Loading...
Report ELe_2D.20-024/c t/60c, 7244) .ftr/c� Switchboard General Information Pow-R-Line C-Specifications Quantity:1 E r Alignment:Front Access/Front and Rear Align E�,/ Service:208Y/120V 3-Phase 4-Wire Minimum Interrupt Rating:42 kA Y 1� Bus Specifications MAY 12 2020 Bus Amps:2000 Bus Bracing Rating:65kA Neutral Amps:2000 CITY OF TIGA D Bus Material:Aluminum Heat Test BUILDING MOON 1N Ground Bus Material: Aluminum .25 X 2.0 Ground Bus Bolted To t„ ;,.e v r�,r v'^` Frame,(1)#6-350 kcmil Ground Lug Incoming Information Terminals,Mechanical,Bottom,See Utility Specifications Incoming Entry: Bottom Incoming Location: Right Incoming Qty & Size: Terminals, Mechanical, Bottom, See Utility Specifications Structure Specifications Service Entrance Enclosure Type:Type 1 Seismic Label(IBC/CBC Seismic Qualified)-Freestanding Refer to seismic installation data sheet TD01508002E and drawing 1A32496 for details. Nameplates: None- Special Notes Qty Description Catalog Number 1 BREAKERS IN SECTION 3 TO BE MINIMUM OF 24" FROM CN92535 FLOOR Utility Specfications Struct#4 2000 Amps Util.Mtr.Compt.-PORTLAND GENERAL ELECTRIC Utility Service Requirements Page References: UGPS Per Dwg.345 LUGS (7)EUSERC Press Bolts Utility Specfications Struct#2 1200 Amps Util.Mtr.Compt.-PORTLAND GENERAL ELECTRIC Utility Service Requirements Page References: Lug Drillings Per Dwg.:347 CT Compartment Per Dwg.322/330 Meter Door per Dwg.332 13J Meter Socket(s) LUGS Doors-(2)-15"with Meter at the Bottom None Enclosure properties Struct# Description/Modifications 1 50x chassis mounted feeders(Feeder Structure) 2 Utility Structures(Utility Structure) Vertical isolating barrier Horizontal isolating barrier The information on this document is PREPARED BY DATE created by Eaton Corporation.It is MARK WHITE 5/5/2020 Eaton SumterSC disclosed in confidence and it is only to be used for the purpose in which it is APPROVED BY DATE JOB NAME La Londe-Tigard Triangle-E7580503X0K1 supplied. DESIGNATION MDS1 VERSION TYPE DRAWING TYPE 9.0.24.5 Switchboards CustAppr NEG-ALT Number REVISION DWG SIZE G,O. ITEM SHEET E7560503X0K1-0002 0 DwgA 001 1 of 5 3 50x chassis mounted feeders(Feeder Structure) 4 Incoming Utility Structures(Incoming Utility Section) Vertical isolating barrier Horizontal isolating barrier The information on this document is PREPARED BY DATE created by Eaton Corporation.It is MARK WHITE 5/5/2020 Eaton SumterSC disclosed in confidence and it is only to be used for the purpose in which it is APPROVED BY DATE JOB NAME La Londe-Tigard Triangle-E7580503X0K1 supplied. DESIGNATION MDS1 VERSION TYPE DRAWING TYPE 9.0.24.5 Switchboards CustAppr NEO-ALT Number REVISION DWG SIZE G.O. ITEM SHEET E7580503X0K1-0002 0 DwgA 001 2 of 5 13J UTIL I I Blank Doorl _ _ PI II I ' a a 2 I 0 11 ®SPD I SECT I 3 ° ° 4 4 ° ° s 214GSl CI l Iffi 3uos I o j I I NGS Front View Struct 1 2 3 4 Depth 30 30 1 30 1 30 Width 36 38 36 45 Power Flow n (Ti 1 I I See 1A32043 For See 1A32043 For Floor Plan Detail Floor Plan Detail Floor Plan Top/Bottom Top/Bottom Rear Cable Exit Cable Exit A A 24 00 r 12.00 s,s�o zoo z�so ` �y 30 T s a 3u _T i 35 T > 300 .4. F 300 ... .4..3.00 Total of 4 Structures.Total Weight of 2512 Weight-Lbs. Total of 4 Structures,Total Width of 155 Inches Structure 1 2 3 4 Ship-Inches 36.00 38.00 36.00 45.00 Ship-MM 914 965 914 1143 Wdth-Inches 36.00 38.00 36.00 45.00 Wdth-MM 914 965 914 1143 Depth(Inner)-In. 30.00 30.00 30.00 30.00 Depth(Inner)-MM 762 762 762 762 Depth(Outer)-In. 30.00 30.00 30.00 30.00 Depth(Outer)-MM 762 762 762 762 Height-Inches 90.00 90.00 90.00 90.00 Height-MM 2286 2286 2286 2286 Weight-Lbs.(Est.) 520 725 617 650 Weight-Kq.