Loading...
Report (2) I6I411I " & 2/a4s 7 Hydraulics Summary Sheet FIRESTOP COMPANY Designer: RD GREEN 3203 NE 65TH STREET SPACE 2 Calc By: RD GREEN ' VANCOUVER, WA. 98663 Dote: 1/5/2011 360-718-8604 Project Information Hydraulics Information DOW AGROSCIENCES BLDG.0 T.I. 16160 SW UPPER BOONES FERRY ROAD Demand... TIGARD, OR. 97224 Spr Req'd Pres: 85.63 PSI MRA #3 Spr Req'd Flow: 346.67 GPM Add'I Flows: 0.00 GPM Hose at Srce: 0.00 GPM Contract No: Total Flow: 346.67 GPM Building: LAB D ROOM 115 Total Pres: 85.63 PSI System ID: DOW AGROSCIENCES TI Static Elev: 0.00 Ft Ref. Drawing No: 1 OF 1 Construction: 9' SMOOTH CEILING Supply... Occupancy: LAB AND OFFICES Water Flow Test Static: 105.00 PSI Authority: CITY OF TIGARD Residual: 76.00 PSI Qty Flowing: 852.00 GPM Elevation: 0.00 Ft System Information Date: Time: By: ^Hydraulics Design Criteria_ Pump Data System Type: WET Rated: 0.0 PSI@ 0.0 GPM Density: .15 GPM/SciFt Boost Pres: (NA) PSI Remote Area: 1500 SoFt Discharge Pres: (NA) PSI Sprinkler Coverage: 324MAX SqFt Discharge Flow: (NA) GPM Design Standard: NEPA #13 (2007) Combined Hazard: LIGHT Static: (NA) PSI Figure: 112311 Curve: Residual: (NA) PSI _Sprinklers / Nozzles_ Qty Flowing: (NA) GPM Manufacturer: RELIABLE Available... Model: JL112 P) 99.51 PSI@ 346.67 GPM Size: 3/4" NPT F) 85.63 PSI@ 685.21 GPM K—Factor: 11.2 Temp. Rating: 165E Margin... Pressure: 13.88 PSI Flow: 338.53 GPM Sigma Dynamics Corporation 7700 Summary Sheet,/ SUBMITTAL SERIAL NO:4126HY1 01-06-2011 PAGE 1 DOW AGROSCIENCES TI BLDG. C .15/LAB D 115 ORD. HAZARD GRP 1 FLOW TEST RESULTS Water Supply STATIC 105 . 00 PSI RESIDUAL 76 . 00 PSI @ 852 . 00 GPM CITY PRESSURE AVAILABLE AT 346 . 7 GPM 99 .51 PSI SUMMARY OF SPRINKLER OUTFLOWS ACTUAL MINIMUM SPR FLOW FLOW K-FACTOR PRESSURE 301 49 .30 49 .00 11 .20 19 . 38 302 49 .23 49 . 00 11 .20 19 .32 303 50 .65 49 . 00 11 .20 20.45 304 49 .44 49 . 00 11 .20 19.49 305 49 .28 49 . 00 11 .20 19 .36 306 49 .76 49 . 00 11 .20 19 .74 307 49 . 00 49 . 00 11.20 19. 14 TOTAL WATER REQUIRED FOR SYSTEM 346 . 67 GPM TOTAL WATER REQUIREMENT 346.67 GPM PRESSURE REQUIRED AT 0 85 .63 PSI - MAXIMUM PRESSURE UNBALANCE IN LOOPS 0. 00 PSI MAXIMUM VELOCITY FROM 7 TO 11 20.40 FPS SUBMITTAL SERIAL NO:4126HY1 01-06-2011 PAGE 2 DOW AGROSCIENCES TI BLDG. C . 