Loading...
Report (pnp ea! (1)1 Si- 3[(P2O2o -CV<3 y AccesslArchitecture PROJECT SCOPE DESCRIPTION — MADRONA RECOVERY T.I. date 05.18.2020 project Madrona Recovery T.I. prepared by Brendan Sanchez GENERAL DESCRIPTION The project is located on a gently sloped, 0.59-acre site at 6980 SW Varns Street, Portland, OR, 97223. The site contains an existing 2-story, wood-framed, non-sprinklered building and a 1-story detached storage garage. The most recent use of the building was as a B occupancy. No site work is proposed. Building interior work proposed with the tenant improvement includes but is not limited to: selective non-structural wall demo and new construction, revisions to existing restrooms to make them fully accessible, the creation of an additional restroom, and the creation of a walled-off entry lobby. The proposed usage of the building is to remain B occupancy. NOTE: Refer to Finish & Lighting Legends in drawing set for additional specification information. BIDDER-DESIGNED SYSTEMS • Electrical / Low voltage • Mechanical / HVAC • Plumbing BID ALETERNATES • Refer to Cover Sheet OVERALL PROJECT & SITE INFORMATION BUILDING INFORMATION Gross Square Footage: Overall: 4,010 sf 1st Floor: 3,476 sf 2nd Floor: 534 sf www.access-arch.com 1400 Columbia Street, Ste 120, Vancouver, WA 98660 1503.756.9213 • AccesslArchitecture BUILDING INFORMATION DIVISION 3- CONCRETE a) None assumed. DIVISION 5- METALS a) None assumed. DIVISION 6—WOOD, PLASTICS &COMPOSITES a) Wood framing: a. Exterior Walls: Infill to match existing. Occurs at west facade infill windows. b. Interior Non-Bearing Walls: 2x4 studs @ 24" o.c. Provide deflection clips at top plates and wall blocking for grab bars at all restrooms for toilets. b) Finish Carpentry: a. Common Area Interior Trim: Match existing, where occurs. c) Adhesives: To be low or no-VOC. DIVISION 7—THERMAL & MOISTURE PROTECTION a) Insulation: a. Exterior Wall Insulation: Infill to match existing. Occurs as west facade infill windows. b. Acoustic Insulation: i. 3-1/2" (R-11) unfaced batt insulation where called out on plans. b) Siding: a. Weather Resistive Barrier: FortiFiber Weathersmart Commercial b. Flexible Flashings: Fortiflash c. Cladding: Infill to match existing. Occurs at west facade infill windows. c) Sheet Metal Flashing and Trim: 24 ga. preprimed steel flashing, unless noted otherwise on drawings. DIVISION 8—OPENINGS a) Windows: Milgard Style Line vinyl nailfin frame, double-pane, advanced low-e argon filled; maximum U- factor of 0.28; maximum SHGC of 0.30; bronze exterior/white interior finish. b) Interior Doors: Flush, wood veneer finish, 1-3/4"thick, solid core (NAUF), Lynden CD200 or approved equal. Provide kickplate. Knock-down frame(Timely), prefinished. c) Door Hardware: Anti-ligature hardware, typical. Refer to hardware sets. d) Exterior Doors: Steel doors&welded steel