Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Report
/ /120//-Udd24 11/Go gw t/ 52 niec F 2 Hydraulics Summary Sheet FIRESTOP COMPANY Designer: RD GREEN 3203 NE 65TH STREET SPACE 2 Calc By: RD GREEN VANCOUVER, WA. 98663 Dote: 1/5/2011 360-718-8604 Project Information Hydraulics Information DOW AGROSCIENCES BLDG.0 T.I. Demand... 16160 SW UPPER BOONES FERRY ROAD Spr Req'd Pres: 41.26 PSI TIGARD, OR. 97224 Spr Req'd Flow: 198.71 GPM MRA #2 Add'I Flows: 0.00 GPM Hose at Srce: 0.00 GPM Contract No: Total Flow: 198.71 GPM Building: TRANS. OFFICE 120 Total Pres: 41.26 PSI System ID: 00W AGROSCIENCES TI Static Elev: 0.00 Ft Ref. Drawing No: 1 OF 1 Supply... Construction: 9' SMOOTH CEILING Water Flow Test Occupancy: LAB AND OFFICES Static: 105.00 PSI Residual: 76.00 PSI Authority: CITY OF TIGARD Qty Flowing: 852.00 GPM Elevation: 0.00 Ft System Information Date: Time: By: Hydraulics Design Criteria Pump Data System Type: WET Rated: 0.0 PSI@ 0.0 GPM Density: .10 GPM/SqFt Boost Pres: (NA) PSI Remote Area: 1,688 SgIt Discharge Pres: (NA) PSI Sprinkler Coverage: 324MAX SgFt Discharge Flow: (NA) GPM Design Standard: NFPA #13 <2007) Combined Hazard: LIGHT Static: (NA) PSI Figure: 112311 Curve: Residual: (NA) PSI Qty Flowing: (NA) GPM Sprinklers / Nozzles___ Manufacturer: RELIABLE Available... Model: JL112 P) 103.04 PSI@ 198.71 GPM Size: 3/4" NPT F) 41.26 PSI@ 1303.58 GPM K—Factor: 11.2 Temp. Rating: 165E Margin... Pressure: 61.78 PSI Flow: 1104.87 GPM Sigma Dynamics Corporation —— i 7700 Summary Sheet) SUBMITTAL SERIAL NO:4126HY1 01-06-2011 PAGE 1 DOW AGROSCIENCES TI BLDG. C .10/TRANSFORMATION OFFICES 120 LIGHT HAZARD FLOW TEST RESULTS Water Supply STATIC 105 .00 PSI RESIDUAL 76 .00 PSI @ 852 . 00 GPM CITY PRESSURE AVAILABLE AT 198 . 7 GPM 103 .04 PSI SUMMARY OF SPRINKLER OUTFLOWS ACTUAL MINIMUM SPR FLOW FLOW K-FACTOR PRESSURE 201 33 . 05 33 . 00 11 .20 8.71 202 33 . 04 33 . 00 11 .20 8 .70 203 33 . 02 33 . 00 11 .20 8 .69 204 33 . 00 33 . 00 11 .20 8.68 205 33 .30 33 .00 11 . 20 8 . 84 206 33 .30 33 . 00 11 . 20 8. 84 TOTAL WATER REQUIRED FOR SYSTEM 198.71 GPM TOTAL WATER REQUIREMENT 198 .71 GPM PRESSURE REQUIRED AT 0 41 .26 PSI MAXIMUM PRESSURE UNBALANCE IN LOOPS 0 . 