Loading...
Plans PERMANENT PLAQUE NOT LESS THAN a rr 50 SQ INCHES IN AREA TO BE PLACED TYPE A IN C❑NSPICU❑US LOCATION STATING r= • y , , � 1 RECEIVED 2200# CAPACITY @ 90', 180' Code V GL/ SI41� ny 0 '� • MAR 3 2020 MAX 1-3 COrICret. c,: a rCei I T.. CITY OF TIGARD I m 'I i LOAD BEAM gg 8o te' ' '- ..,,,;,;:a,s BUILDING DIVISION q i_ Sped&Mc: ,ng Concrete Frame �; • 11 C❑NNECT❑R I k+lnln :r sing SteeITendons c.I.001 PROM 7' 6' g / 0 Hignarrr=s 119/ 0 3trucicl e :- o• T ON a L r r; ra18 U 16'-0' . nn LOAD BEAM ao eCN J. Oe's ":.„t Sr .1._ ;s Materials �C❑NNECT❑R � � :':� DATE: I2l�oLo Z 1.-1 i'.. • ais ris 7'-6' L BRACE-/ u i i i:r ...... .. . ;)1 aria Filling LL lL UPRIGHT LOAD BEAM ELEVATI❑N `-" " In V) CY `. ♦— Q w `'- U H- - - rn Q Q o Q o Q (/) 14GA THK COLUMN 3' a� + Q z o 1 4 3. 9c, of 3/8x 4x 7 BASEPLATE ~zi W2WUW Q' Q- Q " C 1.5 x 1S 1.5 (2) 1/2'A ANCHORS I J C9 J 0 3/8 x 4 x 7 1/8 1-1/2' S'oc W Z W (n c r, BASEPLATE ,14 GA THK I—I BRACE % EA SIDE W X Q v _mW W Q (� (2) 1/2'd ANCHORS FIL�ET1 WELD '74FF v) o J CE Q > w W ~3 EA END T❑ COLUMN , ` 5" 3,25' w I j BRACE 1/e �1' eP 6' W J m¢ W (/) 1/8 r1-1/2' EA FACE V7 Z BRACE CONN 6' CONCRETE SLAB ON GRADE W U Z O COLUMN & BASE PL ` Grit Or�;�D IV ra COLUMN BASE X-SECTION I" 3 3 �: w O� RLYIEEI)PUtI G � $ U II az a z w 0 Apprali a t' • - �' w I- U Li qj a [. >,J : J v) J W E7 Z OTC: i 11 I L_ Q .D ¢ m i , � W r1 CI- m ' Permlt#t �vl, a�,z(7 -rival -I ccr �u w W N w Address: 1 94 6u1 ��-^'� LLI II u \° w w c� " w O CONNECTOR .Suite#i i ♦ CI- IA V1 Ln J O 0 H a L __ 1_518H x 1 W <3) PIN CONK Z 0 0 1- o 1 4.5 o (3) AISI A502-2 RIVETS n 0 Br j`' Cr 'Valet -iC9% Q ¢ U W Q o LOAD BEAM 7/16'0 2'oc 0 8F I, • I GA THICK O qi 15/8x3x o F- Q Q W O CONNECT❑R 0 SAFETY PIN TO RESIST Z II (� J N Q LOAD BEAM 1000* UPLIFT LOAD r „ „ CL COLUMN-BEAM C❑NN r, nI �' v In PERMANENT PLAQUE NOT LESS THAN TYPE 1B" 50 SQ INCHES IN AREA TO BE PLACED IN C❑NSPICU❑US L❑CATION STATING 2200# CAPACITY @ 90' 3'-8' 12'-0" MAX z f LOAD BEAM ��c�Ea P NQE�'�o Dmi un �`' 11949 s A o 12' 0" CONNECTOR OR..'1' 1 OFC` 3 A�~�r x 7'-6' N J. R1�� BRACE- o I H '- u L3 _ x.P. DATE•: 1 2/ z E. U a a UPRIGHT LOAD BEAM ELEVATION OC Ir1 0 , I Q w `' U L7 1- (4 In V) I—I Q Q o Q o Q (/) 14 GA THK .o f COLUMN 3 U oa . 'H' Q N Z 73 3. tic, 0 3/8x 5x 8 BASEPLATE W U=7 W U W It Cr <E C 1.5 x 1.5 1.5 a (1) 1/2'0 ANCHOR I J Ee _J ClJ c 3/8'x 5'x 8' 16 GA THK n 1/8 1-1/2' LUX Z W ~ c 2' OF 1/8' BRACE EA SIDE , W w c au BASEPLATE x V) VI W Q <1) 1/2"0 ANCHORS FILLET WELD W X ¢ Li Ce �- 3" EA END TO COLUMN-- FT (/1 0 q w W N ° 3.25" w I j 75 1/8 �1 1/z' EA FACE BRACE 1/8' I1• �43� 6' -- w m¢ Z - W (/) ^ `I 6' CONCRETE SLAB ON GRADE Q X Q c w CO W W (n COLUMN & BASE PL BRACE C❑NN ds 1n W .o o N Q 7 0 COLUMN BASE X—SECTI❑N 3 Z 3 !I, Z w (A I-H Cr., U II OaN L� '- 2 I� JUJ w � Z 5 H TJx J � JwC7 Z CWli Q �0QCD i�. e ' LIJ 4- � S CU CO W W W 'I U V) w C'7 IL 3 — r w 11 W � (n A j .� 1-5/8'H x 1" W (3) PIN CONN 0 0 —CONNECTOR Ow.. 0 7 Ul J 0 o �Z-' o cu STEP z 0 ! J J ai 4.5' 0 (3) AISI A502-2 RIVETS 0 Q LOAD BEAM 7/16•� 2'oc J 1... z ¢ C U00 16 GA THICK o S 0 � to II Z U I W HOOK THRU SLOTSW II W G] _ W OD 1-5/8x 3x� o IN COLUMN 0 i- II 7 i- - Q U --. O- `-' u' O 2,75' 3/16' THK 0 O 11 U < WOZ > (n 1/8V VERT EDGES 0 Z II (n _IZ N Q o CONNECTOR 0 SAFETY PIN TO RESIST q LOAD BEAM 1000* UPLIFT LOAD ,-, r, CL o COLUMN—BEAM C❑NN N r) �' TYPE 1C" PERMANENT PLAQUE NOT LESS THAN 50 SQ INCHES IN AREA TO BE PLACED IN C❑NSPICUOUS LOCATION STATING 1600# CAPACITY @ 90' 3'-8" 12'-0' [ MAX LOAD BEAM I ��Ed PROF 4_, z w\ iu C�� 26 i N F6 may a `-CONNECTOR 11949 A �� v 10'-0" ORE/ • z 7.