Loading...
Specifications i SHERMAN — ENGINEERING A 3151 NE SANDY BLVD.,.SUITE 100 INCPORTLAND,OR 97232 0-8876 JI ('� 1 PHONE (503) 23RS.COM L,--�� � SHERMANENGINEIILS.CiOM I Structural Calculations RECEIVED September 4, 2019 OFFICE copy April 3, 2020 APR 6 2020 CITY OF TIGARD BUILDING DIVISION MONTGOMERY PLAN �� i� 4-e-, Lot Armand Hts T `Tigarrd, OR 471A1°,&etsvA4*-- 10, ,a3' Prepared For: —E EXPIRES 6-30-20 i Suntel Design, Inc. 16865 Boones Ferry Rd. Lake Oswego, OR 97035 Subject Sheet No. Lateral: Loading LL1-LL5 Diaphragm/Wall Shear LL6-LL7 Overturning LL8 City of Tigard Approved Plans `(`RSA o)n— ccZ3y By 0- _ Date Li 13 zoza REVISION MONTGOMERY PLAN Lateral Load LL I S/1/19 I. Loading 2014 O55C I ,I Wind: Per ASCE 7-I 0 Basic Wind Speed= 120 Kat = 1.00 Exposure Category= B A = 1.00 Building Height= 19 I = 1.00 Roof Slope= 7:12 = 30.3' Zone Pressure ASP LC A51)pressure A 25.7 0.6 = 15.4 17.6 0.6 = 10.6 C 20.4 0.6 = 12.2 D 14.0 0.6 = 8.4 End Zone Distance: Eave lit(ft) 19 x 40% = 7.6 ft Bldg Width (ft) 34 10% = 3.4 ft W,dtn,4%= 1.4 ft Bldg Length(ft)30 10% = 3.0 ft Lenym %m 1.2 ft Minimum = 3.0 ft Edge Strip 3.0 ft (End Zone = 2x Edge St End Zone 6.0 ft I - Per 2014 055C Use Group= Number of Stones= 3 <3 -> Simplified analysts per IBC 5ecpon 1613.5.6.2 S4= 0.7 R= 6.5 1 V= R w - 0.108 W Roof W = 15 850.0 = 12.8 Walls = 8 8.0 ft 1/2 128.0 = 4.1 Partitions = 6 8.0 ft 1/2 66.0 = 1.6 2' 18.4 x 29 = 534 Upr. Floor W= 15 850.0 = 12.8 Walls = 8 9.0 ft 1/2 128.0 + 4.I = 8.7 Partitions = 6 9.0 ft 1/2 84.0 + 1.6 = 3.9 F. 25.3 x 21 = 531 Main Floor W = 15 550.0 = 8.3 Walls = 8 10.0 ft 1/2 66.0 + 8.7 = 11.3 Partitions = 6 10.0 ft 1/2 12.0 + 3.9 = 4.2 F" 23.8 x 1 I = 262 67.5 132e x O.11 7.3 = Base Shear Dlatnbution: QR( 328 X 534 = 2. = 2.1 Q r = 328 X 531 = 2.4 = 2,1 Q Fir = 1328 X 262 - .4 = I .0 LL-Monlpomen SHERMAN ENGINEERING, INC. 3151 NE Sandy Blvd Suite 100 Portland, OR 97232 WIND LOAD 2014 IBC!OSSC JOB: MONTGOMERY PLAN Loading: SIDE/SIDE V1 V2 V3 V4 Roof Wall End Zone = 10.6 psf 15.4 psf Interior= 8.4 psf 12.2 psf End Zone 1 Interior 1 End Zone End Zone Length = 6 ft Roof Ht. 6 ft Diaph 1 width 11 ft Wall Ht. 8 ft Qn Ln IQn Diaph 2 width 23 ft Shear VI V2 V3 V4 REACTION Line Condition load trib trib total load trib trib total load trib trib total load trib trib total Q ROOF width height width width height width width height width width height width psf ft ft ft psf ft ft ft psf ft ft ft psf ft ft ft kips A End Left 10.6 6 6 11 8.4 5 6 11 0.3 B Inter 10.6 6 6 11 8.4 12 6 11 8.4 17 6 23 10.6 6 6 23 1.4 C End Right 8.4 17 