Report r"1S7-zo1g- ooico r2ogo 3 w vrc crzeTT- a- ll CITY OF TIGARD 6/4/2019 12:02:50PM 13125 SW Hall Blvd. T r c;AR n Tigard,OR 97223 (503)639-4171 Conditions Associated With Case #: SUB2015-00010 Project Name: Estates at Aspen Ridge (Formerly Viewcrest Subdivision) # DESCRIPTION STATUS STATUS DATE SEVERITY APPLIED BY ACTION BY 01. ARBORIST VERIFY COMPLIANCE WITH URBAN Continuing 3/3/16 Monica Bilodeau Albert Shields FORESTRY PLAN 01. Prior to any ground disturbance work,the project arborist shall perform a site inspection for tree protection measures,document compliance/non-compliance with the urban forestry plan and send written verification with a signature of approval directly to the city manager or designee within one week of the site inspection. 02. SEMI-MONTHLY ARBORIST INSPECTIONS Continuing 3/3/16 Monica Bilodeau Albert Shields 02. The project arborist shall perform semimonthly(twice monthly)site inspections for tree protection measures during periods of active site development and construction,document compliance/non-compliance with the urban forestry plan and send written verification with a signature of approval directly to the project A planner within one week of the site inspection spa➢ 04. PROVIDE DATA COLLECTION FEE Met 3/3/16 Monica Bilodeau Albert Shields 04. Prior to any site work,the applicant shall provide a fee in the amount of$1,358 for the city's cost of collecting and processing the inventory data for the entire urban forestry plan of 2 retained open grown trees,and 42 planted trees($154 first tree+$1,204($28 x 43)=$1,358). 05. SUBMIT TREE ESTABLISHMENT BOND. Met 3/3/16 Monica Bilodeau Albert Shields 05. Prior to any site work,the applicant shall provide a tree establishment bond in the amount of$21,420(42 planted trees x$510/tree). 06. PFI PERMIT REQUIRED Met 3/3/16 Greg Berry Al Dickman 06. Prior to commencing site improvements,a Public Facility Improvement(PFI)permit is required for this project to cover all infrastructure work and any other work in the public right-of-way. Six(6)sets of detailed public improvement plans shall be submitted for review to the Engineering Department. NOTE:these plans are in addition to any drawings required by the Building Division and should only include sheets relevant to public improvements. Public Facility Improvement(PFI)permit plans shall conform to City of Tigard Public Improvement Design Standards,which are available at City Hall and the City's web page(www.tigard-or.gov). 07. EXACT LEGAL NAME ON PFI Met 3/3/16 Greg Berry Al Dickman 07. Prior to commencing site improvements,submittal of the exact legal name,address and telephone number of the individual or corporate entity who will be designated as the"Permittee",and who will provide the financial assurance for the public improvements. For example,specify if the entity is a corporation,limited partnership, LLC,etc. Also specify the state within which the entity is incorporated and provide the name of the corporate contact person. Failure to provide accurate information to the Engineering Department will delay processing of project documents. 08. CONSTRUCTION VEHICLE ACCESS Met 5/16/16 Greg Berry Al Dickman PLAN/IMPROVEMENT CONSTRUCTION PHASE. 08. Prior to commencing site improvements,the Applicant shall provide a construction vehicle access and parking plan for approval by the City Engineer. The purpose of this plan is for parking and traffic control during the public improvement construction phase. All construction vehicle parking shall be provided on-site. No construction vehicles or equipment will be permitted to park on the adjoining residential public streets. Construction vehicles include the vehicles of any contractor or subcontractor involved in the construction of site improvements or buildings proposed by this application,and shall include the vehicles of all suppliers and employees associated with the project. Page 1 of 5 # DESCRIPTION STATUS STATUS DATE SEVERITY APPLIED BY ACTION BY 09. SHOW FULL-WIDTH IMPROVEMENT/PRIVATE Met 3/29/16 Greg Berry Al Dickman STREET 09. Prior to commencing site improvements,the Applicant's City of Tigard Public Facility Improvement permit construction drawings shall indicate that full width street improvements, including traffic control devices,mailbox clusters,concrete sidewalks,driveway aprons,curbs,asphaltic concrete pavement,sanitary sewers, storm drainage,street trees,streetlights, and underground utilities shall be installed within the interior subdivision streets. Local streets shall be designed and constructed to local street standards or CWS standards for porous pavement. Requirements prior to commencing site improvements for specific streets are as follows: • The private street,shall include and shall be shown on plans to have: - Pavement width,curb to curb shall be 20 feet(in a tract) - Driveway approaches - Storm drainage - 5 foot concrete curb&sidewalk(in tract or easement) - Street trees - Street light layout by Applicant's engineer to be approved by City Engineer - Underground utilities - Street signs and traffic control devices. - Porous pavement section design 10. DESCRIBE HOW ROCK WALL CONFLICT WILL Met 5/11/17 Al Dickman Khoi Le BE RESOLVED. 