frames, 18 ga., 1-3/4"thick, insulated R-5 min., pre-primed. DIVISION 9—FINISHES a) Walls: a. Interior Walls: (1) layer 5/8"type `x' gypsum wallboard each side, where occurs, b. High Pressure Laminate wainscot to 48"high located at all restrooms. b) Ceilings: a. (1) layer 5/8"type 'x' gypsum board, where occurs. c) Flooring: a. Typical: 20 mil vinyl plank tile flooring (glue-down)over existing subfloor. Spray primer over substrate. Low-VOC adhesive. Provide 6" rubber base per finish schedule & legend. www.access-arch.com 1400 Columbia Street, Ste 120, Vancouver,WA 98660 1503.756.9213 AccesslArchitecture b. Restrooms: Commercial grade through-color sheet vinyl over existing subfloor. Spray primer over substrate. Low-VOC adhesive. Provide 6" rubber base per finish schedule & legend. c. Stairs: Carpet, no pad. CRI Green Label. d) Painting /Texture: a. Interior Walls& Ceilings: Level 4, prime and texture with light orange peel texture, typ. 2 coats interior latex, eggshell finish, low VOC, over primer coat. DIVISION 10— SPECIALTIES a) Bathroom Accessories—All accessories to be anti-ligature. a. Toilet paper roll dispenser—Owner furnished and installed. Provide blocking only. b. Soap dispenser—Owner furnished and installed. Provide blocking only. c. Paper towel dispenser—Owner furnished and installed. Provide blocking only. d. Mirror—Owner furnished and installed. Provide blocking only. e. Grab bars at toilets DIVISION 11 — EQUIPMENT a) None assumed. DIVISION 12 — FURNISHINGS a) Acoustic Panels, Wall Mounted: 12"x48"x2" panels. Prismacoustic Paintables, Control Columns. DIVISION 21 — FIRE SUPPRESSION a) None assumed. DIVISION 22— PLUMBING: BIDDER-DESIGNED a) Hot Water: Bidder designed / modification of existing as required. b) Sanitary Sewer I Vent System: Bidder designed / modification of existing. c) Plumbing: a. Lavatories: Accessible, wall hung, vitreous china with integral backsplash, faucet with lever handles, hot water &drain pipe insulation. Lavatory Faucet 1.5 GPM max. b. Water Closet: Floor mounted, 1.28 GPF tank type, water sense labeled (elongated bowl at accessible units). MAP score of 600 or better. d) Bi-Level Electric Water Fountain: As located on plans. DIVISION 23— MECHANICAL: BIDDER-DESIGNED a) Bathroom Ventilation: Continuous run dual-speed exhaust fan in bathroom with occupant sensor (Panasonic Whispergreen), exhaust to exterior. b) Common Areas: Bidder designed. Replace existing HVAC system with similar 95% efficient furnace. Provide new grills, diffusers, and thermostats. DIVISION 26— ELECTRICAL: BIDDER-DESIGNED a) Lighting Fixtures: All new fixtures to be LED. b) Wall Switches: Rocker type switches with decora receptables. c) Security: Provide allowance for(8) camera locations. Locations to be determined by Owner. Provide mag locks doors as indicated on plans, connected to existing fire alarm