15/LAB D 115 ORD. HAZARD GRP 1 Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary From To GPM IN Devices Ft PSI/Ft PSI 137 307 1. 049 L 30.00 C=120 PT 19 .14 (307) Q 49 . 00 F=T, 2E F 9 . 00 PE -3 . 03 DR1 T 39 . 00 0 .6829 PF 26 .63 66 137 1 .442 L 7 . 50 C=120 PT 42 . 74 (137) Q 49 .00 F=T F 5 .40 PE 0 . 00 BN3 T 12 . 90 0.1450 PF 1 .87 PT 44 .61 ( 66) 136 306 1 . 049 L 30 . 00 C=120 PT 19. 74 (306) Q 49 . 76 F=T, 2E F 9 .00 PE -3 . 03 DR1 T 39 . 00 0.7027 PF 27 .41 PT 44 . 12 (136) 135 305 1 .049 L 30 . 00 C=120 PT 19 . 36 (305) Q 49 .28 F=T, 2E F 9 . 00 PE -3 . 03 DR1 T 39 . 00 0 . 6900 PF 26 . 91 PT 43 .24 (135) 134 304 1 . 049 L 30 . 00 C=120 PT 19.49 (304) Q 49 .44 F=T, 2E F 9. 00 PE -3 . 03 DR1 T 39. 00 0.6944 PF 27 . 08 PT 43 . 54 (134) 133 303 1. 049 L 30 . 00 C=120 PT 20 .45 (303) Q 50 .65 F=T, 2E F 9 . 00 PE -3 . 03 DR1 T 39 . 00 0.7261 PF 28 . 32 PT 45 .74 (133) 132 302 1 . 049 L 30 .00 C=120 PT 19 . 32 (302) Q 49 .23 F=T, 2E F 9 .00 PE -3 . 03 DR1 T 39. 00 0.6889 PF 26 .87 PT 43 . 16 (132) 131 301 1. 049 L 30 . 00 C=120 PT 19 .38 (301) Q 49. 30 F=T, 2E F 9 . 00 PE -3 . 03 DR1 T 39 .00 0 .6907 PF 26 . 94 PT 43 .29 (131) 86 136 1 .442 L 62 . 00 C=120 PT 44 . 11 (136) Q 28 .04 F=0/T F 5 .40 PE 0 . 00 BL1 T 67 .40 0. 0516 PF 3 .48 46 86 1 .442 L 2 .30 C=120 PT 47 . 59 ( 86) Q 28 . 04 F=T F 5 .40 PE 1. 00 RN2 T 7.70 0.0516 PF 0.40 SUBMITTAL SERIAL NO:4126HY1 01-06-2011 PAGE 3 DOW AGROSCIENCES TI BLDG. C .15/LAB D 115 ORD. HAZARD GRP 1 Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary ' From To GPM IN Devices Ft PSI/Ft PSI 45 46 2 .635 L 12 .30 C=120 PT 48 . 99 ( 46) Q 28 . 04 F=0 F 0 . 00 PE 0. 00 CM2 T 12 .30 0 .0027 PF 0. 03 PT 49 . 02 ( 45) 85 135 1.442 L 55 .30 C=120 PT 43 . 24 (135) Q 33 .05 F=0/T F 5.40 PE 0.00 BL1 T 60. 70 0. 0700 PF 4 .25 45 85 1 .442 L 2 .30 C=120 PT 47.49 ( 85) Q 33 . 05 F=T F 5.40 PE 1 . 00 RN2 T 7 . 70 0 .0700 PF 0 . 54 44 45DQ 28 . 04 2 . 635 L 12 . 30 C=120 PT 49 . 03 ( 45) Q 61 . 09 F=0 F 0 . 00 PE 0 . 00 CM2 T 12 .30 0 .0116 PF 0. 14 PT 49. 17 ( 44) 134 135 1 .442 L 16 . 00 C=120 PT 43 .24 (135) Q 16.22 F=0 F 0. 00 PE 0 . 00 BL1 T 16 . 00 0 . 0188 PF 0 .30 65 134DQ 49 .44 1.442 L 0. 