-6" e FC- 3 199'1' BRACE J = _ / J. Re o 0 o U a_ ac EXR DATE: 12/ tO t? a_ I__. Z UPRIGHT LOAD BEAM ELEVATI❑N 0 1 Lc) 0 CZ I w `� L) L7 E- v) In v) IH ii Q oraz Q (/) f 0 Q p -- o =in a 14GA THK U ~ C] z � o d ¢ Z 75 1 5/8' �Py0 COLUMN 3-I W (Dw C--) W It n Q c L., 0.13"x 3"x 4" u O.13x 3x 4 BASEPLATE I J J — • C 1.5 x 1.5 1.5 W � w N BASEPLATE <u 1/2'� ANCHOR CI) W (N 0 0 (1) 1/2"b ANCHOR 2"1 O GA THK n BRACE % 1/8 F1-1/2' X Q (N/1 - W Q ro 3' FILLET WELD EA SIDE o J W 0� W EA END TO COLUMN FF g 1/8 r1-1/2' EA FACE BRACE 6' I \ Q m i_ 3 W W 1/8' rt' q- I 3.25" vUi — �/, Iw-- � Cr)¢ z � W (� COLUMN & BASE PL 6" ¢ Y a CO\ W ri BRACE CONN I 6' CONCRETE SLAB ON GRADE Z as 3 z 3 i° 0 NI w5 in I—I 0's, 5 COLUMN BASE X-SECTI❑N II 1-4 J w . Z O d 2 >,_J % J v) JWp Zjci COL_ Q ;4) Q m .- � . o o N _J �I u \O > Ii (.lIL 5 ' CONNECTOR w 0- J C7 0 Z 1-5/8"H x 1' W (3) PIN CONN 0 0 z Q✓ E- N co �� z0 tit QJ . J 4,5" STEP o (3) AISI A502-2 RIVETS 0 W Q U 0_ W Q N = LOAD BEAM 7/16'0 2'oc Z x W o i 16 GA THICK ,.a 0 u 0t W II LU ra W O HOOK THRU SLOTS v1 Z1-5/8x 3x� o IN COLUMN O 0 p i— 1 i E7 II v) Q W lJ Z CL I 0 p 2.75" 3/16' THK 1/8 V VERT EDGES 0 SAFETY PIN TO RESIST Z II q (1 J Q (11 Q a.o CONNECTOR 1000# UPLIFT LOAD .. CL 0 LOAD BEAM .-4 i 4 tri 0 6 cu r COLUMN-BEAM CONN Calculations for : STOUT TANKS r; TIGARD , OR 02/18/2020 Loading: 2300 # load levels 2 pallet levels @ 90, 180 Seismic per IBC 2018 10096 Utilization Sds = 0 . 682 Sdl = 0 . 682 I = 1 . 00 144 " Load Beams Uprights : 44 " wide C 3 . 000x 3 . 000x 0 . 075 Columns C 1 . 500x 1 . 500x 0 . 075 Braces 4 . 00x 7 . 00x 0 . 375 Base Plates with 2- 0 . 500in x 3 . 25in Embed Anchor/Column 4 . 50x 2 . 750x 0 . 060 Load beams w/ 3-Pin Connector by : Ben Riehl Registered Engineer OR# 11949 (R,q PROit v4,�G � NFt•c• ac 11949, �. OFC tq$'1 IF YR DATE: 1-21 '____ 11/26/2019 U.S.Seismic Design Maps O5H p /suk p 16490 SW 72nd Ave, Tigard, OR 97224, USA Latitude, Longitude: 45.40144, -122.74825709999999 1 General Parts Group Oregon 6us ndss Park I II . iyirdas Store FedEx Ship Center , fig} Concentra Urgent Care ae SW RE ev iod St Map data 02019 Date 11/26/2019,7:38:05 AM Design Code Reference Document ASCE7-16 Risk Category II Site Class D-Default(See Section 11.4.3) Type Value Description Ss 0.853 MCER ground motion.(for 0.2 second period) Si 0.39 MCER ground motion.(for 1.0s period) SMS 1.023 Site-modified spectral acceleration value SM1 null-See Section 11.4.8 Site-modified spectral acceleration value Sos 0.682 Numeric seismic design value at 0.2 second SA SD1 null-See Section 11.4.8 Numeric seismic design value at 1.0 second SA Type Value Description SDC null-See Section 11.4.8 Seismic design category Fa 1.2 Site amplification factor at 0.2 second Fv null-See Section 11.4.8 Site amplification factor at 1.0 second PGA 0.388 MCEG peak ground acceleration FpGq 1.212 Site amplification factor at PGA PGA 0.47 Site modified peak ground acceleration Ti_ 16 Long-period transition period in seconds SsRT 0.853 Probabilistic risk-targeted ground motion.(0.2 second) SsUH 0.962 Factored uniform-hazard(2%probability of exceedance in 50 years)spectral acceleration , SsD 1.5 Factored deterministic acceleration value.(0.2 second) S1 RT 0.39 Probabilistic risk-targeted ground motion.(1.0 second) S1 UH 0.45 Factored uniform-hazard(2%probability of exceedance in 50 years)spectral acceleration. I S1D 0.6 Factored deterministic acceleration value.(1.0 second) PGAd 0.5 Factored deterministic acceleration value.