICAL LIFE SAFETY DAMPER = V' rn ADDITIONAL COMPENSATION WILL BE MADE FOR THE FAILURE OF THE CONTRACTOR TO OUTDOOR,SUPPLY-AIR DUCTS: SEAL CLASS A. OBTAIN CLARIFICATIONS PRIOR TO BID. OUTDOOR,EXHAUST DUCTS: SEAL CLASS C. ■--- MOTORIZED AUTOMATIC DAMPER(MAD) MECHANICAL ABBREVIATIONS I .J N > �� v OUTDOOR,RETURN-AIR DUCTS: SEAL CLASS C. •� .0 c - 4 Z> 3. THE MECHANICAL CONTRACTOR'S BID SHALL BE BASED ON THE SCHEDULED UNCONDITIONED SPACE,SUPPLY-AIR DUCTS IN PRESSURE CLASS 2-INCH W.G.AND L.__- MANUAL DAMPER AFF ABOVE FINISHED FLOOR a U U a - 8 EQUIPMENT,MATERIALS,AND MANUFACTURERS WHICH FORM THE"BASIS OF DESIGN". LOWER:SEAL CLASS B. AHJ AUTHORITY HAVING JURISDICTION 0 0 ALL OTHER EQUIPMENT,MATERIALS,AND MANUFACTURERS,ARE CONSIDERED UNCONDITIONED SPACE,EXHAUST DUCTS: SEAL CLASS C. fl CARBON DIOXIDE DETECTOR AHU AIR HANDLING UNIT man r c SUBSTITUTIONS.CONTRACTOR PROPOSED SUBSTITUTIONS MUST BE SUBMITTED TO UNCONDITIONED SPACE,RETURN-AIR DUCTS: SEAL CLASS B. CO2 A.I.P. ABANDON IN PLACE mom ■ '- .c THE ENGINEER OF RECORD FOR REVIEW AND WITH A COMPLETED SUBSTITUTION CONDITIONED SPACE,SUPPLY-AIR DUCTS IN PRESSURE CLASS 2-INCH W.G.AND 0 CARBON MONOXIDE DETECTOR AL ALUMINUM REQUEST FORM.OBTAIN THIS FORM AT r APPROVALS OF SUBSTITUTIONS ARE CONNT{GTS ENT PON ENGIINEER'S REVIEW.THE CONDITIONED SPACE,EXHAUST DUCTS: SEAL CLASS B. OH HUMIDISTAT AP ALOWER;SEAL CLASS C. ALT CC SSTE Q0 PR pe PANEL 'CLt N� u4 ! MECHANICAL CONTRACTOR SHALL MAKE NO PRIOR ASSUMPTIONS ON SUBSTITUTIONS CONDITIONED SPACE,RETURN-AIR DUCTS:SEAL CLASS C. AS AIR SEPARATOR NOT APPROVED BY THE ENGINEER.IF THE ENGINEER APPROVES A SUBSTITUTION 0 MANOMETER ATC AUTOMATIC TEMPERATURE CONTROL VALVE 7• 3 fprREQUEST,THE MECHANICAL CONTRACTOR WILL BE HELD RESPONSIBLE FOR 16. TEST AND ADJUST ALL AIR HANDLING EQUIPMENT,TERMINALS,AND AIR DEVICES TO ATR ALL THREAD ROD ' ENGINEERING REVISIONS,PHYSICAL SIZE,CAPACITIES,COORDINATION, PROVIDE THE REQUIRED AIR VOLUME AGAINST THE AVAILABLE SYSTEM STATIC 0 PRESSURE SWITCH ATU AIR TERMINAL UNIT i` SUPPLEMENTAL DRAWINGS AND INFORMING OTHER TRADE CONTRACTORS RELATED PRESSURE. TEST AND SET ALL DAMPERS,SUPPLY,RETURN,OUTDOOR AIR AND AV MANUAL AIR VENT TO THE INSTALLATION,AS TO ANY SPECIFIED ITEM CHANGES.THE MECHANICAL EXHAUST DEVICES TO THE CFM SHOWN ON THE DRAWINGS.PROVIDE ALL REQUIRED 0RETURN AIR SMOKE DETECTOR BB BASEBOARD HEATER t "' OREGON Q. CONTRACTOR SHALL BEAR AS PART OF HIS CONTRACT,ANY ADDITIONAL COSTS SHEAVE AND BELT MODIFICATIONS REQUIRED TO OBTAIN CFM QUANTITIES SHOWN ON BDD BACK DRAFT DAMPER fty p, t 4/ INCURRINSTALLATION FOR OTHER THAN"BASIS OF DESIGN" IN HIS WORK OR BY THE OTHER CMA TERIALS AND EQUIPMENT. PROCEDURES OUTLINED IN TESTING AND BALANCINGS AS A RESULT OF THE DRAWINGS. TESTING AND BALANCING SHALL BE IN ACCORDANCE VVITH MANUAL AS PUBLISHED BY ()REF REFRIGERANT(Rxxx)DETECTOR BES BFF BLOW FINISHED FLOOR NKING EQUIPMENT SUPPLIER /�' S. � SMACNA.PROVIDE A TEST AND BALANCE REPORT PERFORMED AND PREPARED BY AN DI REFRIGERANT LEAK HORN-STROBE BMS BUILDING MANAGEMENT SYSTEM ��• 6/30/2019 4. MECHANICAL CONTRACTOR SHALL PERFORM WORK IN A SAFE MANNER.COMPLY WITH INDEPENDENT TESTING AND BALANCING CONTRACTOR CERTIFIED AABC OR NEBB. BOD BOTTOM OF DUCT • APPLICABLE OSHA SAFETY GUIDELINES DURING THE COURSE OF COMPLETING THE PROVIDE AN ELECTRONIC COPY OF THE TESTING AND BLANACING REPORT,INCLUDING 0 THERMOSTAT BOE BOTTOM OF EQUIPMENT WORK DESCRIBED ON THESE CONSTRUCTION DOCUMENTS. A MARKED UP PLAN,FOR REVIEW BY THE ENGINEER.TESTING AND BALANCING REPORT BOP BOTTOM OF PIPE SHALL BE COMPLETED AND PROVIDED TO THE ENGINEER PRIOR TO TENANT MOVE IN. Is PIPE/DUCT IN ATTIC BS BRANCH SELECTOR-DAIKIN 5. SHOP DRAWINGS SHALL BE SUBMITTED ELECTRONICALLY AS PDF FILES. SHOP CH CHILLER DRAWINGS SHALL INCLUDE TRANSMITTAL PAGE(S)INDICATING THE NAME OF THE 17. MECHANICAL CONTRACTOR SHALL PROVIDE TEMPERATURE CONTROL WIRING THIS V PIPE/DUCT BELOW FLOOR OR GRADE CLG CEILING 0 0 PROJECT,AND THE NAME,ADDRESS,AND PHONE NUMBER OF THE GENERAL AND WORK,NO EXCEPTIONS OR EXCLUSIONS. ALL SYSTEMS SHALL BE COMPLETE CO CARBON MONOXIDE , MECHANICAL CONTRACTORS. GENERAL CONTRACTOR AND MECHANICAL INCLUDING,BUT NOT LIMITED TO;EXPERTISE,DESIGN,EQUIPMENT,CABINETS,BOXES, PIPE/DUCT ABOVE CEILING CO2 CARBON DIOXIDE RX Q CONTRACTOR SHALL REVIEW SHOP DRAWING SUBMITTALS FOR COMPLIANCE, RELAYS,SWITCHES,CONTACTORS,TRANSFORMERS,CURRENT TRANSFORMERS, CR CONDENSER WATER RETURN C7 CONTENT AND COMPLETENESS AND PROVIDE A STAMP WITH THE DATE OF REVIEW AND WATER METERS AND ELECTRICAL ACCESSORIES. THE EXPANSION OF THE EXISTING r EXPOSED DUCT,W/MILL PHOSPHATIZED FINISH CRAG COMPUTER ROOM AIR CONDITIONER SIGNATURE OF THE REVIEWER. TRANSMITTAL PAGE SHALL HAVE INDEX WITH BAS INTO THIS TENANT FINISH SHALL INCLUDE ALL REQUIRED COMPONENTS TO CRCU COMPUTER ROOM CONDENSING UNIT l,.�'" SPECIFICATION SECTION AND DESCRIPTION OF SUBMITTED ITEMS. NO EXCEPTIONS MONITOR AND CONTROL THE NEW HVAC EQUIPMENT AND METER WATER AND IT, i `* PIPE/DUCT ON ROOF CS CONDENSER WATER SUPPLY 1...„C) WILL BE TAKEN.SHOP DRAWINGS NOT SUBMITTED IN THIS FORMAT WILL BE REJECTED ELECTRICAL USE AS REQUIRED BY PROPERTY MANAGER. WIRING EXPOSED IN RETURN CSST CORRUGATED STAINLESS STEEL TUBING •! AND WILL NOT CAUSE REASON FOR PROJECT DELAYS.EQUIPMENT SHALL NOT BE AIR PLENUM SHALL BE PLENUM RATED CABLE.PROVIDE SHOP DRAWINGS FOR REVIEW I& NEW CONNECTION TO EXISTING(VERIFY SIZE CT COOLING TOWER 411 g ORDERED UNTIL ENGINEER OF RECORD HAS PROCESSED APPLICABLE SHOP AND PROCESSING.THE SHOP DRAWINGS SHALL CONTAIN A CONTROL SEQUENCE AND LOCATION IN FIELD PRIOR TO BID) CU CONDENSING UNIT is. DRAWINGS.A MINIMUM OF SEVEN WORKING DAYS WILL BE ALLOWED FOR SUBMITTAL STATEMENT AND WIRING DIAGRAM WITH ALL PARTS INDICATED OR A BILL OF MATERIAL. CUH CABINET UNIT HEATER Q NEW BRANCH DUCT TAP&CONNECTION PROCESSING BY THE ENGINEER.SUBMITTALS SHALL INCLUDE BUT NOT BE LIMITED TO: ALL CONTROLS SHALL BE SUPPLIED IN ACCORDANCE WITH THE BUILDING STANDARDS. N DDC DIRECT DIGITAL CONTROL COMPUTER ROOM AC EQUIPMENT AND ACCESSORIES,ALL NEW SCHEDULED ALL NEW EQUIPMENT AND PROGRAMMING SHALL COMPLY WITH BUILDING STANDARD TO EXISTING DIFF DIFFUSER la g EQUIPMENT AND ACCESSORIES,REGISTERS AND DIFFUSERS,AND TEST AND BALANCE MONITOR AND CONTROL POINTS. ALL COSTS ASSOCIATED WITH HARDWARE, Q DUCT INSULATION(SEE SCHEDULE) DISC DISCONNECT . 0 E REPORT. SOFTWARE AND TIME TO FULLY INTEGRATE THIS NEW EQUIPMENT INTO THE BUILDING DLSS DUCTLESS SPLIT SYSTEM STANDARD BAS SHALL BE INCLUDED IN THIS BID. ® ® PLAN NOTE SYMBOL DN DOWN 6. SUBMIT AND PAY FOR ALL REQUIRED WORK PERMITS.PROVIDE ALL REQUIRED A REVISION SYMBOL f JS IFETRE IAL PRESSURE SWITCH INSPECTIONS AND RE-INSPECTIONS.PROVIDE A SIGNED CERTIFICATE OF INSPECTION 18. THE LANDLORDS CONSTRUCTION CRI I hKtA,LEASE AGREEMENT,AND CONSTRUCTION AT THE PROJECT COMPLETION. STANDARDS ARE HERE-IN MADE PART OF THIS CONTRACT.ALL REQUIREMENTS IN THE EA EXHAUST AIR eLANDLORDS CONSTRUCTION CRITERIA,LEASE AGREEMENT,AND CONSTRUCTION EQUIPMENT CALLOUT(SEE SCHEDULE) EBB ELECTRIC BASE BOARD 7. ALL EQUIPMENT AND MATERIALS SHALL BE SPECIFICALLY PROVIDED PER WRITTEN STANDARDS REFERRED TO AS TENANT WORK IS DEFINED AS DIVISION 15 MECHANICAL xx EC ELECTRICAL WORK CONTRACTOR INSTALLATION INSTRUCTIONS AS PUBLISHED BY THE MANUFACTURER OF THE WORK AND IS TO BE PROVIDED BY THE CONTRACTOR.IT IS THE RESPONSIBILITY OF GRLLLFJDlFFUSER CALLOUT{SEE SCHEDULE} EF EXHAUST FAN EQUIPMENT OR MATERIAL PROVIDER.MEANS AND METHODS OF INSTALLATION ARE TO THE MECHANICAL CONTRACTOR TO OBTAIN COPIES OF THESE DOCUMENTS AND EG EXHAUST GRILLE BE PROVIDED BY THE MECHANICAL CONTRACTOR.MECHANICAL CONTRACTOR SHALL COMPLETELY FAMILIARIZE HIMSELF WITH THESE DOCUMENTS PRIOR TO BIDDING THIS (E) LIFE SAFETY DAMPER CALLOUT(SEE SCHEDULE) EMS ENERGY MANAGEMENT SYSTEM