Loading...
Permit Support Document Irpi CITY OF TIGARD ELECTRICAL PERMIT • a COMMUNITY DEVELOPMENT 11:7 ¢ ` P""0 Permit#: ELC2020-00206 aas,&PrIILYJF T j{;A RD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 v Date Issued: 4/22l2020 7/ZZ Parcel: 2S113AC01201 Jurisdiction: Tigard Site address: 7319 SW BRIDGEPORT RD Project: Happy Lemon Subdivision: COUNCIL VIEW ACRES(LOTS 1-20) Lot: 18 Project Description: Re-route circuits and add new circuits for new tenant. Install pendant lights and add outlets. 7/22/2020: REPRINT permit to correct address from 7315 to 7319. Contractor: SUNLIGHT ELECTRIC INC Owner: BV CENTERCAL LLC 2804 NE 65TH AVE SUITE D ATTN: FRED BRUNING VANCOUVER,WA 98661 7455 SW BRIDGEPORT RD TIGARD, OR 97224 PHONE: PHONE: 360-772-3877 FAX: 360-694-9728 FEES Quantity Description Date Amount 13 crt Branch Circuits wo/Purchase 04/22/2020 $145.22 Specifics: Service or Feeder 1 ea 12% State Surcharge- 04/22/2020 $17.43 Type of Use: COM Electrical Class of Work: ALT Type of Const: Occupancy Grp: Total $162.65 Required Items and Reports(Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through AR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: Q—f-- Permittee Signature: Lei,/ /1,"LI t 77O OWNER INSTALLATION ONLY The installation is being made on property I own which is not intended for sale,lease or rent. OWNER'S SIGNATURE Date: CONTRACTOR INSTALLATION ONLY SIGNATURE OF SUPR.ELEC' Date: LICENSE NO. Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection.