Permit CITY OF TIGARD BUILDING PERMIT
i N . COMMUNITY DEVELOPMENT Permit#: BUP2020-00142
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 7/21/2020
T t��A t�'C3 9 Parcel: 1 S136DA02500
Jurisdiction: Tigard
Site address: 11090 SW 68TH PKWY
Project: Red Rock Creek Commons Subdivision: RED ROCK CREEK COMMONS Lot: 1
Project Description: Solar photovoltaic system for a new 4 story multifamily building.
Contractor: IMAGINE ENERGY LLC Owner: COMMUNITY PARTNERS FOR AFFORDABL
7001 NE COLUMBIA BLVD HOUSING
PORTLAND, OR 97218 6380 SW CAPITOL HWY,STE 151
PORTLAND,OR 97239
PHONE: 503-477-9585 PHONE: 503-293-4038
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: VA Permit Fee-Additions,Alterations, 07/17/2020 $1,456.27
Demolition
Occupancy Grp: R-2 Occupancy Load: 0 12%State Surcharge-Building 07/17/2020 $174.75
Dwelling Units: Plan Review 06/10/2020 $946.58
Stories: Height: ft Misc Administration Fee 07/17/2020 $16.00
Bedrooms: Bathrooms: Info Process/Archiving-Sm$0.50(up to 07/17/2020 $10.50
Value: $157,607 11)(17)
Floor Areas:
Total Area:
Accessory Struct:
Basement:
Carport:
Covered Porch:
Deck:
Garage:
Mezzanine:
Total $2604.10
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking:
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952.001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
c
Issued By: /� ____ rmittee Signature: y— "
�=
Ca 5• .639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept In a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Building Permit Application
Commercial FOR OFFICE USE ONLY
Received ` Pemtit No.:
City W Tigard E C E /E D Date By: !f� ���� / �'.i�o Upi�ta,
1 Phone:S50 Hall Blvd.,Tigard,OR 9 C C V Plan Review �[_ ���y
_ 503-718-2439 Fax: 503-598-1960 Date/By: 6 O�►i� Related Permit: l0`9—ardor/
Inspection Line: 503-639-4175 J U N 1 0 2020 Date Ready/By: i 7 1c t See Page 2 for���G
IIGAIID Internet: www.tigard-or.gov No' ed/Me o ` Supplemental Information
';jTV OFTiGARQ on-. j
TYPE OFMORNING DtVISO REQUIRED DATA: 1-AND 2-FAMILY DWELLING
.
❑New construction ❑Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
❑✓ Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
Valuation: $
❑ I-and 2-family dwelling ❑Commercial/industrial
Number of bedrooms:
❑Accessory building ®Multi-family
0 Master builder ❑Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address: 11090 SW 68th Parkway New dwelling area: square feet
City/State/ZIP: Tigard,Or 97223 Garage/carport area: square feet
Suite/bldg./apt.#: Project name: Red Rock Creek Commons Covered porch area: square feet
Cross street/directions to job site: Deck area: square feet
Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: Lot it: Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
Tax map/parcel#: equipment,materials,labor,overhead,and the profit for the
._ pt.- DESCRIPTION OF WORK work indicated on this application.
Valuation: $157,607
Installation of 47.20kW rooftop solar PV system
Existing building area: square feet
New building area: square feet
® PROPERTY OWNER ❑ TENANT Number of stories:
Name: Community Partners for Affordable Housing Type of construction:
Address: PO Box 23206 Occupancy groups:
City/State/ZIP: Tigard,OR 97281 Existing:
Phone:( ) Fax ( � ) New:
® APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES*
(Please refer to fee schedule)
Business name: Imagine Energy,LLC Structural plan review fee(or deposit):
Contact name: ,Deprereannurr+ -cth474100/J (A)ettA__
FLS plan review fee(if applicable):
Address: 7001 NE Columbia Blvd
Total fees due upon application:
City/State/ZIP: Portland,Or 97218
Amount received:
Phone:/ sn1a ZO,r—34ipax: :( )
0f 7� PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
E-mail: annnn a msgin^oaocgy net S r KIQ//( •"-- 4 Sf/t,22 i1 fix, fr/ '11rCommercial and residential prescriptive installation of
CONTRACTOR cf w roof-top mounted PhotoVoltaic Solar Panel System.
Business name: Imagine Energy,LLC Submit two(2)sets of roof plan with connection details
and fire department access,along with the 2010 Oregon
Address: 7001 NE Columbia Blvd Solar Installation Specialty Code checklist.
City/State/ZIP: Portland,Or 97218 Permit fee(includes plan review $180.00
and administrative fees):
Phone:( 503 ) 317.4124 Fax:( ) State surcharge(12%of permit fee): $21.60
CCB Lic.: 167963 Total fee due upon application: $201.60
Authorized signature: This permit application expires if a permit is not obtained
g within 180 days after it has been accepted as complete.
Print name: Derry Gannon Date: 6/7/20 * Fee methodology set by Tri-County Building Industry
Service Board.