00 PSI MAXIMUM VELOCITY FROM 43 TO 83 12 .45 FPS SUBMITTAL SERIAL NO:4126HY1 01-06-2011 PAGE 2 DOW AGROSCIENCES TI BLDG. C . 10/TRANSFORMATION OFFICES 120 LIGHT HAZARD Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary - From To GPM IN Devices Ft PSI/Ft PSI 119 204 1. 049 L 30 .00 C=120 PT 8 . 68 (204) Q 33 . 00 F=T,2E F 9 .00 PE -3 . 03 DR1 T 39 . 00 0.3286 PF 12 . 82 PT 18 .47 (119) 121 206 1 . 049 L 30 . 00 C=120 PT 8 .84 (206) Q 33 .30 F=T, 2E F 9. 00 PE -3 . 03 DR1 T 39 . 00 0.3342 PF 13 . 03 83 121 1 .442 L 4 . 00 C=120 PT 18 .84 (121) Q 33 .30 F=T F 5 .40 PE 0. 00 BN3 T 9 .40 0 . 0710 PF 0 .67 PT 19 . 51 ( 83) 120 205 1 . 049 L 30 . 00 C=120 PT 8 . 84 (205) Q 33 . 30 F=T, 2E F 9 . 00 PE -3 .03 DR1 T 39 . 00 0 . 3342 PF 13 .03 85 120 1 .442 L 2 . 00 C=120 PT 18. 84 (120) Q 33 .30 F=T F 5 .40 PE 0 . 00 BN3 T 7 .40 0. 0710 PF 0 . 53 PT 19 .37 ( 85) 117 203 1 . 049 L 30. 00 C=120 PT 8 .69 (203) • Q 33 . 02 F=T, 2E F 9 . 00 PE -3 . 03 DR1 T 39. 00 0.3289 PF 12 .83 PT 18 .49 (117) 116 202 1 . 049 L 30 . 00 C=120 PT 8. 70 (202) Q 33 . 04 F=T,2E F 9 . 00 PE -3 .03 DR1 T 39. 00 0. 3294 PF 12 . 85 PT 18.52 (116) 115 201 1 . 049 L 30 . 00 C=120 PT 8 . 71 (201) Q 33 . 05 F=T, 2E F 9. 00 PE -3 . 03 DR1 T 39. 00 0 .3296 PF 12 .85 COMMENT: INCLUDES EQUIV LEN FOR 4 ' FLEXHEAD DROP PT 18 .53 (115) 85 119 1 .442 L 10. 00 C=120 PT 18.47 (119) Q 30 . 01 F=0/T F 5 .40 PE 0 . 00 BL1 T 15 .40 0 . 0586 PF 0. 90 45 85DQ 33 . 30 1 .442 L 2 .30 C=120 PT 19 . 37 ( 85) Q 63 .32 F=T F 5 .40 PE 1 . 00 RN2 T 7 . 70 0.2330 PF 1.79 PT 22 .16 ( 45) SUBMITTAL SERIAL NO:4126HY1 01-06-2011 PAGE 3 DOW AGROSCIENCES TI BLDG. C . 10/TRANSFORMATION OFFICES 120 LIGHT HAZARD Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary From To GPM IN Devices Ft PSI/Ft PSI 118 119 1.442 L 12 .00 C=120 PT 18 .47 (119) Q 2 . 99 F=0 F 0 . 00 PE 0 . 00 BL1 T 12 . 00 0.0008 PF 0 . 01 117 118 1 .442 L 12 .00 C=120 PT 18 .48 (118) Q 2 . 99 F=0 F 0 . 00 PE 0 . 00 BL1 T 12 . 00 0. 0008 PF 0. 01 65 117DQ 33 . 02 1 .442 L 38 . 00 C=120 PT 18 .49 (117) 36 . 00 F=T F 5 .40 PE 0 . 00 BL1 T 43 .40 0 .0820 PF 3 .56 25 65 1 .442 L 1 .70 C=120 PT 22 .05 ( 65) Q 36 . 00 F=T F 5 .40 PE 0 . 74 RN1 T 7 .10 0.0820 PF 0. 58 PT 23 .37 ( 25) 83 116 1.442 L 11 . 50 C=120 PT 18 . 