(Est.) 235 328 279 294 The information on this document is PREPARED BY DATE created by Eaton Corporation.It is MARK WHITE 5/5/2020 Eaton SumterSC disclosed in confidence and it is only to be used for the purpose in which it is APPROVED BY DATE JOB NAME La Londe-Tigard Triangle-E7580503X0 K1 supplied. DESIGNATION MDS1 VERSION TYPE DRAWING TYPE 9.0.24.5 Switchboards CustAppr NEG-AIT Number REVISION DWG SIZE G.O, ITEM SHEET E7580503XOK1-0002 0 DwgA 001 3 of 5 Switchboard Units Information Str# Unit Description/Modifications Nameplate 1 1 Feeder Breaker-Chassis Mtd-150A 3P[EDS 225A Frame],Trip 150A.,Thermal Mag PANEL L1/L2 Terminals,Mechanical,(1)#4-4/0 PANEL L1 /L2 Neutral Terminal,(1)#6-350 kcmil 2 Feeder Breaker-Chassis Mtd-200A 3P[FDE 225A Frame],Trip 200A.,225A 310+, LSI ATS-1 Terminals,Mechanical,(1)#6-300 kcmil Neutral Terminal,(1)#6-350 kcmil 3 Feeder Breaker-Chassis Mtd-200A 3P[EDS 225A Frame],Trip 200A.,Thermal Mag PANEL M1 Terminals,Mechanical,(1)#6-300 kcmil 2 SECTIONS PANEL M1 2 SECTIONS Neutral Terminal,(1)#6-350 kcmil 4 Feeder Breaker-Chassis Mtd-100A 3P[EDS 225A Frame],Trip 100A.,Thermal Mag FUTURE SOLAR Terminals,Mechanical,(1)#14-1/0 Neutral Terminal,(1)#14-1/0 5 Feeder Breaker-Chassis Mtd-200A 3P[EDS 225A Frame],Trip 200A.,Thermal Mag PANEL M3 Terminals,Mechanical,(1)#6-300 kcmil 2 SECTIONS PANEL M3 2 SECTIONS Neutral Terminal,(1)#6-350 kcmil 6 Feeder Breaker-Chassis Mtd-200A 3P[EDS 225A Frame],Trip 200A.,Thermal Mag PANEL M5 Terminals,Mechanical,(1)#6-300 kcmil 2 SECTIONS Neutral Terminal, (1)#6-350 kcmil 2 Main Breaker-Ind Mtd-1200AAdj,3P[NGS 1200A Frame],Trip 1200A.,310+w/ARMS,ALSI MAIN BREAKER ARMS Operation-Local using breaker interface and remote wired to terminal block-Customer HOUSE POWER to supply 24VDC for remote activation Lockoff devices:Padlockable Hasp 1200A Utility Metering-PORTLAND GENERAL ELECTRIC 3 1 Surge Protective Device-SPD Series 200kA SPD,Basic(Disconnect Included) 2 Feeder Breaker-Chassis Mtd-1000A Adj,3P[NGS 1200A Frame],Trip 1000A.,310+w/ARMS, METER CENTER ALSI MC-1 Terminals,Mechanical,(4)4/0-500 kcmil Lockoff devices:Padlockable Hasp The information on this document is PREPARED BY DATE created by Eaton Corporation.It is MARK WHITE 5/5/2020 Eaton SumterSC disclosede sed inconfidence and ith c it only to APPROVED BY DATE JOB NAME La Londe-Tigard Trian le-E7580503X0K1 be used for the purpose in which it is 9 9 supplied. DESIGNATION MDS1 VERSION TYPE DRAWING TYPE 9.0.24.5 Switchboards CustAppr NEG-ALT Number REVISION DWG SIZE G.O. ITEM SHEET E7580503X0K1-0002 0 DwgA 001 4 of 5 Neutral Terminal,(4)#4-500 kcmil 3 Feeder Breaker-Chassis Mtd-1000A Adj, 3P[NGS 1200A Frame],Trip 1000A., 310+w/ARMS, METER CENTER ALSI MC-2 Terminals, Mechanical,(4)4/0-500 kcmil Lockoff devices:Padlockable Hasp Neutral Terminal,(4)#4-500 kcmil 4 2000A Pull Section-PORTLAND GENERAL ELECTRIC The information on this document is PREPARED BY DATE created by Eaton Corporation.It is MARK WHITE 5/5/2020 Eaton SumterSC disclosed in confidence and it is only to be used for the purpose in which it is APPROVED BY DATE JOB NAME La Londe-Tigard Triangle-E7580503X0K1 supplied. DESIGNATION MDS1 VERSION TYPE DRAWING TYPE 9.0.24.5 Switchboards CustAppr NEG-ALT Number REVISION DWG SIZE G.D. ITEM SHEET E7580503X0K1-0002 0 DwgA 001 5 of 5 Portland General Electric Company 11/21/19 (GE CONTACT: Sabrina La Londe PHONE: 503-308-4777 CUSTOMER NAME: Scott Edwards Architecture ADDRESS: sw Baylor st and sw 72nd ave SDPM/ENGR: Wayne Brabham WR: M2771856 PHONE: 503-672-5440 3-PHASE SECONDARY LINE-LINE FAULT CURRENT (RMS) TRANSFORMER DATA PAD MOUNT? YES XFMR Impedance (%): 5.32 % 3-PH SUBMERSI YES TRANSFORMER SIZE: 750 KVA XFMR? NO Secondary VOLTAGE (L to L): 