system. www.access-arch.com 1400 Columbia Street, Ste 120. Vancouver,WA 98660 1503.756.9213 Access!Architecture RECF_IVED PROJECT SCOPE DESCRIPTION — MADRONA RECOVERY T.I. MAY 2 1 2020 CiTY OF .iUARD date 05.18.2020 E3UILD1NC DIV;S1ON project Madrona Recovery T.I. prepared by Brendan Sanchez GENERAL DESCRIPTION The project is located on a gently sloped, 0.59-acre site at 6980 SW Varns Street, Portland, OR, 97223. The site contains an existing 2-story, wood-framed, non-sprinklered building and a 1-story detached storage garage. The most recent use of the building was as a B occupancy. No site work is proposed. Building interior work proposed with the tenant improvement includes but is not limited to: selective non-structural wall demo and new construction, revisions to existing restrooms to make them fully accessible, the creation of an additional restroom, and the creation of a walled-off entry lobby. The proposed usage of the building is to remain B occupancy. NOTE: Refer to Finish & Lighting Legends in drawing set for additional specification information. BIDDER-DESIGNED SYSTEMS • Electrical/ Low voltage • Mechanical/ HVAC • Plumbing BID ALETERNATES • Refer to Cover Sheet OVERALL PROJECT & SITE INFORMATION BUILDING INFORMATION Gross Square Footage: Overall: 4,010 sf 15t Floor: 3,476 sf 2nd Floor: 534 sf www.access-arch.com 1400 Columbia Street, Ste 120, Vancouver, WA 98660 1503.756.9213 AccesslArchitecture BUILDING INFORMATION DIVISION 3- CONCRETE a) None assumed. DIVISION 5- METALS a) None assumed. DIVISION 6—WOOD, PLASTICS & COMPOSITES a) Wood framing: a. Exterior Walls: Infill to match existing. Occurs at west façade infill windows. b. Interior Non-Bearing Walls: 2x4 studs @ 24"o.c. Provide deflection clips at top plates and wall blocking for grab bars at all restrooms for toilets. b) Finish Carpentry: a. Common Area Interior Trim: Match existing, where occurs. c) Adhesives: To be low or no-VOC. DIVISION 7—THERMAL & MOISTURE PROTECTION a) Insulation: a. Exterior Wall Insulation: Infill to match existing. Occurs as west façade infill windows. b. Acoustic Insulation: i. 3-1/2" (R-11) unfaced batt insulation where called out on plans. b) Siding: a. Weather Resistive Barrier: FortiFiber Weathersmart Commercial b. Flexible Flashings: Fortiflash c. Cladding: Infill to match existing. Occurs at west façade infill windows. c) Sheet Metal Flashing and Trim: 24 ga. preprimed steel flashing, unless noted otherwise on drawings. DIVISION 8 —OPENINGS a) Windows: Milgard Style Line vinyl nailfin frame, double-pane, advanced low-e argon filled; maximum U- factor of 0.28; maximum SHGC of 0.30; bronze exterior/white interior finish. b) Interior Doors: Flush, wood veneer finish, 1-3/4"thick, solid core (NAUF), Lynden CD200 or approved equal. Provide kickplate. Knock-down frame (Timely), prefinished. c) Door Hardware: Anti-ligature