UNDERSTAND THE PRODUCT,MEANS AND METHODS OF INSTALLATION.THE PROJECT.SUBMISSION OF A BID ACKNOWLEDGES THE MECHANICAL CONTRACTOR HAS EXISTING DUCT TO REMAIN EQPT EQUIPMENT MECHANICAL CONTRACTOR SHALL OBTAIN THE INSTALLATION INSTRUCTIONS AND COMPLIED WITH THIS REQUIREMENT OF THE CONTRACT. �4'a ER EXHAUST REGISTER REQUIREMENTS PRIOR TO BID.ALL RFI AND CLARIFICATIONS OF SCOPE DURING - -- - EXISTING TO BE DEMOLISHED ERV ENERGY RECOVERY VENTILATOR CONSTRUCTION WHERE THE CONTRACTOR HAS NOT PREVIOUSLY OBTAINED THIS 19. THE MECHANICAL CONTRACTOR SHALL DISCONNECT AND REMOVE ALL INDICATED ET EXPANSION TANK INFORMATION FOR BIDDING PURPOSES WILL NOT BE CAUSE FOR ADDITIONAL COSTS EXISTING MECHANICAL EQUIPMENT OCCURRING IN DEMOLISHED WALLS,FLOORS, MECHANICAL PIPING EUH ELECTRIC UNIT HEATER OR CONSTRUCTION DELAY. ATTICS AND CEILING AREAS.REFER TO THE ARCHITECTURAL DRAWINGS FOR THE EWC ELECTRIC WATER COOLER GENERAL SCOPE OF DEMOLITION. DISCONNECT AND REMOVE MECHANICAL —A— COMPRESSED AIR LINE EWH ELECTRIC WATER HEATER 8. THE MECHANICAL SCOPE OF WORK SHALL BE PROVIDED TO COMPLY WITH THE 2014 EQUIPMENT,DUCTS,AIR DEVICES,AND PIPING OCCURRING IN THESE AREAS. EXH EXHAUST OREGON MECHANICAL SPECIALTY CODE,LOCAL ORDINANCES,STATE LAW,AND MECHANICAL COMPONENTS INCLUDING MOTORS,TEMPERATURE CONTROL DEVICES, —CD— CONDENSATE DRAIN FA FIRE ALARM FEDERAL LAW.REFER TO THE ARCHITECTURAL CODE BLOCK OR THE MUNICIPALITY GRILLES,DIFFUSERS,AIR TERMINALS,HANGERS,MOUNTING HARDWARE,ETC.,MUST BE ---CD--- CONDENSATE DRAIN BELOW FLOOR OR GRADE FAAP FIRE ALARM ANNUNCIATOR PANEL WEBSITE FOR THE APPLICABLE CODES AND ADOPTED ORDINANCES PRIOR TO BID. REMOVED FROM THE PREMISES,TO BE LEGALLY DISPOSED OF BY THE MECHANICAL FACP FIRE ALARM CONTROL PANEL SUBMISSION OF A BID ACKNOWLEDGES THE MECHANICAL CONTRACTOR HAS CONTRACTOR.ALL LOOSE ENDS OF SYSTEMS WHERE SUCH ABANDONMENT HAS ---CR--- CONDENSER WATER RETURN FC FLEX CONNECTION PERFORMED THIS REQUIREMENT AND THE BID INCLUDES LABOR AND MATERIAL TO TERMINATED SHALL BE TRIMMED CLEAR AND APPROPRIATELY CAPPED OR SEALED IN A —CS— CONDENSER WATER SUPPLY FCU FAN COIL UNIT PROVIDE CODE COMPLIANCE.SEISMIC RESTRAINTS AND ANCHORAGE SHALL BE SAFE AND SECURE MANNER BEHIND NEW FINISHES.MAINTAIN SYSTEM CONTINUITY TO FD FIRE DAMPER PROVIDED TO COMPLY WITH THE TIGARD MUNICIPAL CODE-TITLE 14-BUILDING CODE. ADJOINING AREAS AS NEEDED,THIS INCLUDES BUT IS NOT LIMITED TO REMOVAL, --CHR-- CHILLED&HOT WATER RETURN FPC FIRE PROTECTION CONTRACTOR MODIFICATION AND REINSTALLATION OF EQUIPMENT AS NEEDED TO SUSTAIN THE —CHS— CHILLED&HOT WATER SUPPLY FRT FIRE-RETARDANT-TREATED ' r-A §:92 9. MECHANICAL CONTRACTOR SHALL PROVIDE FIELD COORDINATION WITH OTHER EXISTING WORKING CONDITION OF ALL MECHANICAL --CWS-- CHILLED WATER RETURN EQUIPMENT AND TO RETURN FSC FOOD SERVICE CONSULTANT 0 FSD FIRE/SMOKE DAMPER ® Q TRADES;SYSTEMS AS SHOWN ARE DIAGRAMMATIC AND GIVE THE GENERAL THESE AREAS TO FULL WORKING ORDER AT PROJECT COMPLETION. CQPT.CONTRACTOR a ARRANGEMENT AND LOCATIONS ONLY.MECHANICALFSEC FOOD SERVIE E CONTRACTOR SHALL —CWS— CHILLED WATER SUPPLY FTU FOND SERV CL UNQT e COMPLETELY REVIEW ARCHITECTURAL DRAWINGS,STRUCTURAL DRAWINGS,CEILING 20. THE MECHANICAL CONTRACTOR SHALL CONFINE HIS ACTIVITIES TO THE AREA SET —0— DRAIN LINE FV FIELD VERIFY �"' ELEVATIONS,AND SYSTEM DRAWINGS OF OTHER TRADES FOR DETAILS OF ASIDE FOR HIM TO DO HIS WORK AND SHALL NOT INTERFERE WITH ANY OF THE OWNER 2 O G GAS LINE GC GENERAL WORK CONTRACTOR CONSTRUCTION.ROUGH-IN OF MECHANICAL DEVICES,AIR TERMINALS,EQUIPMENT, OR TENANT ACTIVITIES. THE MECHANICAL CONTRACTOR WILL NOT BE PERMITTED TO �l, •, GF GAS FURNACE DJ PIPING,ATTACHMENTS,AND HANGERS SHALL BE BASED ON THIS REVIEW.EXACT STORE MATERIAL EXCEPT WITHIN THE AREAS AS DIRECTED BY THE G.C. SHOULD ANY —HG— HOT GAS LINE GWH GAS WATER HEATER 11::°)(3 Q LOCATIONS AND FINAL LAYOUT SHALL BE DETERMINED IN THE FIELD,PROVIDE ALL DISTURBANCE OF EXISTING INSTALLATION BE NECESSARY,THE CONTRACTOR SHALL _-HPWR-- HEAT PUMP WATER RETURN HP HEAT PUMP NECESSARY EQUIPMENT,DUCT TRANSITIONS,FITTINGS,HANGERS,SUPPORTS,AND SO INFORM THE OWNER OR TENANT WELL IN ADVANCE OF THE TIME CONTEMPLATED HP HORSEPOWER OFFSETS REQUIRED FORA COMPLETE INSTALLATION IN ALL RESPECTS.THE FOR THE DISTURBANCE.AFTER A PLAN ACCEPTABLE TO THE OWNER OR TENANT HAS —HPWS— HEAT PUMP WATER SUPPLY HRCU HEAT RECOVERY CONDENSING UNIT pil c MECHANICAL CONTRACTOR MEANS AND METHODS OF INSTALLATION SHALL PROVIDE BEEN FORMULATED,THE G.C.SHALL KEEP IN CLOSE PERSONAL CONTACT WITH THE --HPC-- HIGH PRESSURE CONDENSATE HWCP HOT WATER CIRC.PUMP il,- FOR OPERATING EFFICIENCY,NEATNESS OF APPEARANCE,AND EASE OF WORK TO SEE THAT IT IS EXECUTED IN ACCORDANCE WITH THE AGREED PROCEDURE. HX HEAT EXCHANGER MAINTENANCE, THE MECHANICAL CONTRACTOR WILL PREPARE DIMENSIONED FIELD --HWR-- HOT WATER RETURN IAH INTAKE AIR HOOD ERECTION DRAWINGS WHERE REQUIRED FOR USE BY THE INSTALLERS,TO INSURE 21. CONTINUITY OF ALL BUILDING SERVICES AND UTILITIES SERVING FACILITIES IN THE —HPS— HIGH PRESSURE STEAM IOM INSTALLATION&OPERATION MANUAL PROPER INSTALLATION AND COORDINATION.THE MECHANICAL CONTRACTOR SHALL BUILDING SHALL BE MAINTAINED WITHOUT INTERRUPTION,EXCEPT FOR SUCH A PERIOD TAKE THEIR OWN MEASUREMENTS AT THE BUILDING,AND BE RESPONSIBLE FOR THE OF TIME DESIGNATED —HWS- - HOT WATER SUPPLY ID INSIDE BY THE G.C.THE MECHANICAL CONTRACTOR SHALL SO IR INFRA-REDIDEDIAMETER TUBE HEATER(GAS) 1 0 CORRECT LAYOUT,INTERPRETATION,AND USE OF ALL SIZES AND DIMENSIONS.THE ARRANGE AND EXECUTE HIS WORK THAT ANY CONNECTIONS,EITHER TEMPORARY OR --LPC-- LOW PRESSURE CONDENSATE IV INTAKE VENTILATOR CONTRACTOR SHALL KEEP"AS-BUILT'INFORMATION DURING CONSTRUCTION AND PERMANENT,OR REARRANGEMENT OF PRESENT EQUIPMENT,DUCTWORK AND PIPING —LPG— LIQUIFIED PETROLEUM GAS(PROPANE) KEF KITCHEN EXHAUST FAN FURNISH TO THE OWNER OR TENANT A RECORD SET OF LEGIBLE BLACK LINE PRINTS SHALL BE IN SUCH A MANNER AS TO ASSURE FULL RESUMPTION OF SERVICE AT THE LLSV LIQUID LINE SOLENOID VALVE AND AN ELECTRONIC COPY OF THESE DOCUMENTS AT THE PROJECT COMPLETION. TIME DESIGNATED BY THE G.C.PROVIDE TEMPORARY CROSS CONNECTIONS,DUCTS, —LPS— LOW PRESSURE STEAM LV LOUVER M PIPING,HANGERS AND VALVES NECESSARY TO ASSURE THIS CONTINUITY OF THE P --MPC-- MEDIUM PRESSURE CONDENSATE LPG LIQUIFIED PETROLEUM GAS(PROPANE) 10. REVIEW ARCHITECTURAL DRAWINGS AND EXISTING SITE CONDITIONS FOR ALL FIRE BUILDING MECHANICAL SYSTEM AT NO ADDITIONAL COST TO THE OWNER OR TENANT. MAX MAXIMUM RATINGS AND FIRE RATED ASSEMBLIES PRIOR TO BIDDING THE PROJECT.PROVIDE FIRE MAINTAIN IS DEFINED TO INCLUDE,BUT IS NOT LIMITED TO,REMOVAL,MODIFICATION —MPS— MEDIUM PRESSURE STEAM MC MECHANICAL WORK CONTRACTOR + STOP AT EACH RATED WALL,FLOOR,CEILING-ROOF ASSEMBLY PENETRATION. FIRE AND REINSTALLATION OF EQUIPMENT AND PIPING AS NEEDED TO SUSTAIN THE —MUW— MAKE-UP WATER MCA MINIMUM CIRCUIT AMPERES STOP SYSTEMS SHALL BE MANUFACTURED BY"3M".PROVIDE IN STRICT COMPLIANCE EXISTING WORKING CONDITION OF THE MECHANICAL SYSTEM.THE MECHANICAL —RL— REFRIGERANT LIQUID LINE MCC MOTOR CONTROL CENTER sil WITH THE MANUFACTURER'S APPLICATION DETAILS AND INSTRUCTIONS.PROVIDE CONTRACTOR SHALL RETURN THESE SYSTEMS OR AREAS TO FULL WORKING ORDER MD MANUAL DAMPER TAGGED CERTIFICATIONS AT EACH PENETRATION.PROVIDE SHOP DRAWINGS FOR AT PROJECT COMPLETION. —RS— REFRIGERANT SUCTION LINE MIN MINIMUM REVIEW WITH THE U.L.LISTING AND TEST CRITERIA.PROVIDE FIRE STOPPING WHERE TYPE-mEXISTING PIPE TO BE REMOVED MH MOUNTING HEIGHT 911 REQUIRED BY THE AUTHORITY HAVING JURISDICTION.EQUAL SYSTEMS AS 22. THIS PROJECT WILL REQUIRE MULTIPLE PHASES OF CONSTRUCTION.THE /4/394)174 / ,,�� MOCP MAXIMUM OVER CURRENT PROTECTION MANUFACTURED BY"SPEC SEAL"OR"HILTI"WILL BE ACCEPTABLE. CONTRACTOR SHALL REVIEW THE ARCHITECTURAL PLANS AND