Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Report
O lWZoo?-oo5z5 City of Tigard, Oregon • 13125 SW Hall Blvd. • Tigard, OR 97223 October 2, 2008 uI 7 RE: TENANT IMPROVEMENT r' * Fx s Project Information Building Permit: BUP2008-00325 Construction Type: 5-B Address: 9426 SW Maplewood Occupancy Type: R1 Area: 1,262 Sq. Ft. Stories: 2 w/bsmnt The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2007 edition; 2007 Oregon Fire Code. This is fire restoration permit to fix a burned out apartment originally constructed in 1993. The same codes that were in effect at the time of construction will be used to reconstruct the unit. 1) All improvements made to the building shall be inspected prior to covering. 2) Make approved set of plans available for all inspections. The means of egress shall be provided with illumination of not less than 1 foot candle at the floor level anytime the building is occupied. The means of egress illumination shall be provided with a second source of power in case of primary power loss. (Sec. 1006.2) Portable fire extinguishers shall be installed in new and existing Group A, B, E, F, H, I, M, R-1, R-2, R-4, and S occupancies. (OFC Sec. 906) Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall be maintained on the jobsite. The plans shall be available to the Building Division inspectors throughout all phases of construction. (106.3.1 OSSC) Premises Identification: Approved numbers or addresses shall be provided for all new buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Inspections: Construction or work for which a permit is required shall be subject to inspection by the building official and such construction or work shall remain accessible and exposed for inspection purposes until approved. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of this code or of other laws or ordinances of the jurisdiction. Inspections presuming to give authority to violate or cancel the provisions of this code or of other laws or ordinances of the jurisdiction shall not be valid. OSSC 109.1 Approval Required: Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the building official. The building official, upon notification, shall make the requested inspections and shall either indicate the portion of the construction that is satisfactory as completed, or notify the permit holder or his or her agent wherein the same fails to comply with this code. Any portions that do not comply shall be corrected and such portion shall not be covered or concealed until authorized by the building official. OSSC 109.6 Phone: 503.639.4171 • Fax: 503.684.7297 • www.tigard-or.gov 1'1 Y Relay: 503.684.2772 Use and Occupancy: No building or structure shall be used or occupied, and no change in the existing character, use or occupancy classification of a building or structure or portion thereof shall be made until the building official has issued a certificate of occupancy for such change in character, use or occupancy, therefore, as provided herein. Issuance of a certificate of occupancy shall not be construed as an approval of a violation of the provisions of this code or of other ordinances of the jurisdiction. OSSC 110.1 Respec ully, Dan Nelson Senior Plans Examiner (503) 718-2436 dann@tigard-or.gov a iiihn, 1, ' PARK yN sit /fy FIYfO� rJ \ R ..� a�L^as a !• .„A• /Air derOi el Mil9 I r aii<1,y,141111k to, JfL i All ' C __ ,��\ ,��� ,�44, -I a �*� fO CREEK •�`�`,,,. a. ; Iv. . IL F PARK ug 6 VIP II 01111 4k 4. P+1_ 1 i A%. allytty,, aglIP;•^7. ' I lit • 4 1 y �lf CI bajzia • tillitilli ,a WAIF **.gai 'Pliiill 411174 ire ptr,pr iii 411111t "Lib tei • Fw i t . I. � J � y 1! � � LLB' t --=-) I Li 41.411 so •ii! *ii s sow 11 wilt s �� ng • all . ra SITE PLANO is OD w Di elk,J • 11,rd■l a oR[c nLh4Afl� STREET VILLAGE AT FA MO CREEK P- i; av -A- r 237 WATS - _ Scale: 0.1336" Date: 09-22-2008 T-9939 J.A. JOHNSON [VILLAGE APTS.] 6/12 PITCH 2-0 TAILS T 31-06-OD 12-00-00 12-00-00 7-06-00 A- 1 E) \I 0 0 Qi 1 ,- . o 0 i cn o -- o 20 3 Q o o0I a o 0 0 n O O a CT cn co N Lioo I O • 1 r 6 \ smei € / - , — — --- - ©2 . 0 I O 0 I 0 0 0 n w y 8-00-00 y 11-06-00 y 12-00-00 "I'k y 31-06-00 n n b0 a - 1 7 C N M 7 n JOB QUOTE er cos#: 9939-JR JOHNSON-VILLAGE APTS JOB°ESC: 9939-JR JOHNSON-VILLAGE APTS I & nuts ' (LMIAk• OTT: JR JOHNSON VILLAGE APTS CLINT LOCAL BILL TO: SNIP TO: VILLAGE APTS A Plan: Elevation: TRUSS QTY SPAN MBR PITCH OVERHANGS A 6 27-0-0 1 6.00/ 0.00 0-0-0/2-0-0 rues size:2x4/2x4 .