(Peak Ground Acceleration) CRS 0.886 Mapped value of the risk coefficient at short periods CR1 0.866 Mapped value of the risk coefficient at a period of 1 s https://seismicmaps.org 1/2 IBC 2018 LOADING SEISMIC: Ss= 85.3 % g S1= 39.0 % g Fv= 2 T= 1.66 Soil Class D 1.5Ts = 1.14 Modified Design spectral response parameters Sms= 102.3 % g Sds= 68.2 %g Sm1= 78.0 % g Sd1= 52.0 % g Sm1 EQ= 102.3 % g Sd1 EQ = 68.2 % g Seismic Use Group 2 Seismic Design Category D or D le = 1 R= 3.5 R = 3 Cs = 0.1949 W Cs= 0.2273 W Using Working Stress Design V= Cs*W/1.4 V= 0.1392 W V= 0.1624 W Cold Formed Channel Depth 3.000 in Fy = 55 ksi Flange 3.000 in Lip 0.750 in Thickness 0.0750 in COLUMN SECTION R 0.1000 in Blank = 9.96 in wt = 2.5 plf A = 0.747 in2 Ix = 1.191 in4 Sx = 0.794 in3 Rx = 1.263 in Iy = 0.935 in4 Sy = 0.544 in3 Ry = 1.119 in a 2.6500 Web w/t 35.3333 a bar 2.9250 Flg w/t 35 .3333 b 2.6500 x bar 1.2423 b bar 2.9250 m 1.6690 c 0.5750 x0 -2.9114 c bar 0.7125 J 0.0014 u 0.2160 x web 1.2798 gamma 1.0000 x lip 1.7202 R' 0.1375 h/t 38.0000 Section Removing: 0.640 inch slot 0 .75 inches each side of center on web 0.375 inch hole 0.87 inches from web in each flange A- = 0.152 in2 A' = 0.595 in2 x bar = 1.478 in I'x = 1.014 in4 S'x= 0.676 in3 R'x= 1.305 in I'y = 0.743 in4 S'y= 0.476 in3 R'y= 1.117 in Cold Formed Channel Depth 1.500 in Fy = 55 ksi Flange 1.500 in Lip 0.000 in Thickness 0.0750 in BRACE SECTION R 0.1000 in Blank = 4.23 in wt = 1.1 plf A = 0.317 in2 Ix = 0.125 in4 Sx = 0.166 in3 Rx = 0.627 in Iy 0.075 in4 Sy = 0.079 in3 Ry = 0.487 in a 1.1500 Web w/t 15.3333 a bar 1.4250 Flg w/t 17.6667 b 1.3250 x bar 0.5060 b bar 1.4625 m 0.6531 c 0.0000 x0 -1.1592 c bar 0.0000 J 0.0006 u 0.2160 x web 0.5435 gamma 0.0000 x lip 0. 9565 R' 0.1375 h/t 18 .0000 1 Cold Formed Section HEIGHT OF BEAM 4.500 INCHES MAT'L THICKNESS 0.060 INCHES INSIDE RADIUS 0.100 INCHES LOAD BEAM WIDTH 2.750 INCHES STEEL YIELD 55.0 KSI STEP 1.625 INCHES HIGH 1.000 INCHES WIDE ABOUT THE HORIZONTAL AXIS ABOUT THE VERTIC L Y LY LY2 Ii X LX LONG SIDE 4.1800 2.2500 9.4050 21.1613 6.0862 0.0300 0.1254 TOP 1.4300 4.4700 6.3921 28.5727 0.0000 0.8750 1.2513 STEP SIDE 1.3650 3.6575 4.9925 18.2600 0.2119 1.7200 2.3478 STEP BOTT 0.7400 2.8450 2.1053 5.9896 0.0000 2.2200 1.6428 SHORT SID 2.5550 1.4375 3.6728 5.2797 1.3899 2.7200 6.9496 BOTTOM 2.4300 0.0300 0.0729 0.0022 0.0000 1.3750 3.3413 CORNERS 0.2042 4.4228 0.9031 3.9944 0.0003 0.0772 0.0158 2 0.2042 4.4228 0.9031 3.9944 0.0003 1.6728 0.3416 3 0.2042 2.8922 0.5906 1.7082 0.0003 1.7972 0.3670 4 0.2042 2.7978 0.5713 1.5984 0.0003 2.6728 0.5458 5 0.2042 0.0772 0.0158 0.0012 0.0003 2.6728 0.5458 6 0.2042 0.0772 0.0158 0.0012 0.0003 0.0772 0.0158 TOTALS 13.9252 29.3800 29.6403 90.5632 7.6901 17.9100 17.4898 AREA = 0.836 IN2 CENTER GRAVITY = 2.129 INCHES TO BASE 1.256 INCHES TO LONG SIDE Ix = 2.110 IN4 Iy = 0.956 IN4 Sx = 0.890 IN3 Sy = 0.640 IN3 Rx = 1.589 IN Ry = 1.070 IN B BEAM END CONNECTOR COLUMN MATERIAL THICKNESS = 0.075 IN LOAD BEAM DEPTH = 4.5 IN TOP OF BEAM TO TOP OF CONN= 0.000 IN WELD @ BTM OF BEAM = 0.000 IN LOAD = 2300 LBS PER PAIR CONNECTOR VERTICAL LOAD = 575 LBS EACH RIVETS 3 RIVETS @ 2 " oc 0.4375 " DIA A502-2 1st @ 1 "BELOW TOP OF CONNECTOR AREA = 0.150 IN2 EACH Fv = 22.0 KSI Vcap = 3.307 KIPS EACH RIVET BEARING Fb = 65.0 KSI BRG CAP= 2 .133 KIPS EACH RIVET TOTAL RIVET VERTICAL CAPACITY = 6.398 KIPS 9% CONNECTOR 6 " LONG CONNECTOR ANGLE Fy = 50 KSI 1.625 " x 3 " x 0.1875 " THICK S = 0.131 IN3 Mcap = 3.924 K-IN 3.924 K-IN RIVET MOMENT RESULTANT @ 0.7 IN FROM BTM OF CONN M = PL L = 0.8 IN Pmax = Mcap/L = 4.905 KIPS RIVET LOAD DIST MOMENT P1 2.844 4.300 12.228 RIVET OK P2 1.521 2.300 3 .498 P3 0.198 0.300 0.060 P4 0.000 0.000 0.000 TOTAL 4.563 15.786 CONNECTOR OK WELDS 0.125 " x 4.500 " FILLET WELD UP OUTSIDE 0.125 " x 2.875 " FILLET WELD UP INSIDE 0.125 " x 1.625 " FILLET WELD UP STEP SIDE O " x 1.000 " FILLET WELD STEP BOTTOM