hardware,typical. Refer to hardware sets. d) Exterior Doors: Steel doors &welded steel frames, 18 ga., 1-3/4"thick, insulated R-5 min., pre-primed. DIVISION 9 —FINISHES a) Walls: a. Interior Walls: (1) layer 5/8"type 'x'gypsum wallboard each side, where occurs, b. High Pressure Laminate wainscot to 48" high located at all restrooms. b) Ceilings: a. (1) layer 5/8"type 'x' gypsum board, where occurs. c) Flooring: a. Typical: 20 mil vinyl plank tile flooring (glue-down)over existing subfloor. Spray primer over substrate. Low-VOC adhesive. Provide 6" rubber base per finish schedule& legend. www.access-arch.com 1400 Columbia Street. Ste 120, Vancouver.WA 98660 1503.756.9213 AccesslArchitecture b. Restrooms: Commercial grade through-color sheet vinyl over existing subfloor. Spray primer over substrate. Low-VOC adhesive. Provide 6"rubber base per finish schedule & legend. c. Stairs: Carpet, no pad. CRI Green Label. d) Painting/Texture: a. Interior Walls &Ceilings: Level 4, prime and texture with light orange peel texture, typ. 2 coats interior latex, eggshell finish, low VOC, over primer coat. DIVISION 10—SPECIALTIES a) Bathroom Accessories—All accessories to be anti-ligature. a. Toilet paper roll dispenser—Owner furnished and installed. Provide blocking only. b. Soap dispenser—Owner furnished and installed. Provide blocking only. c. Paper towel dispenser—Owner furnished and installed. Provide blocking only. d. Mirror—Owner furnished and installed. Provide blocking only. e. Grab bars at toilets DIVISION 11 — EQUIPMENT a) None assumed. DIVISION 12— FURNISHINGS a) Acoustic Panels, Wall Mounted: 12"x48"x2" panels. Prismacoustic Paintables, Control Columns. DIVISION 21 — FIRE SUPPRESSION a) None assumed. DIVISION 22—PLUMBING: BIDDER-DESIGNED a) Hot Water: Bidder designed/ modification of existing as required. b) Sanitary Sewer I Vent System: Bidder designed/modification of existing. c) Plumbing: a. Lavatories: Accessible, wall hung, vitreous china with integral backsplash, faucet with lever handles, hot water&drain pipe insulation. Lavatory Faucet 1.5 GPM max. b. Water Closet: Floor mounted, 1.28 GPF tank type, water sense labeled (elongated bowl at accessible units). MAP score of 600 or better. d) Bi-Level Electric Water Fountain: As located on plans. DIVISION 23— MECHANICAL: BIDDER-DESIGNED a) Bathroom Ventilation: Continuous run dual-speed exhaust fan in bathroom with occupant sensor (Panasonic Whispergreen), exhaust to exterior. b) Common Areas: Bidder designed. Replace existing HVAC system with similar 95% efficient furnace. Provide new grills, diffusers, and thermostats. DIVISION 26—ELECTRICAL: BIDDER-DESIGNED a) Lighting Fixtures: All new fixtures to be LED. b) Wall Switches: Rocker type switches with decora receptables. c) Security: Provide allowance for(8) camera locations. Locations to be determined by Owner. Provide