Loading...
Plans (53) M EC2018-00080 • 01 00 00 GENERAL DATA 8. PROVIDE ACOUSTIC GASKETS WHERE WALL INTERSECTS STOREFRONT.QUIETJOINT SHH WHERE WALL 2. ADDRESS LOADS BY SPECIFIC LOCATION AND USE,AS WELL AS CRITERIA PROVIDED TO PACTRUST BY a. STANDARD WALL SWITCH WITH OCCUPANCY SENSOR-USE WSD TENANT IMPROVEMENT for �� A� MEETS MULLION AND QUIETJOINT SHG WHERE WALL MEETS GLAZING.COLOR SELECTED BY ARCHITECT, TENANT PRIOR TO CONSTRUCTION: b. WALL SWITCH WITH OCCUPANCY SENSOR AND DIMMING USE WSXD �� GENERAL REQUIREMENTS v 9. AT ALL EXISTING WALLS, REMOVE ALL NAILS, SCREWS, FASTENERS, ETC.LEFT BY PREVIOUS TENANT AND a. EXTERIOR EXPOSURE AREAS ]�?1 y/� _16505 1. ALL CONSTRUCTION WORK SHALL BE DONE IN COMPLIANCE WITH THE LATEST EDITION OF THE OREGON PATCH HOLES READY FOR PAINT. 4. WALL SWITCH WITH DIMMING AND CEILING MOUNTED OCCUPANCY SENSOR-USE SPOD DSPEC OFFICE STRUCTURAL SPECIALTY CODE,AND ALL OTHER STATE OR LOCAL CODE REQUIREMENTS THAT APPLY. b. INTERIOR AREAS, SIZE AND USE WAREHOUSE LIGHTING p[[!! / #3082 2. VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON DRAWINGS AND AT THE EXISTING BUILDING AND 10.REPAIR GYPSUM BOARD AT REMOVED ELECTRICAL RECEPTACLES OR DATA BOXES AND FINISH READY FOR c. CONFERENCE!TRAINING ROOMS PAINT 1. LITHONIA LIGHTING LED BAY LIGHTING IBG15L MVOLT 753573864332 WITH OCCUPANCY SENSOR ON EACH MARTIN W. HANSOM NOTIFY ARCHITECT OF ANY DISCREPANCIES PRIOR TO STARTING THE WORK. d. COMPUTER/SERVER AND TELEPHONE ROOMS TO HAVE PROVISION FOR LOW AMBIENT OPERATION FIXTURE.(warehouses below 24') I 11.UPON REMOVAL OF WALL BASE, REMOVE RESIDUAL ADHESIVE AND PREP WALL TO PAINT READY CONDITION. 3. CONTRACTOR AND ALL SUBCONTRACTORS SHALL PERFORM DUE DILIGENCE INSPECTION OF ALL EXISTING AND 24-HOUR USE,VERIFY NEED FOR A SEPARATE SPLIT SYSTEM TO MAINTAIN TEMPERATURE. 2. LITHONIA LIGHTING ELM LT EGRESS LIGHTING. PROJECT NARRATIVE • CONDITIONS PRIOR TO SUBMITTAL OF A PROPOSAL.SUBMITTAL OF A PROPOSAL SHALL BE CONSIDERED WALL CONSTRUCTION MATERIALS 3. SYSTEM DESIGN CRITERIA-SIZE ZONES FOR 3-5 TON UNITS BASED ON USE&EXPOSURE CRITERIA. W CLAD KAMAS,OREGON CONFIRMATION THAT SUCH INSPECTION HAS BEEN MADE,AND NO FURTHER COMPENSATION SHALL BE DUE 1. PROVIDE STUDS,TRACKS, BRACING, FASTENING AND OTHER ACCESSORIES NECESSARY FOR COMPLETE PACKAGED OR SPLIT SYSTEM EQUIPMENT GREATER THAN 5 TONS SHALL BE SPLIT INTO MULTIPLE ZONES. EXTERIOR LIGHTING THE CONTRACTOR FOR CLAIMS ARISING AS A RESULT OF FAILURE TO PERFORM SUCH INSPECTION. INSTALLATION. VAV OR WATER SOURCE HEAT PUMP SYSTEMS GREATER THAN 3 TONS SHALL BE SPLIT INTO MULTIPLE 1. ENTRY LIGHTING AT RECESSED OPENINGS: LITHONIA LF6N, 26DTT LAMP, F6OSA RELFECTOR. (EMERGENCY WAREHOUSE SPACE.PROJECT CONSISTS OF REMODEL WORK TO 36,116 SF OF EXISTING OFFICE AND WORK SHALL INCLUDE BUT NOT BE LIMITED TO DRYWALL/METAL rQ 4, BY SUBMITTING A PROPOSAL,CONTRACTOR AND ALL SUBCONTRACTORS CERTIFY THAT THEY HAVE 2. FRAMING MEMBERS SHALL HAVE THE STRUCTURAL PROPERTIES INDICATED WHERE PHYSICAL STRUCTURAL ZONES. BATTERY PACK OPTION EL) ,� C{V EXAMINED THE SITE AND INCLUDED IN THEIR PROPOSAL ALL WORK NECESSARY TO COMPLETE THE WORK PROPERTIES ARE NOT INDICATED,THEY SHALL BE AS NECESSARY TO WITHSTAND ALL IMPOSED LIVE LOADS. 4. ALL ENCLOSED ROOMS OR OFFICES TO HAVE DUCTED SUPPLY&RETURN GRILLES. 2. LITHONIA LIGHTING WST LED 1 10A700/40K SR4 MVOLT ELCW DDBXD. EXTERIOR EGRESS LIGHTING. STUDS, SUSPENDED CEILINGS, DOORS/FRAMES AND PAINTING. ALL WORK TO MEET ADA F D[ O� DESCRIBED OR REASONABLY IMPLIED IN THESE DOCUMENTS. THIS INCLUDES BUT MAY NOT BE LIMITED TO DESIGN FRAMING IN ACCORDANCE WITH AISI SG-673. REQUIREMENTS. !f� ALL MATERIALS AND INSTALLATION, DISPOSAL OF EXCESS MATERIALS(USEABLE FINISH MATERIALS SHALL BE 5. VACANT SPACE SHALL HAVE DEDICATED GAS SERVICE FOR FUTURE BUILD-OUT OR FREEZE PROTECTION. LEFT IN THE TENANT SPACE AS NOTED ON PLANS), CLEANING AND ALL PREPARATION OF SUBSTRATE 3. COLD-FORMED FRAMING SHALL BE GALVANIZED METAL CONFORMING TO ASTM A4461A446 M GRADE A(33000 6. UNITS: LENNOX,TRANS, YORK OR CARRIER-7 1I2-TON MAXIMUM UNIT SIZE. ANY UNIT IN EXCESS OF 7 112 WORK INCLUDED BUT PERFORMED UNDER SEP. PERMIT p Q p SURFACES PRIOR TO INSTALLATION,AS WELL AS FINAL CLEAN UP. PSI)G60. TONS SHALL HAVE SPECIAL WRITTEN APPROVAL FROM PACTRUST. PROJECT # 18080 5. IT IS THE INTENT OF THESE CONTRACT DOCUMENTS TO MATCH AND MAINTAIN EXISTING BUILDING 4. PROVIDE THE LISTED GYPSUM BOARD PRODUCTS BY U.S.GYPSUM,GEORGIA PACIFIC, NATIONAL GYPSUM OR PLUMBING WORK STANDARDS FOR ALL EXISTING PRODUCTS AND SYSTEMS. UPON DISCOVERY OF A DISCREPANCY TO THIS AN APPROVED EQUAL, 7. HVAC UNITS MONITORING STATION IOOR GREATNRHE BUILDING.5-TONS TO HAVE DUCT SMOKE DETECTORS AND BE CONNECTED HEATING, VENTILATION & AIR CONDITIONING WORK INTENTION,THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY. TO A MONITORING STATION WITHIN THE ELECTRICAL WORK, LINE VOLTAGE 5. STANDARD GYPSUM BOARD SHALL BE TYPE`X', 5/8"THICK WITH TAPERED EDGES CONFORMING TO ASTM 8. ROOF TOP UNITS SHALL BE PLACED 24'MINIMUM FROM ROOF EDGE TO CENTER OF UNIT. MULTIPLE UNITS 6. FURNISH ALL NEW MATERIALS EXCEPT WHERE SPECIFICALLY NOTED OTHERWISE. C 36. SHALL BE PLACED SYMMETRICALLY IN A LINE BASED ON LOAD CALCULATIONS BY STRUCTURAL ENGINEER. 7. COORDINATE THE WORK OF ALL TRADES. PROVIDE CARPET"WALK-OFF MATS"TO PROTECT EXISTING 6. WATER RESISTANT GYPSUM BOARD SHALL BE 518"THICK WITH TAPERED EDGES. CONFORMING TO ASTM g. CURBS: 14"HIGH CURBS. ASSEMBLED AND LEVELED TO ROOF,ANCHORED TO STRUCTURAL MEMBERS BUILDING INFORMATION TENANT INFORMATION ,, CARPETS. C-630. BELOW ROOFING. OWNER: PACIFIC REALTY ASSOCIATES, L.P. TENANT: pbc196-16505 SPEC OFFICE 0 8. ALL ROOF PENETRATIONS FROM ABANDONED EQUIPMENT TO BE REMOVED. PATCH AND REPAIR ROOF AND 7. AT TOILET ROOMS USE 518"USG FIBERROCK BRAND AQUATOUGH INTERIOR PANEL FROM FLOOR TO 48"A.F.F. a. PROFESSIONALLY ROOF IN ALL CURBS AND PENETRATIONS BY PACTRUSTAPPROVED ROOF W ROOF MEMBRANE TO MATCH THE EXISTING ROOF. ON WALLS BEHIND OR ADJACENT TO PLUMBING FIXTURES. NO SUBSTITUTES. (EXCEPTION: EXCEPTION AT 15350 SW SEQUOIA PKWY#300 CONTRACTOR. LOCATIONS TO RECIEVE PLASTIC LAMINATE OR TILE WAINSCOT.) SEE DIVISION 1 GENERAL NOTES THIS PAGE. PORTLAND, ORE 97224 OCCUPANCY: B 28,855 SF 9. ALL ROOF WORK TO BE PERFORMED BY PACTRUST APPROVED ROOFING COMPANIES. APPROVED b. UNIT MUST BE LEVEL, SEALED WITH NO AIR LEAKS AND COUNTER FLASHED. COMPANIES INCLUDE: 8. AT TILE WAINSCOT LOCATIONS INSTALL CEMENT BACKER BOARD /i'THICK WITH SQUARE, REINFORCED, S-1 7,261 SF a. ARROW ROOFING, ALFONSO PEREZ (503)460-2767 SMOOTH EDGES. PROVIDE DUROCK BRAND CEMENT BOARD OR APPROVED EQUAL. c. CONDENSATE MUST BE TRAPPED AT UNIT. (503) 624-6300 (PHONE) U b. PACIFIC ROOFING, GUY BELT (503)6403163 9. INSTALL WATER-RESISTANT GYPSUM BOARD BEHIND WAINSCOT OF FRP, PLASTIC LAMINATE, ETC. 10.SEISMICALLY ATTACH UNIT TO CURB IN CODE-APPROVED METHOD. (503) 624-7755 (FAX) FLOOR AREA: 36,116 SF TOTAL L. 10.TRIM ACCESSORIES SHALL COMPLY WITH ASTM 0-1047. 