O " x 2.750 " FILLET WELD ACROSS BOTTOM O " x 1.750 " FILLET WELD ACROSS TOP USE EFFECTIVE 0.06 " THICK WELD L = 9.00 IN A = 0.540 IN2 S = 0.405 IN3 Fv = 26.0 KSI Mcap = 10.53 K-IN 10.53 K-IN In Upright Plane Seismic Load Distribution per 2018 IBC Sds = 0.682 1.00 Allowable Stress Increase I = 1.00 R = 4 .0 E = (Sds/R) *I*P1 Weight 60 # per level frame weight Columns @ 44 " Levels Load WiHi Fi FiHi Column: (inches) (#) (k-in) (#) (k-in) C 3 .000x 3.000x 0.075 180 2360 425 359 65 90 2360 212 180 16 O 0 0 0 0 KLx = 90 in 0 0 0 0 0 KLy = 43 in O 0 0 0 0 A = 0.595 in O 0 0 0 0 Pcap = 13249 lbs ---- ---- ---- ---- ---- ---- ---- ---- 4720 637 539 81 Column 32% Stress Max column load = 4198 # Min column load = -482 # Uplift Overturning ( .6- .14Sds)D+ (0.6- .14Sds)Papp- 1.4E = -1383 # MIN (1+0.14Sds)D+ (0 .85+0.14Sds) .7P + .91E = 3261 # MAX REQUIRED HOLD DOWN = -1383 # Anchors: 1 T = 1383 # 2 0.5 in dia HILTI TZ 3.25 inches embed in 3500psi concrete Tcap = 3104 # 45% Stressed V = 283 # per leg Vcap = 5103 # = 6% Stressed COMBINED = 50% Stressed OK Braces: Brace height = 43 " Brace width = 44 " Length = 62 " P = 754 # Use : C 1.500x 1.500x 0.075 A = 0.317 in L/r = 126 Pcap = 3015 # 25% Io In Upright Plane Seismic Load Distribution TOP LOAD ONLY per 2018 IBC Sds = 0.682 1.00 Allowable Stress Increase I = 1.00 R = 4.0 E _ (Sds/R)*I*P1 Weight 60 # per level frame weight Columns @ 44 " Levels Load WiHi Fi FiHi Column: (inches) (#) (k-in) (#) (k-in) C 3 .000x 3 .000x 0.075 180 2360 425 407 73 90 60 5 5 0 O 0 0 0 0 KLx = 90 in O 0 0 0 0 KLy = 43 in O 0 0 0 0 A = 0.595 in O 0 0 0 0 Pcap = 13249 lbs 2420 430 413 74 Column 22% Stress Max column load = 2887 # Min column load = -583 # Uplift Overturning ( .6-.14Sds)D+ (0.6-.14Sds)Papp- 1.4E = -1417 # MIN (1+0.14Sds)D+ (0.85+0.14Sds) .7P + .91E = 2397 # MAX REQUIRED HOLD DOWN = -1417 # Anchors: 1 T = 1417 # 2 0.5 in dia HILTI TZ 3.25 inches embed in 3500psi concrete Tcap = 3104 # 46% Stressed V = 206 # per leg Vcap = 5103 # = 4t Stressed COMBINED = 50% Stressed OK Braces: Brace height = 43 " Brace width = 44 " Length = 62 " P = 577 # Use : C 1.500x 1.500x 0.075 A = 0.317 in L/r = 126 Pcap = 3015 # 19% // PAGE 1 MSU STRESS-11 VERSION 9/89 --- DATE: 02/18/<0 --- TIME OF DAY: 08:37:22 INPUT DATA LISTING TO FOLLOW: Structure Storage Rack in Load Beam Plane 2 Levels Type Plane Frame Number of Joints 10 Number of Supports 6 Number of Members 10 Number of Loadings 1 Joint Coordinates 1 0.0 90.0 S 2 5 8 10 2 0.0 180.0 S 3 73 .5 0.0 S 4 73 .5 90.0 5 73.5 180.0 6 220.5 0.0 S 1 4 7 9 7 220.5 90.0 8 220.5 180.0 9 294.0 90.0 S 10 294.0 180.0 S 6 Joint Releases 3 3 Moment Z 6 Moment Z 1 Force X Moment Z 2 Force X Moment Z 9 Force X Moment Z 10 Force X Moment Z Member Incidences 1 1 4 2 2 5 3 3 4 4 4 5 5 6 7 6 7 8 7 4 7 8 7 9 9 5 8 10 8 10 Member Properties 1 Thru 2 Prismatic Ax 0.836 Ay 0.585 Iz 2.110 3 Thru 6 Prismatic Ax 0.595 Ay 0.298 Iz 1.014 7 Thru 10 Prismatic Ax 0.836 Ay 0.585 Iz 2.110 Constants E 29000. All G 12000. All Tabulate All Loading Dead + Live + Seismic Joint Loads 4 Force Y -1.18 5 Force Y -1.18 7 Force Y -1.18 8 Force Y -1.18 4 Force X 0.032 It PAGE 2 MSU STRESS-11 VERSION 9/89 --- DATE: 02/18/<0 --- TIME OF DAY: 08:37:22 5 Force X 0.064 7 Force X 0.032 8 Force X 0.064 Solve PROBLEM CORRECTLY SPECIFIED, EXECUTION TO PROCEED Seismic Analysis per 2018 IBC wi di widi2 fi fidi # in # 2360 0.9952 2337 64 63 .7 32 64 2360 1.2594 3743 128 161.2 64 128 O 0.0000 0 0 0.0 0 0 O 0.0000 0 0 0.0 0 0 O 0.0000 0 0 0.0 0 0 O 0.0000 0 0 0.0 0 0 4720 6081 192 224.9 192 g = 32.2 ft/sec2 T = 1.6620 sec I = 1.00 Cs = 0.0684 or 0.1137 Sdl = 0.682 Cs min = 0.08525 R = 6 Cs = 0.0852 V = (Cs*I*.7)*W* .7 V = 0.0597 W* .7 = 192 # 100 13 PAGE 3 • MSU STRESS-11 VERSION 9/89 --- DATE: 02/18/<0 --- TIME OF DAY: 08:37:22 Structure Storage Rack in Load Beam Plane 2 Levels Loading Dead + Live + Seismic MEMBER FORCES MEMBER JOINT AXIAL FORCE SHEAR FORCE MOMENT 1 1 0.000 -0.071 0.00 1 4 0.000 0.071 -5.24 2 2 0.000 -0.019 0.00 2 5 0.000 0.019 -1.38 3 3 2.352 0.095 0.00 3 4 -2.352 -0.095 8.58 4 4 1.176 0.060 2.22 4 5 -1.176 -0.060 3.18 5 6 2.352 0.097 0.00 5 7 -2.352 -0. 