The following Tigard High School Deferred Submittals are ready to issue. I have attached an invoice above for you to
reference, and the fees due are listed below:
Tigard High School
Deferred Submittals Fees Due
Aluminum-Frame Storefront $ 914.34
Gym/Misc./Railings $ 185.36
Total: $ 1,099.70
The above permit fees can be paid online through our website: https://aca.accela.com/tigard/Default.aspx. From there,
click on the Building tab, enter the permit number(BUP2018-00188) in the Record Number field,and click Search. Once
paid, please notify us at TigardBuildingPermits@tigard-or.gov, and I will place these Deferred Submittals in the
conference room, adjacent to the outer Permit Center lobby,for pickup between the hours of 8:00 a.m. and 5:00 p.m.,
Monday through Thursday. We are closed on Fridays.
Thank you,
Branden Taggart
q City of Tigard
( s Senior Permit Technician
yle4Community Development
13125 SW Hall Blvd
Tigard,OR 97223
(503171B-2449'
brandent@ttgard-or.gov
1
Pence Construction, LLC
1949 5400 Meadows Road Suite 400
Transmittal
Lake Oswego, Oregon 97035
CONSTRUCTION 503 /399-7223, FAX / No 0551 RECEIVED
JUN222020
CITY OF TIGARD
BUILDING DIVISION
PROJECT: Tigard High School Modernization Project DATE: Jun 16,2020
To: City of Tigard RE:THS-055213-228-03-Gym Railing Shops&
13125 SW Hall Blvd.
Tigard OR 97223
ATTN: Branden Taggart JOB: 317-045
WE ARE SENDING: SUBMITTED FOR: ACTION TAKEN:
Shop Drawings \/ Approval Approved as Submitted
Letter \/ Your Use Approved as Noted
Prints As Requested Returned After Loan
Change Order Review and Comment Resubmit
\/ Plans Submit
Samples SENT VIA: Returned
\/ Specifications V. Attached I Separate Cover Returned for Corrections
Other: Other:HAND DELIVERED Due
‘/ Submittal: Other:
Line Item Package Code Rev. OTY Date Description Status
1 Submittal 055213 055213-228-03 4 2 Jun 16,2020 Gym/Misc.Railings Shop Drawings New Item
REMARKS Deferred Submittal of 055213-228-03-Gym/Misc.Railing Shop Drawings. This deferred submittal includes stamped drawings and
calculations.
CC:
Pence Construction,LLC,Carl Schrank
Pence Construction,LLC, Daniel Jeffery
Pence Construction,LLC, Eric Wren
Pence Construction,LLC, Franto Sternot
Pence Construction,LLC,Jason Stanek
Pence Construction,LLC, Kurt Schwabauer
Tigard-Tualatin School District No.23J,Sarah Mehrabzadeh
Otak, Inc.,Wesley Winship ,'p v,
Signed: 4'4"`# `Ffila"/
Jennifer Fowles
RECEIVED bassetti
J U N 2 2 2020 architects
CITY OF TIGARD
RI HIDING DIVISION
SUBMITTAL REVIEW TRANSMITTAL
Project: Tigard High School Date: 06/16/2020
Project No.: 16992.00 Reviewed by: Damian Andreani-CA
Greg Vohs-BA
From: Greg Vohs- Bassetti
Submittal No.: 055213-228-03 - Gym & Misc Railings Shop Drawings
Section No.: 055213
Deliver to:
® Jennifer Fowles X, Wes Winship
LCG Pence Day CPM Services
If enclosures are not as noted, please inform us immediately.
We transmit: herewith Via:email For your use
With the following review:
A=Reviewed R=Rejected FAC=Furnish as Corrected R&R=Revise& Resubmit SSI=Submit Specific Item
This review is only for general conformance with design concept of the project and general compliance with the information given in the Contract documents.
Corrections or comments made on the shop drawings during this review do not relieve contractor from compliance with the requirements of the plans and
specifications.Approval of a specific item shall not include approval of an assembly of which the item is a component.Contractor is responsible for dimensions to
be confirmed and correlated at the jobsite;information that pertains solely to the fabrication processes or to the means,methods,techniques,sequences and
procedures of construction;coordination of his or her Work with that of at other trades;and for performing all work in a safe and satisfactory manner.
Section Paragraph Description Comments Action
055213 NA Shop Drawings A
055213 Calculations A
Copies to: Project File (1), LCG Pence (1), Day CPM (1)