70 C=120 PT 43 .54 (134) Q 65 .67 F=T F 5.40 PE 0 . 00 BL1 T 6.10 0.2492 PF 1. 52 25 65 1 .442 L 1 .70 C=120 PT 45. 06 ( 65) Q 65 .67 F=T F 5 .40 PE 0 .74 RN1 T 7 . 10 0 .2492 PF 1 .77 PT 47 .57 ( 25) 84 133 1 .442 L 45. 50 C=120 PT 45 . 74 (133) Q 24 . 91 F=0/T F 5.40 PE 0 . 00 BL1 T 50 . 90 0 . 0415 PF 2 . 11 44 84 1.442 L 2 .30 C=120 PT 47.85 ( 84) Q 24 .91 F=T F 5 .40 PE 1. 00 RN2 T 7 .70 0 . 0415 PF 0 . 32 43 44DQ 61 . 09 2 .635 L 12 .30 C=120 PT 49. 17 ( 44) Q 86 . 00 F=0 F 0. 00 PE 0 . 00 CM2 T 12 . 30 0.0218 PF 0.27 PT 49 .44 ( 43) 83 132 1 .442 L 39 .30 C=120 PT 43 . 16 (132) Q 40 .24 F=0/T F 5 .40 PE 0 . 00 BL1 T 44 . 70 0.1007 PF 4 .50 SUBMITTAL SERIAL NO:4126HY1 01-06-2011 PAGE 4 DOW AGROSCIENCES TI BLDG. C . 15/LAB D 115 ORD. HAZARD GRP 1 Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary From To GPM IN Devices Ft PSI/Ft PSI 43 83 1 .442 L 2 .30 C=120 PT 47 .66 ( 83) Q 40 .24 F=T F 5.40 PE 1 . 00 RN2 T 7 .70 0.1007 PF 0 . 78 42 43DQ 86 . 00 2 . 635 L 61 . 00 C=120 PT 49 .44 ( 43) Q 126 .24 F=2E F 8 .60 PE 0 . 00 CM2 T 69.60 0 . 0443 PF 3 . 08 PT 52 . 52 ( 42) 131 132 1 .442 L 20. 00 C=120 PT 43 . 16 (132) Q 8 . 99 F=0 F 0 . 00 PE 0.00 BL1 T 20. 00 0. 0063 PF 0 .13 63 131DQ 49 . 30 1 .442 L 12 . 70 C=120 PT 43 .29 (131) Q 58 . 30 F=T F 5.40 PE 0. 00 BL1 T 18 . 10 0.2000 PF 3 .62 23 63 1.442 L 1 .70 C=120 PT 46 . 91 ( 63) Q 58 .30 F=T F 5 .40 PE 0 .74 RN1 T 7 .10 0 .2000 PF 1.42 PT 49. 07 ( 23) 66 136 1 .442 L 10 . 00 C=120 PT 44 . 11 (136) Q 21 . 73 F=T F 5 .40 PE 0. 00 BL1 T 15 .40 0 . 0322 PF 0.50 26 66DQ 49 . 00 1 .442 L 1 . 70 C=120 PT 44 . 61 ( 66) Q 70. 73 F=T F 5.40 PE 0.74 RN1 T 7 .10 0 .2859 PF 2 . 03 25 26 2 .635 L 12 .30 C=120 PT 47. 38 ( 26) Q 70 . 73 F=0 F 0 . 00 PE 0 . 00 CM3 T 12 . 30 0 . 0152 PF 0 . 19 24 25DQ 65 .67 2 .635 L 12 . 30 C=120 PT 47 .57 ( 25) Q 136 .39 F=0 F 0 . 00 PE 0 . 00 CM3 T 12 .30 0 .0511 PF 0 .63 PT 48.20 ( 24) 64 133 1 .442 L 26 .50 C=120 PT 45 . 74 (133) Q 25 .74 F=T F 5.40 PE 0. 00 BL1 T 31. 90 0. 0441 PF 1 .41 24 64 1.442 L 1 . 70 C=120 PT 47 . 15 ( 64) Q 25.74 F=T F 5.40 PE 0 .74 RN1 T 7 . 10 0 . 