PROPOSED PHASING OF � )Ti EXISTING PIPE TO BE REMOVED MTD MOUNTED ' THE CONSTRUCTION.ALL LABOR AND MATERIAL REQUIRED TO ACHIEVE THE -TYPE(E)- EXISTING PIPING MUA MAKE-UP AIR 11. PROVIDE DUCT,PIPING,AND HANGER PENETRATIONS OF NON-RATED ASSEMBLIES CONSTRUCTION PHASING SHALL BE INCLUDED IN THE CONTRACTORS BID.BY MUW MAKE UP WATER WITH DRAFT STOPPING,OR SMOKE BARRIER SEALANT SYSTEMS.THROUGH SUBMITTING A BID,THE CONTRACTOR ACKNOWLEDGES THEY HAVE REVIEWED THE NORMALLY CLOSED PENETRATION SEALANT SYSTEMS SHALL BE MANUFACTURED BY"3M",APPLY IN STRICT REQUIREMENTS TO COMPLETE THE WORK AND PHASING INDICATED ON THE MECHANICAL PIPING SYMBOLS NIC NOT IN CONTRACT COMPLIANCE WITH THE MANUFACTURER'S APPLICATION DETAILS AND INSTRUCTIONS. ARCHITECTURAL PLANS AND REQUIRED BY THEIR SCOPE OF WORK.ALL COSTS SHALL 0 AUTOMATIC AIR VENT(AAV) NO NORMALLY OPEN PROVIDE DRAFT STOPPING OR SMOKE BARRIER SEALANTS TO MEET APPROVAL OF THE BE INCLUDED IN YOUR BID. OA OUTDOOR AIR AUTHORITY HAVING JURISDICTION.EQUAL SYSTEMS AS MANUFACTURED BY"SPEC © AUTOMATIC FLOW CONTROL VALVE OD OUTSIDE DIAMETER SEAL"OR"HILTI"WILL BE ACCEPTABLE. AUTOMATIC TEMPERATURE CONTROL OX OXYGEN 12. THE MECHANICAL CONTRACTOR SHALL GUARANTEE ALL LABOR,EQUIPMENT AND 'C E N E RAL NOTES: MECHANICAL VALVE (3-WAY) PC PLUMBING WORK CONTRACTOR W A AUTOMATIC TEMPERATURE CONTROL PCF POUNDS/CUBIC FOOT I MATERIAL INSTALLED UNDER THIS CONTRACT TO BE FREE FROM DEFECTS FOR A A. CONTRACTOR SHALL CAREFULLY COORDINATE ANY FLOOR PENETRATIONS WITH DEQ VALVE (2-WAY) PSG PUMP SUCTION GUIDE CO • PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE AND SHALL REPAIR OR GENERAL CONTRACTOR,TENANTS CONSTRUCTION COORDINATOR,BUILDING OWNERS PT PRESSURE TREATED REPLACE WITHOUT COST TO THE OWNER ANY EQUIPMENT WHICH IS DEFECTIVE OR REPRESENTATIVE AND TENANT BELOW. POST TENSIONED FLOOR SLAB CONSTRUCTION 6 BALL VALVE(BV) PVC POLYVINYL CHLORIDE W IMPROPERLY INSTALLED. IN ADDITION,THIS CONTRACTOR SHALL ASSUME FULL SHALL SE X-RAYED AND ALL STRUCTURAL SYSTEMS PERMANENTLY MARKED ON THE r CHECK VALVE(CV) RA0 RETURN AIR RESPONSIBILITY FOR ANY DAMAGE TO THE BUILDING AND ITS CONTENTS OR OTHER FLOOR STRUCTURE AND IDENTIFIED PRIOR TO ANY PENETRATION BEING PERFORMED. RAH RELIEF AIR HOOD EQUIPMENT CAUSED BY DEFECTS OR IMPROPER INSTALLATION OF EQUIPMENT OR 0 CIRCUIT SETTER(CS) RF RETURN FAN MATERIALS INSTALLED UNDER THIS SECTION OF THE WORK B. LONG LEAD TIME ITEMS THAT MAY IMPACT THE PROJECT SCHEDULE MUST BE RG RETURN GRILLE IDENTIFIED ALONG WITH THE SCHEDULE IMPACT AT TIME OF BID. FAILURE TO iS, COMPRESSED AIR QUICK-CONNECT RL EXISTING DEVICE RELOCATED 13. MECHANICAL CONTRACTOR SHALL CUT AND PATCH(OR PATCH AFTER DEMOLITION) COMMUNICATE LEAD TIME ISSUES WILL RESULT IN THE CONTRACTOR,AT HIS EXPENSE, p CONCENTRIC PIPE REDUCER RR RETURN REGISTER ROOF,FLOORS,WALLS,AND CEILINGS WHERE REQUIRED TO INSTALL NEW PROVIDING TEMPORARY FIXTURES OR EQUIPMENT TO ALLOW FOR SCHEDULED TENANT RTD RESISTANCE TEMPERATURE DETECTOR Q MECHANICAL EQUIPMENT,DUCT,AND/OR PIPING SYSTEMS AND/OR DEMOLITION OF OCCUPANCY. THE TENANT/DESIGN TEAM WILL CONSIDER ALTERNATE PRODUCT b ECCENTRIC PIPE REDUCER RTU ROOF TOP UNIT SUCH.SURFACES SHALL BE PATCHED AND LEFT READY FOR FINAL SCHEDULED FINISH. SUGGESTIONS BY THE CONTRACTOR(IF SUBMITTED PRIOR TO BID)TO MAINTAIN THE M RV RELIEF VENTILATOR ` ROOFING REPAIRS SHALL BE PERFORMED BY A QUALIFIED ROOFING CONTRACTOR SCHEDULE. g EMERGENCY GAS SHUT-OFF VALVE SA SUPPLY AIR Z THAT MAINTAINS THE ROOF WARRANTY AT THE MECHANICAL CONTRACTOR'S EXPENSE. SD SPLITTER DAMPER 'I<ALL ROOFING WORK SHALL BE INCLUDED IN THE MECHANICAL CONTRACTOR'S BID. C. CONTRACTOR SHALL PROVIDE TEMPORARY/PORTABLE EQUIPMENT FOR COOLING L/`I FLEXIBLE PIPE CONNECTION SF SUPPLY FAN AND/OR HUMIDITY CONTROL IF REQUIRED FOR CONSTRUCTION AND APPLICATION OF p, GAS SHUT-OFF VALVE(SOV) SG SUPPLY GRILLE I FINISHES. SMS SHEET METAL SCREW C4 GATE VALVE(GT.V.) SS STAINLESS STEEL -I I- GEAR OPERATED BUTTERFLY VALVE SSF SIDE STREAM FILTER W , TA TRANSFER AIR C as GLOBE VALVE(GL.V.) TEMP TEMPORARY �G TOD TOP OF DUCT HOSE END VALVE TOP TOP OF PIPE TXV THERMAL EXPANSION VALVE Y3 MANUAL AIR VENT(MAV) TYP TYPICAL DATE PETE'S PLUG UH UNIT HEATER0128/2019 4. (TEMPERATURE&PRESSURE PORT) UON UNLESS OTHERWISE NOTED SCALE ,v,T PLUG VALVE UNV UNIVERSAL AS NOTED UTR UP THROUGH ROOF • O PRESSURE GAUGE VAV VARIABLE AIR VOLUME MGR JRA VFD VARIABLE FREQUENCY DRIVE 0" PRESSURE REDUCING VALVE(PRV) VRF VARIABLE REFRIGERANT FLOW JCS CEN021 VRV VARIABLE REFRIGERANT VOLUME 1'91 STRAINER(STR) VSD VARIABLE SPEED DRIVE , EET Nr STRAINER WITH SLOWDOWN W/ WP WITH WEATHERPROOF WSHP WATER SOURCE HEAT PUMP M�l 0 0 THERMOMETER XFMR TRANSFORMER OF SHEETS IHDL DESIGN HEREDi EXPRESSLY RESERVES ITS COMMON LAW COPYRIGHT AND OTHER PROPERTY RIGHTS IN THESE PLANS. THESE PLANS AND DRAWINGS ARE IST TO BE REPRODUCED, CHANGED OR COPIED IN ANY FORM OR MANNER WHATSOEVER WITHOUT OBTAINING THE EXPRESSED WRITTEN PERMIISION OF HDL DESIGN NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PARTY WITHOUT FIRST OBTAJNING WRITTEN PERMISSION AND CONSENT. I I I I M 0 h REVISIONS BY -r Q r F 4.1 01/28/19 � PC SUBMITTAL MECHANICAL PIPE & PIPE INSULATION Gk5 COMPUTER ROOM DUCT-FREE SPLIT SYSTEM *SAMSUNG(NOEXCEPTIONS) = C 0a s, SPECIFICATION SCHEDULE �`°�P INDOQRSECTION-FAN COIL OUTDOOR SECTION-CONDENSING UNIT = Zo o 1 (NOT ALL SYSTEMS MAY BE REQUIRED ON THIS PROJECT) �`� �- z Z �\CY/ 4\f PLAN COOLING HEATING ELECTRICAL DATA REFRIG.WEIGHT PLAN * COOLING CAPACITY ELECTRICAL DATA SIZES{O D.E WEIGHT NOTES - v�Z Q� ,C,Q-' MARK MODEL NO.* CFM TOTAL SEER KW VOLTS/PH MCA MOCP (LBS) MARK MODEL NO, ) (LBS) I- Z 0 045 0�� (MBH) (EER) MBH AMBIENT(°F) VOLTS/PH. MCA M.O.C.P. SUCTION LIQUID w 1-2 o 0 �QQ, �y0 CRAC-1 AC018MNADCH/AA 406 18.0 18.8 (9.05) N/A 208/1 0.7 N/A 24 CRCU-1 AC018MXSCCC/AA 18.0 95 208/1 13.0 15 112 1/4 80 1,2,3,4 = - w Zr 114 )-Z " ° � -or -r4 $ 0� ��� NOTES: 1. PROVIDE OUTDOOR UNIT WITH EQUIPMENT CURB, CYCLE PROTECTOR,-40° LOW AMBIENT OPERATION, REFRIGERANT LINE SET. PROVIDE INDOOR UNIT WITH PREMIUM WIRED CONTROLLER WITH SCHEDULING,AND Q E. ,� clk• �O EXTERNAL WALL MOUNTED CONDENSATE PUMP BECKETT#CB201UL WITH SAFETY SWITCH AND POWER CORD(INTERLOCK FANCOIL WITH CONDENSATE PUMP TO SHUT DOWN FANCOIL ON PUMP FAILURE). _ _ 0 c- Il Ell O, v PIPE MATERIAL 42- PGG 2. SYSTEM IS CAPABLE OF 98'LINE LENGTH AND 66'LIFT. COORDINATE PIPING ROUTE WITH PROPERTY MANGER TO KEEP WITHIN LIMITATIONS PRIOR TO BID. _ Z x v .'' CO SEAMLESS DRAWN COPPER TYPE"L-ACR"ASTM B280,WROUGHT COPPER 3. REFRIGERANT LINE SIZES LISTED ARE UNIT CONNECTION SIZES. REFER TO THE MANUFACTURER FOR PIPE SIZES BASED ON EQUIVALENT LINE LENGTH. PROVIDE OIL TRAPS WHERE RECOMMENDED BY THE j v -Y M M FITTINGS ASME 816.22,ASME 816.50, BRAZE PER AWS A5.8/A5.8M;ASTM B32 • MANUFACTURER. 0 °� n ^ SOLDER 95-5 OR ALLOY HB. 0 N m 4. CONTRACTOR SHALL DISABLE ALL NIGHT AND WEEKEND TEMPERATURE SET-BACKS. a u t° `° - SEAMLESS ANNEALED COPPER TYPE"L-ACR"ASTM 13280,WROUGHT COPPER U i -°, o FITTINGS ASME 816.22,ASME 816.50, BRAZE PER AWS A5.8/A5.8M;ASTM B32 • ___It O SOLDER 95-5 OR ALLOY HB. SEQUENCE OF OPERATION: 6 . a 3 ll C? 0. '` 8 FAN-ON,COOLING SETPOINT-68°F. a DRAWN COPPER DIM/TUBE,ASTM B306,CAST COPPER FITTINGS ASME ; v 0 B16.18, OR WROUGHT COPPER ASME B16.22, SOLDER:ASTM B 32 LEAD • - III .- t FREE WITH ASTM B 813 WATER-FLUSHBLE FLUX. TERMINAL UNIT SCHEDULE *TRANS00 PROfie PIPE INSULATION SIZE CFM ��t'r'1�rIi ss� PLAN MARK *MODEL STATIC PRESSURE NC LEVELS FAN ELECTRIC HEAT COIL NOTES j,•`' 7 S .\ij:\ PIPE DIAMETER:ALL • UNIT OUTLET MAX MIN. >i; mi j INLET DOWN MIN. RAD. DISCH. CFM ESP HP CFM KW V/PH. STEPS E.A.T. L.A.T. 1 1/2"THICK, NOTE 1 (WITH VAPOR BARRIER)OR NOTE 2(NO VAPOR BARRIER) FPB 3-9 EXISTING 80 - 825 150 - - - - - - - - - 4.5 - - - 90 1 PIPE DIAMETER< 1.5" 1- OREGON ez, ' . FPB 3-10 EXISTING 100 - 1325 250 - - - - - - - - - 6.0 - - - 90 1 'N4). S p'i •�4i 3 1-1/2"THICK, NOTE 2.