10. Describe the manner and method of resolving the conflict with the proposed street/sidewalk and rock wall. Submit any easements or other agreements required for the work on or to private property to resolve the conflict. 11.SUBMIT SEWER AND STORM DRAINAGE Met 5/31/16 Greg Berry Al Dickman DETAILS FOR APPROVAL. 11. Prior to commencing site improvements,sanitary sewer and storm drainage details shall be provided to the City for review and approval as part of the Public Facility Improvement(PFI)permit plans. Calculations and a topographic map of the storm drainage basin and sanitary sewer service area shall be provided as a supplement to the Public Facility Improvement(PFI)permit plans. Calculations shall be based on full development of the serviceable area. The location and capacity of existing,proposed,and future lines shall be addressed. 12. DOCUMENT DOWNSTREAM CAPACITY OF Met 5/31/16 Greg Berry Al Dickman STORM FACILITY 12. Prior to commencing site improvements,the Applicant's design engineer shall submit documentation,for review and approval by the City(Greg Berry)of the downstream capacity of any existing storm facility impacted by the proposed development. The design engineer must perform an analysis of the drainage system downstream of the development to a point in the drainage system where the proposed development site constitutes 10 percent or less of the total tributary drainage volume,but in no event less than 1/4 mile. 13. SUBMIT DESIGN PLANS FOR STORMWATER Met 6/16/16 Greg Berry Al Dickman FACILITIES 13. Prior to commencing site improvements,the Applicant shall submit design plans for the stormwater facilities meeting the City of Tigard Design Guidelines.This submittal shall include a maintenance plan in accordance with the CWS Design and Construction Standards and the City of Tigard Design Guidelines,for the facility and must be reviewed and approved by the city. 14. SHOW EXTENSION OF PUBLIC WATER LINES, Met 3/29/16 Greg Berry Al Dickman HYDRANTS. Page 2 of 5 # DESCRIPTION : "S STATUS DATE SEVERITYr ' APPLIED BY ACTION BY 25. PLAT TO CONTAIN STATE PLANE Met 10/26/17 Al Dickman Albert Shields COORDINATES 25. Prior to final plat approval,the Applicant's final plat shall contain State Plane Coordinates[NAD 83(91)]on two monuments with a tie to the City's global positioning system(GPS)geodetic control network(GC 22). These monuments shall be on the same line and shall be of the same precision as required for the subdivision plat boundary(per ORS 92.050). Along with the coordinates,the plat shall contain the scale factor to convert ground measurements to grid measurements and the angle from north to grid north. These coordinates can be established by: • GPS tie networked to the City's GPS survey. • By random traverse using conventional surveying methods. Final plat application submission requirements are as follows: A. Submit for City review four(4)paper copies of the final plat prepared by a land surveyor licensed to practice in Oregon and the necessary data or narrative. • Final plat and data/narrative shall be drawn to the minimum standards set forth by the Oregon Revised Statutes(ORS 92.050),Washington County,and by the City of Tigard. • Final plat shall show the right-of-way dedication for all public streets. • Subdivision plats will include signature lines for City Engineer and Community Development Director. • Partition plats will include a signature line City Engineer. NOTE: Washington County will not begin their review of the final plat until they receive notice from the City of Tigard Engineering Department indicating that the City has reviewed the final plat and submitted comments to the Applicant's surveyor. B. Submit a check in the amount of the current final plat review fee(Contact Planner on Duty,at 503-718-2421). 26. PROVIDE PAPER COPY OF RECORDED PLAT. Met 3/3/16 Boris Piatski Albert Shields 26. Prior to issuance of building permits,the Applicant shall provide the Engineering Department with a paper copy of the recorded final plat. 27. SUBMIT CONSTRUCTION VEHICLE ACCESS Not Met 3/3/16 Greg Berry Albert Shields PLAN/HOME BUILDING PHASE 27. Prior to issuance of building permits,the Applicant shall submit and obtain approval of a construction access and parking plan for the home building phase. 28. PUBLIC IMPROVEMENTS SUBSTANTIALLY Not Met 3/3/16 Greg Berry Albert Shields COMPLETE 28. Prior to issuance of building permits within the subdivision,the City Engineer shall deem the public improvements substantially complete. Substantial completion shall be when: 1)all utilities are installed and inspected for compliance,including franchise utilities,2)all city streets shall be fully paved,3)any off-site utility improvements are substantially completed and 4)all street lights within the subdivision are installed and ready to be energized.(NOTE: the City apart from this condition,and in accordance with the City's model home policy, may issue model home permits). 29. PROVIDE AS-BUILTS. Met 3/3/16 Boris Piatski Albert Shields 29. Prior to issuance of building permits,the Applicant shall provide the City with as-built drawings of the public improvements as follows: 1)paper,2)an electronic copy,and 3)the as-built drawings shall be tied to the City's GPS network. The Applicant's engineer shall provide the City with an electronic file with points for each structure(manholes,catch basins,water valves,hydrants and other water system features)in the development, and their respective X and Y State Plane Coordinates,referenced to NAD 83(91). 