From: Branden Taggart
Sent: Thursday,July 23, 2020 2:35 PM
To: Jennifer Fowles
Subject: Tigard High School Deferred Submittals - 9000 SW Durham Rd.
Attachments: Deferred Submittal Invoice.pdf
Hi Jennifer,
The following Tigard High School Deferred Submittals are ready to issue. I have attached an invoice above for you to
reference, and the fees due are listed below:
Tigard High School
Deferred Submittals Fees Due
Aluminum-Frame Storefront $ 914.34
Gym/Misc./Railings $ 185.36
Total: $ 1,099.70
The above permit fees can be paid online through our website: https://aca.accela.com/tigard/Default.aspx. From there,
click on the Building tab, enter the permit number (BUP2018-00188) in the Record Number field, and click Search. Once
paid, please notify us at TigardBuildingPermits(ptigard-or.gov, and I will place these Deferred Submittals in the
conference room, adjacent to the outer Permit Center lobby,for pickup between the hours of 8:00 a.m. and 5:00 p.m.,
Monday through Thursday. We are closed on Fridays.
Thank you,
Branden Taggart
741 q City of Tigard
e , Senior Permit Technician
Community Development
TJt M&D
13125 SW Hall Blvd
Tigard, OR 97223
(503)71B-2449
brandent@tigard-or.gov
1
Pence Construction, LLC
"" 5400 Meadows Road Suite 400
Lake Oswego, Oregon 97035 Transmittal
CONSTRUCTION 503 /399-7223, FAX / No 0544
PROJECT:Tigard High School Modernization Project DATE: Jun 05,2020
To: Bassetti Architects P.S.,P.C. RE: Aluminum-Framed Storefrtonts
721 NW 9th Avenue,Suite 350
Portland OR 97209
ATTN: Greg Vohs JOB: 317-045
WE ARE SENDING: SUBMIT-ED FOR: ACTION TAKEN:
Shop Drawings ✓ Approval Approved as Submitted
Letter Your Use Approved as Noted
Prints As Requested Returned After Loan
Change Order Review and Comment Resubmit
Plans Submit
Samples SENT VIA: Returned
Specifications \/ Attached I Separate Cover Returned for Corrections
Other: Other:N Due
‘/ Submittal: Other:
Line Item Package Code Rev. QTY Date Description Status
1 Submittal 084313 084313-324-01 2 Jun 05,2020 Aluminum-Framed Storefront Shops New Item
and Cafes-Deferred
REMARKS Resubmittal of 084313-324-00.PLEASE NOTE:this is for the review of the deferred permit set of shop drawings and calcs. Please avoid
making markups on the drawings or calcs unless absolutely necessary.
Pages 2-22 of the attachment were previously reviewed with no exception taken(the plan and elevation sheets).Likewise,the calculations
were previously reviewed with no exception taken.
Sheets 501,502,and 308 are interior detail and elevation sheets and do not require engineering.
®REVIEWED ❑MAKE CORRECTIONS NOTED
it REJECTED f REVISE AND RESUBMIT
THIS REVIEW DOES NOT RELIEVE CONTRACTOR FROM COMPLIANCE
CC: WITH THE REQUIREMENTS OF THE DRAWINGS AND SPECIFICATIONS.
THIS REVIEW IS ONLY FOR GENERAL CONFORMANCE WITH THE DESIGN
Pence Construction,LLC,Carl Schrank CONCEPT OF THE PROJECT AND GENERAL COMPLIANCE WITH THE
INFORMATION GIVEN IN THE CONTRACT DOCUMENTS. CONTRACTOR
Pence Construction,LLC,Daniel Jeffery IS RESPONSIBLE FOR CONFIRMING AND CORRELATING ALL QUANTITIES
AND DIMENSIONS, SELECTING FABRICATION PROCESSES AND
Pence Construction,LLC,Eric Wren TECHNIQUES OF CONSTRUCTION COORDINATING THEIR WORK WITH
ALL OTHER TRADES,AND PERFORMING THEIR WORK IN A SAFE AND
Pence Construction,LLC, Franto Sternot SATISFACTORY MANNER
06/10/2020 DAA
Pence Construction,LLC,Jennifer Fowles DATE CATENA CONSULTING ENGINEERS BY REVIEWED
Pence Construction,LLC,Jason Stanek THIS REVIEW IS NOT AN APPROVAL OF ANY
DEVIATION FROM 1HE REQUIREMENTS OF THE
Pence Construction,LLC,Kurt Schwabauer CONTRACT DOCUMENTS.
DATE:REAlIZEN AFPFIV.D BY.Megan Red
Tigard-Tualatin School District No.23J,Sarah Mehrabzadeh gotta—
Bassetti a—
Bassetti Architects P.S., P.C.,Bassetti Distribution List PDfI503.ZET. 02 SALME>z T,8gm
Bassetti Architects P.S., P.C.,Rebecca Walker
Day CPM,Wes Winship
Signed:
Megan Reck
bassetti
architects
SUBMITTAL REVIEW TRANSMITTAL
Project: Tigard High School Date: 6/11/2020
Project No.: 16992.00 Reviewed by: Damian Andreani-CA
Greg Vohs-BA
Rebecca Perez Walker-BA
From: Greg Vohs- Bassetti
Submittal No.: 084313-324-01 -Aluminum-Framed Storefront
Deliver to:
Jennifer Fowles ® Wes Winship
LCG Pence Day CPM Services
If enclosures are not as noted, please inform us immediately.
We transmit: herewith Via: email For your use
With the following review:
A=Reviewed R=Rejected FAC=Furnish as Corrected R&R=Revise& Resubmit SSI=Submit Specific Item This review is only for general conformance with design concept of the project and general compliance with the information given in the Contract documents.
Corrections or comments made on the shop drawings during this review do not relieve contractor front compliance with the requirements of the plans and
specifications.Approval of a specific item shall not include approval of an assembly of which the item is a component.Contractor is responsible for dimensions to
be confirmed and correlated at the jobsite;information that pertains solely to the fabrication processes or to the means,methods,techniques,sequences and
procedures of construction;coordination of his or her Work with that of all other trades:and for performing all work in a safe and satisfactory manner.
Paragraph Description Comments :Action
I ,
1.4 C Shop Drawings IA
i rjt; t. ,a , I 3., ,; f.r.:,nt i ,
1.4 D Design Data: Calculations A
Copies to: Project File(1), LCG Pence (1), Day CPM (1)