52 (116) Q 30. 07 F=0/T F 5 .40 PE 0 .00 BL1 T 16 . 90 0.0588 PF 0 .99 43 83DQ 33 .30 1 .442 L 2 .30 C=120 PT 19 . 51 ( 83) Q 63 .37 F=T F 5 .40 PE 1 . 00 RN2 T 7 . 70 0 .2333 PF 1 . 80 PT 22 . 31 ( 43) 115 116 1.442 L 20.00 C=120 PT 18 . 52 (116) Q 2 . 97 F=0 F 0. 00 PE 0 . 00 BL1 T 20. 00 0 . 0008 PF 0 .02 63 115DQ 33 . 05 1.442 L 40 . 50 C=120 PT 18 . 54 (115) Q 36 . 03 F=T F 5 .40 PE 0 . 00 BL1 T 45 .90 0. 0821 PF 3 .77 23 63 1 .442 L 1 .70 C=120 PT 22 .31 ( 63) Q 36 .03 F=T F 5.40 PE 0 .74 RN1 T 7 . 10 0 .0821 PF 0. 58 PT 23 .63 ( 23) 46 45 2 .635 L 12 . 30 C=120 PT 22 . 16 ( 45) Q 14 .27 F=0 F 0 . 00 PE 0 . 00 CM2 T 12 . 30 0 .0008 PF 0 . 01 86 46 1 .442 L 2 .30 C=120 PT 22 . 17 ( 46) Q 14 .27 F=T F 5 .40 PE -1 . 00 RN2 T 7 . 70 0. 0148 PF 0 . 11 SUBMITTAL SERIAL NO:4126HY1 01-06-2011 PAGE 4 DOW AGROSCIENCES TI BLDG. C . 10/TRANSFORMATION OFFICES 120 LIGHT HAZARD Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary From To GPM IN Devices Ft PSI/Ft PSI 66 86 1 .442 L 72 . 00 C=120 PT 21 .28 ( 86) Q 14 .27 F=T/T F 10. 80 PE 0 . 00 BL1 T 82 .80 0. 0148 PF 1 .23 26 66 1 .442 L 1 .70 C=120 PT 22 . 51 ( 66) Q 14 .27 F=T F 5 .40 PE 0 . 74 RN1 T 7. 10 0. 0148 PF 0 .11 25 26 2 . 635 L 12 .30 C=120 PT 23 .36 ( 26) Q 14 .27 F=0 F 0 . 00 PE 0 . 00 CM3 T 12 . 30 0 . 0008 PF 0 . 01 24 25DQ 36 . 00 2 .635 L 12 .30 C=120 PT 23 .37 ( 25) Q 50 .28 F=0 F 0 . 00 PE 0 . 00 CM3 T 12 .30 0. 0081 PF 0 . 10 PT 23 .47 ( 24) 44 45 2 .635 L 12 . 30 C=120 PT 22 .16 ( 45) Q 49 . 04 F=0 F 0. 00 PE 0. 00 CM2 T 12 .30 0.0077 PF 0 . 09 84 44DQ -34 .64 1 .442 L 2 .30 C=120 PT 22 .25 ( 44) Q 14 .40 F=T F 5.40 PE -1. 00 RN2 T 7. 70 0. 0150 PF 0 . 12 64 84 1 .442 L 72 .00 C=120 PT 21 .37 ( 84) Q 14 .40 F=T/T F 10 . 80 PE 0 .00 BL1 T 82 . 80 0. 0150 PF 1 .24 24 64 1 .442 L 1 .70 C=120 PT 22 .61 ( 64) Q 14 .40 F=T F 5.40 PE 0 . 74 RN1 T 7 . 10 0 . 0150 PF 0. 11 23 24DQ 50 . 28 2 .635 L 12 .30 C=120 PT 23 .46 ( 24) Q 64 .67 F=0 F 0 . 00 PE 0 . 00 CM3 T 12 .30 0 .0129 PF 0 . 16 22 23DQ 36 . 03 2 .635 L 12 .30 C=120 PT 23 . 62 ( 23) Q 100 . 70 F=0 F 0. 00 PE 0. 00 CM3 T 12 .30 0 . 0292 PF 0 .36 PT 23 .98 ( 22) 43 44 2 .635 L 12 . 30 C=120 PT 22 .25 ( 44) Q 34 .64 F=0 F 0 . 00 PE 0 . 00 CM2 T 12 .30 0 .0041 PF 0 . 