Date:July 13, 2020 RECEIVED
Permit#: ELC2020-00314 JUL 20 2020 BLUE RAVEN
• Project Name: Margaret Peggy Dahms Y OF TlGn
RD
Address: 13145 Southwest Ash Dr.Tigard, OR 97723
To whom it may concern,
The new As-Built permit pack that has been provided shows that we will be upgrading the existing 200A
rated meter socket to a 200A meter panel combo that is manufactured by Eaton Corp. Doing so does
change our interconnection method and the type of equipment that will be installed on the property.
The changes are as follows:
Upgrade Scope of Work
• Here at Blue Raven Solar, we have opted to upgrade the existing stand-alone meter socket to a
200A meter panel combo that has an available 4 slot for two 240v full size breakers.The Eaton
MBE24L200BTS will be installed on the property.
Interconnection Method
• With the upgrade scope of work from the main service panel upgrade, we are going to be
executing a new interconnection method that is outlined in Article 705.12(A).The
interconnection method will consist of a 50A breaker on the supply bussing of the new panel
that will be installed on the home.The service is a 200A service, and the combination of
overcurrent protection devices from our Photovoltaic installation will not exceed the rating of
the bus bar nor the service.
Wiring Methods
• The interconnection method that Blue Raven Solar will be executing will ensure that all wiring
methods will be followed that is outlined in Article 300, 690, 705. Please see the new 3-line of
PV5.
Please reach out to me directly if you have any questions.
Caleb D. Bydone Mckay Ashton
Engineering Specialst Engineering Team Lead
Caleb.Bydone@blueravensolar.com Mckay.Ashton@blueravensolar.com
engineering@blueravensolar.com engineering@blueravensolar.com
385-498-6700 385-498-6700
REVISION
\or-
The Future of Energy. Today.
BLUE RAVEN