Plans fv 2-0 20 - DC 'L l
TREE PLANTING NOTES
1.NEW TREES THAT ARE PLANTED TO MEET THE EFFECTIVE CANOPY REQUIREMENTS SHALL CONFORM TO THE APPLICABLE STANDARDS IN THE TIGARD URBAN FORESTRY MANUAL.THEY
4 SHALL BE PLANTED IN ACCORDANCE WITH THE AMERICAN NATIONAL STANDARDS INSTITUTE(ANSI)STANDARDS FOR TREE PLANTING(A300,PART 6)AND ADDITIONAL STANDARDS
ADOPTED BY THE OREGON LANDSCAPE CONTRACTORS BOARD.NURSERY STOCK SHALL MEET THE REQUIREMENTS OF THE AMERICAN ASSOCIATION OF NURSERYMEN FOR NURSERY
V STOCK(ANSI 260.1)FOR GRADE NO.1 OR BETTER DOUBLE STAKE TREES IF NEEDED FOR STABILITY DURING THE ESTABUSHMENT PERIOD.
2.ROOT BARRIERS SHALL BE INSTALLED ACCORDING TO THE MANUFACTURER'S SPECIFICATIONS WHEN A STREET TREE IS PLANTED WITHIN 5'OF ANY HARD SURFACE,PAVING,OR
UTIUTY BOX.
3.IF NEEDED,IRRIGATION TO BE DESIGN/BUILD BY THE LANDSCAPE CONTRACTOR.
4.IF NEEDED,SPECIES SUBSITUTIONS SHALL BE COORDINATED WITH THE PROJECT ARBORIST TO ENSURE EQUIVALENT CANOPY COVER IN ORDER TO AVOID MODIFICATION OF THE
0 10' 20' PREVIOUSLY APPROVED URBAN FORESTRY PLAN.
5.STREET TREES SHALL BE PLANTED WITHIN 6-FEET OF THE RIGHT-OF-WAY.
The project arborist has reviewed this plan and certifies that the trees and tree protection are accurately represented In accordance with the previously approved Urban Forestry Plan.
SCALE: 1"=20'
Morgan Nolen,ISABoardCertified Master Arborist(PN-6145B),ISA Tree Risk Assessor Qualified
June 3R,2020I N
Phone Number.971.409.9354 so
135 136
•
A50.00'•
135 -
it' 138
•
•
• • _ - ' 140
,• I 2
• ••" co 142
- - I � - I
• - • I 144
•
•
- -
- 146
•
•
•
- - - - - 148
•
• 156FFE LOT 18
. •p- II ' 1-I-rn- 152 ( a )avow MR MR out 000w Avsewu
• F t •• J 04144 rw4.m
.1
•
Ift 5 Water Service •
Coordinate with ♦► 4-- 155&- F 1 Drainage -.- •
` Project Arborist E Erosion
I Grade
to monitorl
protection for �- Lot Area: 4679 SF
tree #32387 I Bldg Coverage: 2685 SF
a throughout 1 ifi:
Total Impervious: 2613 SF
8' :,E Coverage: 33% / 43% Total
exterior , L, — — _ _ _
homebuilding I ) ♦ 50. 0' ,15 F
55 T 154 F
y
iali O
0
Appr
Fireplace cantilever.5ax5.5a ` ate: 9 *2-0 rag i
1 date: /
U
dy DATE
08/15/2018
REVISION ELDERBERRY RIDGE 11I CONSULTANTTS
I., DRAWN BY TIGARD, OREGON
CHECKED BY DAB 7540 SW HANSEN LN ENGINEERING • SURVEYING • PLANNING
JAB LOT SETBACKS PACIFIC CORPORATE CENTER
JOB NO. 1306-006 LOT 19' 4679 TIGARD, OREGONH 9722 PARKWAY, SUITE 150 FAX 50d)6682441615527
a