097 8.70 6 7 1.176 0.068 2.54 6 8 -1. 176 -0. 068 3.58 7 4 -0 . 003 -0.075 -5.56 7 7 0.003 0.075 8 7 0.000 -0.079 l2/ • �.vNe _ -.,rw 8 9 0.000 0.079 0.00 N676. 9 5 0.004 -0.023 -1.80 9 8 -0.004 0 .023 -1.59 10 8 0.000 -0.027 -2.00 10 10 0.000 0.027 0.00 APPLIED JOINT LOADS, FREE JOINTS JOINT FORCE X FORCE Y MOMENT Z 4 0.032 -1.180 0.00 5 0.064 -1.180 0.00 7 0.032 -1.180 0.00 8 0,064 -1.180 0.00 REACTIONS,APPLIED LOADS SUPPORT JOINTS /4 PAGE 4 MSU STRESS-11 VERSION 9/89 --- DATE: 02/18/<0 --- TIME OF DAY: 08:37:22 JOINT FORCE X FORCE Y MOMENT Z 1 0.000 -0.071 0 . 00 2 0.000 -0.019 0.00 3 -0.095 2.352 0.00 6 -0.097 2.352 0.00 9 0.000 0.079 0.00 10 0.000 0. 027 0.00 FREE JOINT DISPLACEMENTS JOINT X-DISPLACEMENT Y-DISPLACEMENT ROTATION 4 0.9952 -0.0123 -0.0023 5 1.2594 -0.0184 -0.0008 7 0.9952 -0.0123 -0.0022 8 1.2594 -0.0184 -0.0006 SUPPORT JOINT DISPLACEMENTS JOINT X-DISPLACEMENT Y-DISPLACEMENT ROTATION 1 0.9952 0.0000 0.0009 2 1.2594 0.0000 0.0000 3 0.0000 0.0000 -0.0154 6 0. 0000 0.0000 -0.0155 9 0.9952 0.0000 0.0013 10 1.2594 0.0000 0.0006 Beam-Column Check C 3.000x 3.000x 0.075 Fy = 55 ksi A = 0.595 in2 Sx = 0.676 in3 Rx = 1.305 in Ry = 1.117 in kx = 1.00 ky = 1.00 Stress Factor 1.000 Point P M Lx Ly Pcap Mcap Ratio 7 2.4 8.7 90.0 43.0 13 .25 22.30 57% 8 1.2 3.6 90.0 43.0 13.25 22.30 25% O 0.0 0.0 90.0 43.0 13.25 22.30 0% O 0.0 0.0 90.0 43.0 13.25 22.30 0% O 0.0 0.0 90.0 43.0 13.25 22.30 0% O 0.0 0.0 90.0 43.0 13.25 22.30 0% Load Beam Check 4.50x 2.750x 0.060 Fy = 55 ksi A = 0.836 in2 E = 29,500 E3 ksi Sx = 0.890 in3 Ix = 2.110 in4 Length = 144 inches Pallet Load 2300 lbs Assume 0.5 pallet load on each beam M = PL/8= 20.70 k-in fb = 23 .27 ksi Fb = 33 ksi 71% Mcap = 29.36 k-in 39.14 k-in with 1/3 increase Defl = 0.72 in = L/ 200 w/ 25% added to one pallet load M = .22 PL = 18.22 k-in 62% g' Base Plate Design Column Load 3.1 kips Allowable Soil 1500 psf basic Assume Footing 17.4 in square on side Soil Pressure 1500 psf Bending: Assume the concrete slab works as a beam that is fixed against rotation at the end of the base plate and is free to deflect at the extreme edge of the assumed footing, but not free to rotate. Mmax = w1"‘2/3 Use 4 "square base plate w = 10.4 psi 1 = 3.69 in Load factor = 1.67 M = 79 #-in 6 in thick slab f'c = 3500 psi s = 6.00 in3 fb = 13 psi Fb = 5 (phi) (f'c".5) = 177 psi OK ! ! Shear : Beam fv = 11 psi Fv = 79 psi OK ! ! Punching fv = 15 psi Fv = 158 psi OK ! ! Base Plate Bending Use 0.375 " thick 1 = 1.5 in w = 197 psi fb = 9446 psi Fb = 37500 psi OK ! ! f , Calculations for : STOUT TANKS TIGARD , OR 02/18/2020 Loading: 2300 # load level @ 124" Seismic per IBC 2018 100% Utilization Sds = 0 . 682 Shc = 0 . 682 I = 1 . 00 144 " Load Beams Uprights : 44 " wide C 3 . 000x 3 . 000x 0 . 075 Columns C 1. 500x 1. 500x 0 . 060 Braces 5 . 00x 8 . 00x 0 . 375 Base Plates with 1- 0 . 500in x 3 . 25in Embed Anchor/Column 4 . 50x 2 . 750x 0 . 060 Load beams w/ 3-Pin Connector by : Ben Riehl Registered Engineer OR# 11949 In Upright Plane Seismic Load Distribution TOP LOAD ONLY per 2018 IBC Sds = 0.682 1.00 Allowable Stress Increase I = 1.00 R = 4.0 E = (Sds/R)*I*P1 Weight 60 # per level frame weight Columns @ 44 " Levels Load WiHi Fi FiHi Column: (inches) (#) (k-in) (#) (k-in) C 3 .000x 3 . 