mag locks doors as indicated on plans, connected to existing fire alarm system. www.access-arch.com 1400 Columbia Street, Ste 120,Vancouver,WA 98660 1503.756.9213 618o sul 00172, sU(2v2v --60/3 y MADRONA RECOVERY CENTER T.I. $ " i a g ) (11Y 2 1 2020 HW SET: 01 FOR USE ON DOOR(S): 01 02 EACH OPENING TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 3 EA HINGE 5BB1 HT SH 4.5 X 4.5 NRP 652 IVE 1 EA CLASSROOM SECURITY L9071P6 SL1 XL12-482 630AM SCH 1 EA OH STOP 90S SOC 630 GLY 1 EA SURFACE CLOSER 4050AT TBTRX 689 LCN (PULL SIDE MOUNTED) 1 EA KICK PLATE 8400 10" X 2" LDW B-CS TKTX 630 IVE 1 EA BREAKAWAY SEAL 105-B BLK DSI 1 EA MORTISED BREAKAWAY AMDB3-3-B CL DHS AUTOMATIC DOOR BOTTOM 1 EA THRESHOLD 545A-223 A ZER HW SET: 02 FOR USE ON DOOR(S): 03 EACH OPENING TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 3 EA HINGE 5BB1 HT SH 4.5 X 4.5 NRP = 652 IVE 1 EA CLASSROOM SECURITY L9071P6 SL1 XL12-482 630AM SCH 1 EA SURFACE CLOSER 4050A SCUSH TBTRX 689 LCN 1 EA KICK PLATE 8400 10" X 2" LDW B-CS TKTX 630 IVE 1 EA BREAKAWAY SEAL 105-B - BLK DSI HW SET: 03 FOR USE ON DOOR(S): 04 05 EACH OPENING TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 3 EA HINGE 5BB1 HT SH 4.5 X 4.5 NRP 652 IVE 1 EA CLASSROOM SECURITY L9071P6 SL1 XL12-482 630AM SCH 1 EA SURFACE CLOSER 4050A EDA TBTRX 689 LCN 1 EA KICK PLATE 8400 10" X 2" LDW B-CS TKTX 630 IVE 1 EA ANTI-LIGATURE WALL KG182 630 KIN STOP 1 EA BREAKAWAY SEAL 105-B BLK DSI Project: MADRONA RECOVERY CENTER T.I. Allegion: OPT0163261 Print Date: 05/18/2020 1 MADRONA RECOVERY CENTER T.I. HW SET: 04 FOR USE ON DOOR(S): 06 EACH OPENING TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 1 EA CONT. HINGE 700-HT SECHM 630 IVE 1 EA STOREROOM LOCK L9080P6 SL1 XL12-482 r 630AM SCH 1 EA MAGNETIC LOCK M490P ATS/LED 12/24 VDC 74 /1 628 SCE 1 EA SURFACE CLOSER 4050A SCUSH TBTRX 689 LCN 1 EA KICK PLATE 8400 10" X 2" LDW B-CS TKTX 74 630 IVE 1 EA RAIN DRIP 142AA AA ZER 1 EA BREAKAWAY SEAL 105-B BLK DSI 1 EA DOOR SWEEP 8198AA fe AA ZER 1 EA THRESHOLD 103A-223 F4 A ZER 1 EA POWER SUPPLY PS902 BBK 120/240 VAC e LGR SCE PROVIDE FACTORY POINT TO POINT DIAGRAMS PROVIDE RISER DIAGRAMS 120VAC TO POWER SUPPLY. DOOR NORMALLY LOCKED ON OUTSIDE. ENTRY BY KEY ONLY WITH FREE EGRESS OUT UNLESS DOOR IS LOCKED DOWN BY MAG LOCK. MAG LOCK SECURES DOOR PREVENTING EXITING IN AN EMERGENCY. THERE IS NO MOTION SENSOR OR EMERGENCY EGRESS BUTTON OVER RIDING THE MAG LOCK. RELEASING OF MAG LOCK BY SECURITY. COORDINATE FUNCTIONALITY OF OPENING WITH OWNER, SECURITY, AND ELECTRICAL. HW SET: 05 FOR USE ON DOOR(S): 07 08 09 EACH OPENING TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 3 EA HINGE 5BB1 HT 4.5 X 4.5 652 IVE 1 EA PRIVACY WITH L9456P6 SL1 XL12-482 r 630AM SCH OCCUPIED INDICATOR 1 EA SURFACE CLOSER 4050AT TBTRX 689 LCN (PUSH SIDE MOUNTED) 1 EA KICK PLATE 8400 10"X 2" LDW B-CS TKTX = 630 IVE 1 EA