• FPB 3-11 EXISTING 60 - 400 90 - - - - - - - - - 2.5 - - - 90 1 �Y ,.4.„PIPE DIAMETER> 1.5" • FPB 3-12 EXISTING 80 - 900 150 - - - - - - - - - 4.0 - - - 90 1 S- GR‘ S: THICK, NOTE 2. 3 FPB 3-13 EXISTING 60 - 400 90 - - - - - - - - - 2.0 - - - 90 1 EXP. 6/30/2019 NOTES: 1. INORGANIC GLASS FIBER WITH ASJ 2. CLOSED CELL ELASTOMERIC 3. INSULATE REFRIGERANT PIPE PER FPB 3-17 EXISTING 60 - 400 90 - - - - - - - - - 2.0 - - - 90 1 K=0.27(BTU-IN/H-SOFT-°F)AT 75°F, 1.5 PCF K=0.25(BTU-IN/H-SQ.FT-°F)AT 75°F,0.05 EQUIPMENT MANUFACTURER'S ASTM C 547;TYPE I,TYPE IV PERM-IN I.O.M.COAT INSULATION ON VAV 3-6 EXISTING 60 - 400 90 - - - - - - - - - 1.0 - - - 90 1 ASTM: C 585,C 795 ASTM C 534,TYPE I-TUBULAR GRADE BUILDING EXTERIOR WITH 2 ® O ASTM C 1136(JACKETS);TYPE I, II, III, IV,VIII ASTM E 84 COATS OF ARMAFLEX TYPE WB VAV 3-7 EXISTING 80 - 825 150 - - - - - - - - - 2.5 - - - 90 1 < ASTM:C 665,C 1617,C 1338 ASTM G-211C 1338 FINISH, UV,OZONE,&MOISTURE VAV 3-8 EXISTING 80 - 900 150 - - - - - - - - - 2.0 - - - 90 1 5 ASTM:C 1104,C 356 ASTM G-22 RESISTANT COMPOUND. VAV 3-9 EXISTING 80 - 500 150 - - - - - - - - - 2.0 - - - 90 1 0 GREENGUARD CERTIFICATION ASTM D 1056,2B1 VAV 3-10 VCCF 80 11x10 500 0 1.0 0.25 0.03 23 27 - - - - - - - - - 2 lit2-:. 2. GREENGUARD CHILDREN&SCHOOLS NFPA 255 CERTIFICATION NFPA 90A&90Bi NFPA 90A&90B UL 723 O NOTES: 1. EXISTING UNIT, BALANCE AS SHOWN. UNIT HAS ELECTRIC HEAT, SET HEATING PRIMARY CFM TO PROVIDE 90 DEGREE DISCHARGE TEMPERATURE. UL CLASSIFIED UL 181 --� GREENGUARD CERTIFICATION 2. PROVIDE WITH 24V CONTROL TRANSFORMER, FIBRE FREE LINER, DISCONNECT SWITCH, PRESSURE INDEPENDENT BUILDING STANDARD DIGITAL(DDC) ILI V GREENGUARD CHILDREN&SCHOOLS CONTROLS,AND BUILDING STANDARD THERMOSTAT. . 0 E CERTIFICATION PIPE INSTALLATION: VENTILATION AIR SCHEDULE CONDENSATE PIPE: 2014 OREGON MECHANICAL SPECIALTY CODE 1. PROVIDE MINIMUM 1 %SLOPE IN DIRECTION OF FLOW. (2014 OMSC)MINIMUM VENTILATION RATES REFRIGERANT PIPE: ROOM NAME ZONE FLOOR ZONE TABLE 403.3 MINIMUM TABLE 403.3 MINIMUM TABLE 403.3.1.2 OUTSIDE AIR SUPPLY RETURN 1. PROVIDE LIQUID LINE SIGHT GLASS AND DRYER-STRAINER AS MANUFACTURED BY SPORLAN OR EQUAL. AREA SQ.FT. POPULATION VENTILATION RATE VENTILATION RATE ZONE AIR DISTRIBUTION BASED ON AIR AIR 2. INSTALL REFRIGERANT PIPING IN COMPLIANCE WITH ASHRAE 15,"SAFETY CODE FOR REFRIGERATION SYSTEMS." (Az) (Pz) (CFM/PERSON) (CFM/SQ. FT.) EFFECTIVENESS(Ez) 2014 OMSC 3. COMPLY WITH ASME B31.5,"REFRIGERATION PIPING AND HEAT TRANSFER COMPONENTS." OPEN OFFICE 3805 41 5 0.06 0.8 542 3950 4. CONSTRUCT SOLDERED JOINTS ACCORDING TO ASTM B 828 OR COPPER DEVELOPMENT ASSOCIATION'S"COPPER TUBE HANDBOOK." PRIVATE OFFICES 750 5 5 0.06 0.8 88 1625 5. CONSTRUCT BRAZED JOINTS ACCORDING TO AMERICAN WELDING SOCIETY'S"BRAZING HANDBOOK,"CHAPTER"PIPE AND TUBE." 6. USE TYPE BCuP,COPPER-PHOSPHORUS ALLOY FOR JOINING COPPER SOCKET FITTINGS WITH COPPER PIPE. CONFERENCE ROOM 325 12 5 0.06 0.8 99 900 7. USE TYPE BAg,CADMIUM-FREE SILVER ALLOY FOR JOINING COPPER WITH BRONZE OR STEEL. BREAK ROOM/LOUNGE 525 16 5 0.12 0.8 179 600 8. TESTS AND INSPECTIONS IN COMPLIANCE WITH ASME B31.5, CHAPTER VI. MOTHER'S ROOM 105 1 5 0.06 0.8 14 75 COPY 95 - 5 0.06 0.8 7 150 PHONE 80 1 5 0.06 0.8 12 75 GRILLE, REGISTER, AND DIFFUSER SCHEDULE *TITUS TOTAL 3RD FLOOR 941 7375 6434 PIANMODEL NO.* NECK SIZE FACE SIZE MAX P.D. BORDER PATTERN FINISH NOTES 0 MARK CFM PROPERTY MANAGER TO ADJUST OUTDOOR AIR SYSTEM TO COMPLY WITH OUTDOOR AIR REQUIREMENTS. w fi EX-S EXISTING SUPPLY DIFFUSER; BALANCE TO INDICATED CFM - WI p A SA TBD-80 80 48"x(2) 1-1/2"SLOTS 200 0.1 TYPE 3 2-WAY #26 1,2 W'"` ¢ EX-R EXISTING RETURN GRILLE - DUCT INSULATION SCHEDULE )-7 �0 4 I I ( MATERIAL t-""" THICK- NO. FIELD VAPOR 2 NOTES: 1. MECHANICAL CONTRACTOR TO VERIFY CEILING CONSTRUCTION WITH ARCHITECT AND EXISTING CONDITIONS AND ENSURE THAT ID TAG K BTU.IN AT 75 F. �D IB FORM R-VALUE APPLIED RETARDER IT IS COMPATIBLE WITH GRILLE, REGISTER,AND DIFFUSER FRAMING, INCLUDING BORDER TYPES,T BARS,AND CROSS NOTCHES. H.SQ.FT.F 3 NESS LAYERS JACKET REQUIRED a` 2. PROVIDE WITH MISC. CEILING GRID TEES. ti 1 MINERAL-FIBER BLANKET (0.26/0.75) N/A 1" 3.8 ONE FOIL&PAPER YES la 1 ti3 LINER (0.2411.5) N/A 1" 42 ONE NONE YES V GENERAL NOTE: DUCT SIZES INDICATED ON DRAWINGS ARE SHEET METAL SIZE AND INCLUDE LINER SPECIFIED. ta U.L.SYSTEM WL5028 U.L.SYSTEM NO.CAJ5045 F RATING=1-HR.AND 2-HR. L RATING AT AMBIENT=4 CFM/SQ.FT. INSULATED METAL PIPE THROUGH 2-HR. CONCRETE T RATING=1/2-HR. L RATING AT 400°F=LESS THAN 1 CFM/SQ.FT. FLOOR OR WALL FRONT VIEW SECTION A-A F RATING=2-HR. A-.1 TOP VIEW T RATING=3/4 AND 1-HR. SECTION A-A �n Vo VA o -_--,rte--- 0 -..�...--2. W 0 0 --I -- /4„..N.k. 44 °i (J: timi! I / . 7 . . .. (4, .,. . 2.1 7_//i. .. , z<4.... yit . i, a '�%t moo' s / __ - ,.,,,�,,,, liililli J J_ . J va .‹-----.......„ U Q Ar1 -. A Com,....._ z 1.GYPSUM WALL ASSEMBLY(1-HR.OR 2-HR.FIRE-RATING)(2-HR.SHOWN). 1.CONCRETE FLOOR OR WALL ASSEMBLY: Q 2.PENETRATING ITEM TO BE ONE OF THE FOLLOWING: A.MIN.4-1/2"THICKNESS LIGHTWEIGHT OR NORMAL WEIGHT CONCRETE. 3.MAXIMUM 3/4"THICK(AB/PVC)FLEXIBLE FOAM TYPE PIPE INSULATION, B.MIN.8"CONCRETE BLOCK. U CI 4.HILTI FS-ONE HIGH PERFORMANCE INTUMESCENT FIRESTOP SEALANT: 2.6"DIA.(OR SMALLER)STEEL PIPE(SCHEDULE 10 OR HEAVIER),OR II A.MINIMUM 5/8"DEPTH OF SEALANT FOR A 1-HR.FIRE-RATING. 4"DIA.(OR SMALLER)COPPER PIPE,EMT OR STEEL CONDUIT. B.MINIMUM 1-1/4"DEPTH OF SEALANT FORA 2-HR.FIRE-RATING. 3.MAX.1-1/2"THICK FIBERGLASS INSULATION WITH AN ALL SERVICE JACKET. 5.MINIMUM 1/2"CROWN HILTI FS-ONE HIGH PERFORMANCE INTUMESCENT FIRESTOP SEALANT AT PIPE INSULATION/WALL INTERFACE. 4.MIN.3"THICKNESS MINERAL WOOL BACKING(MIN.4 PCF DENSITY). N 0TE 1.MAXIMUM DIAMETER OF OPENING=7-112". 1 5.MIN.1-1/2"DEPTH HILTI FS 611A FIRESTOP SEALANT. 2.ANNULAR SPACE=MINIMUM 0",MAXIMUM 1-112", NOTES:1,MAXIMUM DIAMETER OF OPENING=12". DATE 01/2$/2019 SEE HILTI FIRESTOP INSTALLATION MANUAL FOR ADDITIONAL INSTRUCTIONS 2.ANNULAR SPACE REQUIRED=MIN.1/2",TO MAX.2-3/8". SCALE AS NOTED HILTI,INC. TULSA,OK 1-800-879-8000 3.WHEN STEEL PIPE OR CONDUIT IS USED,T RATING=1-HR. . U.L.SYSTEM NO.WL5028 4.WHEN COPPER TUBE OR PIPE IS USED,T RATING=3/4-HR. MGR ,RA INSULATED METAL PIPE THROUGH CONCRETE FLOOR FIRE xeCENO21 1 1 -HR. OR 2-HR. GYPSUM WALL ASSEMBLY ,01 PENETRATION DETAIL SSHEETM NO SCALE M-101 NO SCALE 1I1-1c1 OF SHEETS ' HDL DESIGN HEREBY EXPRESSLY RESERVES ITS COMMON LAW COPYRIGHT AND OTHER PROPERTY RIGHTS IN THESE PLANS. THESE PLANS AND DRAWINGS ARE IST TO BE REPRODUCED, CHANGED OR COPIED IN ANY FORM OR MANNER WHATSOEVER WITHOUT OBTAINING THE EXPRESSED WRITTEN PERMYSION OF HDL DESIGN NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PARTY WITHOUT FIRST OBTAINING WRITTEN PERMISSION AND CONSENT. I I I I n o 1`,.. REVISIONS BY SILCONE CAULK BEFORE ROOFING ._0 cr:,,!° 7. 01/28/19 . IS APPLIED. ALL AROUND PIPE(S) ,.._ (-I " N. PC SUBMITTAL Vs' fo, ' 20 GUAGE SHEET METAL CAP GASKET 0 I Z 5 .. U ..... ATTACHED WITH SHEET METAL SCREWS NAILER BY CURB MANUFACTURER _. . --9'1 Z(5 il ,..:, ''' .--1 .... az ,, 1"3 PCF DENSITY LINER -'- ri•LI t 4 0 SECURE CAP TO CURB 8"OVERHANG SPIN IN WITH DAMPER -Z •w' 4/ -- \w. ..\ do_ --- 61-1 "4 z **Ail__ Z ....i :.<- Z z \ L:w L.. J INSULATED FLEXIBLE DUCT(8'MAX. LENGTH) OVERLAP ROOFING UP&INTO BOX 1 n lei 90 ADJUSTABLE ELBOW PULL FLEX Cm) Fa INSULATION OVER ELBOW TO GRILLE \ tx„)C Eill 4:ci,1L.. d PREFABRICATED ROOF CURB i I 1 8 PIPE OR CONDUIT CONNECTION, SEAL WITH TIE WRAP. TJ 6 2 c° re _ . ' ' 1 1 I MAIN DUCT '. a SEAL SEAMS VVITH EXPANDING FOAM 14" I 18 GUAGE FLASHING CONNECT WITH SHEET METAL SCREWS 4 LOCATIONS AT COLLAR. I I I I I I I _ /--- ' ,, ,, : Z i gr-, 04111:1-7 P.L.4 g 5 4.,--r 0 (r) ..., , .,- p A , c 0 t 9 tli ea i IQ r.'' -2 10"MIN STANDARD CEILING ':-:;.c:) 0 4a I.. l'.. .