0441 PF 0.31 SUBMITTAL SERIAL NO:4126HY1 01-06-2011 PAGE 5 DOW AGROSCIENCES TI BLDG. C .15/LAB D 115 ORD. HAZARD GRP 1 Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary . From To GPM IN Devices Ft PSI/Ft PSI 23 24DQ 136 .39 2 .635 L 12 .30 C=120 PT 48 .20 ( 24) Q 162 . 14 F=0 F 0 . 00 PE 0 . 00 CM3 T 12 . 30 0. 0704 PF 0 . 87 22 23DQ 58 .30 2 .635 L 12 .30 C=120 PT 49 . 07 ( 23) Q 220 .43 F=0 F 0 . 00 PE 0 .00 CM3 T 12 .30 0 .1243 PF 1 .53 62 22DQ -208 . 00 1.442 L 1 .70 C=120 PT 50. 60 ( 22) Q 12 .43 F=T F 5 .40 PE -0 . 74 RN1 T 7 .10 0. 0115 PF 0 . 08 82 62 1 .442 L 120. 00 C=120 PT 49 . 94 ( 62) Q 12 .43 F=T/T F 10 .80 PE 0. 00 BL1 T 130 .80 0.0115 PF 1 . 50 42 82 1 .442 L 2 .30 C=120 PT 51 .44 ( 82) Q 12 .43 F=T F 5 .40 PE 1 . 00 RN2 T 7 . 70 0 . 0115 PF 0. 09 41 42DQ 126 .24 2 .635 L 12 .30 C=120 PT 52 . 53 ( 42) Q 138 .67 F=0 F 0 . 00 PE 0 .00 CM2 T 12 . 30 0. 0527 PF 0.65 PT 53 .18 ( 41) 21 22 2 .635 L 12 .30 C=120 PT 50 .59 ( 22) Q 208 . 00 F=0 F 0 . 00 PE 0 . 00 CM3 T 12 . 30 0 . 1117 PF 1 .37 61 21DQ -198.86 1.442 L 1 . 70 C=120 PT 51 . 96 ( 21) Q 9 .14 F=T F 5 .40 PE -0 . 74 RN1 T 7 .10 0 .0065 PF 0 . 05 81 61 1 .442 L 120. 00 C=120 PT 51 .27 ( 61) Q 9 . 14 F=T/T F 10 . 80 PE 0 . 00 BL1 T 130. 80 0. 0065 PF 0. 85 41 81 1 .442 L 2 .30 C=120 PT 52 . 12 ( 81) Q 9 . 14 F=T F 5.40 PE 1 .00 RN2 T 7 .70 0 .0065 PF 0 . 05 40 41DQ 138. 67 2 .635 L 12 .30 C=120 PT 53 . 17 ( 41) Q 147 . 81 F=0 F 0 . 00 PE 0 . 00 CM2 T 12 .30 0 .0593 PF 0 .73 PT 53 . 90 ( 40) SUBMITTAL SERIAL NO:4126HY1 01-06-2011 PAGE 6 DOW AGROSCIENCES TI BLDG. C . 15/LAB D 115 ORD. HAZARD GRP 1 Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary From To GPM IN Devices Ft PSI/Ft PSI 20 21 2 .635 L 12 .30 C=120 PT 51. 96 ( 21) Q 198 . 86 F=0 F 0 . 00 PE 0. 00 CM3 T 12 .30 0 .1027 PF 1 .26 60 20DQ -193 . 04 1 .442 L 1 .70 C=120 PT 53 .22 ( 20) Q 5. 82 F=T F 5.40 PE -0 . 74 RN1 T 7 .10 0 .0028 PF 0 . 02 80 60 1 .442 L 120 .00 C=120 PT 52 . 50 ( 60) Q 5. 82 F=T/T F 10 .80 PE 0. 00 BL1 T 130.80 0. 0028 PF 0 .37 40 80 1 .442 L 2 . 30 C=120 PT 52 .87 ( 80) Q 5. 82 F=T F 5 .40 PE 1 . 00 RN2 T 7 .70 0 . 0028 PF 0. 02 39 40DQ 147 . 81 2 .635 L 12 .30 C=120 PT 53 . 89 ( 40) Q 153 .64 F=0 F 0 . 00 PE 0 . 00 CM2 T 12 . 30 0. 0637 PF 0 . 78 79 39DQ -153 .35 1 .442 L 2 .30 C=120 PT 54 .67 ( 39) Q 0 .29 F=T F 5.40 PE -1 . 00 RN2 T 7. 70 0 . 