-'' :; Yam, B-VAULT 5 27- 0-0 1 6.00/ 3.00 0-0- 0/0-0-0 i-- rc/ec size:2x4/2x4 - � � C-VAULT 4 25-6- 0 1 6.00/ 3.00 0-0-0/0-0-0 g ,_ TC/BC size:2x4/2x4 D-VAULT GE 1 25-6-0 1 6.00/ 3.00 0-0-0/0-0-0 rciec size:2x4/2x4 �] E-GE 1 24-0-0 1 6.00/ 0.00 2- 0-0/2-0-0 rciec size:2x4/2x4 4 F 3 24-0-0 1 6.00/ 0.00 2-0-0/2-0-0 TC/BC size:2x4/2x4 G-GIRDER 1 24-0-0 2 6.00/ 0.00 0-0 0/0-0- 0 TCIBC size:2X4/2x6 I H-GIRDER 1 23-6-0 2 6.00/ 0.00 0-0-0/0-0-0 rc!ec size:2x4/2x6 MISC. ITEM QTY TYPE H2.5T 18 EACH 2X4 SOLIDS 12 EACH 2X4 VENTS 6 EACH MUS26 24 EACH DELIVERY 1 EACH Selling SubTotal $1,997.00 0.000 Sales Tax $0.00 Single Plan Total $1,997.00 9/22/2008 2:44:34 PM Copyright CompuTnu,Inc. Page I C:Icfruslreportslprojmgrldblbatch\Customer101 Customer8id.rtm(10/10/2004 2:59:30 PM) BID #: Pacih Lum er -Pacific Lumber and Truss s ,cuss 5985 SW Jean Rd. Lake Oswego, Or 97035 PROPOSAL/AGREEMENT doe 5 IR JOHNSON-VILLAGE JOB oBSc:9939-JR JOHNSON-VILLAGE APTS SALESMAN: TERMS: BILL TO: JR JOHNSON CLINT PLAN ELEVATION SUBTOTAL 0.00 TAX TOTAL MISC ITEMS VILLAGE APT A 1,997.00 0.00 1,997.00 16 H2.5T 12 2X4 SOLIDS 6 2X4 VENTS 24 MUS26 1 DELIVERY NOTE: PRICES GOOD FOR PRODUCT SHIPPED WITHIN 30 DAYS This proposal only covers those items listed and taxes as shown. Seller is not obligated hereunder unless this quotation is accepted in writing by Buyer or within 10 days from the date hereof,and is approved in writing by an officer or other authorized agent of Seller. Buyer hereby assents to all the leans and conditions on the face and back hereof and on any pages attached hereto,and same are hereby made part hereof. APPROVED Subject to Credit Approval BUYER ACCEPTED By By------- Title Date Title Date 9/22/2008 2:44:34 PM Copyright CompuTnrs,Inc. Page 1 C.1cluslreporls''projmgrldblbatchlCustomerl03 Customer Bid-All Plans rim(9/5/2006 1:22:42 PM) Job Transmittal CornpuTrus, Inc. III IIIIIII !Min �I 31945 Corydon Road, Lake Elsinore, CA 92530 (951) 245-9525 Fax(951) 245-9805 Transaction ID: 11662 TO: PACIFIC LUMBER & TRUSS DATE: 9/22/2008 ATT: Drawings Repairs Sequence #'s Description 8 0 4096767-4096774 9939-JR JOHNSON-VILLAGE APTS1 -9939-JI Transmittal Notes: Design Notes: FTF:11662.zip 9/22/2008 3:06:32 PM Copyright CompuTrus,Inc. Page I III'IIIIIIIIII CompuTrus Inc. This design prepared from computer input by III IIIIIIIIII IIIIIIIIIIIIIIIIIIII IIII Trans ID: 11662 PACIFIC LUMBER / BC 7.4.1T11L1-E LUMBER SPECIFICATIONS TRUSS SPAN 27'- 0.0' IBC 2006 SINGLE MEMBER FORCES 4WR/GDF/Cq=1.25 TCM TC: 2x4 OF 818BTR LOAD DURATION INCREASE = 1.15 I. 2= -1896 1- 7= 1602 2. 7= -406 BC: 2x4 OF /118BTR SPACED 24.0' 0.C. 2- 3= -1664 7- 8= 1046 7- 3= 631 WEBS: 2x4 DF STAND LOADING 3- 4= -1862 8- 5= 1800 3- 8= 629 TC LATERAL SUPPORT <= 12'0C. UON. LL( 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF 4- 6= -1894 8- 4= -403 BC LATERAL SUPPORT <= 12'OC. UON. DL ON BOTTOM CHORD = 10.0 PSF 5- 6= 0 TOTAL LOAD = 42.0 PSF OVERHANGS: 0.0' 24.0' Reactions: 1126 1270 BOTTOM CHORD CHECKED FOR A 20 PSF LIMITED STORAGE BEARINGS LIVE LOAD AT LOCATION SPECIFIED BY IRC 2008 AND IBC 2006. LOCATION REACTION REO'D AREA (SO. IN.) 1133 1.81 OF (625) BOTTOM CHORD CHECKED FOR IOPSF LIVE LOAD. TOP 27'- 0.0" 1135 1.82 OF (625) AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. Design conforms to main windforce-resisting system and components and cladding criteria. Wind: 110 mph, h=15ft, TCDL=4.2,BCDL=6.0, ASCE 7-05, Enclosed, Cat.2, Exp.8, MWFRS, interior zone, load duration factor=1.6 Max Calculated Uplift: Left = -154 Right = -207 i_ - 13-06-00 4 13-06-00 T 12 4x6 12 6.00 L " a4 0" �16.00 . uu! 0' 2.sx3.4 2.5x3.4 .,grc-0 PROFESS l I.GlNgc /Oy ::tie . / it, 4 �, OREGON 4' J T N Ca- Ea �p o m 0 ER 6' Q 3x6 0.25 3x4.3 3x6 ,/loot 5.5x6(S) I EXPIRES 12/31/091 ** For hanger specs. - See approved plans y b b 27-00-00 2-00-00 .S,10** C 44 Scale: tla" C`� 0* NA, 0 JOB NAME: 9939-JR JOHNSON-VILLAGE ARTS - A , � 4r �'�x r( WARNINGS: General Notes,unless otherwise noted: '" q T -, 1.Read all General Notes and Warnings before construction of trusses. 1. Design to support loads as shown. �� 2. Builder and mention contractor should be advised of all General Notes and 2. Des41 assumes the top and bottom chords to be laterally braced at F FILE NO. : A Warnings before construction commences. 2' .C.and at 10'-0'O.e.respectively unless braced throughout her 8/ , . 3.2a4 compression web bracing must be installed when shown s. length by continuous sheathing. .1,...,,,.- 3.All lateral force notating elements such as temporary and permanent bracing, 3 In2x rmPe&bridging or lateral bracing requiredyofth where shown++ DATE: 9/22/2008 must be designed and provided by designer of cent lere structure. 4. Instal agora of eels trussest is the responsibility lily in the respective e e envir ni 17 r-76 p 5. Design assumes are to be used a non-corrosive amironment. .t��p h_'1 t.1_�Gs'�' CompuTrus assumes no responsibilityto nslbilily for such bracing. and are for"dry condition"of use. •�. �� 5.No load should be applied to any component until after all bracing and 6. Design assumes full bearing at all supports shown.Shim or wedge if DES. BY: OS fasteners are complete,and at no time should any loads greater Than design naCessary. Ax �saa••s�,'••'' seo loads be applied to any component. 