05 SUBMITTAL SERIAL NO:4126HY1 01-06-2011 PAGE 5 DOW AGROSCIENCES TI BLDG. C . 10/TRANSFORMATION OFFICES 120 LIGHT HAZARD Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary From To GPM IN Devices Ft PSI/Ft PSI 42 43DQ 63 . 37 2 .635 L 61 . 00 C=120 PT 22 . 30 ( 43) Q 98 . 01 F=2E F 8 .60 PE 0 . 00 CM2 T 69 .60 0.0278 PF 1 . 93 82 42DQ -97 .55 1.442 L 2 .30 C=120 PT 24 .23 ( 42) Q 0 .47 F=T F 5.40 PE -1. 00 RN2 T 7 .70 0.0000 PF 0. 00 62 82 1.442 L 120. 00 C=120 PT 23 . 23 ( 82) Q 0.47 F=T/T F 10 . 80 PE 0 . 00 BL1 T 130 . 80 0 . 0000 PF 0. 00 22 62 1 .442 L 1 . 70 C=120 PT 23 .23 ( 62) Q 0.47 F=T F 5.40 PE 0.74 RN1 T 7. 10 0. 0000 PF 0. 00 21 22DQ 100 . 70 2 .635 L 12 . 30 C=120 PT 23 .97 ( 22) Q 101 . 16 F=0 F 0. 00 PE 0. 00 CM3 T 12 .30 0. 0294 PF 0. 36 PT 24 . 33 ( 21) 41 42 2 . 635 L 12 .30 C=120 PT 24 .23 ( 42) Q 97 . 55 F=0 F 0. 00 PE 0 . 00 CM2 T 12 .30 0.0275 PF 0 .34 • 81 41DQ -96 .20 1 .442 L 2 . 30 C=120 PT 24 . 57 ( 41) Q 1. 35 F=T F 5 .40 PE -1 . 00 RN2 T 7. 70 0 . 0002 PF 0. 00 61 81 1 .442 L 120 . 00 C=120 PT 23 . 57 ( 81) Q 1 .35 F=T/T F 10 . 80 PE 0. 00 BL1 T 130 . 80 0 . 0002 PF 0 . 03 21 61 1 .442 L 1.70 C=120 PT 23 . 60 ( 61) Q 1 . 35 F=T F 5.40 PE 0 . 74 RN1 T 7 .10 0.0002 PF 0 . 00 20 21DQ 101 . 16 2 .635 L 12 . 30 C=120 PT 24 .34 ( 21) Q 102 . 51 F=0 F 0. 00 PE 0 . 00 CM3 T 12 . 30 0 . 0302 PF 0. 37 PT 24 . 71 ( 20) 40 41 2 .635 L 12 . 30 C=120 PT 24 . 57 ( 41) Q 96 .20 F=0 F 0. 00 PE 0 . 00 • CM2 T 12 .30 0 .0268 PF 0 .33 SUBMITTAL SERIAL NO:4126HY1 01-06-2011 PAGE 6 DOW AGROSCIENCES TI BLDG. C .10/TRANSFORMATION OFFICES 120 LIGHT HAZARD Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary From To GPM IN Devices Ft PSI/Ft PSI 80 40DQ -94 . 00 1 .442 L 2 . 30 C=120 PT 24 . 90 ( 40) Q 2 .20 F=T F 5 .40 PE -1 . 00 RN2 T 7. 70 0.0005 PF 0 . 00 60 80 1.442 L 120 . 00 C=120 PT 23 . 90 ( 80) Q 2 .20 F=T/T F 10 . 80 PE 0 .00 BL1 T 130.80 0. 0005 PF 0. 07 20 60 1 .442 L 1.70 C=120 PT 23 . 97 ( 60) Q 2 .20 F=T F 5 .40 PE 0 .74 RN1 T 7 .10 0. 0005 PF 0 . 00 19 2ODQ 102 .51 2 .635 L 12 . 30 C=120 PT 24 .71 ( 20) Q 104 . 71 F=0 F 0. 00 PE 0 . 00 CM3 T 12 .30 0.0314 PF 0 .39 PT 25 .10 ( 19) 39 40 2 .635 L 12 . 30 C=120 PT 24 . 90 ( 40) Q 94 . 00 F=0 F 0.00 PE 0 . 