Loading...
Report (2) pm PM DESIGN GROUP, INC. 3860 Broadway Street, Suite 110 American Canyon, CA 94503 DESIGN CITY OF TIGARD Approved by Planning June 19, 2020 Date: 60 (i-2- 120 Initials: Sc. Samuel Copelan, Assistant Planner City of Tigard - Community Development Department 13125 SW Hall Blvd Tigard, OR 97223 ll/Jec2020 '001127 RE: CHASE BANK TI 11686 SW Pacific Way Tigard, OR 97223 PMDG JOB NO. JPM19015.0 RE: COMPLIANCE NARRATIVE Chapter 18.420 LANDSCAPING AND SCREENING 18.420.050 Screening Standards A. Screening standards are provided in Table 18.420.2 and illustrated in Figures 18.420.1 and 2. These standards must be met as required by the applicable development standards chapter in 18.200 Residential Development Standards or 18.300 Nonresidential Development Standards. B. The following additional requirements apply to the S-1 screening standard Table 18.420.2 Screening Standards Standard Minimum Requirements De.th Service areas: • Sight-obscuring fence or wall Roof-mounted equipment or utilities: S-1 N/A • Parapet wall or sight-obscuring structure Wall-mounted equipment or utilities: • Architecturally incorporated into building or sight-obscuring fence, wall, or structure • Rooftop units above Chase Bank and future marketing offices will be screened by existing parapet walls and gable roofs. No modifications are proposed to neither building elements and provide proper screening to comply with this code section, see photos. pmdg@pmdginc.com pmdginc.com 877.277.9193 f Ie parapet screen let parapet screen wall to remain wall to remain •., ..----e"4-----• 41)11r irkiXAN.,...„n•••, --AlliaigadO \ me`•µ • : lig. 1w t` Ili , (e)parapel scre< .. walls to remain et " Yx F a ... sue' Respectfully, Pedro McCracken DESIGN GROUP, INC. Adrian J. Mora - Assistant Project Manager pm PM DESIGN GROUP, INC. 3860 Broadway Street. Suite 110 American Canyon, CA 94503 DESIGN CITY OF TIGARD Approved by Planning June 19, 2020 Date: (0 f 2Z1� Initials: s� Samuel Copelan, Assistant Planner City of Tigard - Community Development Department 13125 SW Hall Blvd Tigard, OR 97223 RE: CHASE BANK TI 11686 SW Pacific Way Tigard, OR 97223 PMDG JOB NO. JPM19015.0 RE: COMPLIANCE NARRATIVE Chapter 18.420 LANDSCAPING AND SCREENING 18.420.050 Screening Standards A. Screening standards are provided in Table 18.420.2 and illustrated in Figures 18.420.1 and 2. These standards must be met as required by the applicable development standards chapter in 18.200 Residential Development Standards or 18.300 Nonresidential Development Standards. B. The following additional requirements apply to the S-1 screening standard Table 18.420.2 Screening Standards Standard Minimum Requirements Depth Service areas: • Sight-obscuring fence or wall Roof-mounted equipment or utilities: S-1 N/A • Parapet wall or sight-obscuring structure Wall-mounted equipment or utilities: • Architecturally incorporated into building or sight-obscuring fence, wall, or structure • Rooftop units above Chase Bank and future marketing offices will be screened by existing parapet walls and gable roofs. No modifications are proposed to neither building elements and provide proper screening to comply with this code section, see photos. pmdg@pmdginc.com pmdginc.com 877.277.9193 ie)parapet screen le)parapet screen wall to remain wall to remain f el mesuripi �--aa I x! -, :ate; t ..� l . n�;n,�wt I e walls to remain r Gi ' • ar `... �� 5 I \ C .— r- , - . \\ i \ \ lie, L i a f� 111 *..\‘ ,' -• 0,,,,,, ' .,.-.,. .• „.. ,.... ,. ,,), ,_ .,,....,.. „.. , ..... 4,,,,,,,, ,,... ..... Respectfully. Pedro McCracken DESIGN GROUP, INC. Adrian J. Mora Assistant Project Manager pb PM Design Group, Inc. / 6930 Destiny Drive,Suite 100 DESIGN Rocklin, CA.95677 P:916.303.4412 Architectural Solutions Group Transmittal RECEIVED JUN 15 2020 CITY OF TIGARD Date 06/15/20 BUILDING DIVISION To: Dianna Ornelas,Bldg. Division Services Supervisor From: Adrian Mora City of Tigard—Community Development RE: Chase Bank Tenant 13125 SW Hall Blvd. Improvement Tigard,OR 97223 Phone: 503-718-2439 Project JPM19015.0 (In Person Delivery) Number: Sent Via: Fax US Mail f For Your Use For Comment Fax — Number r Overnight As Requested ( For Revision Number I— Electronic iv For Approval _,_ High Priority of Pages t Quantity Date Description 3 6/8/20 1st Building Submittal Sets 2 - Structural Calculations 1 - Building Permit Application 2 6/8/20 ist Mechanical Submittal Sets 1 - Mechanical Permit Application 2 6/8/20 1c Electrical Submittal Sets 1 - Electrical Permit Application 3 6/8/20 1s`Civil Submittal Sets for site work 1 - Site Work Application Comments Hi Dianna— Our minor modification application(MMD2020-00019)was finally approved by Sam on 6/10/20 for the tenant improvements with minor site accessibility upgrades. Please disregard our previous plans(building,site,mechanical and electrical)and accept these updated sets as our formal 1`submittal. I understand Plumbing has been approved as of 6/5/20. Please process for plan check and provide fees at the earliest. If you have any questions,please contact me. Thank you Adrian Mora Assistant Project Manager 562-477-6281 Office Locations Sacramento • Portland • Phoenix • Dallas • San Francisco • Denver • Los Angeles www.pmdciinc.com