7. Design assumes adequate drainage is provided. / a DNA. A p 6.CompuTrvs has no control over and assume no responsibility for the 8. Plates shall be located on both faces of truss.and placed so their center 9/Zt I O, SEQ. : 4096767 fabrication,handling,shipment and Installation of components. Imes rAIdicat sifts Jof p aellnr Imes. 9. Forn Indicate ze of plate In inches. I T.This in IO -furnished TCA I the i limitations s truss designs he feria 11. llbasic designrethe valuesC the CompuTrus Plate see dSR-2529AC80-02,1 �-,/ by s1 or n ueCA in BCSI copies of which will be furnished 11.All plates are ffle'C'series unless OmerWlte indicated. EXPIRES 6/1 W U9 by CompuTrus upon request. • lllllllllit111CompuTrllEl Inc. This design prepared from computer input by IIIIIIIIIIIIIIIIIIIIIIIIIIIIlilllill IllIll! Trans ID: 11662 PACIFIC LUMBER / BC 7.4.1T(1L1-E LUMBER SPECIFICATIONS TRUSS SPAN 27'- 0.0" IBC 2006 SINGLE MEMBER FORCES 4WRJGDF/Cq=1.25 TCM TC: 2x4 DF 018BTR LOAD DURATION INCREASE = 1.15 1- 2= -1910 1- 8= 1573 2- 8= -334 10-12= 1206 BC: 2x4 DF 818BTR SPACED 24.0' 0.C. WEBS: 2x4 DF STAND 3. 4= -2737 9- 0= 487 9- 3= 847 12- 5= 186 3. 4= .2503 9.10= 2487 9- 3= -109 12- 5= -186 LOADING TC LATERAL SUPPORT <= 12'OC. UON. LL( 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF 4- 5= -2476 11-12= 23 3-10= -230 12- 8= -644 BC LATERAL SUPPORT <= 12"OG. (ION. DI. ON BOTTOM CHORD = 10.0 PSF 5- 6= -1303 12.13= 1628 4.10= -239 6-13= 142 TOTAL LOAD = 42.0 PSF 6- 7= -1930 13- 7= 1631 11-10= 15 LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL REQUIREMENTS OF IRC 2006 AND IBC 2006 NOT BEING MET. BEARINGS LOCATION REACTION REO'D AREA (SO. IN.) BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP 0'- 0.0' 1134 1.81 DF (625) AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. 27'- 0.0" 1134 1.81 OF (625) Design conforms to main windforce-resisting system and components and cladding criteria. Wind: 110 mph, h=15ft, TCDL=4.2,BCDL=6.0, ASCE 7-05, Enclosed, Cat.2, Exp.B, MWFRS, 13.06-00 13-06-00 interior zone, load duration factor=l.6 T Max Calculated Uplift: Left = -157 Right = -157 12 6.00l . 7x7.7 J6.00 5 i 2.5x3.4 5.5' 2.5x3.4 2.5x3.4 'C��0 PROpk. 6,c) aG1NEfi /0y 3x4.3 - �kr Q P r- 4x4.3 7x9.4 _ . 9 • OREGON P, J o 3x4.3 Q e O C 1 ee 8 11 12 13 ** 7 , I TO 6,� V 5.5x6 a3.00 2.5x3.4 3x11.9 2.5x3.4 4x4.3 0 R[R �O ** For hanger specs. - See approvedplans ** For hanger specs. - See approvedplans T R. C P� 9PP 9PP 9�2t/OG 4 y I EXPIRES 12/31/091 1-11-08 8-00-00 17-00-08 27-00-00 R• CA Scale: 1!4' 0'~ OF WMS I/ C) JOB NAME: 9939-JR JOHNSON-VILLAGE APTS - 8-VAULT •rw� C CAD WARNINGS: General Notes,unless otherwise noted: C.'Q ry3 ►• . +1- _ E' 1.Read ell General Notes and Warnings before construction of busses. 1. Design to support loads as shown. t 2.Builder and erection contractor should be advised of all General Notes and 2. DesI�n assumes the top and bottom chords to be laterally braced at s! FILE NO. : B-VAULT Warnings before construction commences. 2'-0 o.c.and at 10'-0'o.c.respectively unless braced throughout their 3.2•4 compression web bracing must be installed where shown 4 length by contiguous sheathing. - 4.All lateral force rasleting dements ouch as temporary and permanent bracing, a. 2x[meaoftrbridgingor lateral bract required where respective ** DATE: 9/22/2008 must be designed and provideddesigner of complete structure. 5 Design Installationigsu es r Is trussesthe are t o used in the on-o a environment,ns. 17778 4� t. by g c 5. a assuor merys ys u be used anon-cortosive �1G"=' Corload sho should be tip li responsibility toa confor such bracing.rand are assumes bearingr of use. �. 5. No load be applied to any component until all bracing and 6. De ass fun at all supports shown.Shim or wedge if DES. BY: DS fasteners ere complete,and at no time should any loads greater than design necessary. laade be applied to any component. 7.8. Plates shall bees�ted oanebotifageface ofWsss andplaced so their center 1 , . 6.CompuTms has no control over and assumes no responsibility for the Ones coincide with joint center lines. 8t/0 ' SEQ. : 4096768fabrication,handling.ehlpnent and Installation of components. 9. Digits indicate size of plate in inches. 7.This design Is furnished subject to the limitations on truss designs set forth 10.For basic design values of the CompuTrus Plate see ESR-25291ICB0-4211 [E XPIRES TPI In H1B4 1 or TPIAYTCA In SCSI copies of which will be furnished 11.All plates are Ere"C-series unless otherwise indicated. 