6 23 10.6 6 6 23 0.6 Shear V1 V2 V3 V4 REACTION Line Condition load trib trib total load trib trib total load trib trib total load trib trib total Q UPR FLR width height width width height width width height width width height width psf ft ft ft psf ft ft ft psf ft ft ft psf ft ft ft kips A End Left 15.4 6 4 11 12.2 5 4 11 0.3 B Inter 15.4 6 4 11 12.2 5 4 11 12.2 17 4 23 15.4 6 4 23 0.9 C End Right 12.2 17 4 23 15.4 6 4 23 0.6 TOTAL UPPER FLOOR LOAD LINE ROOF UPR FLR TOTAL A 0.3 0.3 0.66 B 1.4 0.9 2.21 C 0.6 0.6 1.28 4.15 Ff SHERMAN ENGINEERING, INC. 3151 NE Sandy Blvd Suite 100 Portland, OR 97232 MAIN FLR Roof Wall End Zone = 10.6 psf 15.4 psf Interior = 8.4 psf 12.2 psf Wall Ht. 9 ft Diaph 1 width 13 ft Diaph 2 width 20 ft Shear V1 V2 V3 V4 REACTION Line Condition load trib trib total load trib Crib total load trib trib total load trib trib total Q MAIN FLR width height width width height width width height width width height width psf ft ft ft psf ft ft ft psf ft ft ft psi ft ft ft kips A End Left 15 4 6 9 13 12.2 7 9 13 0.B5 B Inter 15 4 6 9 13 12.2 7 9 13 12.2 14 9 20 15.4 6 9 20 1.88 C End Right 12.2 14 9 20 15.4 6 9 20 1.24 3.9/ CRAWL Roof Wall End Zone= 10.6 psf 15.4 psf Interior= 8 4 psf 12.2 psf Wall Ht. 12 ft Diaph 1 width 13 ft Diaph 2 width 20 ft Shear V1 V2 V3 V4 REACTION Line Condition load trib trib total load trib trib total load trib trib total load trib trib total Q CRAWL width height width width height width width height width width height width psf ft ft ft psf ft ft ft psf ft ft ft psf ft ft ft kips A End Left 15.4 0 12 13 12.2 13 12 13 _ 0.95 B Inter 15.4 0 12 13 12.2 13 12 13 12.2 20 12 20 15.4 0 12 20 2.42 C End Right _ - 12.2 20 12 20 15.4 0 12 20 1.46 4.93 1 t, 1 SHERMAN ENGINEERING, INC. 3151 NE Sandy Blvd . Suite 100 Portland, OR 97232 WIND LOAD 2014 IBC/OSSC 2015 IBC/WAC JOB: MONTGOMERY PLAN Loading: FRONT BACK V1 V2 V3 V4 Roof Wall End Zone = 10.6 psf 15.4 psf Interior= 8.6 psf 12.2 psf End Zone 1 Interior 1 End Zone End Zone Length = 6 ft Roof Ht. 9 ft Diaph 1 width 30 ft Wall Ht. 8 ft Qn lOn Ln Shear V1 V2 V3 V4 REACTION Line Condition load trib trib total load trib trib total load trib trib total load trib trib total Q ROOF width height width width height width width height width width height width psf ft ft ft psf ft ft ft psf ft ft ft psf ft ft ft kips 1 End Left 10.6 6 0 30 8.6 24 4 30 0.3 2 End Right 8.6 24 0 30 10.6 6 9 30 0.5 Shear V1 V2 V3 V4 REACTION Line Condition load trib trib total load trib trib total load trib trib total load trib trib total Q UPR FLR width height width