11.ALL GAS PIPING SHALL BE STANDARD BLACK STEEL PIPE W/SUPPORTS PER CODE. PIPING SHALL BE RUN C. ROOF TOPPERS, 360-574-7248 11.USE GEORGIA PACIFIC DENSGLAS GOLD ON EXTERIOR FACE OF EXTERIOR WALLS AND COAT WITH STO FINISH INSIDE OF BUILDING W/LEAD FLASHINGS AT ROOF PENETRATIONS. LEAD ROOF JACKS TO BE SEALED AND TIGARD, OREGON BUILDING JURISDICTION 10.KEEP THE AREA OF WORK FREE OF GARBAGE AND DEBRIS ON A DAILY BASIS INCLUDING DOCK ACCESS SYSTEM. CLAMPED(STAINLESS STEEL WORM GEAR). AREAS AND COMMON AREA. FLOORS TO BE SWEPT OR VACUUMED DAILY. 12.ALL EXISTING AND NEW GAS PIPING EXPOSED TO THE EXTERIOR TO BE PROTECTED FROM RUST AND WALL CONSTRUCTION EXECUTION BLDG. #: PBC BLDG. F (pbc196) a BASED PAINT(COLOR GREY).11.PROViDE ADEQUATE PROTECTION TO ALL EXISTING IMPROVEMENTS INCLUDING BUT NOT LIMITED TO CORROSION WITH OILS } • 0 p COMMON CORRIDORS AND STAIRS, BUILDING ENTRANCES, SUITE ENTRANCES, ETC. THE CONTRACTOR WILL 1. FASTEN FRAMING MEMBERS TOGETHER BY WELDING OR BY USING SELF-DRILLING OR SELF-TAPPINGSCREWS. WELDING SHALL CONFORM TO AWS D13 WELDING PROCEDURE. ELECTRODES AND SCREW CO 13.LOW VOLTAGE IN SEALTITECONDUIT FROM BELOW ROOF LINE DIRECT TO UNIT. DO NOT EXCEED BEND rrI� BE RESPONSIBLE FOR THE REPAIR OF ANY DAMAGES TO EXISTING IMPROVEMENTS DUE TO CONSTRUCTIONRADIUS OF MANUFACTURER'S CO GUIDELINE. CONST. TYPE.: Ill-B U) ACTIVITIES. CONNECTIONS SHALL BE AS REQUIRED AND INDICATED IN THE DESIGN CALCULATIONS. DO NOT FIELD WELD CO MATERIALS LIGHTER THAN 18 GA. 14.ECONOMIZER TO MEET CODE AND AS FOLLOWS: C d) 12.PROVIDE TEMPORARY SANITARY FACILITIES. CONSTRUCTION WORKERS SHALL NOT USE BUILDING THIS 'BUILDING WAS'CURRENTLY OCCUPIED BY MULTIPLE SEPARATE TENANTS. THE � r RESTROOM FACILITIES. 2. PROVIDE ACCURATELY ALIGNED RUNNERS AT TOP AND BOTTOM OF PARTITIONS. ANCHOR TRACKS AS a. 6 TONS AND ABOVE MUST HAVE ECONOMIZER. L V Y 0 INDICATED IN THE DESIGN CALCULATIONS. BUTT WELD JOINTS IN TRACKS OR SPLICE WITH STUD INSERTS. EXISTING BUILDING IS A PARTIAL TWO STORY BUILDING OF 47,552 SF TOTAL WITH ri 13.STORAGE AND STAGING OF CONSTRUCTION MATERIALS SHALL BE LIMITED TO AREAS AS DESIGNATED AT b. BAROMETRIC RELIEF ON 5-7 1/2 TON UNITS. FASTENERS SHALL BE AT LEAST 3 INCHES FROM THE EDGE OF CONCRETE SLABS. 38,303 SF ON THE FIRST FLOOR AND 9,249 SF ON THE SECOND FLOOR. THE BUILDING IS N Q PRE-CONSTRUCTION MEETING. UNDER NO CIRCUMSTANCES SHALL BUILDING UTILITY AREAS OR ANY OTHER Q COMMON BUILDING AREA BE USED FOR STORAGE. 3. CUT STUDS SQUARE AND SET WITH FIRM BEARING AGAINST WEBS OF TOP AND BOTTOM TRACKS. POSITION c. 8 TONS AND ABOVE MUST HAVE POWER EXHAUST. FULLY SPRINKLERED. THERE IS FRONTAGE ON ALL FOUR SIDES OF AT LEAST 52 FEET. . 0 �' STUDS VERTICALLY IN TRACKS AND SPACE AS INDICATED IN DESIGN. DO NOT SPLICE STUDS. PROVIDE AT d. 1 1/2 THRU 4-TON OSA INTAKE WITH DAMPER. 14.KEEP THE ROOF FREE OF DEBRIS(I.E.NAILS, SCREWS, BOTTLES, ETC.)AT ALL TIMES. LEAST TWO FULL HEIGHT KING STUDS AT DOORS AND OTHER OPENINGS 2 FEET WIDE OR LARGER. PROVIDE - • D [ CL 15.ALL DIMENSIONS ARE TO FACE OF GYPSUM BOARD UNLESS OTHERWISE NOTED. JACK STUDS OVER OPENINGS,AS NECESSARY,TO MAINTAIN INDICATED STUD SPACING. PROVIDE TRIPLE 15.ALL UNITS TO MEET OR EXCEED CURRENT ENERGY EFFICIENCY CODE REQUIREMENTS. ACTUAL BUILDING AREA TOTALS O O U7 STUDS AT CORNERS, POSITIONED TO RECEIVE INTERIOR AND EXTERIOR FINISHES. FASTEN STUDS AT TOP 16.DROP CANS TO BE SAME SIZE AS CURB OPENING AND TO EXTENDED TO WITHIN 2'OF SUSPENDED CEILING. 0 w O L0 16.CONFIRM SIZES OF ALL OPENINGS REQUIRED FOR THE INSTALLATION OF STRUCTURAL, MECHANICAL, AND BOTTOM TRACKS BY WELDING OR SCREWING BOTH FLANGES TO THE TRACKS.PROVIDE LONG LEG MINIMUM 26 GAUGE FOR SUPPLY AIR. SEAL EDGES OF SUPPLY AIR. Cn ❑ to ELECTRICAL AND PLUMBING WORK PRIOR TO FRAMING OR CUTTING FOR INSTALLATION. B OCCUPANCY = 39,032 SF FR- �_ TRACK AT TOP OF WALL TO ALLOW FOR DEFLECTION WHERE WALL MEETS STRUCTURE ABOVE. Z C9 17.DISTRIBUTION DUCTWORK: S-1 OCCUPANCY = 8,520 SF 17.LEAVE THE PROJECT CLEAN AND READY FOR OCCUPANCY. 4. INSTALL ALL INTERIOR AND EXTERIOR GYPSUM BOARD PRODUCTS AND ACCESSORIES AS REQUIRED FOR t (n Q N N Z 18.CLEAN ADJACENT EXTERIOR AREA, I.E.WALKS, EXTERIOR GLASS,ETC. THE PROJECT. a. SPIRAL DUCT PERMITTED ONLY IF EXPOSED TOTAL 47,552 SF CO o 0 19.FILL ALL PAPER AND SOAP DISPENSERS IN RESTROOMS AND BREAK AREAS. 5. AT TOILET ROOMS TO RECEIVE SHEET VINYL FLOORING, INSTALL THE GYPSUM BOARD(OR AUQATOUGH) b. 26 GAUGE OR TO SMACNA STANDARDS WHERE DUCT IS CONCEALED ABOVE A CEILING. L V �O j CO .....1 WITH 1/4" GAP BETWEEN THE BOARD AND THE FLOOR TO PREVENT WICKING. c. WRAP CONCEALED SUPPLY DUCTWORK IN NON-CONDITIONED AND SEMI-CONDITIONED SPACE WITH ALLOWABLE AREA FOR B OCCUPANCY: 2 co 0 Oo Oo D 20.CLEAN ALL SUPPLY AND RETURN DIFFUSERS AT PROJECT COMPLETION. MINIMUM R4.2 INSULATION WITH FSK BARRIER. D_ � m 21.PROVIDE"AS-BUILT"DRAWINGS OF AT CONCLUSION OF "AS BUILT" 6. COMPLY WITH USG GYPSUM CONSTRUCTION HANDBOOK AND MANUFACTURER'S RECOMMENDATIONS. ALLOWABLE AREA 19,000 SF DRAWINGS MAY BE IN THE FORM OF THE WORKKIAT THE CONCLUSION CONSTRUCTION.NC "AS-BUILT" WITH RED 7. FINISH QUALITY: d. HANGERS 12 GAUGE WIRE OR 18-GAUGE 1"WIDE STRAP. EXPOSED DUCT MUST HAVE ALL THREAD 75% INCREASE FOR FRONTAGE 14,250 SF OFHANGERS AND FULL DIAMETER STRAP UP TO 18"0. LARGER THAN 18" MUST HAVE SADDLE TYPE CLAMP. PEN.DELIVER RECORD DRAWINGS TO THE ARCHITECT. COMPLETE OPERATION AND MAINTENANCE MANUALSARRA PROCESS TRADE NOMENCLATURE 200% INCREASE FOR SPRINKLERS 38,000 SF e. BRANCH DUCTS SHALL BE PLUMB AND SQUARE(NO OCTOPUS -_... SHALL BE PROVIDED FOR ALL MECHANICAL, ELECTRICAL AND PLUMBING EQUIPMENT. PACTRUST MAY HOLD ) TEES SHALL BE MAXIMUM OF 45 TOTAL ALLOWABLE AREA 71,250 SF CONTRACTOR'S FINAL PAYMENT UNTIL"AS-BUILT"DRAWINGS AND 0&M MANUALS HAVE BEEN RECEIVED WAREHOUSE TAPE/FINISH COAT* TIGHT DOUBLE(LEVEL 3) DEGREES. RECEIVED AND APPROVED. OFFICE/OTHER AREAS TAPE/2 FINISH COATS'/ SMOOTH FINISH TAPED(LEVEL 5) f. EACH BRANCH DUCT TO HAVE BALANCE DAMPER IN Y BRANCH. ALLOWABLE AREA FOR S-1 OCCUPANCY: 22.IT IS THE INTENT OF THE CONTRACT DOCUMENTS THAT THE CONTRACTOR PROVIDE A COMPLETE, USG"FIRST COAT" *SAND AFTER TAPE 1 FINISH COAT(S) g. ALL DISTRIBUTION DUCT WORK TO BE INSTALLED MIN.24"ABOVE FINISH CEILING.FALLOWABLE AREA 17,500 SF TOUNCTIOLING THATPTOJECTN INCLUDINGAM ALL GENERAL,US MECHANICAL AND ELECTRICALA CONSTRUCTION REQUIREDO8. FINISH EXPOSED INTERIOR GYPSUM BOARD WALLS AND CEILINGS SMOOTH STRAIGHT READY FOR FINISH AS 18.FLEX DUCT WILL BE NO LONGER THAN 6'FROM RIGID DUCT DOWN TO DIFFUSER. o MAR 2 0 2018 FULFILL INTENT. ALL ITEMS REQUIRED SHALL BE FURNISHED AND INSTALLED, REGARDLESS OFSHOWN ON PLANS. 