6/10/09 by CompuTms upon request. I1IIIIIII1IIII CompuTr'us Inc. This design prepared from computer input by IIIIIIIIIIIIIIIIIIIIIIIIIIIIIII1111 1III IIII Trans ID: 11662 PACIFIC LUMBER / BC 7.4.1T(1L)-E LUMBER SPECIFICATIONS TRUSS SPAN 25'- 0.5" IBC 2006 SINGLE MEMBER FORCES 4WR/GDF/C8=1.25 TCM TC: 2x4 DF M1&8TR LOAD DURATION INCREASE = 1.15 1. 2= -2113 7- 8= 193 7- 8= -1666 10-1 = 1588 BC: 2x4 OF SPACED 24.0" O.C. 2- 3= -2184 4 4 8-10= 1938 1- 8= 1666 10- 4= 1588 STAND; WEBS: 2x4 DF STAND; 3- 4= -2159 9-11= 20 8- 2= -324 11- 4= -126 2x6 DF #2 A LOADING 4- 5= -1187 11-12= 1529 2-10= 24 11- 5= -649 LL( 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF 5- 6= -1817 12- 6= 1532 3-10= -237 5-12= 142 TC LATERAL SUPPORT <= 12"0C. UON. DL ON BOTTOM CHORD = 10.0 PSF BC LATERAL SUPPORT <= 12'0C. UON. TOTAL LOAD = 42.0 PSF 9-10= 16 LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL REQUIREMENTS OF IRC 2006 AND IBC 2006 NOT BEING MET. BEARINGS LOCATION REACTION REQ'D AREA (SQ. IN.) BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP 0'- 0.0' 1052 1.68 DF (625) AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. 25'- 6.0" 1080 1.73 DF (625) Design conforms to main windforce-resisting system and components and cladding criteria. Wind: 110 mph, h=15ft, TCDL=4.2,BCDL=6.0, ASCE 7-05, Enclosed, Cat.2, Exp.8, MWFRS, interior zone, load duration factor=l.6 __ 12-00-00 13-06-00 Max Calculated Uplift: Left = -152 Right = -150 1. 1- 12 7x7.7 12 6.00 V �16.00 4 2.5x3.4 2.5x3.4 2.Sx3.4 5����0 PROF%c'rSi to 4;'" F� O2r at 3x7.7 .t. o� 7x7.7 e �� " �� , 3x9.4 a • OREGON �47 J 9 11 i2 ** 6 oo !I �p@E'R e,,' (5-1 2.5x3.4 2.5x3.4 3x9.4 2.5x9.4 4x4.3 - 3.oo Telq- T R- G it• 12 l ** For hanger specs. - See approved r ^ c l 0G 8.05-08 17-00-08 ,. EXPIRES 12/31/091 I- • 25-06-00 y 1 .. CA41? Q��oF was 1/4f% Scale: 1/4"^ r ' e JOB NAME: 9939-JR JOHNSON-VILLAGE APTS - C-VAULT `w+ ll�' yy WARNINGS: 3. •$ L General Notes,unless otherwise noted: . Y' . 1.Read all General Notes and Warnings before construction of busses. 1. Design to support loads as shown. .41. .N 2.Builder and erection contractor should ea advised of all General Notes and 2. Design ,end es the lop and bottom chords to be laterally braced at 7.FILE NO.: C-VAULT Warnings before construction commences. 7-0'o.e.and at 10'-0- ea respectively unless braced throughout their 3.2r4 compression web bracing must be Installed where shown+. length by ri continuous sheathing. Y f.;•.,,- a.All lateral force resisting aliment,such as temporary end permanent bracing, 3. 2x Imaael bridging or lateral bracing required where shown++ DATE: 9/22/2008 must be designed and provided by designer of complete structure. 4. DesignInstallation na s of a trssusses ss the are to be usedlity of the respective contractor. 4 17778�� /r 5. and are assumes ys ondses use. M arem-corrosroe environment, 1,Y J,iL`'rV Co shs assumes be ap no responsibility toyco on such bracing. and nfor me full bearing ofg at �, 5. No load are complete,l ,and to any ti mp howl anal leer all endnh end 8. Design assumes fill bearing at all supports shown.Shim or wedge x DES. 8Y: DS fasten be enany comp no time should any loads greater than design necessary. aT��.� AL loads be applied to any component. 8, edges assumes adequate on drainage IS provided. ION AL CompuTrus has no control over and assumes no responsibility for the 8. Plates shall with join on bothrlines.faces oPtruss,and placed so their center 9I17 Q SEO, : 4096769 Fabrication,handling,shipment and installation of components. lines coincidei With joint in inches. 7.Thin design Is furnished subject to the limitations on toss designs set forth 9g Digits basic indicate size o values of in by TPI in NIBA1 or TPIAWTCA In SCSI copiesg A.All are the COmouTrus Plate sae d$R-2529AC8Dd211 ofwhkh will be furnished 11.All plates are a•C"series unless otherwise indicated. EXPIRES 6/10/09 by CompuTrus upon request. iiiimpriv III IIIIIIIIACompuTrus Inc. This design prepared from computer input by IIIIIIIIIIIIIIIIIIIIIIIIIIIIII11 IIIII'll Trans ID: 11662 PACIFIC LUMBER / BC 7.4.1Tf1L1-Z LUMBER SPECIFICATIONS TRUSS SPAN 25'- 0.5" IBC 2006 SINGLE MEMBER FORCES 4WR/GDF/Cq=1.25 TCM IC: 2x4 OF e18BTR LOAD DURATION INCREASE = 1.15 1- 2= -2113 7- 8= 193 7- 1= -1073 10-11= 1090 BC: 2x4 DF M18BTR SPACED 24.0' O.C. 2- 3= -2184 8-10= 1938 1- 8= 1666 10- 4= 1588 WEBS: 2x4 DF STAND; 3- 4= -2159 9-11= 20 8- 2= .324 11- 4= -126 2x6 DF M2 A LOADING 4. 5= -1187 11-12= 1529 2-10= 24 11- 5= -649 LL( 25.0)+0L( 7.0) ON TOP CHORD = 32.0 PSF 5- 8= -1817 12- 8= 1532 3-10= -237 5-12= 142 TC LATERAL SUPPORT <= 12'0C. UON. DL ON BOTTOM CHORD = 10.0 PSF BC LATERAL SUPPORT <= 12'OC. UON. TOTAL LOAD = 42.0 PSF 9-10= 16 C-1x2.6 or equal at non-structural LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL vertical members (uon). REOUIREMENTS OF IRC 2008 AND IBC 2006 NOT BEING MET. BEARINGS LOCATION REACTION REO'D AREA (SO. IN.) BOTTOM CHORD CHECKED FOR 1OPSF LIVE LOAD. TOP 0'- 0.0" 1052 1.68 OF (625) AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. 