ANTI-LIGATURE WALL KG182 _ 630 KIN STOP 1 EA BREAKAWAY SEAL 105-B =. BLK DSI Project: MADRONA RECOVERY CENTER T.I. Allegion: OPT0163261 Print Date: 05/18/2020 2 MADRONA RECOVERY CENTER T.I. HW SET: 01 FOR USE ON DOOR(S): 01 02 E EACH OPENING TO HAVE: � l�a QTY DESCRIPTION CATALOG NUMBER FINISH MFR 3 EA HINGE 5BB1 HT SH 4.5 X 4.5 NRP - 652 IVE 1 EA CLASSROOM SECURITY L9071P6 SL1 XL12-482 2 630AM SCH 1 EA OH STOP 90S SOC 630 GLY 1 EA SURFACE CLOSER 4050AT TBTRX 689 LCN (PULL SIDE MOUNTED) 1 EA KICK PLATE 8400 10"X 2" LDW B-CS TKTX - 630 IVE 1 EA BREAKAWAY SEAL 105-B - BLK DSI 1 EA MORTISED BREAKAWAY AMDB3-3-B CL DHS AUTOMATIC DOOR BOTTOM 1 EA THRESHOLD 545A-223 ! A ZER HW SET: 02 FOR USE ON DOOR(S): 03 EACH OPENING TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 3 EA HINGE 5BB1 HT SH 4.5 X 4.5 NRP =.. 652 IVE 1 EA CLASSROOM SECURITY L9071P6 SL1 XL12-482 630AM SCH 1 EA SURFACE CLOSER 4050A SCUSH TBTRX 689 LCN 1 EA KICK PLATE 8400 10" X 2" LDW B-CS TKTX - 630 IVE 1 EA BREAKAWAY SEAL 105-B BLK DSI HW SET: 03 FOR USE ON DOOR(S): 04 05 EACH OPENING TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 3 EA HINGE 5BB1 HT SH 4.5 X 4.5 NRP 652 IVE 1 EA CLASSROOM SECURITY L9071P6 SL1 XL12-482 630AM SCH 1 EA SURFACE CLOSER 4050A EDA TBTRX 689 LCN 1 EA KICK PLATE 8400 10" X 2" LDW B-CS TKTX 630 IVE 1 EA ANTI-LIGATURE WALL KG182 = 630 KIN STOP 1 EA BREAKAWAY SEAL 105-B BLK DSI Project: MADRONA RECOVERY CENTER T.I. Allegion: OPT0163261 Print Date: 05/18/2020 1 MADRONA RECOVERY CENTER T.I. HW SET: 04 FOR USE ON DOOR(S): 06 EACH OPENING TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 1 EA CONT. HINGE 700-HT SECHM 630 IVE 1 EA STOREROOM LOCK L9080P6 SL1 XL12-482 - 630AM SCH 1 EA MAGNETIC LOCK M490P ATS/LED 12/24 VDC N 628 SCE 1 EA SURFACE CLOSER 4050A SCUSH TBTRX 689 LCN 1 EA KICK PLATE 8400 10" X 2" LDW B-CS TKTX 630 IVE 1 EA RAIN DRIP 142AA AA ZER 1 EA BREAKAWAY SEAL 105-B _- BLK DSI 1 EA DOOR SWEEP 8198AA AA ZER 1 EA THRESHOLD 103A-223 A ZER 1 EA POWER SUPPLY PS902 BBK 120/240 VAC N LGR SCE PROVIDE FACTORY POINT TO POINT DIAGRAMS PROVIDE RISER DIAGRAMS 120VAC TO POWER SUPPLY. DOOR NORMALLY LOCKED ON OUTSIDE. ENTRY BY KEY ONLY WITH FREE EGRESS OUT UNLESS DOOR IS LOCKED DOWN BY MAG LOCK. MAG LOCK SECURES DOOR PREVENTING EXITING IN AN EMERGENCY. THERE IS NO MOTION SENSOR OR EMERGENCY EGRESS BUTTON OVER RIDING THE MAG LOCK. RELEASING OF MAG LOCK BY SECURITY. COORDINATE FUNCTIONALITY OF OPENING WITH OWNER, SECURITY, AND ELECTRICAL. HW SET: 05 FOR USE ON DOOR(S): 07 08 09 EACH OPENING TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 3 EA HINGE 5BB1 HT 4.5 X 4.5 652 IVE 1 EA PRIVACY WITH L9456P6 SL1 XL12-482 630AM SCH OCCUPIED INDICATOR 1 EA SURFACE CLOSER 4050AT TBTRX 689 LCN (PUSH SIDE MOUNTED) 1 EA KICK PLATE 8400 10"X 2" LDW B-CS TKTX 630 IVE 1 EA ANTI-LIGATURE WALL KG182 630 KIN STOP 1 EA BREAKAWAY SEAL 105-B BLK DSI