-. ROOFING AND RIGID INSULATION i \NROOFING MATERIAL GRID SUPPORT PATTERN 0 2 'ag• ---- (BY CONTRACTOR) -- r.- (.1 'c' RECTANGULAR DUCT HANGER SCHEDULE IBAR JOIST OR PAIR SPACING: 10 FT. 8 FT. 5 FT. 4 FT. OTHER a „U 1 I I I /4 i f 1 \N i I f STRUCTURAL -....sia / \ \\__ i \:-.7.-- IF CONCRETE DECK OMIT STEEL, SET DUCT PERIMETER, "Z 0 .9 WITH CURB ON DECK FIRE TREATED LAY-IN DIFFUSER 1 MAXIMUM HALF STRAP WIRE/ STRAP WIRE/ STRAP WIRE/ STRAP WIRE!ROD ROD ROD ROD - --L COMPONENT Imo II •-• 4 .c 3-1/2"X3-1/2"X5/16"ANGLE WELDED TO-/7 N WOOD BLOCKING TO LEVEL CURB,AND ATTACH CURB TO DECK WITH(6)3/8" DIA. EXPANSION BOLT WITH WASHERS. PER SCHEDULE P/2=30" M.x GA 10 GA (.1351 IN.x GA 10 GA (.135") IN.x GA 12 GA (.106") IN.x GA 12 GA (.106") 1 e-• •-_1 (.00 PR°Fes, .s 1 x 22 1 x 22 1 x 22 1 x 22 .\v C,•'''''''.71.e.: ' - STRUCTURAL STEEL WITH FIRE TREATED (MIN.4 CORNERS OF CURB) 4 LAY-IN1 CEILING DIFFUSER AND CDA (" LI DUCT _....., -, WOOD BLOCKING AS REQUIRED TO P/2=72" 1 x 18 3/8" 1 x 20 1/4" 1 x 22 1/4" 1 x 22 1/4" "lik7• 3* . T- A-MACH CURB TO STEEL WITH LVANIZED LEVEL CURB. SEE ARCHITECTURAL AND M-102 No SCALE P/2=96" 1 x 16 3/8" 1 x 18 3/8" 1 x 20 3/8" 1 x 22 1/4" ' (6)3/8"DIA THRU BOLTS WITH SHEET METAL STRUCTURAL PLANS FOR ANY DEVIATIONa NOTE: WASHERS(MIN.4 CORNERS OF P/2=120" 1.5 x 16 1/2" 1 x 16 3/8" 1 x 18 3/8" 1 x 20 1/4" se. STRAP FROM ANGLE SIZES. 'In ALL ROOF WORK SHALL COMPLY WITH BUILDING STANDARDS CURB AND CENTER OF LONG P/2=168" 1.5 x 16 112" 1.5 x 16 1/2" 1 x 16 3/8" 1 x 18 3/8" -, __II 1. OREGON, /.4.. CC"„, v .2 e AND BE INCLUDED IN MECHANICAL CONTRACTOR'S BID. THIS SIDE P/2=192" NONE 1/2" 1.5 x 16 112" 1 x 16 3/8" 1 x 16 3/8" ,1-1Ag8 ' k) cs CONTRACTOR SHALL USE PROPERTY MANAGER APPROVED P/2=193"+ SPECIAL ANALYSIS REQUIRED . S. GF1 -*" ROOFING CONTRACTOR AND MAINTAIN ROOF WARRANTIES. SINGLE HANGER MAXIMUM ALLOWABLE LAP JOINED STRAPS,MINIMUM • LOAD RATED EXP, 6/30/2019 LOAD FASTENERS(PLACE FASTENERS IN - .711 SHEET METAL SERIES,NOT SIDE BY SIDE): SCREW WIRE/ STRAP FASTENERS W/VVASHER 1 PIPING THRU ROOF DETAIL STRAP WEIGHT ROD WEIGHT IN.x GA (QTY)-SIZE Z M-102 NO SCALE IN.x GA 1 LBS. 0(IN.) LBS. 1 x 18,20,22 (2)-#10 SMS or 1 x 22 260 0.106 80 (1)-1/4"0 BOLT iti 44 1 x 20 320 0.135 120 1 x 16 (2)-114"0 BOLT 111P a 1 MAIN DUCT WITH 1"3 PCF DENSITY LINER x 18 420 0.162 160 1.5 x 16 (2)-3/8"0 111*Cct R NEM SPIN IN WITH MANUAL VOLUME DAMPER 1 x 16 700 1/4 1622875000 3/8112 INSULATED FLEXIBLE DUCT(8'MAX. LENGTH) maj 1 ...fg.' 'THY-CURB"(4) CONDENSING UNIT \ 1.5 x 16 1100 518 2000 STRUCTURE MAX. . HANGER STRAPS,.,:jr 2 DUCTWORKNOTREQUIRwiEDTFHOR CROSS-SECTIONAL lki 0 SEISMIC/WIND HOLD-DOWN 3/4 3000 (SEE CHART) AREA STRAPS ATTACHED WITH , - NOTE:TABLE ALLOWS FOR DUCT WEIGHT,1 LBJSQ.FT."INSULATION WEIGHT,AND NORMAL NOTE: (10)#10 TEK SCREWS(5) ,s52c6zzzi - _ 1"NEOPRENE ISOLATION PADS PULL FLEX INSULATION OVER ;L! REINFORCEMENT AND TRAPEZE WEIGHT. I --60 in.MAX.---- ---UNLESS FOOT OF .. Not ALL ROOF WORK SHALL COMPLY WITH EACH SIDE, PROVIDE SHOP , (1)EACH CORNER COLLARS SEAL WITH TIE WRAP. \- ' .„ --1---E- STRAP IS PLACED L'a"• UNDER A BOTTOM BUILDING STANDARDS AND BE INCLUDED IN DRAWING SUBMISSION. f CONNECT WITH SHEET METAL REINFORCEMENT - SCREWS 4 LOCATIONS AT . MECHANICAL CONTRACTOR'S BID. THIS PROVIDE SLACK AS -.--..-0.---..-.--..-.--.-.0,----.-...-. CONTRACTOR SHALL USE PROPERTY /7. RECOMENDED BY RESTRAINT COLLAR. '...-- :'." ......- .. ..,.,..........:...,...........-. -..,........... ..,....,....„.........-.....,,....,.: . 1---3 trki 1 MANAGER APPROVED ROOFING CONTRACTOR WOOD NAILER MANUFACTURER • '' 4:. jt . 4. - .. . • r= . -4: AND MAINTAIN ROOF WARRANTIES. DIFFUSER PLENUM FULL SIZE- :, ' . . . A - 'A ,.. "4., . . .."' .. .. . •: . .' . • OF DIFFUSER NECK, INSULATE .:-, . •A \---SCREWS WITH 1/2"-2#DENSITY LINER . • - 4 - ' - .• . 4 . : ..• --I 1 in.I--- CONDENSING UNIT . . . A . .14.7 MIN. . . .,.. . • SPIN IN COLLAR 4 , • A : 4 A . . • 4. . HANGER 1"NEOPRENE/CORK ISOLATION PAD ' ,4 - A • _ .. 4 A 1 BY M.C. (4)REQUIRED If I \ \ \ I 1 t 4.-1=----- '.1------6- V 1 u STRAP / LOAD RATED-\ WASHER FASTENERS GALV. SHEETMETAL CAP OVER WASHER ROOFING TACKED TO WOOD "MICRO METL"TYPE MM475 EQUIPMENT NUT NAILER N SUPPORT FURNISHED AND INSTALLED BY ; BAND OF SAME SIZE \ • LAY-IN SLOT DIFFUSER PER SCHEDULE - i. : - AS HANGER STRAP - ._ HVAC CONTRACTOR. (TYP OF 2)OR - - N "PATE"EQUAL ROOFING TO BE LAPPED UP ......- , SUPPORT UNDER CAP 'Wil' I (ito,,1 5 LAY-IN CEILING DIFFUSER AND BRANCH DUCT WASHERS MAY BE OMITTED I-) WITH 100 LB MAX LOAD ON 36"0 MAX. ' - 1 2'-0" MO I ROOF INSULATION M-102 NO SCALE 22 GA STRAP WHEN FOLDED 2e0 MAX. I ROOFING @ g [e g II I 1 HI 11 II II 11 Iiii ( III I IIIIH [1 ' 112 H 11 ]fi 1 '11111111 I III IIV $1,1 6 IF CONCRETE DECK OMIT STEEL- _7 :\ - _ 7 SET CURB(S)ON DECK 1NITH 11 2° vs 6 FIRE TREATED WOOD BLOCKING f ' I ROOF DECK 7 DUCT HANGER DETAILS M-102 NO SCALE --,.... TO LEVEL CURB,AND ATTACH' -.._____ ___AL , , CURB(S)TO DECK WITH(6)3/8" 3-1/2"X3-1/2"X5/16"ANGLE WELDED TO P421') 1 op DIA. EXPANSION BOLT WITH , , STRUCTURAL STEEL ATTACH CURB(S) WASHERS.(MIN.4 CORNERS OF , TO STEEL WITH (6) 3/8"DIA. BOLT WITH 2iiii CURB) WASHERS. (MIN.4 CORNERS OF CURB) Iiii .,' ROOF STRUCTURE NOTE: EQ.ON COLUMN OR V- 0 0"FROM PROVIDE INTERMEDIATE BLOCKING EQ. ----, r EDGE OF WALL 1 % FOR DEVICES AS REQUIRED FOR 6" V-0" F.A.VISUAL SIGNAL 2 CONDENSING UNIT SUPPORT DETAIL PLACEMENT AS DIMENSIONED / i 4r. ----- M-102 NO SCALE 1 ...fi F.A.VISUAL SIGNAL WHERE APPLICABLE . 112 • - 4- aim I I EDGE OF COLUMN OR WALL LOW PRESSURE INSULATED FLEX 4 b ____ __ l Id 1 i 1 RIGID ROUND DUCT PER DRAWINGS + THERMOSTAT WALL-MOUNTED TELEPHONE, 1 \ (MAXIMUM 8'-O"LONG) OR AN DEVICE •,„ z.......... I al 6' b L ADDITIONAL DEVICES I -------------- SPIN-IN WITH LOCKING CONDENSATE DRAIN I : • THERMOSTAT(TYP.) DIFFUSER QUADRANT DAMPER(TYP.) „ POWER - REFRIGERANT PIPING WHERE MULTIPLE SWITCHES OCCUR, U . / 0: U (SEE GRILLE, REGISTER& irk MI STRUCTURE GANG WITH SINGLE COVER PLATE -------MEM c=1 11'? .-. DIFFUSER SCHEDULE) 0-____ . I THEN LOCATE THE OTHER DEVICES CENTERED OFF FURTHEST LIGHT SWITCH Za fa: -------- LIGHT SWITCH(TYP.) _ •4 a: 0: i , .,/--<1 a VARIABLE VOLUME BOX a a a0 INSULATED SHEETMETAL DISCHARGE SVVITCH OR DIMMER a: I DUPLEX RECEPTACLE, ZI/ --- (SEE SCHEDULE) LAY-IN CEILING sri' PLENUM(MINIMUM V-0"LONG) COMMUNICATION OUTLET, ETC. -9,,,f' ,_ , RUBBER VIBRATION ISOLATORS& al DOOR OR SIDE LITE FRAME er) 4 to T . (TYP.) 1] - PIPING RACKED ON WALL(TYP) is-) . i 3/8"ALL THREAD ROD(TYP.OF 4) --I VAV AIR INLET I , • -? - MOUNTING BRACKET PROVIDED WITH UNIT. FASTEN TO STUDS / ,!? STRAIGHT RIGID ROUND an..4CC I PER MANUFACTURER'S INSTRUCTIONS ,. . DUCT MIN.3 DIAMETERS , LU / COMPUTER ROOM AIR-CONDITIONING _ . 0 - I 1 ( ) 1 i_-_-.# UNIT(CRAC-1) 6 CENTENE DEVICE LOCATION DIAGRAM TRANSITION TO VAV INLET SIZE .1 .f M-102 NO SCALE MEDIUM PRESSURE INSULATED FLEX - ._„.,.. STAINLESS STEEL BANDING 1 DISCONNECT BY EC44:( (MAXIMUM 3'-0"LONG) . .4.--1STRAP(TYPICAL) 0 . . -s-----.-------- POWER ENTRY THROUGH z BOTTOM OF UNIT. SPECIFICATION FOR LOCATION OF DEVICES P < 0 i A. WHEN MOUNTING MULTIPLE DEVICES FROM DIFFERENT TRADES IN THE SAME LOCATION(SUCH AS LIGHTING SWITCHES, 1 AIRFLOW 1 0, THERMOSTATS, ETC.),THEIR ARRANGEMENT SHALL BE IN ACCORDANCE WITH THE FOLLOWING: W M- L.. WALL STUDS-SEE 1. LOCATE DEVICES AS SHOWN ON THE ARCHITECTURAL PLANS, ELEVATIONS OR SECTIONS. - MAIN RECTANGULAR SUPPLY DUPLEX RECEPTACLE BY E.C. l 4:1e ARCHITECTURAL PLANS u: 2. WHEN SHOWN ON MECHANICAL OR ELECTRICAL DRAWINGS, BUT NOT ON ARCHITECTURAL DRAWINGS, DEVICES SHALL DUCT(MEDIUM PRESSURE) Li k' BE UNIFORMLY AND SYMMETRICALLY MOUNTED. VERTICALLY ALIGN DEVICES MOUNTED AT HEIGHTS INDICATED, .