Loading...
Report (10) iP2o/7 .-e0048 /`o 16 tfal/ Generated by COMcheck-Web Software Envelope Compliance Certificate Section 1: Project Information Energy Code:2009 IECC ' Project Title: Brookside Memory Care Project Type: New Construction Construction Site: Owner/Agent: Designer/Contractor: Building Location(for weather data): Tigard,Oregon Climate Zone: 4c Vertical Glazing/Wall Area Pct.: 21% Building Use:Activity Types) Floor Area 1-Residential Care Facility(Multifamily) :Nonresidential 15615 2-2nd Floor Apartment(Multifamily):Nonresidential 712 Section 2: Envelope Assemblies and Requirements Checklist Envelope PASSES:Design 4%better than code. Envelope Assemblies: Component Name/Description Gross Cavity Cont. Proposed Budget Area or R-Value R-Value U-Factor U-Factorial Perimeter Roof:Attic Roof,Wood Joists,[Bldg. Use 1 -Residential Care 15615 38.0 38.0 0.013 0.027 Facility] Ext.Wall:Wood-Framed, 16in.o.c.,[Bldg.Use 1 - Residential Care 10500 21.0 21.0 0.025 0.064 Facility] Window:Vinyl Frame,Pert.Type:Energy code default,Double 1950 --- --- 0.550 0.350 Pane with Low-E,Clear,SHGC 0.70,[Bldg. Use 1 -Residential Care Facility] Door:,Perf.Type:Energy code default,Double Pane with Low-E, 336 --- --- 0.800 0.800 Clear,SHGC 0.70,[Bldg.Use 1 -Residential Care Facility] Ext.Wall:Wood-Framed, 16in.o.c.,[Bldg.Use 2-2nd Floor 576 21.0 21.0 0.025 0.064 Apartment] Floor:Wood-Framed,[Bldg.Use 1 - Residential Care Facility] 15615 38.0 38.0 0.013 0.033 (a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements. Air Leakage, Component Certification, and Vapor Retarder Requirements: ® 1. All joints and penetrations are caulked,gasketed or covered with a moisture vapor-permeable wrapping material installed in accordance with the manufacturer's installation instructions. ® 2. Windows,doors,and skylights certified as meeting leakage requirements. ® 3. Component R-values&U-factors labeled as certified. ® 4. No roof insulation is installed on a suspended ceiling with removable ceiling panels. ® 5. 'Other'components have supporting documentation for proposed U-Factors. ® 6. Insulation installed according to manufacturer's instructions,in substantial contact with the surface being insulated,and in a manner that achieves the rated R-value without compressing the insulation. ® 7. Stair,elevator shaft vents,and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized dampers. ® 8. Cargo doors and loading dock doors are weather sealed. i 1 ® 9. Recessed lighting fixtures installed in the building envelope are Type IC rated as meeting ASTM E283,are sealed with gasket or caulk. ® 10.Building entrance doors have a vestibule equipped with self-closing devices. Exceptions: Project Title: Brookside Memory Care Report date:06/19/17 Data filename: Page 1 of 2 U Building entrances with revolving doors. ❑ Doors not intended to be used as a building entrance. • Doors that open directly from a space less than 3000 sq.ft.in area. ❑ Doors used primarily to facilitate vehicular movement or materials handling and adjacent personnel doors. U Doors opening directly from a sleeping/dwelling unit. Section 3: Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed envelope system has been designed to meet the 2009 IECC requirements in COMcheck-Web and to comply with the mandatory requirements in the Requirements Checklist. Edward Radulescu /Project Manager 5.18.17 Name-Title Signature Date Project Notes: New 42 Bed Memory Care Facility Project Title: Brookside Memory Care Report date:06/19/17 Data filename: Page 2 of 2