00 CM2 T 12 .30 0.0257 PF 0.32 79 39DQ -90 . 77 1 .442 L 2 .30 C=120 PT 25.22 ( 39) Q 3 .23 F=T F 5.40 PE -1.00 RN2 T 7 . 70 0. 0009 PF 0 . 01 • 59 79 1.442 L 120 . 00 C=120 PT 24 .23 ( 79) Q 3 .23 F=T/T F 10 .80 PE 0 . 00 BL1 T 130 .80 0. 0009 PF 0 . 12 19 59 1 .442 L 1 . 70 C=120 PT 24 .35 ( 59) Q 3 .23 F=T F 5.40 PE 0 .74 RN1 T 7 . 10 0.0009 PF 0. 01 18 19DQ 104 .71 2 .635 L 12 .30 C=120 PT 25 .10 ( 19) Q 107 . 94 F=0 F 0 .00 PE 0 . 00 CM3 T 12 . 30 0. 0332 PF 0.41 PT 25 .51 ( 18) 38 39 2 . 635 L 12 .30 C=120 PT 25 .22 ( 39) Q 90 .77 F=0 F 0 . 00 PE 0. 00 CM2 T 12 . 30 0. 0241 PF 0 . 30 78 38DQ -86 .32 1 .442 L 2 .30 C=120 PT 25 . 52 ( 38) Q 4 .45 F=T F 5 .40 PE -1 . 00 RN2 T 7. 70 0. 0017 PF 0 . 01 SUBMITTAL SERIAL NO:4126HY1 01-06-2011 PAGE 7 DOW AGROSCIENCES TI BLDG. C . 10/TRANSFORMATION OFFICES 120 LIGHT HAZARD Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary " From To GPM IN Devices Ft PSI/Ft PSI 58 78 1.442 L 120 . 00 C=120 PT 24 . 53 ( 78) Q 4 .45 F=T/T F 10 .80 PE 0. 00 BL1 T 130 .80 0. 0017 PF 0. 22 18 58 1 .442 L 1 . 70 C=120 PT 24 .75 ( 58) Q 4 .45 F=T F 5.40 PE 0 . 74 RN1 T 7 .10 0 .0017 PF 0 . 01 17 18DQ 107 . 94 2 .635 L 12 .30 C=120 PT 25 .50 ( 18) Q 112 .39 F=0 F 0 .00 PE 0 . 00 CM3 T 12 . 30 0.0358 PF 0 .44 PT 25 . 94 ( 17) 37 38 2 .635 L 12 .30 C=120 PT 25 . 51 ( 38) Q 86 .32 F=0 F 0 .00 PE 0. 00 CM2 T 12 .30 0.0219 PF 0 .27 77 37DQ -80.43 1.442 L 2 . 30 C=120 PT 25 .78 ( 37) Q 5 . 89 F=T F 5.40 PE -1 . 00 RN2 T 7 .70 0.0029 PF 0 .02 57 77 1 .442 L 120. 00 C=120 PT 24 . 80 ( 77) Q 5. 89 F=T/T F 10. 80 PE 0 .00 BL1 T 130 . 80 0. 0029 PF 0 .38 17 57 1.442 L 1 .70 C=120 PT 25 .18 ( 57) Q 5 .89 F=T F 5 .40 PE 0 .74 RN1 T 7 . 10 0 .0029 PF 0 . 02 16 17DQ 112 .39 2 .635 L 12 .30 C=120 PT 25 . 94 ( 17) Q 118 .29 F=0 F 0 . 00 PE 0 . 00 CM3 T 12 . 30 0 . 0393 PF 0 .48 PT 26 .42 ( 16) 36 37 2 .635 L 12 .30 C=120 PT 25 . 78 ( 37) Q 80 .43 F=0 F 0.00 PE 0 . 00 CM2 T 12 .30 0.0193 PF 0 .24 76 36DQ -72 . 86 1 .442 L 2 .30 C=120 PT 26 . 02 ( 36) Q 7 .56 F=T F 5 .40 PE -1 . 00 RN2 T 7 . 70 0 .0046 PF 0 . 04 56 76 1 .442 L 120.00 C=120 PT 25. 06 ( 76) Q 7 .56 F=T/T F 10 . 80 PE 0 . 00 BL1 T 130 . 80 0. 