Loading...
Permit (2) CITY OF TIGARD BUILDING PERMIT s. COMMUNITY DEVELOPMENT Permit#: BUP2020-00128 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 06/23/2020 Parcel: 1S133DB11700 Jurisdiction: Tigard Site address: 11369 SW SYCAMORE PL Project: Summerwood Village, Building 5 Subdivision:,CHOLLS FERRY ROAD TOWNHOME; Lot: 43 Project Description: Replacement of siding to install new window and sliding glass door Fleshings. Contractor: CHARTER CONSTRUCTION INC Owner: RICHMOND, JUDITH L 3747 SE 8TH AVENUE GRANT, RICHARD C PORTLAND, OR 92020 GRANT, MEGAN CALLAHAN 11369 SW SYCAMORE PL TIGARD, OR 97223 PHONE: 503-546-2600 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: MF Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations. 06/17/2020 $2,078.39 Demolition Occupancy Grp: R-2 Occupancy Load: 10 12%State Surcharge-Building 06/17/2020 $249.41 Dwelling Units: 0 Plan Review 05/27/2020 $1,350.95 Stories: 0 Height: 0 ft Building Misc Fund(copies/prints) 06/17/2020 $10.00 Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Sm$0.50(up to 06/17/2020 $5.00 Value: $260,857 11x17) Metro CET 06/17/2020 $313.03 Tigard CET-Non-Residential-Admin 06/17/2020 $104.34 Floor Areas: Tigard CET-Non-Residential-AH 06/17/2020 $2,504.23 Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $6,615.35 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. Yo ay obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: 1 V/. / /A' Permittee Signature: •••"77.9* Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Buildinc Permit Application RECEIVED . i „ Commercial MAY 7 220 FOR OFFICE USE ONLY City of Tigard Received 1� Er! a 13125 SW Hall Blvd.,Tigard,OR 97223 CITY OFTIGARD Plan ReDate/lyv ;[j i o 6y) 2P4-r w Plan Review Phone: 503-718-2439 Fax: 503-598-1960 BUILDING DIVISION Date By: 6 ,affYYllrr Related Permit: T I G A R(� Inspection Line: 503-639-4175 Date ReadyBy: I /i /, hdt: 1Z See Page 2 for Internet: www.tigard-or.gov Nord hod (t/C,�/ J Supplemental Information TYPE OF WORK REQUIRED DATA:I-AND 2-FAMILY DWELLING ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ® Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ I-and 2-family dwelling ❑Commercial/industrial Valuation: $ ElAccessory building ®Multi-family Number of bedrooms: ❑Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATIONS` G lero✓C - Total number of floors: nefli Job site address. 13490,11385,11383,11381,11380,11378,11376,11374 SW RAMP'. New dwelling area: square feet City/State/ZIP: Tigard,OR 97223 1/144 It, 1r5C, n/CG Garage/carport area: square feet Suite/bldg./apt.#: Bldg.#5 Project name: Summerwood Village 11-I Covered porch area: square feet Cross street/directions to job site: SW Scholls Ferry Road,to SW 135th Deck area: square feet Ave and east to SW Summerwood Drive Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision:SUB 95-0005/PDR 95-0006/SLR 95-0015NAR 95-0010 Lot#: Pemnit fees*are based on the value of the work performed. 15133D607500 Indicate the value(rounded to the nearest dollar)of all Tax map/parcel#: equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK Itt.. S Ji3'70 work indicated on this application. Exterior project maintenance. Valuation: $260,857 eleeks-Targeted replacement of siding to install new window and Existing building area: ,52 acres square feet sliding glass door flashings. New building area: .52 acres square feet ❑ PROPERTY OWNER ❑ TENANT Number of stories: Name: Summerwood Village Town homes Type of construction: V-N 1 hour rated walls Address: do Association Management Services, NW Occupancy groups: between units City/State/ZIP: 15350 SW Sequoia Pkwy.Suite 200, Portland,OR 97224_ Existing: R-1 Phone:(503)858.1093 Fax:(503)598.0554 New: R-1 0 APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES* (Please refer to fee schedule Business name: West Coast Forensics, Engineering and Design, LLC Structural plan review fee(or deposit): Contact name: Jeff Lewis, PE, SE and/or Mike Milakovich, AIA FLS plan review fee(if applicable): Address: 3835 SW Kelly Ave Total fees due upon application: City/State/ZIP: Portland,OR 97239 Amount received: Phone:(503)756.1689 Fax: :( ) E-mail: jeff@wcfore.com; mike@wcfore.com; helen@wcfore.com; PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted Photovoltaic Solar Panel System. Submit two(2)sets of roof plan with connection details Business name: Charter Construction, Inc. and fire department access,along with the 2010 Oregon Address: 3747 SE 8th Ave Solar Installation Specialty Code checklist. City/State/ZIP: Portland,OR 97202 Permit fee(includes plan review $180.00 and administrative fees): Phone:(971 ) 303.3202 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB Lic.: 166313 I(S— /Zl Total fee due upon application: $201.60 Authorized signature: / This permit application expires if'a permit is not obtained within 180 days after it has been accepted as complete. Print name: Date: * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BLIPCOM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB) City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 111111 Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tieard-or.aov a> REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/18/2014 I City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Plan Submittal Requirements Commercial & Multi-Family - New, Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov 1. SITE PLAN (3) copies - fully dimensional, drawn to scale and labeled with: A. 10 map&tax lot# IN project name 161 site address K3 suite number M zoning DI applicant name IN phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking,including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations,plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit - based on valuation of project. 4. ADDITIONAL INFORMATION AS FOLLOWS: A. Fire Department Building Survey with (1) additional full set of architecture drawings. I:\Building\Peanits\BUP_COM_PemvtApp.doc Rev.12/18/2014 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT IPlan Submittal Requirements Matrix Commercial & Multi-Family - New, Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov Type of Submittal # of Plans (Includes new, additions and alterations.) Required at Submittal Demolition Permit 2 (site plan is required showing location and square footage of all buildings to be demolished,erosion control plan and tree protection,if applicable) Site Work 3 (must include location of all accessible parking) Plumbing (site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing (building fixtures) 2 Electrical 2 Solar Photovoltaic 2 (Requires check list for prescriptive installation. If not prescriptive installation,engineering is required.) Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington County, and Tualatin Valley Fire &Rescue),if applicable. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/18/2014