208 v WYE OH BANK? NO VAULT--> VAULT ( or Pole --> Pole) SECONDARY Secondary Wire LENGTH: 1 Feet WIRE SIZE Number of SECONDARY RUNS: 1 Run(s) of: Secondary WIRE Resistance R: 0.0180 Ohms/1000' Secondary WIRE Reactance X: 0.0258 Ohms/1000' VAULT ( or Pole) --> PANEL SECONDARY (or Svc Drop) Service Wire LENGTH: 15 Feet WIRE SIZE Number of Service RUNS: 6 Run(s) of: 750 QX UG M Service WIRE Resistance R: 0.0286 Ohms/1000' Service WIRE Reactance X: 0.0264 Ohms/1000' MAXIMUM FAULT CURRENT*: 37,562 Amps *Maximum fault current based upon transformers/conductors sized for 100% of electrical panel rating. Based on a panel size of: 2000 Amps To Print This Page: "Ctrl M"and choose "Print 3-Phase Data" Generated by COM check-Web Software (11:\rirfil Interior Lighting Compliance Certificate Section 1: Project Information Energy Code:2014 Oregon Energy Efficiency Specialty Code Project Title:Tigard Triangle(72nd&Baylor) Project Type: New Construction Construction Site: 11600 SW 72nd Ave., Tigard, OR 97223 Designer/Contractor: Owner/Agent: Community Development Partners Section 2: Interior Lighting and Power Calculation B C D A Floor Area Allowed Allowed Watts Watts/ft2 Multifamily 87180 0.58 50564 Total Allowed Watts= 50564 Section 3: Interior Lighting Fixture Schedule A B C D E Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Multifamily(87180 sq.ft.) LED:Li:Flush Lights:LED PAR 16W: 1 520 16 8320 LED:L2:Hallway Lighting:LED Linear 22W: 1 115 22 2530 LED:L4:Wall Wash Light:LED Linear 17W: 1 2 18 36 LED:L5:Designer Common Area:LED A Lamp 7W: 4 2 28 56 LED:L6:Vanity Light:LED PAR 8W: 2 91 16 1456 LED:L7.1:Service Spaces:LED Linear 33W: 1 10 33 330 LED:L8:Wall Sconce:LED Other Fixture Unit 16W: 1 5 18 90 LED:L10:Bedroom Lights:LED Other Fixture Unit 16W: 1 224 20 4480 LED:L12:Common Suspended Lights:LED Other Fixture Unit 60W: 1 4 74 296 LED:L14:Bathroom Can Lights:LED PAR 16W: 1 92 16 1472 LED:L15:Community RM Pendant Lights:LED Other Fixture Unit 13W: 1 7 13 91 LED:L16:Community Room Lights:LED Other Fixture Unit 13W: 1 23 14 322 LED:L20:Community Room Lights:LED Other Fixture Unit 13W: 1 4 13 52 LED:L21:Common Space Wall Sconce: LED Other Fixture Unit 13W: 1 4 11 44 LED:L22:Elevator Lobbies:LED Other Fixture Unit 60W: 1 5 60 300 LED:L23:Lobby-Small Pendant:LED Other Fixture Unit 103W: 1 3 100 300 LED:L24:Elevator Lobby:LED Other Fixture Unit 16W: 1 6 16 96 LED:Exit Lights:Exit Lights:Other: 1 24 5 120 Total Proposed Watts= 20391 Section 4: Requirements Checklist In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met.Checkmarks identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in the plans/specs the requirement can be verified as being satisfied. Lighting Wattage: ® 1. Total proposed watts must be less than or equal to total allowed watts. Allowed Wattage:50564 Proposed Wattage:20391 Complies:YES Mandatory Requirements: a 2. Exit signs.Internally illuminated exit signs shall not exceed 5 watts per side. Project Title:Tigard Triangle Copy 2 Copy 2 Report date: 05/11/20 Data filename: Page 1 of 6 Plans reference page/section: 21 3. Daylight zone control.All daylight zones are provided with individual controls that control the lights independent of general area lighting in the non-daylight zone.In all individual daylight zones larger than 350 sq.ft.,automatic daylight controls is provided.Automatic daylight sensing controls reduce the light output of the controlled luminaires at least 50 percent,and provide an automatic OFF control, while maintaining a uniform level of illumination.Contiguous daylight zones adjacent to vertical fenestration may be controlled by a single controlling device provided that they do not include zones facing more than two adjacent cardinal orientations(i.e.,north,east, south,west).Daylight zones under skylights shall be controlled separately from daylight zones adjacent to vertical fenestration. Exception(s): • Retail spaces adjacent to vertical glazing(retail spaces under overhead glazing are not exempt). • Display,exhibition and specialty lighting O HID lamps 150 watts or less. [?