0000 PF 0. 00 59 79 1 .442 L 120 . 00 C=120 PT 53 .67 ( 79) Q 0 .29 F=T/T F 10 . 80 PE 0. 00 BL1 T 130 . 80 0. 0000 PF 0 .00 19 59 1 .442 L 1.70 C=120 PT 53 .67 ( 59) Q 0 .29 F=T F 5.40 PE 0 .74 RN1 T 7. 10 0 .0000 PF 0 . 00 PT 54 .41 ( 19) 38 39 2 . 635 L 12 .30 C=120 PT 54 .68 ( 39) Q 153 . 35 F=0 F 0 . 00 PE 0. 00 CM2 T 12 .30 0 .0635 PF 0 . 78 78 38DQ -147 .45 1.442 L 2 .30 C=120 PT 55.46 ( 38) Q 5. 90 F=T F 5.40 PE -1 . 00 RN2 T 7 . 70 0. 0029 PF 0 . 02 58 78 1 .442 L 120 .00 C=120 PT 54 .48 ( 78) Q 5 . 90 F=T/T F 10. 80 PE 0 . 00 BL1 T 130 . 80 0.0029 PF 0 .38 SUBMITTAL SERIAL NO:4126HY1 01-06-2011 PAGE 7 DOW AGROSCIENCES TI BLDG. C . 15/LAB D 115 ORD. HAZARD GRP 1 Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary ' From To GPM IN Devices Ft PSI/Ft PSI 18 58 1 .442 L 1 . 70 C=120 PT 54 . 86 ( 58) Q 5 . 90 F=T F 5.40 PE 0 .74 RN1 T 7.10 0.0029 PF 0 . 02 PT 55 .62 ( 18) 37 38 2 .635 L 12 .30 C=120 PT 55 .46 ( 38) Q 147 .45 F=0 F 0 . 00 PE 0. 00 CM2 T 12 .30 0 .0591 PF 0. 73 77 37DQ -138 .22 1.442 L 2 .30 C=120 PT 56 . 19 ( 37) Q 9 .23 F=T F 5 .40 PE -1 . 00 RN2 T 7 . 70 0.0066 PF 0 . 05 57 77 1.442 L 120. 00 C=120 PT 55 .24 ( 77) Q 9 .23 F=T/T F 10. 80 PE 0. 00 BL1 T 130.80 0. 0066 PF 0 .86 17 57 1 .442 L 1 .70 C=120 PT 56 .10 ( 57) Q 9 .23 F=T F 5.40 PE 0 .74 RN1 T 7 . 10 0.0066 PF 0. 05 PT 56. 89 ( 17) 36 37 2 . 635 L 12 .30 C=120 PT 56 . 19 ( 37) Q 138.22 F=0 F 0.00 PE 0 . 00 CM2 T 12 .30 0 .0524 PF 0 .64 76 36DQ -125.69 1 .442 L 2 . 30 C=120 PT 56 . 83 ( 36) Q 12 .54 F=T F 5 .40 PE -1. 00 RN2 T 7 . 70 0 .0116 PF 0 . 09 56 76 1 .442 L 120. 00 C=120 PT 55. 92 ( 76) Q 12 .54 F=T/T F 10. 80 PE 0 . 00 BL1 T 130 . 80 0 . 0116 PF 1 . 52 16 56 1.442 L 1 . 70 C=120 PT 57 .44 ( 56) Q 12 .54 F=T F 5.40 PE 0. 74 RN1 T 7 . 10 0. 0116 PF 0 . 08 PT 58 .26 ( 16) 35 36 2 .635 L 12 .30 C=120 PT 56 .83 ( 36) Q 125 .69 F=0 F 0. 00 PE 0 . 00 CM2 T 12 .30 0 . 0440 PF 0 .54 75 35DQ -109.59 1 .442 L 2 .30 C=120 PT 57 . 37 ( 35) Q 16 . 09 F=T F 5 .40 PE -1 . 00 RN2 T 7 . 70 0. 0185 PF 0 . 14 SUBMITTAL SERIAL NO:4126HY1 01-06-2011 PAGE 8 DOW AGROSCIENCES TI BLDG. C .15/LAB D 115 ORD. HAZARD GRP 1 Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary ' From To GPM IN Devices Ft PSI/Ft PSI 55 75 1 .442 L 120 . 