= io UNLESS SEPARATED HORIZONTALLY BY A MINIMUM OF 24". , b ILo 8 VAV BOX INSTALLATION DETAIL DA/I oi/28/2019 EXTERNAL CONDENSATE PUMP ..1 3. DEVICES INSTALLED IN MASONRY OR SURFACES TO RECEIVE WOOD PANELS,WALL COVERING OR SIMILAR MATERIALS ,SHALL BE INSPECTED BY THE ARCHITECT AT TIME OF ROUGH-IN. SCALE • 4. IF THE CONTRACTOR HAS ANY DOUBTS REGARDING THE LOCATION OF DEVICES, HE SHOULD CONSULT WITH THE M-102 NO SCALE AS NOTED PROJECT ARCHITECT/ENGINEER PRIOR TO ROUGHING-IN. ' MGR 5. CONTRACTOR SHALL CONFIRM THE FINAL LOCATION OF MONITORS WITH THE TENANT PRIOR TO ROUGH-IN.AN JRA FINISHED FLOOR I , I I SIGNALS SHALL BE A MINIMUM OF 36"HORIZONTALLY FROM ANY MONITOR. ' JOS CEN021 3 C RAC UNIT MOUNTING DETAIL B. DEVIATIONS FROM THE ABOVE PRINCIPLES WITHOUT PRIOR APPROVAL BY THE ARCHITECT/ENGINEER SHALL BE ' SHEET CORRECTED BY THE INSTALLING CONTRACTOR.ANY COST, INCLUDING CUTTING &PATCHING, ENTAILED IN THE M-102 NOT TO SCALE REMOVAL, RELOCATION,AND REINSTALLATION OF ANY DEVICES SHALL BE THE RESPONSIBILITY OF THAT CONTRACTOR. IA-1 0 2 I OF SHEETS HDL DESIGN HEREBY'EXPRESSLY RESERVES ITS COMMON LAW COF'YRIGHT AND OTHER PROPERTY RIGHTS IN THESE PLANS. THESE PLANS AND DRAWINGS ARE IIT TO BE REPRODUCED, CHANGED OR COPIED IN ANY FORM OR MANNER WHATSOEVER INITHOUT OBTAINING THE EXPRESSED WRITTEN PERMIISION OF HDL DESIGN NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PARTY WITHOUT FIRST OBTAINING WRITTEN PERMISSION AND CONSENT. I I I I r 8 T REVISIONS BY r � PC SUBMITTAL SILCONE CAULK BEFORE ROOFING g__ 01/28/19 IS APPLIED. ALL AROUND PIPE(S) V 1` M 20 GUAGE SHEET METAL CAP GASKET 4� O ~ ATTACHED WITH SHEET METAL fl m Z r SCREWS NAILER BY CURB MANUFACTURER M \ / Z* J SECURE CAP TO CURB 1" 3 PCF DENSITY LINER w b 6 0 I / 8"OVERHANG SPIN IN WITH DAMPER w O _ ` rA?:. INSULATED FLEXIBLE DUCT (8' MAX. LENGTH) a Q 0 q (,A o •dl Z Z MI 90 ADJUSTABLE ELBOW PULL FLEX �. ... _r OVERLAP ROOFING UP& INTO BOX `+ \ r ■ INSULATION OVER ELBOW TO GRILLE \ `J a m c E PIPE OR CONDUIT CONNECTION, SEAL WITH TIE WRAP. \\\ � Zz ,O °' 2 PREFABRICATED ROOF CURB �� F CONNECT WITH SHEET METAL SCREWS 4 ! MAIN DUCT 8 0 •— 7 6 2 v 1 1 1 x _ u a {f'� v 111 �n SEAL SEAMS WITH EXPANDING FOAM 14" FLASHING GUAGE LOCATIONS AT COLLAR. ! f _ 10"MIN STANDARD CEILING " ""'"" _1 r 5 M O (9 °ei f n g ROOFING AND RIGID INSULATION ROOFING MATERIAL v V Q �` • GRID SUPPORT PATTERN � - 8 �'� (BY CONTRACTOR) RECTANGULAR DUCT HANGER SCHEDULE -� > �' / / BAR JOIST OR ,.a — Iv x Q -6 r /—7772N PAIR SPACING: 10 FT. 8 FT. 5 FT. 4 FT. OTHER /� U el �'� 1F CONCRETE DECK OMIT STEEL, SET I1 1 I 4 fl I DUCT PERIMETER, STRUCTURAL ` 0 o / �� \ CURB ON DECK WITH FIRE TREATED MAXIMUM HALF STRAP WIRE/ STRAP WIRE/ STRAP WIRE! STRAP WIRE/ - COMPONENT Z - .. .15 WOOD BLOCKING TO LEVEL CURB,AND LAY-IN DIFFUSER ■ PER SCHEDULE ROD ROD ROD ROD -13s ATTACH CURB TO DECK WITH (6) 3/8" IN.x GA IN.x GA IN.x GA IN.x GA 3-1/2"X3-1/2"X5/16"ANGLE WELDED TO DIA. EXPANSION BOLT WITH WASHERS. P/2=30" 10 GA 10 GA 12 GA 12 GA ! {co,EC1 p80FF , // STRUCTURAL STEEL WITH FIRE TREATED (MIN. 4 CORNERS OF CURB) 1 x 22 (135„) 1 x 22 (135' 1 x 22 (106") 1 x 22 (.106`) -- ,, C1 NPc_ `r"G WOOD BLOCKING AS REQUIRED TON ATTACH CURB TO STEEL WITH 4 LAY-IN CEILING DIFFUSER AND BRANCH DUCT P/2=72" 1x18 3/8" 1x20 1/4” 1x22 1/4" 1x22 1/4" ' N-GALVANIZED • x•53 17-- LEVEL � LEVVEL CURB. SEE ARCHITECTURAL ANDM-102 NO SCALE P/2=96" 1 x 16 3/8" 1 x 18 3/8" 1 x 20 318" 1 x 22 1/4" ,, STRUCTURAL PLANS FOR ANY DEVIATION (6) 3/8" DIA. THRU BOLTS WITH SHEET METAL iii WASHERS (MIN. 4 CORNERS OF P/2=120" 1.5 x 16 1/2" 1 x 16 3/8" 1 x 18 3/8" 1 x 20 1/4" — STRAP Iv -' FROM ANGLE SIZES. NOTE: t 4- ALL ROOF WORK SHALL COMPLY WITH BUILDING STANDARDS CURB AND CENTER OF LONG P/2=168" 1.5 x 16 1/2" 1.5 x 16 112" 1 x 16 3/8" 1 x 18 3/8" _II �� `l OREGON 1 AND BE INCLUDED IN MECHANICAL CONTRACTOR'S BID. THIS SIDE P/2=192" NONE 1/2" 1.5 x 16 1/2" 1 x 16 3/8" 1 x 16 3/8" LIA, q '8,20 ��` CONTRACTOR SHALL USE PROPERTY MANAGER APPROVED P/2= 193"+ SPECIAL ANALYSIS REQUIRED S. GR1-5 ROOFING CONTRACTOR AND MAINTAIN ROOF WARRANTIES. SINGLE HANGER MAXIMUM ALLOWABLE LAP JOINED STRAPS,MINIMUM LOAD RATED EXP. 6/30/2019 LOAD FASTENERS(PLACE FASTENERS IN -c--=- SHEET METAL SERIES, NOT SIDE BY SIDE): SCREW PIPING THRU ROOF DETAIL STRAP WEIGHT WIRE/ WEIGHT STRAP FASTENERS Wnn1ASHER ROD IN. x GA (QTY)-SIZE C 1 IN.x GA LBS. 0(IN.) LBS. ®1 x 18 20 22 (2)-#10 SMS or Q M-102 NO SCALE 1 x 22 260 0.106 80 (1)-114"0 BOLT MUG Q MAIN DUCT WITH 1" 3 PCF DENSITY LINER 1 x 20 azo 0.135 120 1 x 16 (2)-114"O BOLT ,E, 2 1 x 18 420 0.162 160 1.5 x 16 (2) 318"0 SPIN IN WITH MANUAL VOLUME DAMPER I x 16 700 1/4 270 STRUCTURE 1.5 x 16 1100 3/8 680 NOT REQUIRED FOR g ( LENGTH) 112 1250 /4- DUCTWORK WITHZ JINSULATED FLEXIBLE DUCT 8' MAX. LESS THAN 6 IT FT. "THY-CURB" (4) CONDENSING UNIT 518 2000 CHANGER STRAPS_ CROSS-SECTIONAL SEISMICIWIN❑ HOLD-DOWN 314 3000 MAX (SEE CHART) AREA g , STRAPS ATTACHED WITH NOTE:TABLE ALLOWS FOR DUCT WEIGHT, 1 LB./SO. FT.INSULATION WEIGHT,AND NORMAL cm) r NOTE: (10)#10 TEK SCREWS (5) ozzi2m1 - 1" NEOPRENE ISOLATION PADS PULL FLEX INSULATION OVER I' \- REINFORCEMENT AND TRAPEZE WEIGHT. - 60 in.MAX. ----- -" UNLESS FOOT OF ALL ROOF WORK SHALL COMPLY WITH EACH SIDE, PROVIDE SHOP (1) EACH CORNER COLLARS SEAL WITH TIE WRAP. O STRAP IS PLACED UNDER A BOTTOM BUILDING STANDARDS AND BE INCLUDED IN DRAWING SUBMISSION. CONNECT WITH SHEET METAL REINFORCEMENT MECHANICAL CONTRACTOR'S BID. THIS PROVIDE SLACK AS SCREWS 4 LOCATIONS AT RECOMENDED BY RESTRAINT �.� CONTRACTOR SHALL USE PROPERTY \ COLLAR. MANAGER APPROVED ROOFING CONTRACTOR WOOD NAILER ° MANUFACTURER AND MAINTAIN ROOF WARRANTIES. DIFFUSER PLENUM FULLtSIZE — ..: OF DIFFUSER NECK, INSULATE • G E e v ` WITH 112"-2#DENSITY LINER • d 4 : I I I I S 1,1' REVISIONS BY 5,o v. 01/28/19 r on J Qn cg SUBMITTAL M Z 1: 8' r cnZ W W w v6 0 GENERAL NOTES – MECHANICAL DEMOLITION CI PLAN NOTES – MECHANICAL DEMOLITION0V w Z I Z A. UNLESS OTHERWISE NOTED, EXISTING DUCT, SUPPLY DIFFUSERS, RETURN AIR GRILLES, 1. IDENTIFY ANY PIPING WITHIN THE AREA OF THE PROPOSED NETWORK ROOM AND NOTIFY THE - Z 0 TRANSFER AIR GRILLES, TERMINAL UNITS AND HVAC CONTROLS SHALL REMAIN AND BE ARCHITECT AND ENGINEER DURING THE BID PERIOD FOR DIRECTION ON HOW TO RELOCATE Q a REUSED. PROTECT FROM DUST AND DAMAGE. THEM. 0 t C7 m i B. TURN OVER TO PROPERTY MANAGER/OWNER OR PROPERLY DISPOSE OF ANY REMAINING 2. CAREFULLY REMOVE AND RELOCATE EXISTING THERMOSTAT/SENSOR. EXTEND CONTROL Z Z ti U `r' r •O in QQ� o REMOVED AIR DEVICES AFTER RELOCATED DEVICES ARE ACCOUNTED FOR. WRING TO NEW LOCATION. w o H ki U n 3. CAREFULLY REMOVE AND RELOCATE EXISTING SUPPLY AIR DIFFUSER. REMOVE FLEX DUCT• 0 W 0.6 i r CAP AND SEAL MAIN DUCT IF BRANCH DUCT IS NOT REUSED. -2,`7' OQ ^ ^ ' g 4. CAREFULLY REMOVE AND RELOCATE EXISTING RETURN AIR GRILLE WITH BOOT. U ,°.:rn E a 5. REMOVE EXISTING EXHAUST FAN AND FLEX DUCT FROM NETWORK RACK AFTER CRAC • € z a 3 SYSTEM IS OPERATIONAL. REMOVE ASSOCIATED CONTROLS. Q U 5 °"'' 1 •Z o mn 6 .n 6. REMOVE EXISTING EXHAUST FAN. REMOVE ASSOCIATED CONTROLS, DUCTWORK, rrr ■ - v r THERMOSTAT, AND GRILLE. 7. CAREFULLY REMOVE PORTION OF EXISTING DUCT INDICATED. CAP OPEN END OF DUCT. ;..0 I'ROFes i G, Gl NE� `5)01, 8. NO HVAC WORK IN THIS AREA. 753. ,Pi Li I -- ' -, OREGON Q, . Li na,1Y8 2c ,1/4-.\• ' S. G F0.- EXP. 6/30/2019 C ii4 Ti __,..„..„, -.4,---A.Porramr Mg g ®. ® (1) 0 // 4.1.4,...--__ 151sir 7:17.4wiii,* ._,0„ 0 0 ® CI) t E g ��� "' /// e r/-/-// % " /my ,. W For / /7 i'jj /7 't/1 ' ' ' '' , , >'" /1 // ,;// m. 0 r 7 . ,../// //_ / ./, / ,,, ,.. A r , 1 AR: / /12 AAP/ / 9 oiliP a / ( / ./7/ AW / 4,6v44/AP6173 , "e'r , A'0,9".7' // / . Avr r - 0 / ' /—`g/' ' Pr / / VA' re/ A 9 rf/v .