� Spaces required to have occupancy sensors. Plans reference page/section: E1.1 through E1.6 a 4. Interior lighting controls.At least one local shutoff lighting control has been provided for every 2,000 square feet of lit floor area and each area enclosed by walls or floor-to-ceiling partitions.The required controls are located within the area served by the controls or are a remote switch that identifies the lights served and indicates their status. Exception(s): ® Lighting systems serving areas designated as security or emergency areas that must be continuously lighted. j Lighting in public areas such as concourses,stairways or corridors that are elements of the means of egress with switches that are accessible only to authorized personnel. ▪ Lighting for warehouses,parking garages or spaces using less than 0.5 watts per square foot. ❑ Lighting for contiguous,single-tenant retail spaces. Plans reference page/section: E1.1 through E1.6 ® 5. Sleeping unit controls.Master switch at entry to hotel/motel guest room. Plans reference page/section: E2.1 &E2.3 a 6. Egress lighting.Egress illumination is controlled by a combination of listed emergency relay and occupancy sensors to shut off during periods that the building space served by the means of egress is unoccupied. Exception(s): p Building exits as defined in Section 1002 of the Oregon Structural Specialty Code. Plans reference page/section: E1.1 -E1.6 La 7. Additional controls. Each area that is required to have a manual control shall have additional controls that meet the requirements of Sections 505.2.2.1 and 505.2.2.2. Plans reference page/section: See all E-Sheets ® 8. Light reduction controls. Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either 1)controlling(dimming or multi-level switching)all luminaires;or 2)dual switching of alternate rows of luminaires, alternate luminaires,or alternate lamps;or 3)switching the middle lamp luminaires independently of other lamps;or 4)switching each luminaire or each lamp. Exception(s): ❑ Only one luminaire in space. [g An occupant-sensing device controls the area. • The area is a corridor,storeroom,restroom,public lobby or sleeping unit. • Electrical and mechanical room. LI Areas that use less than 0.6 Watts/sq.ft. Plans reference page/section: See all E-sheets xj 9. Buildings larger than 2,000 square feet are equipped with an automatic control device to shut off lighting in those areas.This automatic control device shall function on either:1)a scheduled basis,using time-of-day,with an independent program schedule that controls the interior lighting in areas that do not exceed 10,000 square feet and are not more than one floor;or 2)an occupant sensor that shall turn lighting off within 30 minutes of an occupant leaving a space;or 3)a signal from another control or alarm system that indicates the area is unoccupied. Exception(s): D Sleeping units,patient care areas;and spaces where automatic shutoff would endanger safety or security. Project Title:Tigard Triangle Copy 2 Copy 2 Report date: 05/11/20 Data filename: Page 2 of 6 Plans reference page/section: E1.1 -E1.6 3 10.Occupancy sensors in rooms that include daylight zones are required to have Manual ON activation. Plans reference page/section: E1.1-E1.6 ® 11.An occupant sensor