25'- 6.0' 1080 1.73 OF (625) Design conforms to main windforce-resisting system and components and cladding criteria. Wind: 110 mph, h=15ft, TCDL=4.2,BCOL=6.0, ASCE 7-05, Enclosed, Cat.2, Exp.B, MWFRS, interior zone, load duration factor=1.6 12.00-00 13-08-00 _ _ Max Calculated Uplift: Left = -152 Right = -150 12 7x7.7 12 6.00U- �16.00 4 2,5x3.4 5E' as 2 2.5x3.4 .5x3.4 c,<,PE)PROFFSSi e.iiiiiiiiiiagraimmumniii., (e., Eg oyr 3x7.7 o /�b 7x7.7 c • ¢� �� 7AA 3x9.4 f -- O � �hTaREGC)N�0) 2.5x3.4 n II 12 ** e c �0 •�RER '' Ov • 2.5x3.4 3x8.4 2.5x3.4 4x4.3 l� RQ "3.00 R. C�` 12 ** For hanger specs. - See approved p19 $truv l l y EXPIRES 12/31/091 8-05-08 17-00-08 .1.- b 25-06-00 g• CAk,, � �oFwAsy7ti 7� JOB Scale: 114^ r ` JOB NAME: 9939-JR JOHNSON-VILLAGE APTS - D-VAULT GE aw+ A t O �' ro WARNINGS: General Notes,unless otherwise noted: r.1004 • % t.Read all General Notes and Warnings before construction of trusses. 1. Design to support loads as shown. _ '. 2.Builder and erection contractor should be advised of all General Notes and 2. Design assumes the top and bottom chords to be laterally braced at y FILE NO. : D-VAULT GE Warnings before construction commences. 2'-0 o.c.and at 10'-0-o.c.respectively unless braced throughout their '�pr, 3.2sa compression web bracing must be Installed when shown a. length by continuous sheathing. 4.All lateral force resisting elements such as temporary and permanent bracing, 3. In2x Impact bridging or lateral bracing required the where shown+a DATE: 9/22/2008 must be designed and provided by designer of complete stwcture. 4. assumesInstallation of truss is the responsibility be useds of non-corrosivec oe rtor. . 16 1771 CompuTrue assumes no responsibility for such bracing. 5. and Design "d trusses are use. In a environment, 7- n jfftl` S. Mn load should be applied to any "r s are Incss"dry full i of pp component until to a all bracing and 6. Design assumes full bearing at all supports shown.Shim or wedge 6 DES. BY: DS fasteners are complete,and et no time should any loads greater than design necessary. A s...�r loads be applied to any component. 7. Design assumes adequate drainage Is provided. ANAL V.rampuTws has no control over and assumes no responsibility for Me 8. Plates shall be locatedJoint on both fades of truss,and placed so their center 9/Zt/0` . f SEQ. : 4096770 fabrication,handling,shipment and installation of components. lines cioincide withsizeofpate in nliche 7.This design Is furnished subject8. Digit basiccidesi size slate in inches. - g copies of which ctwee designs forts 10.For designvalues ethelesslouTrus Plate see dSR-2529/ICBOd2t1 by Co p ln,s1 prnrequtt:A In SCSI copies ol will be furnished 11.All plates are�le-C'series unless otherwise indicated. EXPIRES 6/10/09 by GempuTws upon request. --Ilia, 41111Pr- • IIIIIIIIIIIIII / CompuTr'us Inc. This design prepared from computer input by IIIIIII'IIIIIIIIII'IIIIIIIIIIIIII1IIIllllllll Trans ID: 11662 PACIFIC LUMBER / BC Trans (111-Z LUMBER SPECIFICATIONS TRUSS SPAN 24'- 0.0' IBC 2006 SINGLE MEMBER FORCES 4WR/GOF/Cq=1.25 TCM TC: 2x4 OF N1&BTR LOAD DURATION INCREASE = 1.15 1- 2= 0 2. 8= 357 8- 3= 133 BC: 2z4 DF N18BTR SPACED 24.0' O.C. 2. 3= -477 8- 9= 354 3- 9= -815 WEBS: 2x4 OF STAND 3- 4= 262 9-10= -12 9- 4= -447 LOADING 4- 5= 261 10. 8= -19 9- 5= -194 TC LATERAL SUPPORT <= 12'0C. UGH. LL( 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF 5- 6= 133 5-10= -291 BC LATERAL SUPPORT <= 12'OC. UON. DL ON BOTTOM CHORD = 10.0 PSF 6- 7= 0 TOTAL LOAD = 42.0 PSF OVERHANGS: 24.0' 24.0' Reactions: 581 387 LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL BEARINGS REQUIREMENTS OF IRC 2006 AND IBC 2006 NOT BEING MET. LOCATION REACTION REO'D AREA (SO. IN.) C-1x2.6 or equal at non-structural BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP 0'- 0.0' 427 0.68 DF (625) vertical members (uon). AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. 12'- 0.0' 983 1.54 DF (625) 17'- 8.6' 401 0.64 DF (625) 24'- 0.0' 225 0.36 DF (625) Design conforms to main windforce-resisting system and components and cladding criteria. Wind: 110 mph, h=15ft, TCDL=4.2,BCOL=6.0, ASCE 7-05, Enclosed, Cat.2, Exp.B, MWFRS, 12-00-00 12-00-00 interior zone, load duration factor=l.6 f T ---- -- f Max Calculated Uplift: Left = -119 Right = -88 12 4x4.3 12 INT. = -107 @ 12'- 0.0' 6.00I� ---J6.00 INT. = -59 @ 17'- 8.6' 4.r� N 2.5x6+ 2.5x6 .y ��P>vD PRpFFSs, 6:04 �,.yG1NEA' �Oy :.Cr y-- o . m B �� 2.Sx4.3 ❑ o �TOREGONh. f 6• 2.5x3.4 0.25' 2.5x3.4 2.5x4.3 16 ��• �RE �v 5.5x7.7(S) f T'R. C P'?" PROVIDE FULL CONTINUOUS BEARING 9/2/f0 1 k y 1 EXPIRES 12/31/091 11-06-08 12-05-08 2-00-00 24-00-00 J. 2-00-00 R. Cq�Q,, Scale: 1/4' '-or OF WASy�� ��-O JOB NAME: 9939-JR JOHNSON-VILLAGE APTS - E-GE t , i�' 1ptCj, �eA WARNINGS: General Notes,unless otherwise noted: • yT '}- I. ` -- 1.Read all General Notes and Warnings before construction of trusses. 