000x 0.075 124 2360 293 402 50 0 0 0 0 0 0 0 0 0 0 KLx = 210.8 in 0 0 0 0 0 KLy = 41 in 0 0 0 0 0 A = 0.595 in 0 0 0 0 0 Pcap = 3465 lbs ---- ---- ---- ---- ---- ---- ---- ---- 2360 293 402 50 Column 67% Stress Max column load = 2314 # Min column load = -67 # Uplift Overturning ( .6-.14Sds)D+ (0.6-.14Sds)Papp- 1.4E = -740 # MIN (1+0.14Sds)D+ (0.85+0.14Sds) .7P + .91E = 1870 # MAX REQUIRED HOLD DOWN = -740 # Anchors: 1 T = 740 # 1 0.5 in dia HILTI TZ 3.25 inches embed in 3500psi concrete Tcap = 2025 # 37% Stressed V = 201 # per leg Vcap = 2551 # = 8% Stressed COMBINED = 44% Stressed OK Braces: Brace height = 41 " Brace width = 44 " Length = 60 " P = 550 # Use : C 1.500x 1.500x 0.060 A = 0.278 in L/r = 113 Pcap = 3301 # 17% PAGE 1 MSU STRESS-11 VERSION 9/89 --- DATE: 02/18/<0 --- TIME OF DAY: 08:50:17 INPUT DATA LISTING TO FOLLOW: Structure Storage Rack in Load Beam Plane 1 Levels Type Plane Frame Number of Joints 6 Number of Supports 4 Number of Members 5 Number of Loadings 1 Joint Coordinates 1 0 . 0 124.0 S 1 3 5 6 2 73 .5 0.0 S 3 73.5 124.0 4 220.5 0.0 S 5 220.5 124.0 6 294.0 124.0 S 2 4 Joint Releases 1 Force X Moment Z 6 Force X Moment Z 2 Moment Z 4 Moment Z Member Incidences 1 1 3 2 2 3 3 4 5 4 3 5 5 5 6 Member Properties 1 Prismatic Ax 1.500 Ay 0.800 Iz 7.600 2 Thru 3 Prismatic Ax 0.600 Ay 0.300 Iz 1. 000 4 Thru 5 Prismatic Ax 1.500 Ay 0.800 Iz 7.600 Constants E 29000. All G 12000. All Tabulate All Loading Dead + Live + Seismic Joint Loads 3 Force Y -1.18 5 Force Y -1.18 3 Force X 0.071 5 Force X 0.071 Solve PROBLEM CORRECTLY SPECIFIED, EXECUTION TO PROCEED PAGE 2 MSU STRESS-11 VERSION 9/89 --- DATE: 02/18/<0 --- TIME OF DAY: 08:50:17 Structure Storage Rack in Load Beam Plane 1 Levels Loading Dead + Live + Seismic MEMBER FORCES MEMBER JOINT AXIAL FORCE SHEAR FORCE MOMENT 1 1 0.000 -0.056 0.00 1 3 0.000 0.056 -4.10 2 2 1.176 0.071 0.00 2 3 -1.176 -0.071 8.75 3 4 1.176 0.071 0.00 3 5 -1.176 -0.071 8.86 4 3 0.000 -0.060 -4 .64 4 5 0.000 0.060 -4 .16 5 5 0.000 -0.064 (4.70.N. ,6j.1.4 5 6 0.000 0.064 v.0 , ` " - APPLIED JOINT LOADS, FREE JOINTS /� JOINT FORCE X FORCE Y MOMENT Z 3 0.071 -1.180 0.00 5 0.071 -1.180 0.00 REACTIONS,APPLIED LOADS SUPPORT JOINTS JOINT FORCE X FORCE Y MOMENT Z 1 0.000 -0.056 0.00 2 -0.071 1.176 0.00 4 -0.071 1.176 0.00 6 0.000 0.064 0.00 FREE JOINT DISPLACEMENTS JOINT X-DISPLACEMENT Y-DISPLACEMENT ROTATION 3 1.6199 -0.0084 -0.0006 5 1.6199 -0.0084 -0.0004 V PAGE 3 MSU STRESS-11 VERSION 9/89 --- DATE: 02/18/<0 --- TIME OF DAY: 08:50:17 SUPPORT JOINT DISPLACEMENTS JOINT X-DISPLACEMENT Y-DISPLACEMENT ROTATION 1 1.6199 0.0000 0.0001 2 0.0000 0.0000 -0.0193 4 0.0000 0.0000 -0.0194 6 1.6199 0.0000 0.0004 Seismic Analysis per 2018 IBC wi di widi2 fi fidi # in # 2360 1.6199 6193 142 230.0 70 141 O 0.0000 0 0 0 . 0 0 0 O 0.0000 0 0 0 . 0 0 0 O 0.0000 0 0 0 .0 0 0 0 0.0000 0 0 0.0 0 0 0 0.0000 0 0 0.0 0 0 2360 6193 142 230.0 141 g = 32.2 ft/sec2 T = 1.6585 sec I = 1.00 Cs = 0.0685 or 0.1137 Sdl = 0.682 Cs min = 0.08525 R = 6 Cs = 0.0852 V = (Cs*I* .7) *W V = 0.0597 W = 141 # 99%- Beam-Column Check C 3.000x 3.000x 0.075 Fy = 55 ksi - A = 0.595 in2 Sx = 0.676 in3 Rx = 1.305 in Ry = 1.117 in kx = 1.70 ky = 1.00 Stress Factor 1.000 Point P M Lx Ly Pcap Mcap Ratio 5 1.2 8.9 124.0 41.0 3.47 22.30 74% 0 0.0 0.0 124.0 41.0 3.47 22.30 0% 0 0.0 0.0 124.0 41.0 3.47 22.30 0% 0 0.0 0.0 124.0 41.0 3.47 22.30 0% 0 0.0 0.0 124.0 41.0 3.47 22.30 0% 0 0.0 0.0 124.0 41.0 3.47 22.30 0% Load Beam Check 4.50x 2.750x 0.060 Fy = 55 ksi A = 0.836 in2 E = 29,500 E3 ksi Sx = 0.890 in3 Ix = 2 .110 in4 Length = 144 inches Pallet Load 2300 lbs Assume 0.5 