0046 PF 0 .60 SUBMITTAL SERIAL NO:4126HY1 01-06-2011 PAGE 8 DOW AGROSCIENCES TI BLDG. C .10/TRANSFORMATION OFFICES 120 LIGHT HAZARD Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary " From To GPM IN Devices Ft PSI/Ft PSI 16 56 1.442 L 1 .70 C=120 PT 25 .66 ( 56) Q 7 . 56 F=T F 5 .40 PE 0 .74 RN1 T 7 .10 0 . 0046 PF 0 . 03 15 16DQ 118 .29 2 .635 L 12 .30 C=120 PT 26 .43 ( 16) Q 125 .85 F=0 F 0. 00 PE 0 . 00 CM3 T 12 . 30 0. 0441 PF 0.54 PT 26 . 97 ( 15) 35 36 2 .635 L 12 .30 C=120 PT 26 . 02 ( 36) Q 72 .86 F=0 F 0 .00 PE 0 . 00 CM2 T 12 .30 0 . 0160 PF 0 .20 75 35DQ -63 . 38 1.442 L 2 .30 C=120 PT 26 .22 ( 35) Q 9 .48 F=T F 5 .40 PE -1 . 00 RN2 T 7 .70 0. 0069 PF 0. 05 55 75 1.442 L 120 . 00 C=120 PT 25.27 ( 75) Q 9.48 F=T/T F 10. 80 PE 0 .00 BL1 T 130 .80 0.0069 PF 0 .90 . 15 55 1.442 L 1 .70 C=120 PT 26 .17 ( 55) Q 9.48 F=T F 5 .40 PE 0 .74 RN1 T 7 . 10 0. 0069 PF 0 . 05 14 15DQ 125 .85 2 .635 L 12 .30 C=120 PT 26 . 96 ( 15) Q 135 .33 F=0 F 0. 00 PE 0 . 00 CM3 T 12 .30 0. 0504 PF 0. 62 PT 27 .58 ( 14) 34 35 2 .635 L 61. 00 C=120 PT 26 .22 ( 35) Q 63 .38 F=2E F 8 .60 PE 0 . 00 CM2 T 69.60 0. 0124 PF 0 . 86 74 34DQ -53 .23 1 .442 L 2 .30 C=120 PT 27 . 08 ( 34) Q 10 . 15 F=T F 5 .40 PE -1 . 00 RN2 T 7 . 70 0 . 0079 PF 0. 06 54 74 1 .442 L 72 .00 C=120 PT 26 .14 ( 74) Q 10.15 F=T/T F 10. 80 PE 0. 00 BL1 T 82 .80 0 .0079 PF 0 .65 14 54 1.442 L 1 .70 C=120 PT 26 .79 ( 54) Q 10 . 15 F=T F 5.40 PE 0 .74 RN1 T 7 .10 0 .0079 PF 0. 06 SUBMITTAL SERIAL NO:4126HY1 01-06-2011 PAGE 9 DOW AGROSCIENCES TI BLDG. C .10/TRANSFORMATION OFFICES 120 LIGHT HAZARD Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary From To GPM IN Devices Ft PSI/Ft PSI 13 14DQ 135 .33 2 .635 L 12 . 30 C=120 PT 27. 59 ( 14) Q 145.48 F=0 F 0. 00 PE 0. 00 CM3 T 12 . 30 0.0576 PF 0. 71 PT 28 .30 ( 13) 33 34 2 . 635 L 12 .30 C=120 PT 27 . 08 ( 34) Q 53 .23 F=0 F 0. 00 PE 0. 00 CM2 T 12 .30 0. 0090 PF 0 . 11 73 33DQ -39. 38 1 .442 L 2 .30 C=120 PT 27 . 19 ( 33) Q 13 . 85 F=T F 5 .40 PE -1 .00 RN2 T 7 . 70 0. 0140 PF 0 .11 53 73 1 .442 L 72 . 00 C=120 PT 26 .30 ( 73) Q 13 .85 F=T/T F 10. 80 PE 0 . 00 BL1 T 82 . 80 0. 0140 PF 1 . 16 13 53 1 .442 L 1. 70 C=120 PT 27 .46 ( 53) Q 13 . 85 F=T F 5.40 PE 0.74 RN1 T 7. 10 0.0140 PF 0 .10 12 13DQ 145.48 2 . 635 L 12 .30 C=120 PT 28 . 30 ( 13) Q 159. 34 F=0 F 0 . 