1, Design to support loads as shown. ' . 2.Builder and erection contactor should be advised of ail General Notes and 2. Design assumes the top and bottom chords to be laterally braced at !. FILE NO. : E-G E warnings before construction commences. 2'-0 o.c.and at 10•-0-o.c.respectively unless braced throughout their ,'IV;7, D.2x4 compresslon web bracing must be Installed where shown.. tenpin by continuous sheathing. ' All lateral force resisting elements such as temporary and permanent bracing, 3. in rmppaaof bo s Is lateral bedrr,�gg requited where shown 4- 4. �Q DATE: 9/22/2008 must be designed and provided by designer of complete structure. 5. Design sign as of deer Is the are to used of the on-coodve a environment, 9 ��17`t 7 � CompuTrus assures no responsibility for such bracing. 5. a assumes ye trusses use.be In a non-corrosive AIL. �U and are for-dry full condition' t 5.No load sere c bem le applied to any time should anal after all bracing and 6. Design assumes fun bearing at all supports shown.Shim or wedge H DES. BY: DS loads fasteners pp complete,and at no t. should any bade greater than design necessary. eo loads be applied to any component. 7. NAL 8. Plates shallube located On both drainage Is truss and placed so their center 91 /(1 ,. , - e.Compstrue has no control over and assumes no responsibility for the lines coincide with Joint center lines. /!2l/ • ' SEQ. : 4096771 fabrication,handling,shipment and Installation of components. 9. Digits indicate size of plate in Inches. 7.This design Is furnished subject to the limitations on truss designs ant forth 10.For basic design n values of the CompuTrus Plate see ESR-2529/ICBO-4211 by TPI In HIB-g1 or TPNNTCA In BCSI copies of which will be furnished 11.All plates are the-C-series unless otherwise Indicated. ' EXPIRES 6/10/09 I by CompuTrus upon request. 4 -soy 411111P"` IIliiiIIIIIII Compuli-us Inc. This design prepared from computer input by IIIIIIIIIIIIIIIII111111IIIIIIIIII'IIIIIIIIII Trans ID: 11662 PACIFIC LUMBER / BC 7.4.1T(1L1-E LUMBER SPECIFICATIONS TRUSS SPAN 24'- 0.0" TC: 2x4 OF 41&BTR LOAD DURATION INCREASE = 1.15 IBC 2006 SINGLE MEMBER FORCES 4WR1-348Cq=1.25 TCM BC: 2x4 DF 0/18BTR SPACED 24.0" O.C. 2- 2= 0 2- 8= 140E 3- 4= -348 WEBS: 2x4 DF STAND . 3= -1667 8- 6= 917 8- 4= 567 LOADING 3- 4= -1478 9- = 1403 4. 9= 567 TC LATERAL SUPPORT <= 12"OC. UON. LL( 25.0)+DL( 7.0) ON TOP CHORD = 32.0 PSF 4- 6- -1478 9- 5= -348 BC LATERAL SUPPORT <= 12'OC. UON. DL ON BOTTOM CHORD = 10.0 PSF 5- = -1667 TOTAL LOAD = 42.0 PSF 6- 7= 0 OVERHANGS: 24,0" 24.0" Reactions: 1136 1136 BOTTOM CHORD CHECKED FOR A 20 PSF LIMITED STORAGE LIVE LOAD AT LOCATION SPECIFIED BY IAC 2006 AND IBC 2006. BEARINGS LOCATION REACTION REO'D AREA (SO. IN.) BOTTOM CHORD CHECKED FOR 1DPSF LIVE LOAD. TOP 0'- 0.0" 1008 1.61 DF (625) AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. 24'- 0.0" 1008 1.61 DF (625) Design conforms to main windforce-resisting system and components and cladding criteria. Wind: 110 mph, h=l5ft, TCDL=4.2,BCDL=6.0, ASCE 7-05, Enclosed, Cat.2, Exp.B, MWFRS, interior zone, load duration factor=1.6 Max Calculated Uplift: Left = -186 Right = -186 12-00-00 12-00-00 T T 12 4x6 72 6.00L- . 16,00 444 0' 2.5x3.4 2.5x3.4 � E11 0 NROF�cSs/O Co OREGON +%ao oo i� �ORER�,�� o T �� 4xa.3 R. C &0.25" 2.Sx4.3 4x4.3� 9�jt��C T `?- s.sx6(S) 1 EXPIRES 12/31/09 l b b .1 2-00-00 24-00-00 2-00-00 R C,g Scale: 1/4" of wAsyi • , ��- JOB NAME: 9939-JR JOHNSON-VILLAGE APTS - F -"����� ono , . WARNINGS: General Notes,unless otherwise noted: y I.1.Read all General Notes and Warnings before construction of busses. 1. Design to support loads as shown. jr,'F� FILE N0. : F 2.Builder and erection contractor should be advised of all General Notes and 2. Design assumes the top and bottom chords to be laterally braced at ,0 Warnings before construction commences. 2'-0 o.c.and at 10'-0-o.c.respectively unless braced throughout their • .. y;. 3.2s4 compression web bracing must be Installed where shown a length by continuous sheathing. 4.All lateral fore,resisting elements ouch as temporary and permanent bracing, 3. 2x impact bridging or lateral bracing required where shown++ ""•`r=:�%'T A, DATE: 9/22/2008 must be designed and provided by designer of complete structure. 