//4J il, A : / / i / /0 • _. of., 5 , , A, ttl / /FA 0: r r9 ipop i l' ES A . .pd . , .,.. ,:. .:... .., 4,1: ...i..,.:7 , // , ,, //, ® 1 twvi Fol /:'ri //::://///1"fol.'do/i)// 7 / 2 // / / / / / Or /4 - //7: A ,,,,,1,, -4r W / . . ,. . . #(//, . 1 . ' ,,e. 4 41 I ' r /77 0.*/I OS re ": '... / :////- tg 0 E N / / ".. . A. 111,4,- co ,s//1:e-, .- 61.„,7 05.-f,/: .. ... . . :.,.. ,L:., / Zr-i ESN '‘, ' ............, // /rA"./ 0 j• PI -, v Aior ite #A ryi - : A 0 A //I: A . /re' i, r 41 / , ,,, Arrer ,. 7 4 , �� Imil i 1 r� /arirlowtr / �.,, / f 01(Alel �� /riiil A I/-, 1/ W I 4 ik -----' ' ' / /AAIT'''': ','..''..-;'"::'....:'. ...:.. ';... '1:1:.." i /1/ --A / IA04 4 1 rico ri? A 9 i I A A i Z ... ,A r /// / A frr iv/ . r4.1Piit2m444 ill 1411 I AZIONA44 11 A04 triltitAd.: ' Arin.ini 111 Of.) / // ' r L... :.-..; ::::::. /:°, e.":'". .. ::.- ..:.. -H.-. . -.,,,,,AP--(// 1 r #rip, 4" ' Zoor , rj , /.:i 0.10. •,i,._,:.,:•• ..:,..:...:. :.... , ...:::, 0/\ IV g IP - t // P 1--E] / ri- /3/ /77/// A i 0,4 :.,.....-. "7 .OA..217.....:-._,. ..-..-. , . \/ /I/r////;-' 1- 7_11 .14+L% • - - . ', -.. • re4. • . • 4 ,/ AO ,/ /7", / 1/// Ag',--2/ CD t // 7 4 .0,E, /_ .-. -..._..4 ., /. • .• ...//i0, A :,j, ..-L. . . frAl r .. • / /i / \ r , _ Nu A I ao(Ell / . - - 41027 ir , 4a7 = A/ Fa P 4---1111t-- El 1 —11--_ x.J. VA I / dt/1 80(E) /13 ////' iEtr0I I / �� �� /�� /fes/ // �► /////; iiii , ��4 41 410F -- i'. T .J . / Ai , A4i/ „,, 7 / 'El\ 1 L BO(E) I /7/:/ / / �/� if, '' 0 • 1 8 0(E) 80(E) 1 ,� :7,,,c,;,' .....__ 2 I 1aEa0 E V 1 I ji I 1 / // ' ' ' '/ - ' / Ait III/ Air ❑ 100 fE) 3 / I Ank 1 la A ci4g,/,,d' ,A,4 a \c..._.E . I 3-9 I--- -- ,i _ t iii / oz y 60{E) 1 aAl�i 3 .,,,,< 80(E) Arri 3-9 /I/ , fr H1 /•,r,i- ,ifjr vA �►111 I J j , i 7 1 j 1 1 f i ci ag(E) . / _ ./717 r' �Ad � Ali7 a 0 r 1 : ,/..,.0 a.1-——_—-—- —-—-— _—- ❑ 1 f ) O w avi 4.1,,,, FE-4 L---- , Icy: / 0 80(E) I1=1 1 3-10 2 // ;,/ !l/i�/ 77�i./. l , L ______�”jJ0(E) IL(E) -1- c„._ LLI 80(E) 8 z ® 2 84J S $O(E) 8@ fE) ® I I,E II mrx iir� //4/70//,40r / = Iyl I� e I.1I_rn Y Irl I�'1 7 �/ �// / / / / / /,/ , , . /,'!/-, !!!! :�/ �4 ,_ - L �� `- ,cry I,L An Hn I © 148— 0 CC wFPB1-8.1:E))— I ® ® €1-, I ` , 80(E) 120{E) - / Iii` 120[E} (1 a u t2�1(E) 1 ) 120(E) 400 DATE 01/28/2019 • SCALE 'r— 120�) 120(E) 1 120(E) 120„ _____ (E) AS NOTED 0 ® 0 0 0 -------„,. .1 . . i_______ ______ 0 0 ® ® him JRA JOB CEN021 AO 3RD FLOOR CEILING PLAN — MECHANICAL DEMOLITION SHSN ISCALE: 1/8”= 1'-0" M—241 OF SHEETS IHDL DESIGN HEREBY EXPRESSLY RESERVES ITS COMMON LAW COPYRIGHT AND OTHER PROPERTY RIGHTS IN THESE PLANS. THESE PLANS AND DRAWINGS ARE IT TO BE REPRODUCED, CHANGED OR COPIED IN ANY FORM OR MANNER WHATSOEVER WITHOUT OBTAINING THE EXPRESSED WRITTEN PERMI1SION OF HDL DESIGN NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PARTY WITHOUT FIRST OBTAINING WRITTEN PERMISSION AND CONSENT. I I I I r 8 r` REVISIONS BY 0\. 0 G8ENERAL NOTES - MECHANICAL C PLAN NOTES - MECHANICAL 0c n 01/28/19 SUBMITTAL ' 0 .-1 g co A. EXISTING DUCT SIZES, DUCT LOCATIONS, EQUIPMENT SIZES, H. ADEQUATE SPACE SHALL BE PROVIDED FOR THE FIRE 1. NEW LOCATION FOR EXISTING THERMOSTAT/SENSOR. EXTEND 8. SPILL CONDENSATE DRAIN INTO EXISTING SERVICE SINK. ZN Q ' ON ROOF EQUIPMENT LOCATIONS,AND AIR DEVICE SIZES WERE SUPPRESSION SPRINKLER PIPING. COORDINATE DUCT CONTROL WIRING TO NEW LOCATION. CUT AND PATCH AS PROVIDE CODE REQUIRED AIR GAP. 0 0 In 3" CD-- __r[L___�i OBTAINED FROM EXISTING PLANS OR LIMITED SITE ELEVATIONS WITH FIRE SPRINKLER CONTRACTOR PRIOR TO REQUIRED. MOUNT AT 48"AFF. 1 Z M 1 I OBSERVATIONS AND SHALL BE CONSIDERED APPROXIMATE. START OF CONSTRUCTION. 9. PROVIDE VARIABLE AIR VOLUME(VAV) BOX AS SCHEDULED Z w J I 41----�e SITE VERIFY EXISTING DIMENSIONS AND LOCATIONS DURING 2. NEW LOCATION FOR EXISTING SUPPLY DIFFUSER. CONNECT AND SPECIFIED. EXTEND INSULATED SUPPLY AIR DUCT FULL w �. Z 0 U U BIDDING PROCESS AND IDENTIFY ANY DISCREPANCIES I. COORDINATE DUCT OPENINGS IN THE WALL FRAMING WITH THE TO EXISTING BRANCH DUCT WITH NEW FLEX DUCT, RIGID SIZE FROM UNIT CONNECTIONS AND TRANSITION TO DUCT w Z \ �/ PREVENTING THE NEW SCOPE OF WORK AS SHOWN. FRAMING CONTRACTOR PRIOR TO START OF CONSTRUCTION. ROUND METAL DUCT OR PROVIDE NEW TAP TO EXISTING MAIN SIZED AS SHOWN. INTERLOCK WITH WALL MOUNTED w Q w DUCT. THERMOSTAT. 04Z �.��-�r 0 X fi / B. WHERE WALLS ARE EXTENDED UP TO DECK REPLACE FLEX J. OFFSETS AND TRANSITIONS ARE TO BE PROVIDED FOR G O Z / \ r DUCTS WITH SHEET METAL DUCT THROUGH WALL. COORDINATION WITH OTHER SYSTEMS AND THE BUILDING 3. NEW LOCATION FOR EXISTING RETURN AIR GRILLE WITH BOOT. 10. NO HVAC WORK IN THIS AREA. ~ e < Z c ■ N - STRUCTURE. 0 (.7 m iis. U C. WIPE CLEAN FACE OF EXISTING SUPPLY DIFFUSERS AND 4. PROVIDE WALL MOUNTED COMPUTER ROOM AIR 0 Ir o_ RETURN GRILLES. K. PROVIDE ACCESS PANEL WHERE REQUIRED FOR HVAC CONDITIONING UNIT AS SCHEDULED AND SPECIFIED. WALL Z z v . N DAMPERS AND COMPONENT ACCESS WHEN INSTALLED ABOVE MOUNT UNIT AT 6-0 A.F.F. TO BOTTOM. PROVIDE CONDENSATE � Q eh) 5 � ill { D. PROVIDE INSULATED BASE FOR THERMOSTATS OR SENSORS NON-ACCESSIBLE CEILINGS. PUMP, MOUNT PUMP BENEATH UNIT AT 5-0"A.F.F. AND EXTEND w 4 Z ^1^�� c -4 1° 'L� LOCATED ON EXTERIOR WALL OR COLUMN FURRING THAT IS CONDENSATE PIPING ABOVE CEILINGS TO EXISTING SERVICE D 0 �]/ 1 o —RL/RS INTEGRAL WITH EXTERIOR WALL. L. COORDINATE ACTUAL ROUTE OF SUPPLY, RETURN, EXHAUST SINK IN JANITORS CLOSET. EXTEND REFRIGERANT PIPING I` DUCT,AND MECHANICAL PIPING ROUTES IN THE FIELD. ABOVE CEILINGS THEN UP THROUGH ROOF TO CONDENSING = u E. WHERE DUCTS PENETRATE THE ASSEMBLY, FIRE STOP CAULK COORDINATE WITH ARCHITECTURAL, ELECTRICAL, PLUMBING, UNIT ON ROOF. PROVIDE PIPE PENETRATION BOX ON ROOF AS u ? o SHALL BE APPLIED IN ACCORDANCE WITH MANUFACTURES FIRE PROTECTION, AND STRUCTURAL CONDITIONS. DETAILED. FLASH AND SEAL WATER TIGHT. COIL CONDENSATE J Q S INSTALLATION GUIDELINES AND U.L. LISTED TESTING PUMP CORD AND SECURE NEATLY TO WALL. ' -C 5 a . o r I-�`=L 1 I UC APPROVALS. M. COORDINATE DUCTWORK DROPS WITH STRUCTURAL a i Q a D COMPONENTS. 5. PROVIDE COMPUTER ROOM CONDENSING UNIT ON ROOF AS Q 9- .D - To- L-! - F. THE MECHANICAL CONTRACTOR SHALL PROTECT ALL OPEN SCHEDULED AND SPECIFIED. UNIT SHALL SET DEAD LEVEL ON ■ - DUCT, PIPING, AND MECHANICAL EQUIPMENT, NEW AND N. EQUIVALENT AREA DUCTS AND MODIFICATIONS TO LAYOUT ARE EQUIPMENT RAILS. EXTEND RAILS A MINIMUM OF 6" BEYOND E- -- - � EXISTING FROM CONSTRUCTION DUST AND DIRT. MECHANICAL ACCEPTABLE BASED ON FIELD CONDITIONS AND COORDINATION. EQUIPMENT ON BOTH SIDES. EXTEND REFRIGERANT PIPING AS vsEO I'ROFF • SYSTEMS SHALL NOT BE OPERATED DURING CONSTRUCTION SCHEDULED TO CORRESPONDING EVAPORATOR COIL. '��.��,IN _ SSS 1 EXCEPT WHERE WRITTEN APPROVAL IS OBTAINED FROM THE 0. PRIOR TO THE START OF CONSTRUCTION, THE MECHANICAL COORDINATE LOCATION OF UNITS WITH LANDLORDS TW G ENGINEER AND OWNER. WHEN APPROVAL IS ISSUED, PROTECT CONTRACTOR SHALL COMPLETELY REVIEW AND CONFIRM THE CONSTRUCTION REPRESENTATIVE PRIOR TO SETTING , 7`53 ' � 34.7 - EACH RETURN AIR DUCT OPENING WITH MERV 8 FILTERS AND INTENDED RETURN AIR PATH TO MECHANICAL EQUIPMENT IS EQUIPMENT CURBS. ANCHOR TO STRUCTURE AND FLASH INTO S` I `' 10 a, INSTALL MERV 8 FILTER(S) IN EQUIPMENT FILTER RACK. PRIOR OPEN AND WILL BE FUNCTIONAL. CONFIRM AGAIN, PRIOR TO ROOF PER ROOFING COMPANIES WARRANTY REQUIREMENTS. '�;`"'°'"' TO TESTING AND BALANCING, REMOVE FILTERS AND INSTALL THE AIR BALANCE OF THE MECHANICAL SYSTEM. ' -f. OREGON q °®' NEW MERV 8 FILTERS. AT COMPLETION OF CONSTRUCTION, 6. REFRIGERANT LINES UP THROUGH JANITORS CLOSETS ABOVE. fi1i '1.ay , J REMOVE CONSTRUCTION FILTERS AND REPLACE EQUIPMENT P. COORDINATE LOCATION AND SUPPORTS OF MECHANICAL UNITS OFFSET PIPING ABOVE CEILINGS OF FIFTH FLOOR TO ROOF 4' S GR1�S� ! cRac-1 FILTERS WITH NEW FILTERS. WITH OTHER TRADES. PENETRATION. COORDINATE PIPING ROUTE TO ROOF WITH �! T PROPERTY MANAGER. M.0 SHALL AND EXP. 6/30/2019 1 I ' G. ELBOWS IN MECHANICAL SYSTEMS DUCTS SHALL BE HELD TO A Q. REFRIGERANT AND CONDENSATE PIPING SHALL BE ROUTED AT EXISTING CEILING TILES AS SHALL REMOVE FOR INSTALLATION REINSTALL OF MINIMUM. COORDINATE LOCATION OF DUCTS WITH OTHER THE BOTTOM OF STRUCTURE WHERE POSSIBLE. PIPING. W ENLARGED NETWORK ROOM TRADE CONTRACTORS PRIOR TO STARTING WORK. � D 1 7. NO PIPING SHALL BE INSTALLED ABOVE NETWORK ROOM. ® O 0 M-301 SCALE: 1/4" = 1'-0" 11111 < E r. . J 2 ri �'� - O �- o CD o a yi� E+r r, ��izirs.4 (i) ® ci), Wo Eg, a ii, . I -1 a ij - / t ,,// / . ,,-._ -,/,,,,, ,. ,, „di- - ,- ,._�.r /,,, „, r //7 // ',� , ,, I ./ "i/- -1/ ��.,�.