00 PE 0. 00 CM3 T 12 .30 0 . 0682 PF 0 .84 PT 29 . 14 ( 12) 32 33 2 .635 L 12 .30 C=120 PT 27. 19 ( 33) Q 39.38 F=0 F 0.00 PE 0 . 00 CM2 T 12 .30 0.0051 PF 0. 06 72 32DQ -21 . 71 1.442 L 2 .30 C=120 PT 27 .25 ( 32) Q 17 . 66 F=T F 5.40 PE -1 . 00 RN2 T 7. 70 0.0220 PF 0 . 17 52 72 1.442 L 72 . 00 C=120 PT 26 .42 ( 72) Q 17. 66 F=T/T F 10 .80 PE 0 .00 BL1 T 82 . 80 0.0220 PF 1 . 82 12 52 1 .442 L 1. 70 C=120 PT 28.24 ( 52) Q 17 .66 F=T F 5.40 PE 0 . 74 RN1 T 7.10 0. 0220 PF 0 . 16 11 12DQ 159. 34 2 . 635 L 12.30 C=120 PT 29 .14 ( 12) Q 177. 00 F=0 F 0.00 PE 0.00 CM3 T 12 .30 0. 0828 PF 1 . 02 PT 30. 16 ( 11) SUBMITTAL SERIAL NO:4126HY1 01-06-2011 PAGE 10 DOW AGROSCIENCES TI BLDG. C .10/TRANSFORMATION OFFICES 120 LIGHT HAZARD Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary From To GPM IN Devices Ft PSI/Ft PSI 31 32 2 . 635 L 12 .30 C=120 PT 27 .25 ( 32) Q 21 . 71 F=0 F 0 . 00 PE 0 . 00 CM2 T 12 .30 0 . 0017 PF 0 . 02 71 31 1 .442 L 2 .30 C=120 PT 27 .27 ( 31) Q 21 . 71 F=T F 5.40 PE -1 . 00 RN2 T 7 . 70 0 .0322 PF 0 .25 51 71 1.442 L 72 . 00 C=120 PT 26 . 52 ( 71) Q 21 .71 F=T/T F 10. 80 PE 0.00 BL1 T 82 .80 0 .0322 PF 2 .67 11 51 1.442 L 1 .70 C=120 PT 29 . 19 ( 51) Q 21 . 71 F=T F 5.40 PE 0 . 74 RN1 T 7 . 10 0 . 0322 PF 0 .23 7 11DQ 177 . 00 2 .635 L 13 . 00 C=120 PT 30 .16 ( 11) Q 198 . 71 F=2E F 8 .60 PE 0 . 00 F1K1 T 21 .60 0 .1026 PF 2 .22 1 7 4 . 026 L 9 . 20 C=120 PT 32 .38 ( 7) Q 198 .71 F=0 F 0. 00 PE 3 .99 FR2 T 9.20 0 . 0130 PF 0 . 12 0 1 4 .026 L 4 . 00 C=120 PT 36 .49 ( 1) Q 198 .71 F=DDC F 0 . 00 PE 1 .73 FR1 T 4 . 00 0 . 0130 PF 0 .05 4" AMES 300a DBL. CHECK DET. ASSY. 2 .99 COMMENT: INCLUDES FRICTION LOSS FOR 4 INCH DDCVA PT 41 .27 ( 0) Sigma Dynamics Corporation ' DOW AGROSCIENCES TI 7700 Supply! Demand Graph . 250 • 240! Margin 220 Pressure 61.78 PSI Flow 1104.87 GPM 20 210 200 190 180 170 1601 150 m 140 n. 130 i 120� eg. 1101 r 100 0 ..,.... 80 • 70 601 50 v5� 40 • ® - 30 .? 20 , ' NM 10 0 - Boo 700 800 1000 0100 200 300 400 500 Water Flow(GPM) System Demand.. Water Supply..tic 105.00 PSI Sprinkler Demand 41.26 PSI @ 198.71 GPM Stai Residual 10 0 PSI @ 852.00 GPM Additional Flows 0.00 GPM Hose at Source 0.00 GPM Elevation 0.00 PSI Total Demand 41.26 PSI @ 198.71 GPM