Permit (2) CITY OF TIGARD BUILDING PERMIT
s. COMMUNITY DEVELOPMENT Permit#: BUP2020-00128
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 06/23/2020
Parcel: 1S133DB11700
Jurisdiction: Tigard
Site address: 11369 SW SYCAMORE PL
Project: Summerwood Village, Building 5 Subdivision:,CHOLLS FERRY ROAD TOWNHOME; Lot: 43
Project Description: Replacement of siding to install new window and sliding glass door Fleshings.
Contractor: CHARTER CONSTRUCTION INC Owner: RICHMOND, JUDITH L
3747 SE 8TH AVENUE GRANT, RICHARD C
PORTLAND, OR 92020 GRANT, MEGAN CALLAHAN
11369 SW SYCAMORE PL
TIGARD, OR 97223
PHONE: 503-546-2600 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: MF
Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations. 06/17/2020 $2,078.39
Demolition
Occupancy Grp: R-2 Occupancy Load: 10 12%State Surcharge-Building 06/17/2020 $249.41
Dwelling Units: 0 Plan Review 05/27/2020 $1,350.95
Stories: 0 Height: 0 ft Building Misc Fund(copies/prints) 06/17/2020 $10.00
Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Sm$0.50(up to 06/17/2020 $5.00
Value: $260,857 11x17)
Metro CET 06/17/2020 $313.03
Tigard CET-Non-Residential-Admin 06/17/2020 $104.34
Floor Areas: Tigard CET-Non-Residential-AH 06/17/2020 $2,504.23
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $6,615.35
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. Yo ay obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: 1 V/. / /A' Permittee Signature: •••"77.9*
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Buildinc Permit Application RECEIVED .
i „
Commercial MAY 7 220 FOR OFFICE USE ONLY
City of Tigard Received 1�
Er!
a 13125 SW Hall Blvd.,Tigard,OR 97223 CITY OFTIGARD Plan ReDate/lyv ;[j i o 6y) 2P4-r
w Plan Review
Phone: 503-718-2439 Fax: 503-598-1960 BUILDING DIVISION Date By: 6 ,affYYllrr Related Permit:
T I G A R(� Inspection Line: 503-639-4175 Date ReadyBy: I /i /, hdt: 1Z See Page 2 for
Internet: www.tigard-or.gov Nord hod (t/C,�/ J Supplemental Information
TYPE OF WORK REQUIRED DATA:I-AND 2-FAMILY DWELLING
❑New construction ❑Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
® Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
❑ I-and 2-family dwelling ❑Commercial/industrial Valuation: $
ElAccessory building ®Multi-family Number of bedrooms:
❑Master builder ❑Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATIONS` G lero✓C -
Total number of floors:
nefli
Job site address. 13490,11385,11383,11381,11380,11378,11376,11374 SW RAMP'.
New dwelling area: square feet
City/State/ZIP: Tigard,OR 97223 1/144 It, 1r5C, n/CG Garage/carport area: square feet
Suite/bldg./apt.#: Bldg.#5 Project name: Summerwood Village 11-I Covered porch area: square feet
Cross street/directions to job site: SW Scholls Ferry Road,to SW 135th Deck area: square feet
Ave and east to SW Summerwood Drive Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision:SUB 95-0005/PDR 95-0006/SLR 95-0015NAR 95-0010 Lot#: Pemnit fees*are based on the value of the work performed.
15133D607500 Indicate the value(rounded to the nearest dollar)of all
Tax map/parcel#: equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK Itt.. S Ji3'70 work indicated on this application.