5. Design Installation of assumess trusses is the responsibility n be u of the on-coctive contractor.tnr. q 17778 CompuTrus assumes no responsibility for such bracing. 5. and area -dryon are use.ee used In a non-conoslve environment, ?' beand nfor-drycondition" bia ri gl 5.No load should re c m applied to any component unMl after all beta and 6. n Design s assumes kill bearing al all supports shown.Shim or wedge �' �DES. BY: DSfasteners are complete,end at no time should any babe than9remr design necessary. x ��� Cf loads be applied to any component 7. Design assumes adequate drainage Is provided. ' e.CompuTrus has no control over and assumes no responsibility for the 8. Plates shall be located on both faces oruss,and placed so their center 9/2l/�('i ' v s SEQ. : 4096772 fabrication,handling,shipment lines coincide with joint center lines. pment and installation of n trussents. 9 Digits indicate size of plate in inches. 7. This design is furnished subject to the Ilmitadons an truss designs set forth 10.For basic design values of the CompuTrus Plate see ESR-2529/ICBOd211 n by Tp1 pNgai91 or TPINu.CA in SCSI copies of which will be furnished 11.All plates are the-C-series unless otherwise indicated. (EXPIRES 6/10/09 I by CompuTms upon request. IIIII I III ComPuTc Inc.us � C. This design prepared from computer input by I111111 l III IIIII IIII I II IIII IIIII II IIII Trans ID' 11662 PACIFIC LUMBER / BC 7.4.1TI1L1-E LUMBER SPECIFICATIONS 24-00-00 GIRDER SUPPORTING 27-00-00 IBC 2006 2 MEMBER FORCES 4WRIGOFICq=1.25 TCM TC: 2x4 DF WIABTR LOAD DURATION INCREASE = 1.15 4 1- 2= -12298 1. 8= 10756 8- 2= 2122 5-11= 3010 BC: 2x6 OF SS 2- 3= -10180 8- 9= 10682 2- 9= -1932 11- 6= -1932 WEBS: 2x4 DF STAND; LOADING 3- 4= -7836 9-10= 8902 9- 3= 3010 6-12= 2122 2x6 DF 1/2 A TC UNIF LL( 50.0)4DL( 14.0)= 64.0 PLF 0'. 0.0' TO 24'- 0.0' V 4- 5= -7836 10.11= 8902 3-10= -2950 BC UNIF LL( 312.5)+DL( 232.5)= 545.0 PLF 0'- 0.0' TO 24'- 0.0' V 5- 6= -10180 11-12= 10682 10- 4= 6752 iC LATERAL SUPPORT <= 12'OC. UON, 6- 7= -12298 12- 7= 10756 10- 5= -2950 BC LATERAL SUPPORT <= 12'OC. UON. LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL REQUIREMENTS OF IRC 2006 AND IBC 2006 NOT BEING MET. BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD, TOP BEARINGS AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. LOCATION REACTION REO'D AREA (SQ. IN.) , ( 2 ) complete trusses required. 24'- 0.0" 7308 11.69 DF (625) Join together 2 ply with 16d Common nails staggered at 12' oc throughout 2x4 top chords, Design conforms to main windforce-resisting 5' oc throughout 2x6 bottom chords, system and components and cladding criteria. 12' oc throughout webs. Note: Stagger splices on adjacent members. Wind: 110 mph, h=15ft, TCDL=4.2,BCOL=6.0, ASCE 7-05, Enclosed, Cat.2, Exp.B, MWFRS, interior zone, load duration factor=1.6 Max Calculated Uplift: Left = -1009 Right = -1009 11-09-01 11.09.01 12� 7x7.7 12 6.00 4 �16.00 4x7.7 4x7.7 10 4;14.k �ssD PROF�rS,s 2.5x7,7 2.5x7.7 e.�g �G1N F 'c IIII `�• �- 5.5x11.9 S.Sx11.9 :;eCe/�^^ $ B mg --- - - __ m il �- �TOREGONNn c 1 e a -10 II 12 -iff o y , ER 6' w 2,5x6 5.5x6 7x9.4 5.5x7.7(S)5.5x6 2.5x6 �T7- CP"C1- 9/it/OB MFLx.`F REQiIIRED AT HEEL(S1, • J, b y EXPIRES 12/31/091 14-00-00 10.00.00 y 24-00-00 y R. CAA, Scale: 1/4' O`�► Of WASy4 fCI JOB NAME: 9939-JR JOHNSON-VILLAGE APTS - G-GIRDER t' . Ai'' OK ,o ts a.r4 y i-'WARNINGS: General Notes,unless otherwise noted: T , Z L. 1.Reed all General Notes and Warnings before construction of buses- 1. Design to support loads as shown. . 2.Builder end erection contractor should be advised of all General Notes and 2. Design assumes the top and bottom chords to be laterally braced at a r- FILE NO. : G-GIRDER warnings before construction commences. 2'-0 o.c.and at 10'-0"o.c.respectively unless braced throughout their f`; 3. aaa compression web bracing must be Installed where shown w length by continuous sheathing. t 4.All lateral resisting element.such as temporary and permanent bracing, 3. In2x m�ct bridging or lateral bracing ityoft required where ++ - DATE: 9/22/2008 must be designed and provideddesigner of co 4. Instal atlon of buss Is the responsibility of the respective contractor. by g "cing,structure. 5. Design assumes trusses are to use. used in a non-corrosive environment, R 1.,_T 7 78�� Co lead e assumes no responsibility for such bracing. and are for"dry condition"of use. k. C 4STe 5. No load should be applied to any component until after all bracing and 6. Design assumes full bearing at all supports shown.Shin or wedge If -/: DES. BY: DS fasteners are complete,and at no time should any bads greater than design 7 DDe weary. e� yf eLT`Sce loads be applied to any component. 