Project: MADRONA RECOVERY CENTER T.I. Allegion: OPT0163261 Print Date: 05/18/2020 2 MADRONA RECOVERY CENTER T.I. HW SET: 01 FOR USE ON DOOR(S): 01 02 EACH OPENING TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 3 EA HINGE 5BB1 HT SH 4.5 X 4.5 NRP 652 IVE 1 EA CLASSROOM SECURITY L9071P6 SL1 XL12-482 630AM SCH 1 EA OH STOP 90S SOC " 630 GLY 1 EA SURFACE CLOSER 4050AT TBTRX 689 LCN (PULL SIDE MOUNTED) 1 EA KICK PLATE 8400 10"X 2" LDW B-CS TKTX  630 IVE 1 EA BREAKAWAY SEAL 105-B BLK DSI 1 EA MORTISED BREAKAWAY AMDB3-3-B CL DHS AUTOMATIC DOOR BOTTOM 1 EA THRESHOLD 545A-223 A ZER HW SET: 02 FOR USE ON DOOR(S): 03 EACH OPENING TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 3 EA HINGE 5BB1 HT SH 4.5 X 4.5 NRP 652 IVE 1 EA CLASSROOM SECURITY L9071P6 SL1 XL12-482 630AM SCH 1 EA SURFACE CLOSER 4050A SCUSH TBTRX 689 LCN 1 EA KICK PLATE 8400 10"X 2" LDW B-CS TKTX S 630 IVE 1 EA BREAKAWAY SEAL 105-B BLK DSI HW SET: 03 FOR USE ON DOOR(S): 04 05 EACH OPENING TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 3 EA HINGE 5BB1 HT SH 4.5 X 4.5 NRP f 652 IVE 1 EA CLASSROOM SECURITY L9071P6 SL1 XL12-482 =. 630AM SCH 1 EA SURFACE CLOSER 4050A EDA TBTRX 689 LCN 1 EA KICK PLATE 8400 10" X 2" LDW B-CS TKTX =. 630 IVE 1 EA ANTI-LIGATURE WALL KG182 if 630 KIN STOP 1 EA BREAKAWAY SEAL 105-B BLK DSI Project: MADRONA RECOVERY CENTER T.I. Allegion: OPT0163261 Print Date: 05/18/2020 1 MADRONA RECOVERY CENTER T.I. HW SET: 04 FOR USE ON DOOR(S): 06 EACH OPENING TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 1 EA CONT. HINGE 700-HT SECHM 630 IVE 1 EA STOREROOM LOCK L9080P6 SL1 XL12-482 630AM SCH 1 EA MAGNETIC LOCK M490P ATS/LED 12/24 VDC ^' 628 SCE 1 EA SURFACE CLOSER 4050A SCUSH TBTRX 689 LCN 1 EA KICK PLATE 8400 10" X 2" LDW B-CS TKTX 630 IVE 1 EA RAIN DRIP 142AA AA ZER 1 EA BREAKAWAY SEAL 105-B BLK DSI 1 EA DOOR SWEEP 8198AA AA ZER 1 EA THRESHOLD 103A-223 A ZER 1 EA POWER SUPPLY PS902 BBK 120/240 VAC N LGR SCE PROVIDE FACTORY POINT TO POINT DIAGRAMS PROVIDE RISER DIAGRAMS 120VAC TO POWER SUPPLY. DOOR NORMALLY LOCKED ON OUTSIDE. ENTRY BY KEY ONLY WITH FREE EGRESS OUT UNLESS DOOR IS LOCKED DOWN BY MAG LOCK. MAG LOCK SECURES DOOR PREVENTING EXITING IN AN EMERGENCY. THERE IS NO MOTION SENSOR OR EMERGENCY EGRESS BUTTON OVER RIDING THE MAG LOCK. RELEASING OF MAG LOCK BY SECURITY. COORDINATE FUNCTIONALITY OF OPENING WITH OWNER, SECURITY, AND ELECTRICAL. HW SET: 05 FOR USE ON DOOR(S): 07 08 09 EACH OPENING TO HAVE: QTY DESCRIPTION CATALOG NUMBER FINISH MFR 3 EA HINGE 5BB1 HT 4.5 X 4.5 652 IVE 1 EA PRIVACY WITH L9456P6 SL1 XL12-482 630AM SCH OCCUPIED INDICATOR 1 EA SURFACE CLOSER 4050AT TBTRX 689 LCN (PUSH SIDE MOUNTED) 1 EA KICK PLATE 8400 10"X 2" LDW 6-CS TKTX 630 IVE 1 EA ANTI-LIGATURE WALL KG182 630 KIN STOP 1 EA BREAKAWAY SEAL 105-B BLK DSI Project: MADRONA RECOVERY CENTER T.I. Allegion: OPT0163261 Print Date: 05/18/2020 2