control device is installed that automatically turns lighting off within 30 minutes of all occupants leaving a space. Exception(s): • Classrooms and lecture halls. O Conference,meeting and training rooms. • Employee lunch and break rooms. • Rooms used for document copying and printing. • Office spaces up to 300 square feet. Restrooms. O Dressing,fitting and locker rooms. Plans reference page/section: E1.1 -E1.6 12.Additional controls.An occupant sensor control device that automatically turns lighting off within 30 minutes of all occupants leaving a space or a locally activated switch that automatically turns lighting off within 30 minutes of being activated is installed in all storage and supply rooms up to 1000 square feet. Plans reference page/section: E1.1-E1.6 • 13.Occupant override.Automatic lighting shutoff operating on a time-of-day scheduled basis incorporates an override switching device that: 1)is readily accessible,2)is located so that a person using the device can see the lights or the area controlled by that switch,or so that the area being lit is annunciated,3)is manually operated,4)allows the lighting to remain on for no more than 2 hours when an override is initiated,and 5)controls an area not exceeding 2,000 square feet. Exception(s): ❑ In malls and arcades,auditoriums,single-tenant retail spaces,industrial facilities and arenas,where captive-key override is utilized,override time is permitted to exceed 2 hours. ❑ In malls and arcades,auditoriums,single-tenant retail spaces,industrial facilities and arenas,the area controlled shall not exceed 20,000 square feet. Plans reference page/section: E1.1 -E1.6 j 14.Holiday scheduling.Automatic lighting shutoff operating on a time-of-day scheduled basis has an automatic holiday scheduling feature that turns off all loads for at least 24 hours,then resumes the normally scheduled operation. Exception(s): ❑ Retail stores and associated malls,restaurants,grocery stores,places of religious worship,theaters and exterior lighting zones. p Single zone electronic time control devices and self-contained wall box preset lighting controls. Plans reference page/section: ® 15.Exterior lighting controls. Lighting not designated for dusk-to-dawn operation shall be controlled by either a combination of a photosensor and a time switch,or an astronomical time switch.Lighting designated for dusk-to-dawn operation shall be controlled by an astronomical time switch or photosensor. Plans reference page/section: E1.1 -E1.6 • 16.Tandem wiring.The following luminaires located within the same area shall be tandem wired:1.Fluorescent luminaires equipped with one,three or odd-numbered lamp configurations,that are recess-mounted within 10 feet center-to-center of each other.2.Fluorescent luminaires equipped with one,three or any odd-numbered lamp configuration,that are pendant-or surface-mounted within 1 foot edge- to-edge of each other. Exception(s): • Where electronic high-frequency ballasts are used. [g Luminaires on emergency circuits. ❑ Luminaires with no available pair in the same area. Plans reference page/section: E1.1 -E1.6 • 17.Medical task lighting or art/history display lighting claimed to be exempt from compliance has a control device independent of the control of the nonexempt lighting. Plans reference page/section: Not Applicable • 18.Each dwelling unit in a building is metered separately. Project Title:Tigard Triangle Copy 2 Copy 2 Report date: 05/11/20 Data filename: Page 3 of 6 Plans reference page/section: E0.2 Interior Lighting PASSES:Design 60%better than code. Section 5: Compliance Statement Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2014 Oregon Energy Efficiency