8. Plates shall be local on both faces'or t ssandplaced so their center p q j `V��s-compuTms has no control over and assumes no responsibility for the /I(t/Qt� Y a SEQ. : 4096773 fabrication,handling,shipmentand Installation of components. IlnescIdcateside izeth ofpnt ateinIr nche. 9. Digits Indicatedesign e plate in Inches. 7.This in gnHI -s1furnished TPIITCA In to limitations of s tress designs het forth 10.1 Forllbasic the C"values of the lesslouTru9 Platesee dSR•2529/ICBOd211 / 0 9 by Co p uln,. or n requesA In SCSI copies whicho/ will be furnished 11.All plates are the"C'series unless otherwise indicated. EXPIRES 6l1 V(QJ by CampuTms upon ragueat. 11111111111 CampuTrus Inc. This design prepared from computer input by IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIiiIIIIIIII Trans ID: 11662 PACIFIC LUMBER / BC 7.4.1T(lL1-E LUMBER SPECIFICATIONS 23-06-00 GIRDER SUPPORTING 27.00.00 IBC 2006 2 MEMBER FORCES 4WR/GDF/Cq=1.25 TCM TC: 2x4 DF #1&BTR LOAD DURATION INCREASE = 1.15 + 1- 2= -12000 1- 8= 10492 8- 2= 2066 5.11= 2936 BC: 2x6 DF SS WEBS: 2x4 DF STAND; LOADING 2- 3= -9946 8- 9= 10418 2- 9= -1868 11- 6= -1868 2x6 DF #2 A TC UNIF LL( 50.0)+DL( 14.0)= 64.0 PLF 0'- 0.0' TO 23'- 6.0" V 4- 5= -7662 0-11= 8694 9- 0= 2 6-12= 2066 BC UNIF LL( 312.5)+DL( 232.51= 545.0 PLF 0'- 0.0' TO 23'- 6.0' V 5- 6= -7662 10-1 = 8694 3-10= •66676 00 TC LATERAL SUPPORT <= 12'0C. UON. 5- 6= -9946 11.12= 10418 10- 4= 6600 BC LATERAL SUPPORT <= 12'0C. UON. LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL 6- 7= -12000 12- 7= 10492 10- 5= -2878 REQUIREMENTS OF IRC 2006 AND IBC 2006 NOT BEING MET. BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP BEARINGS ANO BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. LOCATION REACTION REO'D AREA (SO. IN.) 0'- 0.0" 7156 11.45 DF (625) ( 2 ) complete trusses required. 23'- 6.0' 7158 11.45 DF (625) Join together 2 ply with 16d Common nails staggered at 12' oc throughout 2x4 top chords, Design conforms to main windforce-resisting XX5' oc throughout 2x6 bottom chords, system and components and cladding criteria. 12' oc throughout webs. Note: Stagger splices on adjacent members. Wind: 110 mph, h=15ft, TCDL=4.2,8CDL=6.0, ASCE 7-05, Enclosed, Cat.2, Exp.B, MWFRS, interior zone, load duration factor=1.6 Max Calculated Uplift: Left = -988 Right = -988 11-06-01 11-06-01 12 7x7.7 12 6.00� '.--.16.00 • d ' Iv. 4x6 4x6 5.5' 40. A ,,, :, PRQFFtS 2.5x7,7 2.5x7,7 (2 k, G1 NE' , s'Q, 17 .� �^ 5.5x11.9 5.5x11,9 " v di "- � iae - -- ra o o _. __ lc, O OREGON�°° c I ' 8 s to 1t 12 QW i p �OIRER6"° v 2.5x6 5.Sx6 5.5x7.7(S) 5.5x6 2.5x6 i" �Q-O 7x9.4 9I2al/AA R• GP WFIIGF RFOIIIRFn AT HFFI(8). - )' -_ y EXPIRES 12/31/09 13-06-00 10-00-00 y 23-06-00 l ¢e C.r4* 0eN-�Of WASyAt, 0 Scale: 1/4° JOB NAME: 9939-JR JOHNSON-VILLAGE APTS - H-GIRDER T WARNINGS: General Notes,unless otherwise noted: '"P u I-' al Z L. 1.Read all General Notes and Warnings before construction of busses. 1. Design to support loads as shown. 2.Builder and erection contractor should be advised of air General Notes and 2. Design assumes the lop and bottom chords to be laterallybraced at - e .,,e.. FILE NO. : H-GIRDER Warnings before construction commences. 7-0 o.c.and at 10'-0"o.c.respectively unless braced throughout their h sheathing. ✓_-3.Ira compression web bracing must be Installed b d whereshown+. y continuous 9- 4.All lateral force resisting elements such as temporary end permanent baring, 3 In2x rmplebo frpus or lateral resbraciponsibility o required where tie contractor+« DATE: 9/22/2008 must be deal ned and rovided des) ner of corn lete structure. 5. D esig hers of es tr s the rte o b tidy I ae rescocgve envron g p g c 5. and ar aor'd ys ondses am to ee used In anon-corrosive environment, '�j4.661S0 r1,,+r77Mr�.{l Lomadshopanis assumes no responsibility oacomponent such bracing. and are for'dryfull bear of use. CIJ1 L•-V 5. No load should be to any component until after all bracing end 6. Design assumes bearing at all supports shown.Shim or wedge K v. n -/- DES. BY: DS fasteners an complete,and at no time should any load,greatest an design necessary. `tYsttAl T�J1V loads be applied to any component. 7. Design assumes odeaquete drainage is Drovided. I, f�Aa•. 8.CompuTrua has no control over and assumes no responsibility for the 8. Plates shall e located olr body faces sof buss,end placed so their center 9/'f/O�, SEQ. : 4096774 fabrication,handling,shipment and installation of components. lines coincidetwith jointplatea center lines. 9. Digits indicatedesi size of in inches.Com 1.ibis design is furnished subject to the limitationsasof on truss designs he forth 10.For basic are values a the CompuTNS Plate see ESR-2529/ICBOd211 I(�".'.by Tpl In HI941 or TPIMRCA in SCSI copies of which will be furnished 11.All plates are me"C"series unless otherwise Indicated. [EXPIRES 6/10/09 J by CompuTrus upon request. L