�r/_/�_�1,w- / % - y. . iji p W ......„..„„,,,_ a.-o-o_„f.,---).r.."— / , ; _ . . . . . . , . 46...„ ..., , , ,_ / pr• e / _AO - / / , ' / y fr r Apprz, ri, _.mow _ w... �� . // „.. / . / 7/ �J-yam`' ////z/A,.....0,v, ./ / / / /1 , /Irr 1 i/( • //;' /ArAi / / r / /7// /01,A( e • ..: - ►r;.� ,, • .�i / Pyr li • ./_z /. , , 1 „12, _ 1 . (10) r / / ��iT/ 1 / taut"...( / / , / 4112:/' .• // , ,/ , -w• A e. r / n p: / / �/ '/'-'/r1 / // . /// // .. // /, / 4 / .#3 //' / 0:VINO!' > Z Mr i/A ' '..4 Y..01 . .4:01401, , r"A , VW / Agri4 7 A P.1, . 44/71F, / / I. 11 ° io, Ai .// i jjAlte2/, / , 1 -/// / - SC MAGA 7 MI Af./ / / i 4...... . r ...„....,,__ #,4 zir ,,, ps , - // P2fr 7•Ar/ 40 / / ApAr Jr // , . A, r „d/. , ,, ./A,,,/ , /// 1 /v. Al • - r // A" /2 /(•;lierr /1/ 11,Ar ,,,,73FX ir , , _ 4E: f.-,; .:Po 4".09...41. /104,1 / 51:. , _,7'W1 4.7u, .. / -- -.7 zrjr 7 // / //// , 0 4 / V 0 / . / / re- 7 / f/7',//, FJ"{rier I, / At/44r / /// r larrjv / 4 /. .. ..1PAr/ 14 r ' t/4'' /7 '/ 40 .4....„..e-r . / ,.., , . /, . ,.... .., . ,„ , ,,,,,. / / r_..„,„ 7.,,, „,,,,,, . r .,.--.7- Awn , 21/:://- 7.,,,„ ,, ,_A _ , / / . . . // A !''G, ,/ .: / � JJ ior' c,,,, /�a -� « /4 // r� FFA / :/// � �I� �� /,� ►.,rr'?,�/�' ,ri,,, //,.,/ , , / /// �%/7 / .r. ,e, ' �Ig/,/ MN / / // _,r4,...,„:,,/, ; /„„,-.,.., , �/ ' I,+, ,-/-.- 21. / / 4/IC J /. p/ // Il VA/l� ��':/// / //:.. _ 4 A. ,„. /'7/ A Ar . , /Iw. / /= / 1 /7 ..*F -4// / - r : 'IRK,* ," / / / / /p w 'Wiry ' - ./.--//,/ /2 . . . .. .. ./., -/x/' /„ )/( . .,../ ,' ////_ . — ' I,, /e4 r p CD 4 , , / V : Arr / /, . _ /fir ,_:, . ,, .,, ,-/A6 Az, , ' r , /00.7 .-..:., ..._:..,:p :7.:.. r.. ./.-.:.:...:;. ...-4. - 7z.- . ' -- -, :,, l A.,. /.!A Af /,,,/ ,, 600' ,. ,,,,...07 ,,,,, / ,r, iVe4 / ' r:.• aw ,: /"/A . ./. A/ , A ei N ;. R . . ,, .2 V I..?/ Fr T.': ...'..: -: ' '''i. // "F . r AZA ZwAl , Ad/ ,'� 17.,A1 /1/H.::: .:. .:, :.,;. ,, :6, ( ( rr, f//moi mi 07r J,-. Ar. s� ://1J , ,1,# A Z° 3 .... I;,�._ 1...1► Al .. _ .I.., ._..r A .AMOIA • , irrAir il /� ... : . / / . —`ter, ..; / / 7tw �[ %/ / .1w . / #.,# ,2// V /7. or 4W ,f1''fr ,, r poi 4, , //.//,, e, pr '' :0 'ref-n /re • /- . ./"./ r0 _4 /"/// / A.'- ''' di„, 00„o .. ,, /J .. .__.. wr'aideitir . 1 1;1 1r ' ° AdAr / / r:/// Ar alit. gtA / ► ' T7 // ,�7 • I -� I �/ ' / �I,� ,..r. �, /4: � �! / Sr 1 ._-_ er- / 6.111191111r" i 1 f/ ./. tu. r PrOjOrY AY /7 er / /"' / -/ r fee ,,,1 . // � .. .,/rr/44, ( At- 4 . ,,4 CLEC�. xF i�� �i� AAr, _0it �I !PAOI A,<'. )71197 ' ./ ✓ A, . // /• 1 , ��i��.111►. / :. >d rAi (0/ r./moi / lb" 1 •, t.'47 / 1 017 a Iii/ rd6 101 l AK EX-R / .`/' / �/ / ��.. ■ w ��� ■ Ia. Ilii/ •r �r r�'�. / 133N7 / % /,� �/ / / / � _l-I u �_/ �� / / ., �, .�� /01. Al . � 240 / / v / / :I/ / // -•�, r . e .e, .= _.� moi... .. �• %.I , �I�►/., y,�F:Ilf•� , ��.F (TY F2) ,� ,' / r r� fi_•0 smAnk _6. I Bd , •►� .,.e .,:. ' ;f !�. /i \ 7 31 . %/. mrffAi%.►.I/ r.. '/ �!/. Al" 7 /409,- //if/7/2: 4., „ , ,.,_2_ - 7 // / Af 00 • / ,// '//�C�' /, -;it, 3-6 VA r 3-s I my►_, am(E� r IN 150 //1 // , / , '# , ./ 1, / IfT / 1 , , , �r >Per. / rf / // al �,,►�� i/ , CAP ® U+ 0�M r, 0,- s i� / R00�"TsO{e ►.f %� / .•a /,fir 2001 Air 00 A4/1.10, . .e2 ./ / G./7". P41://Aw ././'/+:..• :- _ / 74 I/ r >/. ;; I ® I T i 1 ' # j i COz©O AV 3-8 _ . \ I `� i /�/ / .� iiia ///: ���/ 6 0 / fes, / I_ % �. I VA��ifl 1 1 y 1 %/ FI /� / /L%���� . •�. �� ,1/ ►� / I 1 • sm, i�/ tjfr �/ i�� r' �� .7�� ir.� ..1 r 4. /1 j riy/ /. . . /:/:/, \ I100(E) C�. • ' 1 en ti 5 i 80 80 7 , 1 I , , ARV / ,rd I i / /.340 1 n I n I n 4 n �4 —�_... - , I / E /8H 110W; ?s/AV w :1\v1 ! M-301 `© Imil spr '/� a� / �r;; .% Ii/, %% I AlElk ANA 150 ,�,�,. ler 250 L ®�\ $� j �-�© 9 $ ME. - - - - - - �- -- _ _.. ==•1- I j ii • / i�:/ iii Z 1 254 2 0 1 7 '', 9 ■/ � 1: //��I/�,/ff. r �� / �_! + �.+� �1, n FPB 1 �; am �.. IKOrk /.>�� !% �. /� 4 :/r:ar° fL- i IMF ,� n �_ _ _ ! n E?�R n I � ^ EX S .. I I I //. f/.% i► //. / /- _ - - - - - I �0(E7i 225 150 //1" /mi r.MI 11 - .__ ,--E 1 1I1,W.--11.141/4 i.._i x_R 3�g ICE I � 80 200 180 G I /97 1► / ' / 0, a 4 , AA, 2 .. . /-i; . A - ,. / 140A ME7I =7 •\XPB 3 B I n � al 0 n n8 VAV 3.9 v I I Anik 1), ii0.-iri. i Nur . . : 1 E . L OliNc7E I L/r.'." rArAt / /�% // / . / ��r' / ' `n REPLACE o ^ I I Vam(E) x ., J MISSING I / am(r> 7 3-10 I _ - CAP /' 2 /f / ►•i J ,I a OVER I 17 'r'-'�-E+1 ,■ / %8 �,. �� ❑ - ---�;AP ® I � 77-"\FPB . ;� /Al:A / r r / /� / / r V I FPB 310 # 00(E) F / rL.� /r//i1 // f� / a�r �s t. !/ Trem Bo 82 8�a-p0 = , 1 ` 1 �C, I 1 �� 7' „„),„„),,,,, iii r iiri _rri ,/ 1 .! �x rri r_ 8 z Olir AK �' ( �JIFPB 3 17 V� LV�PB 3 12 O A r _r- �. _ , -/�. ;Ifil[ / ��/Lw=" , Aw // rt/rr/ a u n ® MIRFi 1 FPB 311 1111, - FPB , FRB 3-13 A Li. i ® ® ® ® ® ® R ® 3-12 N. An,W. /� 150 200 200 200 Mr MrWEEF ® �® i F F.2 �.I� • ■r/. 1y 200 3 3 i CONFER E \ICE S�**►.: :wro W IF/ A(E4, n Ir 01 FPB0 /I/. C9 3 -74-14 ----- / 120{E) ere& 41, em(E) { 342 12O(E) - - r r_ ;,aft a tj 1201(E)aft 120(E) AEU ,�� 1,+727 i �..� 4 a�`� 01/28/2019 • --- t20{f) 120':(E) 12m E _ 200 200 � 12`0(E) > 200 �il� AS NOTED SCALE co ® CD ® 2001_`_inkAatt200 GIA0 ® ® MGR JRA CEN021 /O 3RD FLOOR CEILING PLAN - MECHANICAL SHS N .:-.1. SCALE: 118"= 1'-0" M —3O1 OF SHEETS IHDL DESIGN HEREBY EXPRESSLY RESERVES ITS COMMON LAW COPYRIGHT AND OTHER PROPERTY RIGHTS IN THESE PLANS. THESE PLANS AND DRAWINGS ARE IN TO BE REPRODUCED, CHANGED OR COPIED IN ANY FORM OR MANNER WHATSOEVER WITHOUT OBTAINING THE EXPRESSED WRITTEN PERMtISION OF HDL DESIGN NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PARTY WITHOUT FIRST OBTAINING WRITTEN PERMISSION AND CONSENT. REVISIONS 8Y I CRCU- 2 EXISTING 4' HIGH PARAPET 80 lbs M401 ON A (5)-STORY STRUCTURE. 2 tja � ? o li ti P N Q o o ® -- ;O (4 ui i O Z M WN � � C ti a I 1111 Li, 73,_ , Li REFRIGERANT o- 7 I - PIPING DOUJN 000 ; 000 000 t EXISTING RTU - 000 0 o 0ol TYP. ' W I 1 — — -- ,iiii z ig 8 0 cg i W J U " 0 r I .. . , -... ..... .. .---f it I o c �g__ -- _ © o 8 o s'A r-, ROO: PLAN - MECH4NIC0AL M ��:V q.,I40y SCALE: I/16'"=1'-O' NORTH < o 141,-T-5, R Z6 § P 111101:?" u 6 Z W Q f 0 t I N , HVAC EQUIPMENT SECURED TOEQUIPMENT 24 GA GAL V. STEEL CURB CAP. UNISTRUT PER MANUF. REQUIREMENTS. UNI STRUT, TYP. OF 2. NYAC ' 1 EQUIPMENT J "L" BRACKET BOLTED TO I �I Iil ' Q ---- -'-}S Z UN f STRUT FASTENED TO - 1/2 TN I CK PLYWOOD V CURB THROUGH GAP W/1/4" 2'x12" PRESSURE EATED Z Q LAG SCREW_ TYP. AT (4)-PLACES. LUMBER, ALL AROUND. U CELLULOSE CANT STRIP ALL AROUND 1 -24 GA. "L' BRACKET. NEW ROOF FLASHING MEMBRANE. M / USE BRACKET TO LEVEL- r_ , 12" MIN CURS. TYP. OF 4. (MIN.) TO MMATCHEXISTING ROOFING. I \ A Z EXISTING Q ROOFING/INSULATION ti J SECTION A - A VFELU ROOF DECK LL TOP VIEW LL i3I.ICT�ESS SPLITS eT I I Ol. TOOON I T ROOF CU iB O C-2) uSCALE: NONE CC °ATE 4/4/2019 SCALE AS NOTED MGR JOB ' SHEET M-401 190907m401--4/4/19 OF SHEETS