75/o INCREASE FOR FRONTAGE 13,875 SF WHETHER OR NOT SHOWN ON THE DRAWINGS. 19.DIFFUSERS', 200% INCREASE FOR SPRINKLERS 35,000 SF 23.ITEMS OR WORK NOT TO BE FURNISHED OR ACCOMPLISHED BY CONTRACTOR ARE(VOTED"N.LC.". 09 53 00 SUSPENDED ACOUSTICAL CEILING a. SUSPENDED CEILING SYSTEM(T-BAR)-PERFORATED FACE ADJUSTABLE CURVED BLADES-DESIGN TOTAL ALLOWABLE AREA 66,375 SF CITY OF TIGARD 24."ALIGN"AS USED IN THESE DOCUMENTS, MEANS TO ALIGN THE FINISHED FACES OF ELEMENTS IN THE SAME 1. IN EXISTING SPACES REPLACE WATER STAINED OR DAMAGED TILES. TITUS PCS SUPPLY AND TITUS PAR RETURN OR APPROVED EQUAL. BUILDING DIVISION PLANE, EITHER IMMEDIATELY ADJACENT TO ONE ANOTHER OR ACROSS AN OPENING. 2. TUNE UP GRID SYU-UTEM TO WITHIN PLUS OR MINUS 0.5 INCHES OF LEVEL. b. GYPSUM BOARD CEILING: SUPPLY-CURVED BLADE W/OBD DESIGN TITUS 250; RETURN-BAR TYPE- NON SEPARATED USES -OSSC 508.3 25.D0 NOT DISASSEMBLE SETS OF CONSTRUCTION DRAWINGS. DRAWINGS ARE INTERRELATED. 3. BENT OR DAMAGED T-BARS TO BE REPLACED. DESIGN TITUS 350; EXHAUST-METAL OR ALUMINUM-1/2"x1/2"EGG CRATE DESIGN TITUS 50F. 26.SUBMIT SAMPLES OR DRAW DOWNS FOR ALL FINISHES REQUESTED TO THE ARCHITECT OF RECORD WITHIN 4. REPAIR HOLES IN GRID FROM REMOVED WALLS. USE OF ARMSTRONG"BP ES-4"EXPANSION SLEEVE c. ALL SUPPLY REGISTERS TO HAVE MANUAL VOLUME DAMPERS LOCATED IN DUCT AT OR NEAR CLOSEST TWO WEEKS OF PROJECT AWARD.PRODUCTS INSTALLED WITHOUT APPROVED SAMPLES ARE SUBJECT TO ACCEPTABLE. WYE BRANCH. REPLACEMENT AT CONTRACTOR COST.AN APPROVED SUBMITTAL DOES NOT CHANGE THE CONTRACTUAL d. CLEAN OR REPLACE ALL SUPPLY AND RETURN AIR GRILLS AND THEIR HOUSINGS AT PROJECT REQUIREMENT TO PROVIDE THE SPECIFIED ITEMS UNLESS SPECIFICALLY NOTED AS A SUBSTITUTION BY THE 09 62 00 SPECIALTY FLOORING COMPLETION. CONTRACTOR AND SPECIFICALLY APPROVED BY THE ARCHITECT AS SUCH. REPLACE SUCH PRODUCTS AS CONCRETE DIRECTED AT CONTRACTOR'S COST. 20.THERMOSTAT: ALL EXISTING MERCURY TYPE THERMOSTATS TO BE REPLACED, NEW THERMOSTATS TO BE >"4 • MILLWORK, SPECIAL SYSTEMS, ELECTRICAL AND 1. AT WAREHOUSE CONDITION, FILL ALL CRACKS, EXPANSION JOINTS AND OTHER DEFECTS WITH SPAL-PRO RS HONEYWELL COMMERCIAL GRADE VISIONPRO 8000 TOUCH SCREEN MODEL TB8220U1003 WHERE POSSIBLE. 4.11 27.SUBMIT COMPLETE SHOP DRAWINGS FOR PLUMBING SYSTEMS(INCLUDING FIRE PROTECTION SYSTEMS). SUBMIT MINIMUM MECHANICAL,TWO COPIES ALL 2000. APPROVED SUBSTITUTE: TOTAL-LINE SIGNATURE COMMERCIAL "THERMOSTAT MODEL NO. P374-2800 -7 DAY PROGRAMMABLE WITH LOCKOUT FUNCTION-AUTO CHANGEOVER ONLY. MOUNT AT ADA HEIGHT(MAY r SHOP DRAWINGS FOR REVIEW AND APPROVAL TO THE ARCHITECT OF RECORD.ARCHITECT WILL RETAIN ONE 09 65 19 RESILIENT FLOORING -SHEET VINYL FLOORING REQUIRE CHANGING HEIGHT AT"REPLACEMENT"LOCATIONS), CONTRACTOR SHALL PROGRAM CI COPY AND ONE COPY WILL BE RETURNED TO THE CONTRACTOR. 1. SEAL THE EDGES OF THE SHEET VINYL FLOORING TO THE CONCRETE FLOOR WITH A CONTINUOUS BEAD OF THERMOSTATS AND BALANCE SYSTEM. 28.THE DESIGN OF FIRE PROTECTION SYSTEMS IS THE RESPONSIBILITY OF THE FIRE PROTECTION SYSTEMS APPROVED SEALANT. SET THE 4"VINYL COVE BASE INTO A FRESH BED OF SEALANT TO SEAL THE BASE TO 21.THERMOSTAT LOCATIONS TO BE REVIEWED BY ARCHITECT PRIOR TO INSTALLATION. ''' w CONTRACTOR.ALL FIRE PROTECTION SYSTEMS SHALL BE DESIGNED BY A PROFESSIONAL ENGINEER THE SHEET VINYL. MITER THE CORNERS AND APPLY A BEAD OF SEALANT TO SEAL THE JOINT. • V V 22.WAREHOUSE HEAT: LICENSED BY THE APPROPRIATE JURISDICTION FOR THE DESIGN OF THIS TYPE OF SYSTEM. COORDINATE 09 65 19 RESILIENT FLOORING -VINYL COMPOSITION TILE INTERFACE WITH EXISTING BUILDING SYSTEMS AND WITH ARCHITECT. ALL SPRINKLER HEADS SHALL BE a. GAS FIRED UNIT HEATERS USED IN NON-CONDITIONED AREAS SHALL COMPLY WITH CURRENT STATE CENTERED IN CEILING TILE(OR 2 x 2 MODULE OF A SECOND LOOK II TYPE OF CEILING TILE WHERE 1. FINISH FLOORING TO EXTEND UNDER CASEWORK. ENERGY CODE REQUIREMENTS. PROVIDE ADJUSTABLE T-STAT FOR EACH UNIT. APPLICABLE). LOCATION OF THOSE IN GYPSUM BOARD CEILINGS SHALL BE PRE-APPROVED IN WRITING BY 2. INSTALL TILES IN C'_'ARTER TURN PATTERN. '' • THE ARCHITECT PRIOR TO INSTALLATION. 23.EXHAUST FANS: 29.COORDINATE ALL CONSTRUCTION SEQUENCING WITH PACTRUST AND SCHEDULE ALL SERVICE 09 91 23 PAINTING a. CEILING MOUNTED EXHAUST FANS SHALL HAVE A MINIMUM PERFORMANCE TO MEET THE CURRENT INTERRUPTIONS OUTSIDE NORMAL BUSINESS HOURS TO MINIMIZE INCONVENIENCE TO CURRENT TENANTS. INTERIOR: CODE REQUIREMENTS INCLUDING INTEGRAL BACKDRAFT DAMPER AND VENTING TO THE EXTERIOR. COOK GEMINI SERIES 100 OR EQUAL;80 CFM WITH A SONE RATING OF 1.6 OR LESS, 100 CFM WITH A GENERAL 1. WALLS: SONE RATING OF.9 OR LESS, 200 CFM WITH A SONE RATING OF 1.6 OR LESS. 1. REMOVE ALL EXISTING VCT, SHEET VINYL, ETC. IN AREAS WHERE NEW FLOOR COVERING IS SPECIFIED PRIOR a. PRIME NEW DRYWALL WITH MILLER'S HIGH-BUILD"SUPER SEAL"PRIMER. b. SINGLE FIXTURE RESTROOMS, JANITOR'S CLOSETS OR SINGLE SHOWER ROOMS TO HAVE CEILING SW 72ND AVENUE TO INSTALLATION OF NEW FLOORING. b. NEW AND EXISTING DRYWALL TO BE FINISHED TO ACHIEVE UNIFORM COVERAGE WITH MILLER'S MOUNTED EXHAUST FANS,WIRED PER DIVISION 16 AND SWITCHED WITH THE LIGHTS. 2. ALL ROOF PENETRATIONS FOR ELECTRICAL, LOW VOLTAGE, GAS PIPING, ETC.SHALL BE SLEEVED THROUGH 120-4-XX WITH A TIGHT ROLLER STIPPLE FINISH. RESTROOM FINISHES TO BE MILLER'S 170-5-XX SIG c. MULTIPLE FIXTURE RESTROOMS, COMBINATION RESTROOM&SHOWER,AND LOCKER ROOMS TO HAVE _ AO LEAD ROOF JACK, K, CLAMPED SILICONE WITH A SEALANTSTAINLESS NOT PERMILAMP AND SEALED WITH VULKEM 921 2. LATDOORS AEX ENAMEL.X FRAMES: ROOFTOP MOUNTED EXHAUST FAN, FACTORY CURB AND BACKDRAFT DAMPER, WIRED PER DIVISION 16, - _ III'lll'lllll j1jj11j11 hh-- Q~�CONTROLS AS REQUIRED BY DESGN. COOK ACE-D SERIES OR EQUAL. B D W08 10 00 DOORS AND WINDOWS a. NEW HOLLOW METAL-PRIME, SAND, AND FINISH WITH TWO COATS OF SEMI-GLOSS OIL.SPRAY OR d. SPECIALTY ROOMS REQUIRING EXHAUST SHALL MEET THE ABOVE MINIMUM REQUIREMENTS 0 I 1 I I _ I I , _ 1. RE-USE EXISTING DOORS AND FRAMES WHERE POSSIBLE ROLLED APPLICATION. INDIVIDUAL ROOMS WITH AN EXHAUST REQUIREMENT GREATER THAN 250 CFM,SHALL HAVE A cz [HA URI+H+O _ ra, ` U ROOFTOP MOUNTED FAN. C Qty K 3711-171/14/ P 1 rrrr 2. APPROVED DOOR, FRAME,AND HARDWARE SUPPLIERS INCLUDE: b. EXISTING HOLLOW METAL SAND, FILL IMPERFECTIONS WITH BONDO,SAND AND PRIME PATCHES WITH! 24.HVAC TESTING. iii ALKYD PRIMER,AND FINISH WITH SEMI-GLOSS OIL ENAMEL. SPRAY OR ROLLED APPLICATIONLi- a. BAXTER AND FLAMING. (503)225-0486 a. CONTROL SYSTEMS SHALL BE TESTED TO ENSURE THAT CONTROL DEVICES, COMPONENTS, c. WOOD-PRIME WITH ALKYD OIL UNDER-COATER, SAND, FILL ALL FASTENING HOLES WITH PAINTER'S 4* I """""""1Li- b. D&D DOOR (503)205-5533 EQUIPMENT AND SYSTEMS ARE CALIBRATED,ADJUSTED AND OPERATE IN ACCORDANCE WITH r� PUTTY, CAULK ALL CRACKS IN CASINGS AND BETWEEN JAMBS AND WALLS USING DAP LATEX CAULK, �- APPROVED PLANS AND SPECIFICATIONS. ��� N c. BENSON INDUSTRIES (503)907-2200 AND FINISH WITH SATIN OIL ENAMEL. ■�� M O -d. GRANT SUPPLY (360)887-0647 d. WOOD-STAIN, SEAL AS REQUIRED,AND VARNISH WITH SATIN VARNISH. b. SEQUENCES OF OPERATION SHALL BE FUNCTIONALLY TESTED TO ENSURE THEY OPERATE IN --•-- --- 1 If+HI J -- ACCORDANCE WITH APPROVED PLANS AND SPECIFICATIONS. AQ 1 3. DOOR AND RECITE FRAMES SHALL BE ALPHA ALUMINUM PRODUCTS, INC.