3. SUBMIT SOIL VOLUME PLAN Not Met 3/3/16 Monica Bilodeau Albert Shields 03. Prior to any site work,the applicant shall submit a soil volume plan to demonstrate the soil volume standard is met. 30. SUBMIT MAINTENANCE AGREEMENTS Not Applicable 3/3/16 Boris Piatski Albert Shields 30. Prior to issuance of building permits,the Applicant shall submit water quality and rain garden maintenance agreements on city forms for recording. Page 4 of 5 # DESCRIPTION STATUS STATUS DATE SEVERITY APPLIED BY ACTION BY 14. Prior to commencing site improvements,any extension of public water lines,hydrants and water services shall be shown on the proposed Public Facility Improvement(PFI)permit construction drawings and shall be reviewed and approved by the City and Washington County,as a part of the Engineering Department plan review. NOTE: An estimated 12%of the water system cost will be assessed prior to approval of the City of Tigard's PFI permit. 15. EROSION CONTROL PLAN Met 3/3/16 Greg Berry Al Dickman 15. Prior to commencing site improvements,an erosion control plan shall be provided as part of the Public Facility Improvement(PFI)permit drawings. The plan shall conform to the"CWS Erosion Prevention and Sediment Control Design and Planning Manual"(current edition)and submitted to City of Tigard with the PFI plans. 16/ OBTAIN 1200-C-N GENERAL PERMIT. Met 7/8/16 Al Dickman Albert Shields 16. Prior to commencing site improvements,the Applicant shall obtain a 1200-C-N General Permit issued through the City of Tigard pursuant to ORS 468.740 and the Federal Clean Water Act. 17. FINAL GRADING PLAN Met 5/16/16 Greg Berry Al Dickman 17. Prior to commencing site improvements,a final grading plan shall be submitted showing the existing and proposed contours. The plan shall detail the provisions for surface drainage of all lots,and show that they will be graded to insure that surface drainage is directed to the street or a public storm drainage system approved by the Engineering Division. The grading plan shall include any recommendations stated in the May 21,2015 Geotechnical Report. The design engineer shall indicate,on the grading plan,which lots will have natural slopes between 10%and 20%,as well as lots that will have natural slopes in excess of 20%. This information will be necessary in determining if special grading inspections and/or permits will be necessary when the lots develop. 18. OBTAIN CWS STORMWATER CONNECTION Met 7/8/16 Al Dickman Albert Shields AUTHORIZATION 18. Prior to commencing site improvements,the Applicant shall obtain a(CWS)Stormwater Connection Authorization prior to issuance of the City of Tigard PFI permit.Plans shall be submitted to the City of Tigard for review. The city will forward plans to CWS after preliminary review. 19. SUBMIT FINAL STORMWATER REPORT. Met 5/24/16 Greg Berry Al Dickman 19. Prior to commencing site improvements,provide final stormwater report for the street and lots. 20. PROVIDE WRITTEN APPROVAL FROM TVF&R Met 3/29/16 Greg Berry Al Dickman 20. Prior to commencing site improvements,the Applicant will be required to provide written approval from Tualatin Valley Fire&Rescue for fire flow, hydrant placement and access. 21. SHOW RAIN GARDEN DETAILS. Met 6/16/16 Greg Berry Al Dickman 21. Prior to commencing site improvements, submit plans showing rain garden details and maintenance agreements. 22. PAY ADDRESSING FEE. Met 3/3/16 Agnes Lindor Albert Shields 22. Prior to final plat approval,the Applicant shall pay an addressing fee in the amount of$300.00.(6 lots X$50/address(STAFF CONTACT: Jeremy Hanson, Engineering,503-718-2467). 23. DECLARE PRIVATE STREET OWNERSHIP& Met 10/26/17 Al Dickman Albert Shields MAINTENANCE BY OWNERS. 23. Prior to final plat approval,the Applicant shall cause a statement to be placed on the final plat to indicate that the proposed private street(s)will be jointly owned and maintained by the private property owners who abut and take access from it(them). 24. DEMONSTRATE FORMATION OF HOA Not Met 11/2/17 Al Dickman Albert Shields 24. Prior to issuance of building permits,the Applicant shall demonstrate that they have formed and incorporated a homeowner's association to manage and maintain the pervious private street. Page 3 of 5 # DESCRIPTION STATUS STATUS DATE SEVERITY APPLIED BY ACTION BY 31. PROVIDE SIGNAGE AT FLAG LOTS AND Not Met 3/3/16 Greg Berry Albert Shields PRIVATE STREETS. 31. Prior to issuance of building permits,the Applicant shall provide signage at the entrance of each shared flag lot driveway or unnamed private street that lists the addresses that are served by the given driveway or street. Page 5 of 5 Nava Contracting& Engineering,Inc. 4106 S.E.Oak St,. Portland,Oregon 97214 Ph: (503)238-0633 ; Email: navaengr(a,gmail.com Invoice for Engineering Services Rendered RECEIVED Invoice Number: 03-14-2019 An 1 a 2019 CITY of-OGAS1pN DIVClient: Pavel Kutsar BUILDING Project: Structural Analysis and Design Razilov Residence Date: 03/14/2019 Amount: $ 2600.00 M. (/,i%(/ Invoice amount reflects work performed to date. Inspections or any other additional work as required shall be invoiced separately. Thank You, V. Nava