Exterior project maintenance. Valuation: $260,857
eleeks-Targeted replacement of siding to install new window and Existing building area: ,52 acres square feet
sliding glass door flashings. New building area: .52 acres square feet
❑ PROPERTY OWNER ❑ TENANT Number of stories:
Name: Summerwood Village Town homes Type of construction: V-N 1 hour rated walls
Address: do Association Management Services, NW Occupancy groups: between units
City/State/ZIP: 15350 SW Sequoia Pkwy.Suite 200, Portland,OR 97224_ Existing: R-1
Phone:(503)858.1093 Fax:(503)598.0554
New: R-1
0 APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES*
(Please refer to fee schedule
Business name: West Coast Forensics, Engineering and Design, LLC
Structural plan review fee(or deposit):
Contact name: Jeff Lewis, PE, SE and/or Mike Milakovich, AIA
FLS plan review fee(if applicable):
Address: 3835 SW Kelly Ave
Total fees due upon application:
City/State/ZIP: Portland,OR 97239
Amount received:
Phone:(503)756.1689 Fax: :( )
E-mail: jeff@wcfore.com; mike@wcfore.com; helen@wcfore.com; PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
Commercial and residential prescriptive installation of
CONTRACTOR roof-top mounted Photovoltaic Solar Panel System.
Submit two(2)sets of roof plan with connection details Business name: Charter Construction, Inc.
and fire department access,along with the 2010 Oregon
Address: 3747 SE 8th Ave Solar Installation Specialty Code checklist.
City/State/ZIP: Portland,OR 97202 Permit fee(includes plan review $180.00
and administrative fees):
Phone:(971 ) 303.3202 Fax:( ) State surcharge(12%of permit fee): $21.60
CCB Lic.: 166313 I(S— /Zl Total fee due upon application: $201.60
Authorized signature: / This permit application expires if'a permit is not obtained
within 180 days after it has been accepted as complete.
Print name: Date: * Fee methodology set by Tri-County Building Industry
Service Board.
I:\Building\Permits\BLIPCOM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB)
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
111111
Accessibility: Barrier Removal Improvement Plan
Commercial & Multi-Family - Additions or Alterations
TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tieard-or.aov
a>
REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five percent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering: [1] $
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(f) Accessible drinking fountains:and, $
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line [2] of Valuation Computation): $
I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/18/2014
I
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
Plan Submittal Requirements
Commercial & Multi-Family - New, Additions or Alterations
TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
1. SITE PLAN (3) copies - fully dimensional, drawn to scale and labeled with:
A. 10 map&tax lot# IN project name 161 site address K3 suite number
M zoning DI applicant name IN phone number
B. North arrow.
C. Scale (architectural or engineering only).
D. Street names.
E. Setbacks.
F. Parking,including disabled access.
G. Finished floor elevations.
2. EROSION CONTROL PLANS AND DETAILS.
3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of
plans required based on submittal type (no redlines or tape-ons accepted).
All details listed below shall be incorporated into the plans:
A. Scale (architectural or engineering only).
B. Foundation plan.
C. Floor plan(s).
D. Cross sections.
E. Reflective ceiling plan.
F. Seismic bracing detail for suspended ceiling.
G. Roof plan.
H. Exterior elevations.
I. Structural calculations,plans, details and specifications.
J. Accessibility barrier removal worksheet.
K. Deposit - based on valuation of project.
4. ADDITIONAL INFORMATION AS FOLLOWS:
A. Fire Department Building Survey with (1) additional full set of architecture
drawings.
I:\Building\Peanits\BUP_COM_PemvtApp.doc Rev.12/18/2014
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
IPlan Submittal Requirements Matrix
Commercial & Multi-Family - New, Additions or Alterations
TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
Type of Submittal # of Plans
(Includes new, additions and alterations.) Required at
Submittal
Demolition Permit 2
(site plan is required showing location and square footage
of all buildings to be demolished,erosion control plan and
tree protection,if applicable)
Site Work 3
(must include location of all accessible parking)
Plumbing (site utilities) 2
Building 3
Fire Protection System 3
Mechanical 2
Plumbing (building fixtures) 2
Electrical 2
Solar Photovoltaic 2
(Requires check list for prescriptive installation. If not
prescriptive installation,engineering is required.)
Plan review is dependent upon submittal of a completed application and plans.
After plan review approval, the Plans Examiner will contact the applicant to request
additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington
County, and Tualatin Valley Fire &Rescue),if applicable.
I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/18/2014