pallet load on each beam M = PL/8= 20.70 k-in fb = 23.27 ksi Fb = 33 ksi 71% Mcap = 29.36 k-in 39.14 k-in with 1/3 increase Defl = 0.72 in = L/ 200 w/ 25% added to one pallet load M = .22 PL = 18.22 k-in 62% Z3 Base Plate Design Column Load 1.5 kips Allowable Soil 1500 psf basic Assume Footing 11.8 in square on side Soil Pressure 1500 psf Bending: Assume the concrete slab works as a beam that is fixed against rotation at the end of the base plate and is free to deflect at the extreme edge of the assumed footing, but not free to rotate. Mmax = w1A2/3 Use 5 "square base plate w = 10.4 psi 1 = 0.41 in Load factor = 1.67 M = 1 #-in 6 in thick slab f'c = 3500 psi s = 6.00 in3 fb = 0 psi Fb = 5(phi) (f'c'.5) = 177 psi OK ! ! Shear : Beam fv = 1 psi Fv = 79 psi OK 11 Punching fv = 1 psi Fir = 158 psi OK ! ! Base Plate Bending Use 0.375 " thick 1 = 1.5 in w = 58 psi fb = 2793 psi Fb = 37500 psi OK ! ! Calculations for : STOUT TANK S TIGARD , OR 02/18/2020 Loading: 1600 # load level @ 120" Seismic per IBC 2018 100% Utilization Sds = 0 . 682 Shc = 0 . 682 I = 1 . 00 144 " Load Beams Uprights : 44 " wide C 3 . 000x 1 . 625x 0 . 075 Columns C 1 . 500x 1 . 500x 0 . 060 Braces 3 . 00x 4 . 00x 0 . 130 Base Plates with 1- 0 . 500in x 3 . 25in Embed Anchor/Column 4 . 50x 2 . 750x 0 . 060 Load beams w/ 3-Pin Connector by : Ben Riehl Registered Engineer OR# 11949 i f Cold Formed Channel Depth 3.000 in Fy = 55 ksi Flange 1.625 in Lip 0.750 in Thickness 0.0750 in COLUMN SECTION R 0.1000 in Blank = 7.21 in wt = 1.8 plf A = 0.541 in2 Ix = 0.750 in4 Sx = 0.500 in3 Rx = 1.177 in Iy = 0.217 in4 Sy = 0.223 in3 Ry = 0.633 in a 2.6500 Web w/t 35.3333 a bar 2.9250 Flg w/t 17.0000 b 1.2750 x bar 0.6139 b bar 1.5500 m 0.9488 c 0.5750 x0 -1.5627 c bar 0.7125 J 0.0010 u 0.2160 x web 0.6514 gamma 1.0000 x lip 0.9736 R' 0.1375 h/t 38.0000 Section Removing: 0.640 inch slot 0.75 inches each side of center on web 0.375 inch hole 0.87 inches from web in each flange A- = 0.152 in2 A' = 0.389 in2 x bar = 0.728 in I'x = 0.573 in4 S'x= 0 .382 in3 R'x= 1.213 in I'y = 0.172 in4 S'y= 0.184 in3 R'y= 0 .665 in Cold Formed Channel Depth 1.500 in Fy = 55 ksi Flange 1.500 in Lip 0.300 in Thickness 0.0600 in BRACE SECTION R 0.1000 in Blank = 4.64 in wt = 0 .9 plf A = 0.278 in2 Ix = 0.108 in4 Sx = 0.145 in3 Rx = 0.624 in Iy = 0.079 in4 Sy = 0. 088 in3 Ry = 0.532 in a 1.1800 Web w/t 19.6667 a bar 1.4400 Flg w/t 19.6667 b 1.1800 x bar 0.5802 b bar 1.4400 m 0.8072 c 0.1400 x0 -1.3875 c bar 0.2700 J 0.0003 u 0.2042 x web 0.6102 gamma 1.0000 x lip 0.8898 R' 0.1300 h/t 23.0000 In Upright Plane Seismic Load Distribution TOP LOAD ONLY per 2018 IBC Sds = 0 .682 1.00 Allowable Stress Increase I = 1.00 R = 4 .0 E = (Sds/R) *I*P1 Weight 60 # per level frame weight Columns @ 44 " Levels Load WiHi Fi FiHi Column: (inches) (#) (k-in) (#) (k-in) C 3.000x 1.625x 0.075 120 1660 199 283 34 O 0 0 0 0 O 0 0 0 0 KLx = 204 in O 0 0 0 0 KLy = 50 in O 0 0 0 0 A = 0.389 in O 0 0 0 0 Pcap = 2090 lbs ---- ---- ---- ---- ---- ---- ---- ---- 1660 199 283 34 Column 77% Stress Max column load = 1602 # Min column load = -21 # Uplift Overturning (.6- .14Sds)D+ (0.6-.14Sds)Papp- 1.4E = -488 # MIN (1+0.14Sds)D+ (0.85+0.14Sds) .7P + .91E = 1295 # MAX REQUIRED HOLD DOWN = -488 # Anchors: 1 T = 488 # 1 0.5 in dia HILTI TZ 3.25 inches embed in 3500psi concrete Tcap = 2025 # 24% Stressed V = 142 # per leg Vcap = 2551 # = 6% Stressed COMBINED = 30% Stressed OK Braces: Brace height = 50 " Brace width = 44 " Length = 67 " P = 428 # Use : C 1.500x 1.500x 0.060 A = 0.278 in L/r = 125 Pcap = 2692 # 16% V PAGE 1 " MSU STRESS-11 VERSION 9/89 --- DATE: 02/18/<0 --- TIME OF DAY: 09:06:56 INPUT DATA LISTING TO FOLLOW: Structure Storage Rack in Load Beam Plane 1 Levels Type Plane Frame Number of Joints 6 Number of Supports 4 Number of Members 5 Number of Loadings 1 Joint Coordinates 1 0.0 124.0 S 2 73.5 0.0 S 1 3 5 6 3 73.5 124.0 4 220.5 0.0 S 5 220.5 124.0 6 294.0 124.0 S 2 4 Joint Releases 1 Force X Moment Z 6 Force X Moment Z 2 Moment Z 4 Moment Z Member Incidences 1 1 3 2 2 3 3 4 5 4 3 5 5 5 6 Member Properties 1 Prismatic Ax 1.500 Ay 0.800 Iz 7.600 2 Thru 3 Prismatic Ax 0.400 Ay 0.200 Iz 0.600 4 Thru 5 Prismatic Ax 1.500 Ay 0.800 Iz 7.600 Constants E 29000. All G 12000. All Tabulate All Loading Dead + Live + Seismic Joint Loads 3 Force Y -1.18 5 Force Y -1.18 3 Force X 0.05 5 Force X 0.05 Solve PROBLEM CORRECTLY SPECIFIED, EXECUTION TO PROCEED 7 PAGE 2 MSU STRESS-11 VERSION 9/89 --- DATE: 02/18/<0 --- TIME OF DAY: 09:06:56 Structure Storage Rack in Load Beam Plane 1 Levels Loading Dead + Live + Seismic MEMBER FORCES MEMBER JOINT AXIAL FORCE SHEAR FORCE MOMENT 1 1 0.000 -0.036 0.00 1 3 0.000 0.036 -2.68 2 2 1.174 0.050 0.00 2 3 -1.174 -0.050 6.15 3 4 1.174 0.050 0.00 3 5 -1.174 -0.050 6.25 4 3 0.000 -0.042 -3.47 4 5 0.000 0.042 -2.73 5 5 0.000 -0.048 iialla /1'f, CC,N/u 5 6 0.000 0.048 0.00 Air- APPLIED JOINT LOADS, FREE JOINTS JOINT FORCE X FORCE Y MOMENT Z 3 0.050 -1.180 0.00 5 0.050 -1.180 0.00 REACTIONS,APPLIED LOADS SUPPORT JOINTS JOINT FORCE X FORCE Y MOMENT Z 1 0.000 -0.036 0.00 2 -0.050 1.174 0. 00 4 -0.050 1.174 0. 00 6 0.000 0.048 0.00 FREE JOINT DISPLACEMENTS JOINT X-DISPLACEMENT Y-DISPLACEMENT ROTATION 3 1.8721 -0.0126 -0.0005 5 1.8721 -0.0126 -0.0002 11 PAGE 3 .MSU STRESS-11 VERSION 9/89 --- DATE: 02/18/<0 --- TIME OF DAY: 09:06:56 SUPPORT JOINT DISPLACEMENTS JOINT X-DISPLACEMENT Y-DISPLACEMENT ROTATION 1 1.8721 0.0000 0.0000 2 0.0000 0.0000 -0.0224 4 0.0000 0.0000 -0.0225 6 1.8721 0.0000 0.0004 Seismic Analysis per 2018 IBC wi di widi2 fi fidi # in # 1660 1.8721 5818 100 187.2 50 99 0 0.0000 0 0 0.0 0 0 0 0.0000 0 0 0.0 0 0 0 0.0000 0 0 0.0 0 0 0 0.0000 0 0 0.0 0 0 0 0.0000 0 0 0.0 0 0 1660 5818 100 187.2 99 4 = 32.2 ft/sec2 T = 1.7819 sec I = 1.00 Cs = 0.0638 or 0.1137 Sdl = 0.682 Cs min = 0.08525 R = 6 Cs = 0.0852 V = (Cs*I*.7) *W V = 0.0597 W = 99 # 99% Beam-Column Check C 3.000x 1.625x 0.075 Fy = 55 ksi ' A = 0.389 in2 Sx = 0.382 in3 Rx = 1.213 in Ry = 0.665 in kx = 1.70 ky = 1.00 Stress Factor 1.000 Point P M Lx Ly Pcap Mcap Ratio 5 0.8 6.3 120.0 50.0 2.09 12.60 90% 0 0.0 0.0 120.0 50.0 2.09 12.60 0% 0 0.0 0.0 120.0 50.0 2.09 12.60 0% 0 0.0 0.0 120.0 50.0 2.09 12.60 0% 0 0. 0 0.0 120.0 50.0 2.09 12.60 0% 0 0.0 0.0 120.0 50.0 2.09 12.60 0% Load Beam Check 4.50x 2.750x 0.060 Fy = 55 ksi A = 0.836 in2 E = 29,500 E3 ksi Sx = 0.890 in3 Ix = 2.110 in4 Length = 144 inches Pallet Load 1600 lbs Assume 0.5 pallet load on each beam M = PL/8= 14.40 k-in fb = 16.19 ksi Fb = 33 ksi 49% Mcap = 29.36 k-in 39.14 k-in with 1/3 increase Defl = 0.50 in = L/ 288 w/ 25% added to one pallet load M = .22 PL = 12.67 k-in 43% (/--- �1 4 t Base Plate Design Column Load 1.0 kips Allowable Soil 1500 psf basic Assume Footing 9.8 in square on side Soil Pressure 1500 psf Bending: Assume the concrete slab works as a beam that is fixed against rotation at the end of the base plate and is free to deflect at the extreme edge of the assumed footing, but not free to rotate. Mmax = w1A2/3 Use 3 "square base plate w = 10.4 psi 1 = 0.42 in Load factor = 1.67 M = 1 #-in 6 in thick slab f'c = 3500 psi s = 6.00 in3 fb = 0 psi Fb = 5 (phi) (f'cA .5) = 177 psi OK ! ! Shear : Beam fv = 1 psi Fv = 79 psi OK ! ! Punching fv = 1 psi Fv = 158 psi OK ! ! Base Plate Bending Use 0.13 " thick 1 = 1.5 in w = 112 psi fb = 44839 psi Fb = 37500 psi Upsize