Report (2) pm PM DESIGN GROUP, INC.
3860 Broadway Street, Suite 110
American Canyon, CA 94503
DESIGN
CITY OF TIGARD
Approved by Planning
June 19, 2020 Date: 60 (i-2- 120
Initials: Sc.
Samuel Copelan, Assistant Planner
City of Tigard - Community Development Department
13125 SW Hall Blvd
Tigard, OR 97223
ll/Jec2020 '001127
RE: CHASE BANK TI
11686 SW Pacific Way
Tigard, OR 97223
PMDG JOB NO. JPM19015.0
RE: COMPLIANCE NARRATIVE
Chapter 18.420
LANDSCAPING AND SCREENING
18.420.050 Screening Standards
A. Screening standards are provided in Table 18.420.2 and illustrated in Figures 18.420.1 and 2.
These standards must be met as required by the applicable development standards chapter in
18.200 Residential Development Standards or 18.300 Nonresidential Development Standards.
B. The following additional requirements apply to the S-1 screening standard
Table 18.420.2
Screening Standards
Standard Minimum Requirements
De.th
Service areas:
• Sight-obscuring fence or wall
Roof-mounted equipment or utilities:
S-1 N/A • Parapet wall or sight-obscuring structure
Wall-mounted equipment or utilities:
• Architecturally incorporated into building or sight-obscuring fence, wall,
or structure
• Rooftop units above Chase Bank and future marketing offices will be screened by existing
parapet walls and gable roofs. No modifications are proposed to neither building
elements and provide proper screening to comply with this code section, see photos.
pmdg@pmdginc.com pmdginc.com 877.277.9193
f Ie parapet screen let parapet screen
wall to remain wall to remain
•.,
..----e"4-----• 41)11r irkiXAN.,...„n•••, --AlliaigadO
\ me`•µ • :
lig.
1w
t` Ili , (e)parapel scre<
.. walls to remain
et "
Yx F
a ... sue'
Respectfully,
Pedro McCracken DESIGN GROUP, INC.
Adrian J. Mora -
Assistant Project Manager
pm PM DESIGN GROUP, INC.
3860 Broadway Street. Suite 110
American Canyon, CA 94503
DESIGN
CITY OF TIGARD
Approved by Planning
June 19, 2020 Date: (0 f 2Z1�
Initials: s�
Samuel Copelan, Assistant Planner
City of Tigard - Community Development Department
13125 SW Hall Blvd
Tigard, OR 97223
RE: CHASE BANK TI
11686 SW Pacific Way
Tigard, OR 97223
PMDG JOB NO. JPM19015.0
RE: COMPLIANCE NARRATIVE
Chapter 18.420
LANDSCAPING AND SCREENING
18.420.050 Screening Standards
A. Screening standards are provided in Table 18.420.2 and illustrated in Figures 18.420.1 and 2.
These standards must be met as required by the applicable development standards chapter in
18.200 Residential Development Standards or 18.300 Nonresidential Development Standards.
B. The following additional requirements apply to the S-1 screening standard
Table 18.420.2
Screening Standards
Standard Minimum Requirements
Depth
Service areas:
• Sight-obscuring fence or wall
Roof-mounted equipment or utilities:
S-1 N/A • Parapet wall or sight-obscuring structure
Wall-mounted equipment or utilities:
• Architecturally incorporated into building or sight-obscuring fence, wall,
or structure
• Rooftop units above Chase Bank and future marketing offices will be screened by existing
parapet walls and gable roofs. No modifications are proposed to neither building
elements and provide proper screening to comply with this code section, see photos.
pmdg@pmdginc.com pmdginc.com 877.277.9193
ie)parapet screen le)parapet screen
wall to remain wall to remain
f el
mesuripi
�--aa I x! -, :ate; t
..� l . n�;n,�wt I e
walls to remain r
Gi '
• ar
`... �� 5
I
\ C .— r-
, - . \\ i \ \ lie,
L i
a f� 111
*..\‘ ,' -• 0,,,,,, ' .,.-.,. .• „.. ,....
,. ,,), ,_ .,,....,.. „.. , ..... 4,,,,,,,, ,,... .....
Respectfully.
Pedro McCracken DESIGN GROUP, INC.
Adrian J. Mora
Assistant Project Manager
pb PM Design Group, Inc.
/ 6930 Destiny Drive,Suite 100
DESIGN Rocklin, CA.95677
P:916.303.4412
Architectural
Solutions Group
Transmittal RECEIVED
JUN 15 2020
CITY OF TIGARD
Date 06/15/20 BUILDING DIVISION
To: Dianna Ornelas,Bldg. Division Services Supervisor From: Adrian Mora
City of Tigard—Community Development RE: Chase Bank Tenant
13125 SW Hall Blvd. Improvement
Tigard,OR 97223
Phone: 503-718-2439 Project JPM19015.0
(In Person Delivery) Number:
Sent Via:
Fax US Mail f For Your Use For Comment
Fax —
Number r Overnight As Requested ( For Revision
Number I— Electronic iv For Approval _,_ High Priority
of Pages t
Quantity Date Description
3 6/8/20 1st Building Submittal Sets
2 - Structural Calculations
1 - Building Permit Application
2 6/8/20 ist Mechanical Submittal Sets
1 - Mechanical Permit Application
2 6/8/20 1c Electrical Submittal Sets
1 - Electrical Permit Application
3 6/8/20 1s`Civil Submittal Sets for site work
1 - Site Work Application
Comments
Hi Dianna—
Our minor modification application(MMD2020-00019)was finally approved by Sam on 6/10/20 for the tenant
improvements with minor site accessibility upgrades. Please disregard our previous plans(building,site,mechanical and
electrical)and accept these updated sets as our formal 1`submittal. I understand Plumbing has been approved as of
6/5/20. Please process for plan check and provide fees at the earliest.
If you have any questions,please contact me.
Thank you
Adrian Mora
Assistant Project Manager
562-477-6281
Office Locations
Sacramento • Portland • Phoenix • Dallas • San Francisco • Denver • Los Angeles
www.pmdciinc.com