Specialty Code requirements in COMcheck-Web and to comply with the mandatory requirements in the Requirements Checklist. Bruce La Londe,Vice President i774 _ _ r 5/1112020 Name-Title Signature Date Project Notes: Tigard Triangle(72nd&Baylor)11600 SW 72nd AvenueTigard,OR 97223 Project Title:Tigard Triangle Copy 2 Copy 2 Report date: 05/11/20 Data filename: Page 4 of 6 GExteriorenerated by COMcheckLighting-Web Software Compliance Certificate Section 1: Project Information Energy Code: 2014 Oregon Energy Efficiency Specialty Code Project Title:Tigard Triangle Copy 2 Copy 2 Project Type: New Construction Exterior Lighting Zone: 2 (Residentially zoned area) Construction Site: Owner/Agent: Designer/Contractor: Section 2: Exterior Lighting Area/Surface Power Calculation A B C D E F Exterior Area/Surface Quantity Allowed Tradable Allowed Proposed Watts/ Wattage Watts Watts Unit (B x C) Front Entry(Entry canopy) 100 ft2 0.25 Yes 25 32 32 Space Parking Area(Parking area) 9883 ft2 0.06 Yes 593 800 Deck in Front(Illuminated length of facade wall/surface 25 ft 2.5 No 62 64 or roof path) Outside Area(Parking area) 8800 ft2 0.06 Yes 528 650 Total Tradable Watts*= 1146 1482 Total Allowed Watts= 1208 Total Allowed Supplemental Watts**= 600 *Wattage tradeoffs are only allowed between tradable areas/surfaces. **A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Section 3: Exterior Lighting Fixture Schedule A B C D E Fixture ID: Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Front Entry(Entry canopy,100 ft2):Tradable Wattage LED:LED PAR 16W: 1 2 16 32 32 Space Parking Area(Parking area,9883 ft2):Tradable Wattage LED:LED Other Fixture Unit 40W: 1 20 40 800 Deck in Front(Illuminated length of facade wall/surface or roof path,25 ft):Non-tradable Wattage LED:LED PAR 16W: 1 4 16 64 Outside Area(Parking area,8800 ft2):Tradable Wattage LED:LED Roadway-Parking Unit 130W: 1 5 130 650 Total Tradable Proposed Watts= 1482 Section 4: Requirements Checklist In the following requirements, blank checkboxes identify requirements that the applicant has not acknowledged as being met. Checkmarks identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in the plans/specs the requirement can be verified as being satisfied. Controls, Switching, and Wiring: ® 1. Lighting designated to operate more than 2000 hours per year for Uncovered Parking Areas shall be equipped with motion sensors that will reduce the luminaire power by thirty-three percent or turn off one-third the luminaires when no activity is detected. Plans reference page/section: El 0 Exterior Lighting Restrictions and Exceptions: Project Title:Tigard Triangle Report date: 05/11/20 Page 5 of 6 2. Mercury vapor and incandescent lighting is not permitted for use as exterior lighting. Exception(s): ❑ Incandescent lighting controlled by motion sensors and having total power less than 150 watts. Incandescent lighting used in or around swimming pools,water features,or other locations subject to the requirements of Article 680 of the National Electric Code. JD 3. Exempt lighting fixtures are equipped with a control device independent of the control of the nonexempt lighting and are identified in Section 3 table above. Plans reference page/section: All are non-exempt. Exterior Lighting PASSES: Design 15%better than code. Section 5: Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2014 Oregon Energy Efficiency Specialty Code requirements in COMcheck-Web and to comply with the mandatory requirements in the Requirements Checklist. Bruce La Londe, Vice President � �i. 5/11/2020 Name-Title Signature Date Project Title:Tigard Triangle Copy 2 Copy 2 Report date: 05/11/20 Data filename: Page 6 of 6