Report ea 2016- CO-- zct
9S77 uIA Sq tt) 07
OFFICE COPY
firm daniels
Revision#1 ARCHITECT 5
December 20, 2018 RECEIVED 2145 Ford Parkway, Suite 301
Saint Paul, Minnesota 55116
Re: Morphe #040 651.690.5525
Washington Square
JAN 1 5 2019 www.finn-daniels.com
9577 SW Washington Square Rd. CITY
Y OFNG GDIVISION D
Tigard, OR 97223
The following revisions amend the construction documents previously issued for bid. Notify all plan
holders and incorporate the bulletin items into your construction documents.This bulletin forms a part
of the contract documents and modifies the original specifications, plans, and detail drawings. If costs
are involved due to the enclosed bulletin items, whether credits or charges, such shall be computed and
forwarded to the Morphe Project Manager for approval prior to effecting the change(s). If there are any
questions regarding these changes please contact Kelsey Irlbeck with Finn Daniels Architects at
651.888.6893
Permit Revision—12.20.2018: all changes are a result of building department comments
Item# Description Location
1 Added revision to drawing index Sheet A000—Updated Drawing Index
2 Corrected address Sheet A000—Updated address (on all sheets)
3 Updated structural details Sheet S-301 —Added detail 7/S-301 and structural calculations
Landlord Revision— 12.20.2018: all changes are a result of landlord comments
Item if Description Location
1 Added revision to drawing index Sheet A000—Updated Drawing Index
2 Added landlord plan review Sheet A000—Added Landlord Plan Review Comments Section
comments
3 Added finishes Sheet A210—Added finishes in Finish Schedule, updated toilet
room finishes in 1/A210 Finish Plan.
Sheet A700—Updated finishes in 3/A700 Toilet Room Plan and
11/A700 Toilet Room Wainscot Detail
4 Updated toilet room ceiling Sheet A300—Updated toilet room ceiling material
5 Updated noting for digital controls Sheet MP000—Updated Mechanical and Plumbing
for VAV's Specifications
Sheet M200—Updated Fan Powered Variable Air Volume Box
Schedule
6 Updated floor drain to be 3" Sheet P100—Updated Plumbing Fixture Schedule, 2/P100
Plumbing Waste and Vent Plan, and 4/P100 Plumbing Waste
and Vent Riser Diagram
7 Added a main water shut off valve Sheet P100—Updated 1/P100 Plumbing Domestic Water Plan,
3/P100 Plumbing Domestic Water Riser Diagram and Plumbing
Plan Keynotes-
8 Updated electrical service Sheet E001 —Updated Responsibility Schedule
Sheet E400—Updated Electrical Panel Schedules and Electircal
One Line Diagram
Tenant Revision — 12.20.2018: all changes are a result of tenant comments
Item# Description Location
1 Added revision to drawing index Sheet A000— Updated Drawing Index
2 Updated responsibilies Sheet A010—Updated Responsibility Schedule
3 Studio updates Sheet A030— Updated 1/A030 Egress Plan
Sheet A200—Updated 1/A200 Floor Plan
Sheet A220—Updated 1/A220 Fixture Plan and Fixture
Schedule
Sheet A230—Updated 1/A230 Fixture Outlet Location Plan and
Plan Keynotes
Sheet A300— Updated 1/A300 Reflected Ceiling Plan and
Reflected Ceiling Plan Keynotes
Sheet A400—Updated 5/A400 Studio Elevations, 4/A400 Rear
Sales Area Wall Elevation, and Sales Area Interior Elevation
Keynotes
Sheet A600 —Updated 8/A600 Non-rated Partition Detail,
9/A600 Non-Rated Furred Partition Detail, and 12/A600 Gyp. Bd.
Ceiling Assembly Detail
Sheet A620—Updated 18/A620 LED Display Wall Section
4 Updated finishes on column Sheet A210—Updated 1/A210 Finish Plan
surround at storefront
5 Updated lighting layout Sheet A300—Updated 1/A300 Reflected Ceiling Plan and
Reflected Ceiling Plan Legend
Sheet E200—Updated 1/E200 Lighting Plan and Lighting Plan
Keynotes
6 Updated delivery buzzer location Sheet A410—Updated 1/A410 Stockroom Elevations, 3/A410
Manager's Office Elevations, and Back of House Interior
Elevation Keynotes
7 Updated light box details Sheet A510—Updated 1/A510 Storefront Section at Entry
Doors, Updated 2/A510 Storefront Section at Display Window,
and Keynotes
8 Brake metal detail updates Sheet A520—Updated 4/A520 Brake Metal Seam Detail, 5/A520
Glazing Head Detail, 6/A520 Neutral Pier Detail, and keynotes.
Added detail 7/A520 Glazing Jamb Detail.
9 Updated light fixture install detail Sheet A600—Updated 18/A600 Light Fixture Install Details
10 Updated sales/hallway door Sheet A610—Updated Door Schedule
11 Updated transition details Sheet A610—Updated 4/A610 Transition Detail and 5/A610
Transition Detail
12 Updated electrical design Sheet E100— Updated 1/E100 Power Plan, and Power Plan
Keynotes
Sheet E200—Updated 3/E200 Wiring Diagram for Toilet Room
Exhaust Fan
Sheet E300—Removed Switchplate Detail, and updated 2/E300
Floor Box Detail