(AAP)OR APPROVED. SUBMITTAL 3. CEILINGS: c. A COMPLETE COMMISSIONING REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED AND a V REQUIRED PRIOR TO ORDERING MATERIAL. a. EXISTING GYP BOARD 1 PLASTER SAND, SPACKLE ALL IMPERFECTIONS,SPOT PRIME AND FINISH TO FILED WITH PACTRUST. , HIll "" ° 4. EXTERIOR DOORS AND FRAMES TO BE HOLLOW METAL. FRAMES OF ONE-PIECE WELDED CONSTRUCTION, ACHIEVE UNIFORM COVERAGE WITH MILLER'S 6200 OR 4480. o • - UJ 14-GA. GALV. SHEET STEEL. DOORS, SDI-100, GRADE II,SEAMLESS EDGES, 16 GA.GALV.SHEET STEEL. 25.PROJECT CLOSE OUT DOCUMENTS REQUIRED: b. NEW GYP BOARD 1 PLASTER -PRIME WITH SUPER SEAL AND FINISH TO ACHIEVE UNIFORM COVERAGEOm FABRICATE DOORS AND FRAMES WITH HARDWARE REINFORCING WELDED IN PLACE. WITH MILLER'S 6200 OR 4480. a. AutoCAD FILE SHOWING AS-BUILT INFORMATION. 4-o• A 5. FIELD VERIFY EXISTING DOOR, FRAME AND HARDWARE FINISH!PRIOR TO ORDERING. ALL NEW DOORS, 4. GENERAL NOTES: b. ELECTRONIC PDF FILE OF THE AutoCAD FILE ABOVE. ZT 1.21 U) r FRAMES AND HARDWARE TO MATCH EXISTING BUILDING STANDARDS. 4-C. HARD COPY OF AutoCAD FILE ABOVE. oJ LL-j a. KEEP ALL HARDWARE, HINGES,AND DOOR KNOBS CLEAN OF ALL PAINT SPLATTERS, DRIPS, OR ROLLER a _ 6. DOOR FINISH SUBMITTAL: CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR DOOR FRAMES, DOOR1, - BUILDING LOCATION HARDWARE AND DOORS AS WELL AS A CONTROL SAMPLE OF THE FINISHED DOOR SKIN W/STAIN AND FINISH SPRAY. d. OPERATIONS MANUALS FOR ALL EQUIPMENT, INCLUDING T-STATS. 0) APPLIED(IF NEW DOORS ARE BEING PROVIDED). BEFORE FINISHING OF DOORS IS COMMENCED ARCHITECT b. ALL SURFACES TO BE SANDED BETWEEN COATS, PRIOR TO INSTALLATION OF NEXT COAT. e. COLORED ZONE MAP WITH THERMOSTAT LOCATIONS INDICATED. Q U SHALL APPROVE CONTROL SAMPLE. FINISHED PRODUCT IS SUBJECT TO REJECTION BY ARCHITECT IF THIS C. DURING PROGRESS OF WORK, KEEP JOB SITE CLEAN OF ALL PAINT MATERIALS, RUBBISH, CANS,AND 26 00 00 ELECTRICAL : DESIGN 1 BUILD ' U)PROCESS IS NOT FULLY ADHERED TO AND FIELD PRODUCT DOES NOT MATCH THE APPROVED CONTROL RAGS AT THE END OF EACH DAY. • SAMPLE. GENERAL To Tac i&u W W N d. UPON COMPLETION OF WORK, CLEAN ANY PAINT SPLATTER BY USING PROPER METHODS OF WASHING . 7. ALL INTERIOR GLAZING SHALL B£TEMPERED. AND SCRAPING, USING CARE NOT TO SCRATCH OR DAMAGE FINISHED SURFACES. 1. ALL ELECTRICAL FEEDS TO OUTLETS, SWITCHES, ETC. MUST BE VERTICAL DROPS FROM ABOVE EXCEPT FOR N , Z Q 0) 8. DEAD BOLT LOCKS AT NEW EXTERIOR DOORS TO BE INSTALLED WITH A SCHLAGE MORTISE DOUBLE HORIZONTAL RUNS UNDER WINDOWS AND RECEPTACLES ON THE SAME STUD. LOCATION MAP1 a 0 I e. PROTECT WORK OF OTHER TRADES. ❑ r, CYLINDER 20-0130 "C'KEYWAY;SOLID BRASS; WITH ADAMS-RITE CAM AND COMPRESSION RING 1 1/8"LENGTH 2. ALL ELECTRICAL FEEDS TO OUTLETS AND DATA BELOW WINDOW SILLS TO BE ROUTED THROUGH BUILDING A-� NOT TO SCALE Ira COZ O WITH HARDENED CYLINDER GUARD RING KEEDEX K-24. FINISH TO MATCH BUILDING STANDARD. f. PROVIDE"WET PAINT"SIGNS AS REQUIRED TO PROTECT NEWLY PAINTED FINISHES. SHELL WALLS. DO NOT FEED FROM PERPENDICULAR INTERIOR PARTITIONS. -•_ in N 9. PATCH AND REPAIR ALL HOLES OR DAMAGE TO EXISTING STORE FRONT WINDOWS AND DOORS.TOUCH UP 10 00 00 SPECIALTIES 3. ALL NEW ELECTRICAL DEVICES TO BE WHITE T I "� 4 ❑ FINISH FOR AS NEW LOOK. 10 44 16 FIRE EXTINGUISHERS 4. REPLACE ALL NON-WHITE EXISTING ELECTRICAL DEVICES TO WHITE W ,- . , ZQ 10.TOUCH UP ALL EXISTING INTERIOR DOORS AND FRAMES FOR AS NEW LOOK. 1. FIRE EXTINGUISHER 2A10 BC (WALL MOUNTED OR IN SEMI RECESSED CABINET AS INDICATED ON PLAN) 5. PROVIDE LABELS AT EACH ELECTRICAL RECEPTACLE IDENTIFYING CORRESPONDING PANEL AND BREAKER. B 5,273 SF V 11.OVERHEAD DOORS; WAYNE DALTON THERMOSPAN 125, EXTERIOR WHITE/STUCCO. FLUSH STEEL INSULATED, ` AREA OF WORK C) 1- O F- 2"THICK;STANDARD LIFT OPERATING STYLE WITH TRACK AND HARDWARE. OPERATION; PULL ROPE FOR 2 FIRE EXTINGUISHER CABINET: JL INDUSTRIES ACADEMY SERIES MODEL#C1027V10. 6. PROVIDE TYPEWRITTEN UPDATED SCHEDULE AT PANEL TO IDENTIFY CIRCUIT BREAKERS. S-1 1,259 SF Q U DOORS TO 10'TALL,CHAIN HOIST FOR TALLER DOORS. 12 00 00 FURNISHINGS 7. VERIFY ELECTRICAL METER AND TAG METER WITH THE TENANT'S ADDRESS OR SUITE NUMBER. METER It- • �`. • EL ci , cQ d 12.TUNE UP EXISTING OVERHEAD DOORS FOR SMOOTH OPERATION. WORK INCLUDES: 1. CLEAN/REFURBISH EXISTING VERTICAL BLINDS AT ALL EXTERIOR GLASS. IDENTIFICATION NUMBER AND TENANT ADDRESS INFORMATION SHALL BE GIVEN TO PACTRUST PRIOR TO M !AI R,.., / , TENANT'S MOVE-IN. ;:. 1 i /. / _Cr:.; a LI' a. ADJUST OVERHEAD SPRING TENSION TO MEET MANUFACTURER'S SPECIFICATIONS. �� 21 00 00 FIRE SUPPRESSION : DESIGN !BUILD li . . r Pr . DATE: 3112118 b. REPLACE TOP AND BOTTOM DOOR SEALS AS NEEDED. 8. ELECTRICAL CONTRACTOR TO PROVIDE EMERGENCY LIGHTING IN EXIT PATH SHOWN ON PLAN EQUAL TO 1. ADJUST EXISTING SPRINKLERS THROUGHOUT SPACE AS REQUIRED BY CODE. SPRINKLER HEADS SHALL BE 1-FOOT CANDLE 1 ,/ / t / q BUDGET SET c. REPLACE BENT TRACKS AND PANEL SECTIONS. CENTERED IN 2 X 2 CEILING TILE. LAYOUT OF SPRINKLERS BY CONTRACTOR. SPRINKLER LAYOUT IN ALL HARD 9. EXIT LIGHTS:RUUD LIGHTING"PLASTIC LED EXIT SIGN"MODEL EXPBURWH RED LETTERS,WHITE HOUSING, /S 1 7,261 SF✓ d. REPLACE ROLLERS AND HINGES AS NEEDED. CEILING AREAS (GYPSUM BOARD/PLASTER)TO BE REVIEWED AND APPROVED BY ARCHITECT PRIOR TO WITH BATTERY BACKUP. B 4,904 SF INSTALLATION. 10.WHERE NEEDED,CONTRACTOR TO FURNISH AND INSTALL NEW DRY TYPE TRANSFORMERS TO PROVIDE " / X % REVISION e. REPLACE ROPES AS NEEDED. 2. IN NEW CEILING GRID SYSTEMS OVER 144 SF PROVIDE FLEXIBLE HEADS FOR MINIMUM SEISMIC MOVEMENT. 208V1120V POWER FROM THE 480V1277V SYSTEM. SIZE TO BE BIDDER DESIGN. Ep 1. LUBRICATE ROLLERS NO"OOPS RINGS ALLOWED". ° E. a. TRANSFORMERS TO BE ENERGY STAR LABELED, G B 19,606 SF 09 00 00 FINISHES 23 00 00 HVAC : DESIGN I BUILD 1 . b. CASE TO BE TOTALLY ENCLOSED WITH LOUVERS TO PREVENT FOREIGN OBJECTS INTO THE INTERIOR. h d. _ GENERAL GAS METER c. ENCLOSED AND VENTILATED,AIR COOLED TYPE,CLASS H INSULATION, DESIGNED FOR 115 DEGREES C I FIRST FLOOR SECOND FLOOR 2. 