1:\Building\Permits\BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB)
,
City of Tigard
Building Division
- 13125 SW Ha11 Blvd,Tigard,OR 97223 RECEIVED
Phone: 503.718.2439 Fax: 503.598.1960 JUN 1 2020
TIGARD Inspection Line: 503.639.4175
www.tigard-or.gov cm/OF TIGARD
BUILDING DIVISION
2010 Oregon Solar Installation Specialty Code
Check List for Prescriptive Installation of Roof-Mounted
PhotoVoltaic Solar Panel System
Property Information
Installation Address: 11090 SW 68th Parkway
City: Tigard,Or Zip: 97223
Owner's Name: Community Partners for Affordable Houseing Date: 6/1/20
Contractor's Name: Imagine Energy, LLC CCB #: 167963
Design Parameters of the Property/Structure
If"Yes", does not
Is the installation Y qualify for the
Flood Hazard esLocated in a flood prescriptive path, follow
Area plain/flood way? j No OSSC or ORSC for
design requirements.
Is the wind exposure Yes If"Yes", qualifies for
Wind Exposure "C"or less? ❑ No the prescriptive path.
Installations on detached Is the Ground Snow
single/two-family Load 70 psf or less?
dwelling/single/two- If"Yes", qualifies for
family townhomes ❑ Yes the prescriptive path.
and/or their accessory
Ground structures. ❑ No
Snow Load Is the Ground Snow
Installations on all Load 50 psf or less?
If"Yes", qualifies for
structures other than
® Yes the prescriptive path.
above
❑ No
1
I:Building/Forms/Photo Voltaic-Checklist02-O 1-1 I.docx
Is the construction
material wood and does Yes
Type of If"Yes", qualifies for
the construction qualify
Construction ❑
No the prescriptive path.
as"conventional light
frame"construction?
Is the spacing 24 inches
or less?
If"Yes", qualifies for
Pre-engineered trusses. I1 Yes the prescriptive path.
❑ No
Roof framing
members Is the spacing 24 inches
or less?
Nominal lumber. El
If"Yes", qualifies for
Yes the prescriptive path.
❑ No
Is the combined weight D Yes
of the PV modules and If"Yes", qualifies for
racking less than or 10 No the prescriptive path.
Solar equal to 4.5 psf?
installation Is the solar installation
layout in accordance Yes
with Section 305.4(3) of If"Yes", qualifies for
the 2010 Oregon Solar ❑ No the prescriptive path.
Code?
❑ Metal
Single layer If roofing material is
Roofing Check the type of ❑ of wood one of the three types
material roofing material shingle/shake checked, qualifies for
Max. two layers the prescriptive path.
❑ of composition
shingle. TPO
Is the roof mountedID Yes
Connections of solar assembly If"Yes", qualifies for
the solar assembly connected to roof ❑ No the prescriptive path.
to the roof framing or blocking
directly?
2
I:Building/Fotms/Photo V oltaic-Checklist02-0I-1 I.doc x
__ J
Is the gauge 26 or less? El Yes If"Yes", qualifies for
n No the prescriptive path.
115 lbs for 60 inch
spacing or less?
If"Yes", qualifies for
❑ Yes the prescriptive path.
❑ No
Minimum Uplift rating
of Clamps? 75 lbs for 48 inches
spacing or less?
If"Yes", qualifies for
❑ Yes the prescriptive path.
❑ No
Attachment of
roof mounted Minimum 24 inches If the spacing falls
solar systems Spacing of clamps? within 24 inches and 60
directly to inches Maximum 60 inches inches, qualifies for the
standing seam prescriptive path.
metal panels Width of roofing If the width of the panel
panels? 18 inches or less
is less than 18 inches,
inches qualifies for the
prescriptive path.
Minimum#10 at 24
inches o/c?
Size and spacing of If"Yes", qualifies for
fastener? ❑ Yes the prescriptive path.
❑ No
Is the roof decking of
WSP min. '/2"thickness, El Yes
decking connected to If"Yes", qualifies for
framing members ❑ No the prescriptive path.
w/min. 8d nails @
6"/12"o/c?
Is the height less than or
Maximum 18 inches equal to 18 inches?
Height of the from the top of the If"Yes", qualifies for
solar modules module to the roof J Yes the prescriptive path.
surface. ❑ No
3
I:Building/Fonns/Photo Voltaic-Checklist02-01-11.docx
Submittal Documents required for Prescriptive Installations
Show the location of the PV system in relation to buildings, structures,
property lines, and, as applicable, flood hazard areas.
Site Plan Details must be clear and easy to read.
Minimum size of the plan is 8.5 x 11 inches.
Attach a simple structural plan showing the roof framing(rafter size, type, and
spacing)and PV module system racking attachment.
System must be shown in sufficient detail and clarity to assess whether it
Structural Plan meets the prescriptive construction requirements as listed earlier above in the
matrix.
Minimum size of the plan is 8.5 x 11 inches.
PV Modules
Manufacturer: Hanwha Q. Peak Duo-G5
Model Number: Q. Peak Duo-G5 400W
Listing Agency:
4