00 C=120 PT 56 .51 ( 75) Q 16 . 09 F=T/T F 10 . 80 PE 0 . 00 BL1 T 130. 80 0. 0185 PF 2 .42 15 55 1 .442 L 1 .70 C=120 PT 58 . 93 ( 55) Q 16 . 09 F=T F 5.40 PE 0 . 74 RN1 T 7 . 10 0 .0185 PF 0.13 PT 59 . 80 ( 15) 34 35 2 .635 L 61 . 00 C=120 PT 57 . 37 ( 35) Q 109. 59 F=2E F 8.60 PE 0 . 00 CM2 T 69 .60 0. 0341 PF 2 .37 74 34DQ -92 .28 1 .442 L 2 .30 C=120 PT 59 . 74 ( 34) Q 17 .32 F=T F 5.40 PE -1 . 00 RN2 T 7 .70 0.0212 PF 0 .16 54 74 1.442 L 72 . 00 C=120 PT 58. 90 ( 74) Q 17. 32 F=T/T F 10 . 80 PE 0. 00 BL1 T 82 .80 0 .0212 PF 1 . 76 14 54 1.442 L 1 . 70 C=120 PT 60 .66 ( 54) Q 17 .32 F=T F 5 .40 PE 0. 74 RN1 T 7 . 10 0. 0212 PF 0.15 - PT 61 .55 ( 14) 33 34 2 .635 L 12 .30 C=120 PT 59 . 75 ( 34) Q 92 .28 F=0 F 0 . 00 PE 0 . 00 CM2 T 12 .30 0. 0248 PF 0 .31 73 33DQ -68. 36 1 .442 L 2 . 30 C=120 PT 60 . 06 ( 33) Q 23 . 92 F=T F 5 .40 PE -1 . 00 RN2 T 7 . 70 0 . 0385 PF 0 . 30 53 73 1.442 L 72 . 00 C=120 PT 59 . 36 ( 73) Q 23 . 92 F=T/T F 10. 80 PE 0 .00 BL1 T 82 . 80 0. 0385 PF 3 .19 13 53 1 .442 L 1. 70 C=120 PT 62 . 55 ( 53) Q 23 . 92 F=T F 5.40 PE 0 . 74 RN1 T 7.10 0 .0385 PF 0 .27 PT 63 .56 ( 13) 32 33 2 . 635 L 12 .30 C=120 PT 60 . 05 ( 33) Q 68 .36 F=0 F 0 . 00 PE 0 . 00 CM2 T 12 .30 0.0143 PF 0 . 18 SUBMITTAL SERIAL NO:4126HY1 01-06-2011 PAGE 9 DOW AGROSCIENCES TI BLDG. C . 15/LAB D 115 ORD. HAZARD GRP 1 Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary From To GPM IN Devices Ft PSI/Ft PSI 72 32DQ -37.74 1 .442 L 2 .30 C=120 PT 60 .23 ( 32) Q 30 .63 F=T F 5 .40 PE -1 . 00 RN2 T 7 . 70 0 . 0608 PF 0 .47 52 72 1 .442 L 72 . 00 C=120 PT 59. 70 ( 72) Q 30 .63 F=T/T F 10 .80 PE 0 . 00 BL1 T 82 . 80 0.0608 PF 5. 03 12 52 1.442 L 1 .70 C=120 PT 64 .73 ( 52) Q 30 . 63 F=T F 5 .40 PE 0 . 74 RN1 T 7 .10 0 . 0608 PF 0 .43 PT 65 . 90 ( 12) 31 32 2 .635 L 12 . 30 C=120 PT 60 . 23 ( 32) Q 37 . 74 F=0 F 0 . 00 PE 0. 00 CM2 T 12 . 30 0.0047 PF 0 . 06 71 31 1 .442 L 2 .30 C=120 PT 60 .29 ( 31) Q 37. 74 F=T F 5 .40 PE -1 . 00 RN2 T 7. 70 0. 0894 PF 0 . 69 51 71 1.442 L 72 . 00 C=120 PT 59 . 98 ( 71) Q 37. 74 F=T/T F 10 .80 PE 0. 00 BL1 T 82 . 80 0. 0894 PF 7 .40 11 51 1.442 L 1 . 70 C=120 PT 67 .38 ( 51) Q 37 . 74 F=T F 5 . 40 PE 0. 74 RN1 T 7 . 10 0 .0894 PF 0 .63 PT 68 .75 ( 11) 19 20 2 .635 L 12 .30 C=120 PT 53 .22 ( 20) Q 193 . 04 F=0 F 0 . 00 PE 0 . 00 CM3 T 12 . 30 0. 0973 PF 1 .20 18 19DQ 0 .29 2 .635 L 12 .30 C=120 PT 54 .42 ( 19) Q 193 .33 F=0 F 0 . 00 PE 0. 00 CM3 T 12 .30 0.0975 PF 1 . 20 17 18DQ 5. 90 2 .635 L 12 . 30 C=120 PT 55.62 ( 18) Q 199 .22 F=0 F 0. 00 PE 0. 00 CM3 T 12 . 30 0. 1031 PF 1 .27 16 17DQ 9 .23 2 .635 L 12 .30 C=120 PT 56 . 89 ( 17) Q 208 .45 F=0 F 0 .00 PE 0 . 00 CM3 T 12 .30 0.1121 PF 1 .38 • SUBMITTAL SERIAL NO:4126HY1 01-06-2011 PAGE 10 DOW AGROSCIENCES TI BLDG. C . 15/LAB D 115 ORD. HAZARD GRP 1 Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary • From To GPM IN Devices Ft PSI/Ft PSI 15 16DQ 12 . 54 2 . 635 L 12 .30 C=120 PT 58 .27 ( 16) Q 220. 99 F=0 F 0. 00 PE 0 . 00 CM3 T 12 .30 0 .1249 PF 1 .54 14 15DQ 16 . 09 2 . 635 L 12 .30 C=120 PT 59 . 81 ( 15) Q 237 . 08 F=0 F 0 . 00 PE 0. 00 CM3 T 12 .30 0. 1422 PF 1 . 75 13 14DQ 17 .32 2 .635 L 12 .30 C=120 PT 61 .56 ( 14) Q 254 .40 F=0 F 0 . 00 PE 0. 00 CM3 T 12 . 30 0. 1621 PF 1 . 99 12 13DQ 23 . 91 2 .635 L 12 .30 C=120 PT 63 .55 ( 13) Q 278 .31 F=0 F 0 . 00 PE 0.00 CM3 T 12 .30 0. 1914 PF 2 .35 11 12DQ 30 .63 2 .635 L 12 .30 C=120 PT 65 . 90 ( 12) Q 308 . 94 F=0 F 0 . 00 PE 0 . 00 CM3 T 12 . 30 0.2321 PF 2 . 85 7 11DQ 37 . 74 2 .635 L 13 .00 C=120 PT 68. 75 ( 11) Q 346 . 67 F=2E F 8 .60 PE 0 . 00 FM1 T 21 .60 0 .2873 PF 6 .21 1 7 4 . 026 L 9 .20 C=120 PT 74 . 96 ( 7) Q 346 .67 F=0 F 0. 00 PE 3 . 99 FR2 T 9 .20 0. 0365 PF 0. 34 0 1 4 .026 L 4 . 00 C=120 PT 79.29 ( 1) Q 346 .67 F=DDC F 0 . 00 PE 1 .73 FR1 T 4 . 00 0. 0365 PF 0 . 15 4" AMES 300a DBL. CHECK DET. ASSY. 4 .47 COMMENT: INCLUDES FRICTION LOSS FOR 4 INCH DDCVA PT 85.64 ( 0) Sigma Dynamics Corporation DOW AGROSCIENCES TI 7700 Supply/ Demand Graph 250 .__... - 240 Margin 230 Pressure 13.88 PSI 220 Flow 338.53 GPM 210 200 190 180 170 180 150 E 140 130 120 110 100 s 0 900 B , 70 S 80 50 4" 1 40 30 - - - - 20 dip-- 10' N185 0 100 200 300 400 500 800 700 800 900 1000 Water Flow(GPM) System Demand.. Water Supply.. Sprinkler Demand 85.63 PSI @ 346.67 GPM Static 105.00 PSI Additional Flows 0.00 GPM Residual 76.00 PSI @ 652.00 GPM Hose at Source 0.00 GPM Elevation 0.00 PSI Total Demand 85.63 PSI @ 346.67 GPM . . . . , .