1. CLEAN,SEAL AND WAX ALL RESILIENT FLOORS PER MANUFACTURERS SPECIFICATIONS. 1. CONTRACTOR TO VERIFY GAS METER AND TAG METER WITH THE TENANT'S ADDRESS OR SUITE NUMBER. TEMPERATURE RISE ABOVE 40 DEGREES C AMBIENT TEMPERATURE AT FULL LOAD CONTINUOUS B 9,249 SF 2. SUBMIT SAMPLES OR DRAW DOWNS FOR THE FOLLOWING: METER IDENTIFICATION NUMBER AND TENANT ADDRESS INFORMATION SHALL BE GIVEN TO PACTRUST PRIOR OPERATION. EQUIP WITH 2-1/2 PERCENT ANFC TAPS AND FOUR 2-1/2 PERCENT BNFC TAPS. MAXIMUM 3. TO TENANT'S MOVE-IN. SOUND LEVEL SHALL BE NEMA STANDARD WITH ISOLATION DAMPERS BETWEEN THE CORE AND COIL a. FLOOR COVERINGS, BASE AND TRANSITION STRIPS HVAC BID PROCEDURE ASSEMBLY AND CASE. b. PLASTIC LAMINATES 1. FOR BIDDING PURPOSES,THE HVAC CONTRACTOR WILL ASSUME THAT EXISTING HVAC EQUIPMENT IS IN 11.FOR FLOOR POWER AND DATA ACCESS 2 BUILDING PLAN 4. C. ALL NATURAL WOOD(INCLUDING DOORS AND CASEWORK) PROPER WORKING ORDER. a. AT RAISED SLABS: USE WIREMOLD RC7 FLUSH POKE-THRU SERIES OR EQUAL A`1 NOT TO SCALE . 5. d. PAINT 2. INVENTORY EXISTING H.V.A.C. ROOFTOP UNITS AND SUBMIT TO ARCHITECT A CONDITIONS REPORT OF EACH b. AT SLAB ON GRADE: USE WIREMOLD RFB4E BOX WITH 6CTC2 COVER AT CONFERENCE ROOMS AND e. TILE, GRANITE,STONE, GROUT AND SCHLUTER TRIMS UNIT 6CFFTC COVER AT FURNITURE FEEDS. PROVIDE 1"CONDUIT FOR POWER AND 2"CONDUIT FOR DATA. 6. f. TOILET PARTITIONS 3. LIST TONNAGE OF EACH UNIT. 12.LOW VOLTAGE SYSTEMS (TELECOMMUNICATION AND DATA)BY FUTURE TENANT. ' •. g. HARDWARE HVAC-DESIGN PROCEDURE 13.LIGHTING ENERGY MANAGEMENT IS REQUIRED IN ALL BUILDINGS. r 7 3. FINISH FLOORING TO EXTEND UNDER ALL NEW CASEWORK. USE EXISTING AND/OR NEW EQUIPMENT TO DESIGN MECHANICAL H.V.A.C.SYSTEM PER DESIGN STANDARDS 14.00CUPANCY CONTROL DEVICES SHALL BE LEVITON OR WATT STOP. 8. LISTED BELOW. • 15.TEST ALL LIGHTING CONTROL SYSTEMS TO ENSURE THAT CONTROL DEVICES,COMPONENTS, EQUIPMENT 4. PROVIDE A TRANSITION STRIP WHERE EVER TWO DIFFERENT FLOOR MATERIALS MEET PRIOR TO AWARD OF CONSTRUCTION CONTRACT, H.V.A.C.CONTRACTOR SHALL SUBMIT TO ARCHITECT FOR AND SYSTEMS ARE CALIBRATED, ADJUSTED AND OPERATE IN AC'::ORDANCE WITH APPROVED PLANS AND 5. PROVIDE SCHLUTER METAL TRIM AT ALL EXPOSED EDGES OF TILE(EXCEPT AT BULLNOSED EDGE)OF TILE REVIEW AND APPROVAL A FULL DESIGN SCHEMATIC FOR THE TENANT SPACE INCLUDING BOTH SPECIFICATIONS. SEQUENCES OF OPERATION SHALL BE FUNCTIONALLY TESTED TO ENSURE THEY OPERATE DRAWN BY: (CERAMIC,QUARRY OR PORCELAIN) NEW/RENOVATED WORK AND SYSTEMS UNTOUCHED BY THE TENANT IMPROVEMENT AS APPLICABLE. IN ACCORDANCE WITH APPROVED PLANS AND SPECIFICATIONS. 09 21 00 GYPSUM BOARD INCLUDE THE FOLLOWING: • 16.REQUIRED IN DIVISION 15, PROVIDE MONITORING OF HVAC EQUIPMENT PER CODE. OFFICE COPY R.M.T. a, DUCTING AND SIZES POWER BOXES AND INFILL WITH GYP BOARD. EXCEPTION-UNUSED DATA GENERAL 17.REMOVE ALL UNUSED DATA AND CITY OF TIGARD 4. ALL GYPSUM BOARD WALLS: ONE LAYER 5/8"TYPE X GYPSUM WALLBOARD,EITHER AT RIGHT ANGLES OR b. SUPPLY AND RETURN LOCATIONS AND CFM AT EACH GRILL OR DIFUSER BOXES UNDER WINDOW SILLS TO REMAIN. ALL BLANK COVER PLATES TO BE BUILDING STANDARD FINISH, PARALLEL TO FRAMING ON EACH SIDE OF METAL STUDS SPACED AT 24"O.C. FASTEN WITH 1"TYPE S C. ROOF EQUIPMENT, SIZES AND LOCATIONS 18.REMOVE ALL UNUSED LOW VOLTAGE WIRING(TELEPHONE AND DATA)FROM THE RECEPTACLE TO THE REVI i D FOR CODE COMPLIANCE DRYWALL SCREWS 8"O.C.TO VERTICAL EDGES AND 12"O.C.TO TOP AND BOTTOM RUNNERS AND d. UNITS REQUIRING DUCTED SMOKE DETECTION DISTRIBUTION BOARD. LEAVE PULL STRINGS FROM THE BOX TO THE SPACE ABOVE THE CEILING. A SECTION INTERMEDIATE STUDS. STAGGER ALL VERTICAL AND HORIZONTAL JOINTS 24"O.C.(OR ONE STUD SPACING), OF THE EXISITNG LOW VOLTAGE WIRE MAY BE LEFT IN LIEU OF A PULL STRING A'SPtOvei 1 EACH SIDE AND OPPOSITE SIDES.. e. THERMOSTAT LOCATIONS AND ZONE/UNIT ASSOCIATED THEREWITH �zVl OFFICE LIGHTING OTC, i 5. ALL OFFICE GYPSUM BOARD TO RECEIVE ONE TAPE COAT AND TWO FINISH COATS WITH SANDING BETWEEN f. ANY SUPPLEMENTAL EXHAUST FANS OR SPECIAL SYSTEMS 1. INSTALL ALL NEW OFFICE LIGHT FIXTURES: LITHONIA LED FIXTURE.2BLT2 40L ADP MVOLT EZ1 LP835. w.di f., �i r L k. 1) _ FINISH COATS(LEVEL 5 FINISH). APPLY USG SHEETROCK BRAND FIRST COAT. PAINT AS INDICATED. g. ZONE DIAGRAM Permit#: f ---t) 6. ALL OTHER GYPSUM BOARD TO RECEIVE ONE TAPE COAT AND ONE FINISH COAT WITH SANDING AFTER FINISH 2. OFFICE EGRESS LIGHTING: !SOLITE MINI GENIE SERIES LED VERSION LMIGN NM SQ-CEILING AND WALL CITY OF TIGARD 0 HVAC DESIGN STANDARDS MOUNT. SEE PLAN FOR EGRESS PATH. USE OF'SOLITE INVERTER AS ALTERNATE TO BATTERY IS COAT(LEVEL 3 FINISH). PAINT AS INDICATED. Address:THE FOLLOWING ARE MINIMUM DESIGN STANDARDS ACCEPTABLE. Approved by Planning 6A-to,:c1 $'"' --7h6 h �'� 7. IN FINISHED SPACES FURR-OUT BUILDING COLUMNS AND EXTERIOR WALLS WITH 5/8"GYPSUM BOARD OVER &lite#: METAL STUDS. 1. 350 SQUARE FOOT PER TON (UNLESS OTHERWISE APPROVED IN WRITING BY PACTRUST). 3. LIGHT SWITCHES:ACUITY CONTROLS PRE SET ALL PRIVATE OFFICE AND CONFERENCE ROOM SWITCHES TO Date. -2.4-i.R "VACANCY"AND TO TURN ON AT LAST DIM LEVEL. (L By Date:.3-ao - J v 1 nitials: , BUILDING DEPARTMENT USE 1 .,,-1, 1 i • • .• _ �C '� �U , . 3 1 ' / I MARTIN W.HANSON n i C) — — ___ A' �y CLA KAM'S,OREGON.-:11 f I I F I• `II 1 0,11 CPT-, WOC `_ if OF I [ OPEN OFFICE PROJECT # 18080 `` // I ,,II�II,, I ,�{, Cr-I EYCT 1 `♦♦ /r fill!! a a fi d fill n5- ► 4 i♦ MICRO I. U li I p, 1 0 I / C12. 0 AAi� } I�°..._ • O E-PT CPr-1 / • '/, • " HEALTH L WOMEN U .' j BUILDING ELECTRICAL ROOM 11131 RR 1)-{111071 4 L / CIRC. sv_ cPr-I „1I C) {j�'�() � W Ii,a1 I-II as -T •� �.-'I t7 I0 el CRC. ROOM ' I F f T _ Ill ,/' l '1 (P,3 jjy�ls-..� _ .., 11F.5 j 1as1 11041 .. _Vn�l ii c_p (1-) (� a_yi I !T I"t' t O 42 E SY CPT 1 I O 01 f . // % I ws_ ,,..er. F~ T CIRC LOCKERSO p 1 I ley_ «� i i HEALTH 11091 MEN 1I REMOVE AND GOUT IN EXISTING FLOOR / // II I ` rT I+I1 ' ' _. 1112 - ® 11061 MONUMENT,TYP- \ � It 1/ II F_ --Y Yarm-1 1 - - CPT.' I_ESV E-PT CPT4 ,�� �♦ CO / , 1 I -1-1-l-1-T-T-I-T Z-I-T-7-11 I I I �- -- Y' "'1Y•' // 11 +% r ,/ IV"�_ _I_LJ_I_L1_I_L.L-1-1—L_I� 1 fT"~` I /UI�I AOgq�y AO@ •tp��y, �I /// ,\ (- 11°~- I t I 1 �c r-J l II v� II 1/ ♦ V .a I-� ,/1 1/+ .fn c-1 REHOUSE Rl4 _ h.v,. II • i'll I I c 1 — _ \ \ t'�' ----- -- - 8119' II-N k 3 /, , 11 / 8 I III ♦ 11 n 11 �` 'f q n I I n n E \ / I I .. .. I /^ CK — - — r' ' ! 8119 5 fn Ifn �fn 11 .1' d4rr a'4 Y� c-r ll C I _—_ ' _ '�l - ___.-- __ J.Ges-..- // ♦ +a H• E ,,,IIS u111. r+�� SL-_�1'_-_ • `lL'_ -__ 1 _�_.._ �L__Rnx�_ KvY 'JA. _ __ ---- Dr , 17.:_1-71 - --- __l -r. -- �� ♦'E -- ,-5''...