width height width width height width width height width psf ft ft ft psf ft ft ft psf _ ft ft ft psf ft ft ft kips 1 End Left 15.4 6 4 30 12.2 24 6 30 1.0 2 End Right 12.2 24 5 30 15.4 6 6 30 1.1 TOTAL UPPER FLOOR LOAD LINE ROOF UPR FLR TOTAL 1 0.3 1.0 1.37 2 0.5 1.1 1.60 2.97 4 SHERMAN ENGINEERING, INC. 3151 NE Sandy Blvd Suite 100 Portland, OR 97232 MAIN FLR Roof Wall End Zone= 10.6 psf 15.4 psf Interior= 8.6 psf 12.2 psf Wall Ht. 9 ft Diaph 1 width 30 ft Diaph 2 width 30 ft Shear V1 V2 V3 V4 REACTION Line Condition load trib trib total load trib trib total load trib trib total load trib trib total 0 MAIN FLR width height width width height width width height width width height width psf ft ft ft psf ft ft ft psf ft ft ft psf ft ft ft kips 1 End Left 15.4 6 9 30 12.2 24 9 30 ' 1.80 2 End Right 12 2 24 9 ' 30 . 15.4 6 9 30 1.80 CRAWL Roof Wall End Zone= 10.6 psf 15.4 psf • Interior= 8.6 psf 12.2 psf • Wall Ht. 12 ft Diaph 1 width 30 ft Diaph 2 width 30 ft • Shear V1 V2 V3 V4 REACTION Line Condition load trib trib total load trib trib total load trib trib total load trib trib total a CRAWL width height width width height width width height width width height width psf ft ft ft psf ft ft ft psf ft ft ft psf ft ft ft kips 1 End Left 15.4 0 12 30 12.2 _ 30 12 30 _ 2.20 2 End Right ' 12.2 30 12 30 ' 15.4 0 12 30 4 2.20 8.8 T , \ .,,, 4 MoNT�or-� �.y L L (o 1-A- 2p4L l-oAt7: 9-1-9 �co 1✓ l7 IP 4 = ( 2X) p .--I 5 - A 2 UPR VIZ I, 3-7-'' (1.051') - 11 V = 140'` ' I_rz,P pi P C = (211 K) 0 S(-IF 2 1/J/AVL S - 4Al1.1 30' Vz 1, 3014 (2. 1'-) ILoon n Apt4 Q-�- ►, t 23 l4F J,dLS- GREW L V, 4r4V`+ 17'G= 41-W(2, 9 ) 30 ! MONTetomed2-/ LLB LAA-L trbs 9-L_lq Q s210 Q C,1 28''`) 1 51-4EPlz 1^1A1.1-c - UpR Yp, = £t(d ' (or +w) 11 Zell` ( 1,o5'`) V4,7- 11204" (01641 Q ( i. o4 I.CI. oe) 4`1P.L LS - MP'Ir1 Vp = �185"� D1 ( 1 ,24'"41,2 = 2.. 5214- (I1t ) CLoor2 DIAR-ff a ti , `o Q,4-( 0141n 1%1,7 /col �) _ I 1 9 L =( i-l i s i'%lgfi,4) 51 �� V :7- � + 4 4,0�' 6a 26 (2. W) In& .7 'Up = IX2.0' %� (lam)/ 2.18" /ci- OVERTURNING - FRONT TO BACK LL ° 4/3/2020 GRID SHEAR DEAD DEAD DEAD LOAD LOAD NET LINE LEVEL LENGTH SHEAR/FT HEIGHT TRIES LOAD M,reslst REDUCTION M.ot ABOVE UPLIFT LINE A V-1 6 0.098 6 4 15 1.94 WIND 3.5 0.00 0.39 OK w/A.B.'z , LINE B V-1 20 0.326 6.5 6 50 70.40 WIND 42.4 0.00 0.01 I OK w/A.D.'s I LINE C V-1 16 0.153 9.5 4 15 17.41 WIND 23.3 0.00 0.50 , Use 5111D 14 I LINE I V-1 11 0.158 6.5 3 50 12.22 WIND 11.3 0.00 0.36 I OK w/ A.B.'s I LINE I V-1 23 0.158 9.5 4 15 35.97 WIND 34.5 0.00 0.56 I Uere STHD 14 I OTMonlgornery GL fawl walls