�'�'` u ` O LL 1f F ► C2 0 O L!7 Wci-y j THIS AREA TO BE F y y., � o i CONVERTED TO _ri r �% ♦\ Q N N z_ CONVENTIONAL 07 WAREHOUSE. z ��i Ir cLu co � co J r� i1--..1, ♦+ / .2.A-F F. ::. ‘, 1 1 j 1 .. I ,/,/ MAiN LOBBY j1 ;tt ' 1113 . \ INSTALL RELOCATED DOOR WITH I CLOSER ANO N705 LEVER LATCH i „, <� , A \\, E%TEND EXISTING WAtI,TO o� / I /1�1 \ ROOF STRUCTURE w • -, y I 1 1 ... .............•.._.........._..................... ..........._ ................_....... O �? O O [� Ccs ! // �� (zD ill MEN E-0T I CPT-1 ,! 11 ♦♦a// r e ROOM J f J I - a 5r~' rr101 • i' �� �/ ' r 3 I I 11 / ♦♦ I �,` • // E REMOVE POWER 1 ii, / • 41 x Q . IflI I IDI O x POLE-RETAIN J-BOX r�� 1 ♦�♦♦ tet,-, /f// /' CIRC. ', m ABOVE CEILING >_ f 9 N; w� Ill (ff1l /+l} (((ll rAN 1 z�' 1 _ v VA �. AI J 'ILL V V V V 11521 151 FLL X 1 • ) r l `\\ +I ♦i c�,// O I I I L 1 L nl, � // t_t V lil ! 13 h -24.1! ...,- -Ss- -,'/ 1 { EXTEND EXISTING WALL TO m X11 �0 a EXTEND EXISTING WALL TO 1 -�I I ROOF STRUCTURE ROOF STRUCTURE UTILITY SPLIT LINE A, i i WOMEN E ..� _ _ _ 1 +1 11531 E-PT CPT- �� -',� ,r 44-'7 1- 19 I I I 11 Olt!) IIi // I r 444 f �1 —REMOVE POWER ! -� ..�Yul I 1 FEF REMOVE POWER i A 1 ' POLE.RETAIN J-BOX POLE.RETAIN.1-BOX .I -cul (G) `I �,� I 1 I ABOVE CEILING ABOVE CEILING w SG ',CPT-1 •1 �1•� ii I f L.4th • �\�j e r i�. tf-l� Ij�} III \ I;TL ► 11031 II I I 111 1 1 ! fill J ,. t1,4,), -,-sig t l f..4 C'•4 II \ cn 11 v 4 I , \ ' I MONUMENT,TYP. REMOVE AND GOUT IN ' 6 >_ dU 11 I EXISTING FLOOR \ , I ,''I a 0 - 1v a 1 r ice= \ ! 111 D y'{� iKJ 4� J \ \ I1[yl 1, \ H I cPT-1 MroC I c�+ \\ + I. I ED \ �:' •;��11�J. `I ll�• `REMOVE AND GOUT IN I IU4 - t' `'� C_ly \ EXISTING FLOOR \ I ROOM - t' I I 4x I I MONUMENT,TYP. P1 ... W \ - �] REMOVE POWER 1 50 I I I, - `U _ L J 1 li \ POLE.RETAIN J-BOX YII IF �'� 6,' AY / ♦ ABOVE CEILING r J. V \ REMOVE POWER I \ POLE.RETAIN J-BOX \ /".-- \ W ABOVE CEILING '. �I j} qI I� 11 ,}E I7� �}, Ay / (ILl lir - Ii0 1 __ .- ._.,-_. -_•--- VI FI • ' I ;, �� DEMO 1 CONSTRUCTION PLAN - FIRST FLOOR WN W 11 Al a I,`- ;I ' SCALE 1" = 10' 111.11 il I I I, NOTES LLI I IDEMO WALLS AS SHOWN.RETAIN EXISTING DOORS AND PROVIDE PACTRUST WITH INVENTORY (I) F- I • DEMO ALL FLOOR COVERING INCLUDING VCT AND OTHER HARD SURFACES.CLEAN FLOOR Ln3 a z READY FOR NEW FINISHES.EXCLUDING RESTROOMS AND SHOWER ROOMS. W • CONSTRUCT NEW WALLS AS SHOWN (E !`- • INSTALL NEW CARPET AND BASE THROUGHOUT OFFICE ,^ `♦ 1 • NEW PAINT THROUGHOUT I/ CO i I,� __ \i I J.� J.� • WAREHOUSE TO OFFICE EXISTING WALLS TO BE EXTENDED TO ROOF STRUCTURE r n w W N T�) TT T l I} 9-_� T IT U V � T • r T T Fly ♦ r • CREATE FULL UTILITY SPLIT AS INDICATED ON PLAN cif J1- 1 E �� _ I r � - 1 ,a r z , ,,,,-, C0 m• 12C— 01 z o Cr) 1– tio o r Cn ¢ • FINISH MATERIALS (FOAM1(2016) . 4( ,... , L-r) H ALL FINISHES MUST BE SUBMI-TED TO PACTRUST PRIOR TO INSTALLATION. p Et Fin- EL add CARPET PLANK TILE: CPT-1 MOHAWK GROUP PTR-CARPET PLANK"ICONIC EARTH" DRIFTED GROUND BT389I QI3389 – -- -- - DATE: 3/12/18 358 CLASSIC RIDGE, FLEXLOK CONNECTORS-PATTERN RANDOM _'a --- BLDG.STRUCTURE ABOVE w �� DEFLECTION CHANNEL BUDGET SET WALK OFF CARPET TILE: WOC MOHAWK GROUP TUFF STUFF II-STEP UP II --- CAULKING IN 112"SPACE REVISION 983 IRON ORE, DIRECT GLUE ~ USE MOHAW `K M700 ADHESIVE. (M95 0 IN HIGH MOISTURE AREAS) R-11 BATT INSULATION iINSTALL GYP. BRD. TO ROOF (NOTE: FOR PRICING OF ALL MOHAWK PRODUCTS CONTACT: STRUCTURE BOTH SIDES O BETH CISH (503) 705-4168 or STEPHEN DELONG (971) 241-0458 0DEMISING WALL CONSTRUCTION LEGEND 2. VINYL COMPOSITION TILE 1'+I - — SUSPENDED CEILINGEXISTING TO REMAIN 3' VCT ARMSTRONG STANDARD EXCELON, 51803 PEARL WHITE, 12"x 12"x 1/8" - 34/8"MTL.STUDS 16"O.C. bxxx.x.xxx' DEMO WORK 4. BASE Lu RF FLEXCO 4" FLAT RUBBER BASE, 071 BLACK 1 BROWN,AT ALL CARPET AREAS. u) iAl'') ' 7 - 5/8"TYPE X GYP. BRD. , . . NEW STANDARD WALL TO ROOF STRUCTURE 5. RC FLEXCO 4" COVE RUBBER BASE, 071 BLACK I BROWN, AT ALL HARD SURFACES. - - CC I BOTH SIDES SCREW ATTACHED 6. . CENTER LINE OF STUD DUPLEX RECEPTACLE PAINT: O I 7. PT-1 MILLER 110-4 ACRO PURE ULTRA-LOW VOC 0017 LUNA MOON, SATIN LATEX. • PT-2 MILLER 8180 PERFORMANCE FLAT-MIX IXX79W(WAREHOUSE WALLS) o w Q T. e:% FOURPLEX RECEPTACLE z l- 0_ 8. m z O - - D=; ) DEDICATED OUTLET L, I Cv EXISTING ELECTRICAL TO REMAIN - z z R-11 BATT INSULATION DRAWN BY: D 0 4"RUBBER BASE TYP. FLOOR MONUMENT WI SERVICES SHOWN R.M.T. y► - - ATTACH BOTTOM TRACK TO FLOOR WITH Q M / POWDER DRIVEN ANCHORS AT 24"O.C. SPECfAL OUTLET FINISH FLOOR 4 TEL/DATA MUD RING WITH PULL STRING WAREHOUSE 147x;3' I OFFICE © ELECTRICAL PANEL FIRE EXTINGUISHER IN RECESSED CAB. �2 OFFICE TO WAREHOUSE SEP. WALL • FIRE EXTINGUISHER-SURFACE MOUNTED A-1 SCALE 1" = 1'-0" 0 THERMOSTAT ' I / ! �� i I Y / . X3082 ▪� — _ — •— — — -- __--_— I� — is MARTIN W, HANSON .. i . C rT —T-a ,,j— I K I� -�_ CLA KAMbS,OREGON • 1 .6 1 1 .� p = /C� I LJ I i 1 1 ��F �Y V ' ; I -7--r--1--7--r--1-_7-11 1 1 I i i - i - I I --- 1 v • I I I 1 1 I I L I 1 L 1 L _.f._ l I - 7 r I I r 1 I I I I I I e I I OF I I I I I I 1 1 I 1 I 1 $ v l I - h4 1 _ PROJECT # 18080 ".N''''',�1..__I__..-- %'7'--- --+---Ir-f-- ^+ 11-.HIT _.-. \ ,II I I \ rIi I h1 PI 1 h\ r1 t'" I h� rl • X II--i—1-- v i--I•--1--w °#---11--1-- i� f-_I __b y ' --- n 1 A ' _ �-t IF:JLA- -i-_Y.r_-4 — \,I 1 I r Nil I hr 1} I hl Al I i Ir Ail I� - i " 1 - ••-•'- _1.�.}r-� -r-- -A,--1---L 1 1 1 I I t i I I I - .......I 1 1 1 1 1 1 1 1 I I I 1 1 1 1 1 , • 5 • -1--L_--._1-_L.-J-ti l_...1-..[�'�.l.-...L- 1L--�_-J._.,�1.-_L-J-1 :.. I I 1 I I I Ili 1 I I l 1 I I , • _— - . -- iiiim I I I I I I I I I I I I 1 ! I I ,iiiiiii _ - .J L__L-J--J Lam.-L_..1-.... 4»-•»1 ...JIF_rt1--1 1J .tel L ' 1- i- L-J- To— - • III=X`lr- T F 71 I 1 F- I IIl'�7v — 1 / ,1% r1, 1 1 +\ r11 1 \ / \ / , \ / = Uv1 yr vu v `^ 11II ^ 4I ^ I1 ^ r I--i ^ 4 -19{— aa �-{�I111 1 I Lr \I I r \ IILr-\ t I Lr `4 , }i__.._. _. ......... .......... ......... -4-' "\Y- -7--1'--4,--r--r.-- -----r--l--144--I--Y--!'.'�--��' _ .... ........ _ �. - -(---D--) CA 1 I I I I L____1__L____1__L__I__1L____ 7--r_ -- --r-----�-- IEp • =r _ 0 I I I I I I II I I I I I I I 1 1 1 1 I I 1 1 1 I , BUILDING ELECTRICAL ROOM _1) �J. � ® _• � -�- _ i' -Y"7r--1--4-- --,--4--r_Hk--F--ri --.�»-k--,.,,-.-_I-_'7--R-71-- - lj- /�- I i/ // ff - 1\V II 1 1 1\vrtl--1 01 /1 I I\V k I F\V 1 �� ...._.... ! III ---- �'/./� 3 -Ir^\N I 1 I/ 10 1 0/ 11 I Irn\1 L I --II 11 __ I —� — �,.� ..�..._rI ,=-_-,•_._.:ll J__J IL__L_J__J IL__L J__J IL_ J4�31--1--1--16. --J'----' '--I--�--IG��I--'t--1- IL>>I-- --'-- -- --I--i-��--I--+ I I r' ,• _ 1 1 I 1 1 1 1 1 1 1 1 1 1 I , I I I 1 I I I 1 I '.••._.-:!_-;t `• l I i ' t--r-ti- +--t-y--Y-^r-y--t--h- 1�-h--1^^+ F-�i--+--F-1--+--r-i- ' I I I I 1 I 1 I I I I I I I I 1 I I I E I I I I I I I I I ! 1 I I ® I — C Q I _ _+__r_y_-+_.-r._y__y__r_y__+__r_y__*__r_y__Y__r_,__T__r_,__T__r_,__T,_r_ ^_T__r_,_-.T__r_1__.r__.r-..y_.-T__. — _ —�— • �/ 1 ! ! 1 1 l 1 1 1 I 1 1 ! 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11111111 1 1 1 1 1 1 1 1 1 1 1 1 k 1 1 1 1 1 1 1 1 1 1 1 I ISG ' Q ' I I l 1 ! i I , I 1 I I I I I ! I I I I 1 I I 11111111 11111111 j L I 1 L I L J 1 L I I 1 I I 1 I__,1__ ~� : - - - O i T--r--,--7--r-1--7--r-1--7--r-1--T--r-1--7--r-1--T--r--1--7--r-1--7--r•-1--7--r-1--7--r--1--T- r l I r 1 7 t 1 1 1 1 I 1 1 I I I 1 I,-- I I 1 I 1`____ L-� - - I 1 1 i , 1 1 1 I 1 1 1 1 1 1 3 1 I 1 1 , 1 I , I 1 1 1 1 I I I t 1 , 1 1 1 1 1 I i I 1 I 1 1 1 1 \ /1 1 1 , 1 1 <, I 4> II' . • \'� ,� 1__ L_J__ L_J-_ L_�__1__-_ 1__L_J L_J__ L_J_ L_J__ L_J__ L_J__1__ +__L_ L_-I__ I__-1__a.__ L_ L_ V It.__I__1__I___l__1�--r_:l I I _ _ - • I \ I� \ !II 1 \ r11 1 \ III 1 1 '\ ! I 1 \ r 1 \ r,yl \ I 1 \ !11 + \ ry4 1 \ 11� I I \ id I h\ r1 I I h\ rl l 3 I h\ i1 1 r \ 1 1 1 1 I 1 _ \� • ', - 1 _ v 11 v Ii I v ,I I \, 1 I v - 1 I V 1 v Y v __I \r II _I V j \r 11 h 1 v II I h v 1 I I 1 V 1 I I 1 3 u pi,____,, ' y� 1 1 1 1 1 I _— "", 1r = ■� �` T I- t-- r^ -- -1-- n -r--1- n ,k--I--1-- A ,1--r'r n 1-- A r- n �_ w sr r^y-- -r—�-- r—�— r—�-- f^t--w— -yI --r-ti- -..- 1 n fi- n Ir- n 0_ n - yy n ,''- n rt;._ i n f-- i n f-- i n 1 ", ///////, / \+ r \ + r \,I I ! t 1 I r \ I I 1 \� 1 r 111 I \ I r \P - I r \tj itl\d I 1 r \� 1 hr \I 1 1 hr 11 1 i I �r \1 I I I n rl 1 I 1 I I .. CIO U `/.j 1 -4,-- }! 1 1 1 1 -�_Y__I 1 z 1 I I 1 1 - l I t 11 1 1 -"44 I J__ r3L_J_-1__Y._i1_"-+ -. -J;�- , 1 --- I 1 I V 1_ 1 ,____, ... _ �^ �— .. - �1 T'•- r-1-- r-1-- r-�--T- E T--r-1 �T--r-1-- r-1-� r-1- r-1-- r- --T--, 1 T I I --I - I I I 1 I I I 1 I I I 1 I I A I 1 /. �'t — Iy�� � + — ,. N. T LL • I I I ! + , I I I I I I k ! I I 1 I 1 I I 1 I I , ! 1 + mom !1 ? I , I I I I I 1 I I I I 1 I I I I Ir \1 I 1 ,%:� �� I I II'' 1e I , l+ N a- - _� �� 1__L_J__1__ .{ 1__L_J__1__L_J__1__L_J__1__L_ L_J__1 L_J_ .a L_J__1__L_�__Jt__L_J__1__L_�_ �_�__y____�__;4-1._A__{__L-A-_41,,:.....11-...14.-..41.--1--_ ,-....4:1�-� - • . ' I I I I -� �7t I I 1 1 I ! 1 I 1 I 1 1 1 I -- .— _------ --- ` ~ - I I I I '•'•''I 1 I I I I I I E I I }. 1 I I I I I I I I I ! ' "' s ! 1 I I.- 1 I• '� 1 \� Q C\I I I I tl I , I I 1 I I I I I 1 I I , I 1 I I I I ! ! I I 1 I illI I 1 I I I I I 1 I I i ! 1 I I I 1 I I I I , \ O I y --__. --__ __ -_ ____ ___ _-_ _ —--I -__ - _--1__. _ _ _ �.\`\\` ILL E — - — — — — - L . ! 1 F J I--.L I 1 I I 1 I I 1 _L 1__J L_. E _ I 1 -i- 1 1 : i 1 I ! ! ! 1 , --�_ Fes- I—I 1 - r_ . aryl co ts,.... I I I 1 1 I I 1 I 1 7 1 1 1 I 1 1 1 I 1 I I 1 1 1 t ! I 1 1 1--1 1 J-- 1 1 11--L--1-- 1 : ,1, I I L_ .L.... ! _.L_J ----- _.I. ` ., �J7( --K,.+ -- '--r--t^_. ^•„yr"...-1_-7--r-y-- 3r----7--r-1-- ^.' r-1--7--r_-k_`lI` `yr-1--7--r-1_._ .�r'1--7--r---- - , 7--r- 1 I I ! ! 1 1 1 1 1 —. I - '-- • In ///I I I 1 !\ r11 I I I h 11 r4 i I 1\ /II I I I 1\ Pi I I I 11 III 1 1 \ r4 I 1 I \ r 1 1 1 ! I Ioh, . 1 \ rY \‘:.-, O Q \�✓ i, J__J V IL_J__1__L_� V IL__L_J__L_JL_J \! IL____1__L____� \� IL____J__L__L L.J V IL____J__L__L_J V IL----1__L__L_ v 4___L._J..._L_ \r _..!_.-�.__}__I--• .._L•-•4.-_L_-__i \r �__I__4__�__L_ V I ��---. , W 41" I 1 ^ I I I ; 1 ^ 4 I I 1 I n11 1 I 1 ^ II 1 11 ^ I1 I I 1 1 !\ I, I I ^4 I 1 t ^ 1 I 1 1 I I A 1 I I I ^ I Ir \I I I r_ Ir \h I I 1 Ir \II ! 1 Ir \h I I Ir \II I I i Ir \h 1 3 r \4 i I , r \ I I I ! 1 I �r \1 ! 1 I 1 r \1 �, (Q 1.11:___40 -- � i--t--r , - ^�r- ,--rt--r-y-- r-ti--+--r-�-- }r- i--+--r- - r- --+--r- s-- �r I +- r ,-- --rt--r-�-- r-7--T--r-7-- r-z--T--r--7---11—r---1--T--r--7- — — -- -- — I 1 I I I I 4 3 I I I 1 I I t , I I I I I I I I i i I I I , I 1 I I I I I I ! I i I I I I 1 1 I I I _� ,,,`.. % {� Z 4-4----4-4-2t--4-4--1--4-4- I I I F 3 , I I I I I I 1 1 I I I I I I I I i t 1 1 I ! 1 I I I 1 L 1 L I 1 L 1 1 I I I 1 , T'• ' a �_Z T r ---7--r -I- 7--r^1--T _r_{ -7--r�1-,7 --7 r 1J-T--t`1 I-T r 1 7 r 1 T r 1 T r T r l I 1 1 1 1 I I 1 1 1 I I I I j — � t Cl) J (NI C\I I 1 1 1 t I i III III 1 1 t I 1 1 I 1 1 1 1 I i i I I I pill 'I I 1 1 mil I 1 I } ii I I I I I I I (CD • 1__L_J__ "1--t-1 -1-1-- r 4_-I--1....L-.J__`� L_J__1--L_.J.... L".J__1__L_J__ L_J__4__L_J__ L_-__4__1---1__Ac. , /---1-_+_._t-_-4__ 1-_J__-L__L_J__ ,.,,'?L._J__*__ ^� '1 , rt Q I I I I I I , 1 I I I I I 1 I I I i _-! 1 I I I I I 1 n ---- I 1 I A - 1 • -- /' . • `V \,\r, \n , \n , \ r -- - 1--r---- II 1\\'r� T--r--r_ \r 7 _T_ • / �1 f • I I \r 11 i I I 1 \r I I 1 I v ,I + 1 \r ! t I \r ,I 1 l v ,+ 1 1 1 v 1 1 I I I 1 I I I ` CL C'7 M — 1--r---- Y----,^I--h--I-- .-. -....F--*---- F----i--1------ I----�i--i----- 11♦.-._F._y__.}. ». Y_-1-- r--Y- ---- -- -- ` Cr),L0 Q Q D I I r \,I I I ! I r \,I I I I I I / \11 I 1r \1+ I I I r \11 I I r \11 1 1 hr \I 1 1 1 I r \d 1 1 I r \II I 1 • I4) Ln1 1 I - I_- 1 I ! I --I ' - -- I I I _ -- I I 1 t I I __ + _ J-_1..-L-J_-.hL�.�L__+_-1 L-J__�-n?L 1 I I _n>1_ I _1__ —.— —.____--.. 'S.� '� rt .� m T--r-1-- r 1 7--r--}-- r- T--r---- r __ T--r-1- r 1 4_4_ l-- f_4__.4--r-1-- r---- I_`1`_l f- i I I I I 11-I l ! ! I I I 1 1 1 1 pp - �� , I I I I 1 1 I 1 I I i 1 1 I ! 1 1 1 1 , 1 1 , 1 I 1 1 I I I 1 F , I I 1 , I I I 1 I 1 1 1 1 I 1 I v 1__L_J__1__L_J1L_J__1-_L_. --1-_L_J__1__L_ 1..._L,„J..._1_-l-_.J.....1._-L_J__1__L_J. __L_J__1__L_J__ __L_J__1__L_�__;__1-_�__+__t-_�__; L._..;__-�__L_J__.L__L_J__1__L_.�__+__�, _—.— �� I I 1-1 1-1-1 I I I 1 1 1 i I}_ 11 1 I 1 I I I 1 113 l 1 1 I I I ! , 1 1 1 1 1 1 1 1 1 1 1111111 - 1 I 11111111 1 1 1 I 1 I 1 1 1 I 1 1 I I I I 1 1 ! I I i ! I I IIIIIIII I I I I I I , "" = —H -- I \ • • t__ *__r".."-I— y-..+..._.r"_..1— �_i__+__0-_y__ r_i__+__*_i__ i__+__I-_-1__ r..•"y__1 -_r_y__ y__T__Y_-__ -r-••,,i ---- -- �� k'• -- ^"�- #_� "� it--yr- �.,`q yt^ Tr- Tr' 7r- --T--r -- �- T--r--1--��y i T--r--i-- — 1\ /I I I I 1\ ,1 1 I I 1\ ,II I 1 , 1\ ,II I I (\ /11 I ? 1 tly ,l I I �\ /N I 1 I I\ !r I I I 111/1 r l I I\ rI 1 1 1 1 1\ /I • \� I I \iI I 1 I s v 1 I 1 I 1 I v 11 I I I 1 v II I I 11 V II 1 t I. I v`I 1 1 I V G 1 i 1 1 V ki_ 1__L-_I_--11 V L__I-_1__L__-- I V I 1 1 1 1 + V 1 l • �\\7:\,,,.1--1 A Ir-1--T--r--1 A Ir----1--r--I--1 A Ir----7--r--i-1 A 1r----7--r--- In 1r----1--r--1--') A,r 7 r f A u I i I- I A it IIIF IIII 7 n u I 1 I 1 ^I Ir \! I I I F✓ \Ik 1 , I 1 V \I I f I Ir \I I f Ir \II 1 i 1 IJ \II I I 1r \II t I I Ir \ r:\1__IS_1,__1__L_J__1l' ..\L_J_-1__L_J__1L-.,.1L-J__1..-L_J__.JF1L_J__1__L_J_,14,,.2L_J__1---i._J_,�.%-..._:c_J__1__1-_J_- J'L_J__1__!-_ ___1__4__ - _�- I 1 I I I I I 3 I I I I 1 I I Y I I I I E I I I 1 I I I I I 1 i I 1 ! --# I I - -- }I --�--�-J #�yl --�-^�-�- 1 - ' \• I 1 1 1 I I $ , I I I 1 11 1 1 1 1 11 1 1 1 1 1 ! 1 i% i 1 1 3 1 f [ 1 1 1 I I I ' 1 1 1 1 1 11 1 1 1 1 1 i1, 1 _ \Q- i- - r--I--1--I 1 111I i 1 I I I 1 111LII I , I I _ -, I ; Y , �•qFpY-- I _____ , I1 1tI1 I _ "^"i' -- I1 Q! ! i 11▪ }.-J--1--L—:. .M-L..»-L_L1__L_...I11 1 1 1 1I I .h I .3LJl s 1 --" ..._ I p 7�� }--T__r "_K"'7r--r-1--'(--1--1{--yr- �--r--I- Ep r--Ir�Tj---- "(--r-._ .a ! iIIt1�"""xiI I I IC fl I I _ -�\ r11 I I I ! I\ rllI1 ` -L-�•\v I'�----'t--1---1-- tf\ r�---- 1 �'---- \ r I---�=- II\ r4 1 , \ 'h , —. • '�J--1---- J v IL 1--L--i--� V IL_ J__1__L.. .a - JJ v r'� v }--I-- \r i--I--'1 I-- \r 'L-J-- - \ II 1 1 ^ II L itr111 ^ hi 1 1 • - 1/ '"'-D 1 ^ 4 1 I I y ^ 61'T .( 1 A I 1 F ^ 4 1 '•4 --1 ^ 1 +--', �- 1 ..I , �r \II IIr \h1 , I Ir \4 , t I !r \�f t I \ I I I r \ I I 1 .r�\1 I I i 'f•-z' -14-'y' .-- -t--t--r .; --i--kA 11--Y--r-ti-- I IF/ NI1--Y-_!"_-1'-_'f__ �1 ---- _� ,__Y-_r -1--7�- � '-�--r- r-T-- 1--T -r- 1 , I I I I 1 II� I , - 1 1I I II ! l1 1 1 1 1 1 : 1 I I 1 1 II11i I , 1IIiI1II■ 1 1 II1I11L + 1L11L1 L 1II1II1L 1--T-7-111.1--1--r--riii,,,,,__„_,,: _irrir, "1--T--Ir-1--1""-r `� I r l I ! 3 rIII1 II1I t I 1 III1 I I iH I -I I I I I I F I1 I 1 I I - IIII k I 1 fI I 1 I 1 , I 1 i I l 1 1 I 1 I I 1 I I J__ L_J__L__LJ L_1__1__ _J __L. _1__L_J__1__ _ 1__1__L_J_--a__ 4__1-_ -_41__ ;-_4_J__1__ 1__L__a__1__ - -_ -- _-_ ---- p -.r ---- ' I - I- III , I • • - IIIII III IIIIIII VHIIII I I I I I I 1 v r1 1 1 1 \, 1 , I 1 u ,1 � � t rryihvi � rihv lrir- -- v i i--r--i-- I • -- \n lr y r- r --\��_ i--y--•t--r- \n �--1- � � � I ` \n�fin7,r-- }\A �--__ j n� �� .. n, II I I 1 1 •1 r \� I I I ! \11 ! I I ! r \ I I 4 I r \,! ;/ t1 I I I 1 =-- I �I I-- �-- 1 ,— I I hr \,I t 1 I r \� I I 1 1 1r --- - 01: �. — — Ii1 _ i _ 4 X1 - J ,. s r 1 3£.31--1--L 1--1--IEr� 1 L I Il �+ I I 1 1 K % -- II - 1 r- r - 1 T -r• 1 T r 7 r- , -7- Ir ! 1III1I I1I ! I I 1 1 1 I1I - I1 III1IIIIiIIII 3 I I I I I I I I I I 1 I I I I I _I' H II I I $ • i I V i i III I - II - I I I _ = - f I _ - e i I I _ '$ 0 — I e 3 I i T _ I - � _ fir.\ _ _ 1 • - • i I I — � • NA \ j I I �• 1 I I H-- I--- H I I 1 I - I f. • := = ;;;---4-- + = • M_ 1I I I I W i 1 — - IX 1 . I C r ] u_ 41-1 ----- l - - I-1 -= I ^ H — iaI _I I I I • j I p I I I I I I ; _ - - ____ • II II 1 I I I 0 I . ...Li ' -- - - . L I I I - - • I . 11" I DEMO 1 CONSTRUCTION CEILING PLAN - FIRST FLOORr‘,4Wa Cn -2 SCALE 1" = a' • III I I I I NOTES W _ DEMO CEILING IN AREA AS INDICATED .u/(, TT II I 1 I 1 1 1 • TUNE UP EXISTING GRID,TILES,AND DIFFUSERS PER PTR SPECIFICATIONS 1' z = = — 1 -" I REMOVE EXISTING 2 X 4 FLUORESCENT LIGHT FIXTURES(APPROX.356)AND INSTALL NEW LED 3 O U 1 ..z, FIXTURES. II i1 1 RESTROOM LIGHT FIXTURES TO REMAIN.RE-LAMP FIXTURES.REPLACE BALLASTS AS NEEDED- ♦�/ ---i I I I I I I I INDICATES COMMON PATH OF TRAVEL REQUIREING EMERGENCY LIGHTING (.0 w W NC\I . .:( c,, ______ . y --- - �•+.— 4 EQUAL TO 1-FOOT CANDLE FOR A MINIMUM DURATION OF 9q MINUTES. ti ,a GI( . . • . Ct 0 a) H r,_ a . . • . . o r ,„� � ¢ in V • • ift � Et �oLn 0_ °Cx1- • DATE: 3112118 BUDGET SET REVISION 1 . 2. • 3. • CEILING LEGEND 4 • I LITHONIA BLT 5• LED FIXTURE 6. • - LED HIGH BAY WAREHOUSE FIXTURE OCCUPANCY SENSOR ON EACH FIXTURE. 7 RECESSED CFC LIGHT 8. • • RECESSED LED LIGHT $ DRAWN BY: STANDARD SWITCH R.M.T. I OCCUPANCY SWITCH I 2) CEILING OCCUPANCY SENSOR SUPPLY DIFFUSER RETURN DUCT • • ® I EXHAUST FAN A_ 2 TILE SPRINKLER HEAD !! EXIT SIGN(LED RED) con.0-° /Its, ..... _... #3082 �► MARTIN W.HANSON n i (p CLA KAMAS,OREGON 9� �'D FOF 0k� 9 10 11 ! 12 13 9 10 , • 11 ;, 12 13 PROJECT # 18080 /, •• v [� 1 . -ET: ( C ) � �; _L J►w U A( U U cp U• (WA. 1 m ,*,,IQ! 4.'4- I --- rj� - .. / I VAC- ►,- •- r' I I I 1 • I 1 • Q OPEN OFFICE inii \ 1 ' III , 1• -z7 1207 Ly i,--•r JJ XX " • u) * vc.c, 1 • I I . I • 6 . I a) C ,-_- CO 41 1 Tf F-I WOMEN i `� LL \ _ F 206 E-PT CPT-7 -- - - %' OPEN OFFICE 1 • E :v. I O O- C. d . • 0 • .� C� C� aa I I • z � � Qt l a 1 � (n Q N N z 4 Q EE 3'A-7 I a •�r� e e `� • '1 - J ❑ FOR ELECT �/ X '•." as Q . �. , � J RECIUIREMEN1S. - Vim\ _ -- -- -- O O 2 in 0 4 r Cp7.� MEN E•PT CPT-I \\. �, 1 0 • 0 —7\77 \;• nn co LL tii tiW _ ibi, erzl i [2051 OPEN OFFICE . . - yx{i) ► =d - 208 ��` ` �`\\ ' • I • - , ' - `\\ OFFICE — i • / I 203 \\ iI I \\\\ qd • E , L :0 _j 7, , , / OFFICE I \, , \ \ E.- Al I. 'I ._L 202 \*\\\ \\\ • \\� . T 1 ► ,\\ \'• 1 ' . I . . \\\ • • \, p DEMO REUTES AND LOWER WALL \\/ \\ - -' I' -- \ 1 ..:-_,P= 1 \ \., \\:..\\ EY 1 i T042'AND INSTALL TOP CAP TO i,, • I \ v 1 MATCH TOP OF STAIR RAIL. \\ - I T"x a - -- I \\ ,0 0 I 4 1 Ikksi‘I: _.--: i p % / • OPEN OFFICE I �e\. .,,s„ ,-\ � � — -- •—�- - — ,• �'•. ` =- - tel} I , 201 \\\ / I IR.r�. T / %fr / <:/ 5 _-- I '�� = ��Ll I_ • • -•- 1 - �-- I I , 1r4 , xt �---�1 _ _ ( III. - ' �I , W 111 I % tl l 7 _ G ° y a .. -..---A I '- G i - H I L� > + llm i�' H _ � . _ jj �� I - t • .� _i = = iii f:T., L JII h- 1 l ,W 11 • . , NJ, i II ! ��' + A/ HI I I /' J„ Li IE U I ! II --. ' CC I Cl)$1 II 1 II I!Et,- ' c-_ - � iVIl ,I •- 11 I - II �- LLI • -_2)1 1_ _t' Ll -• • - • = - • = •j• • ____a,.._.__. LO in 12 11 I 1 3 a W II I I '7. (n. �_ - 0 ( I ay y i ` -„ —_ - L —� _ — - z, .... _ _ I co ¢ � m z 0 0 LilO) F N D 1 DEMO 1 CONSTRUCTION PLAN - SECOND FLOOR 2 DEMO 1 CONSTRUCTION CEILING PLAN - SECOND FLOOR T,,1 w v r co A-3 SCALE 1" = 10' A-3 SCALE 1" = 10' `,�-' U .0 15 ~ 0 •NOTES a Q. T Q NOTES • TUNE UP EXISTING GRID,TILES,AND DIFFUSERS PER PTR SPECIFICATIONS (/} • DEMO WALLS AS SHOWN • REMOVE 2 X4 FLUORESCENT LIGHT FIXTURES AND INSTALL NEW LED FIXTURES. • DEMO ALL FLOOR COVERING INCLUDING VCT AND OTHER HARD SURFACES.CLEAN FLOOR • REMOVE CFC RECESSED CAN LIGHT FIXTURES AND INSTALL NEW LED RECESSED CAN DATE: 3112118 READY FOR NEW FINISHES.EXCLUDING RESTROOMS AND SHOWER ROOMS. FIXTURES AT MAIN LOBBY 100 ONLY • NEW PAINT THROUGHOUT • RESTROOM LIGHT FIXTURES TO REMAIN.RE-LAMP FIXTURES.REPLACE BALLASTS AS NEEDED. BUDGET SET • INSTALL NEW CARPET AND BASE THROUGHOUT OFFICE • LOWER WALL AT TWO STORY LOBBY AND INSTALL TOP RAIL TO MATCH STAIR RAIL. INDICATES COMMON PATH OF TRAVEL REQUIREING EMERGENCY LIGHTING EQUAL TO 1-FOOT CANDLE FOR A MINIMUM DURATION OF 90 MINUTES. REVISION CONSTRUCTION LEGEND CEILING LEGEND 1. EXISTING TO REMAIN LITHONIA BLT 2. .x><,......-N DEMO WORK LED FIXTURE 3 ink NEW STANDARD WALL TO ROOF STRUCTURE LED HIGH BAY WAREHOUSE FIXTURE OCCUPANCY SENSOR ON EACH FIXTURE. 4. DUPLEX RECEPTACLE 5 0 RECESSED CFC LIGHT FOURPLEX40 RECEPTACLE 6. D, DEDICATED OUTLET • RECESSED LED LIGHT 7 • $ STANDARD SWITCH Q7 EXISTING ELECTRICAL TO REMAIN 8. FLOOR MONUMENT W/SERVICES SHOWN ® OCCUPANCY SWITCH CEILING OCCUPANCY SENSOR SPECIAL OUTLET DRAWN BY: .41 TELIDATA MUD RING WITH PULL STRING X SUPPLY DIFFUSER R.M.T. ELECTRICAL PANEL RETURN DUCT iv FIRE EXTINGUISHER IN RECESSED CAB. I EXHAUST FAN • FIRE EXTINGUISHER-SURFACE MOUNTED 2X2 SPRINKLER HEAD TILE 0 THERMOSTAT 0 EXIT SIGN(LED RED)